MICO July 07 Jean-Sébastien Graulich Slide 1
Detector DAQ StatusDetector DAQ Status
o Overview – Hardware status
o Installation at RAL
o DAQ workshop
o Current Activities
Jean-Sebastien Graulich, Geneva
MICO July 07 Jean-Sébastien Graulich Slide 2
Hardware Status Hardware Status UpdateUpdate
VME Trigger Scalers arrivedVME Trigger Scalers arrived- One isn’t working properly- One isn’t working properly- Second not tested- Second not tested
Inventory of tested Inventory of tested NIM and Camac Crates and NIM and Camac Crates and
PSPS- 3 NIM crates- 3 NIM crates- 1 CAMAC crate- 1 CAMAC crateShould be enough – looking Should be enough – looking
for sparesfor spares
Inventory of tested Inventory of tested NIM logic boards is Under NIM logic boards is Under
wayway
2 new VME crates ordered2 new VME crates orderedDid NOT arrive Did NOT arrive (not critical (not critical
yet)yet)RAL Net
MICE Main 1GB Switch
Control & Monitoring
100 MB Switch
MICE DAQ 1GB Switch
User PCs and Wi-Fiin Local Control Room
EPICS network for MICEControl and Monitoring (MCM)
Trigger distribution
Trackers EMCal TOF Trigger + Ckovs
Event Builder(GDC)
Run Control
Dedicated Link to Remote Mass Storage
VME Crates
Optical links
Linux PCs(LDCs)
MCMReadout
Data Saver
Online Monitoring
MICE Private Subnet
RAL Net
MICE Main 1GB Switch
Control & Monitoring
100 MB Switch
MICE DAQ 1GB Switch
User PCs and Wi-Fiin Local Control Room
EPICS network for MICEControl and Monitoring (MCM)
Trigger distribution
Trackers EMCal TOF Trigger + Ckovs
Event Builder(GDC)
Run Control
Dedicated Link to Remote Mass Storage
VME Crates
Optical links
Linux PCs(LDCs)
MCMReadout
Data Saver
Online Monitoring
MICE Private Subnet
MICO July 07 Jean-Sébastien Graulich Slide 3
Installation @ RALInstallation @ RAL
In R12 (East)In R12 (East)
2 VME Crates2 VME Crates- 2 Interfaces- 2 Trg Receiver- TDC V1290- Scaler V830- fADC V17241 PCs1 PCs2 NIM Crate2 NIM Crate1 Network 1 Network
SwitchSwitch
2 Scint. + PMT2 Scint. + PMTfrom ICfrom IC
MICO July 07 Jean-Sébastien Graulich Slide 4
Installation issue
Detector DAQ NeedsDetector DAQ Needs Main Power (+ UK power cords) - OK Network access + Dedicated link to Atlas Center ? –
OK Took some time … Remote access request is being processed
Digital scope - OK
MICO July 07 Jean-Sébastien Graulich Slide 5
DAQ WorkshopDAQ Workshop
GoalsGoals DAQ and Trigger Systems requirements
Working document is circulating Organize activities on Online Monitoring and
Reconstruction Good progress
Introduce & Train people with DATE 7 participants to training sessions
Review Tracker readout scheme Plan for the DAQ System Review
Will happen around January, depending on Tracker readout test results
Also discussedAlso discussed Control & Monitoring System
How to get it started ? Online Database
MICO July 07 Jean-Sébastien Graulich Slide 6
Current Activities Current Activities
Readout code for fADC (new format) - GVAReadout code for fADC (new format) - GVA Online Monitoring software framework- GVAOnline Monitoring software framework- GVA
Only Ascii event dump available now
Unpacking VLSB data – IIT (Ben Freemire)Unpacking VLSB data – IIT (Ben Freemire) Readout code for VLSB - Osaka (Hideyuki Readout code for VLSB - Osaka (Hideyuki
Sakamoto)Sakamoto) Initialization of AFEII-t – IC (James Leaver)Initialization of AFEII-t – IC (James Leaver)
Via DATE framework first Via EPICS soon after
Data Saver Software – RAL (Matt Thorpe)Data Saver Software – RAL (Matt Thorpe)