30
Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Scenic Byway Corridor Management Plan

Embed Size (px)

Citation preview

Page 1: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Scenic Byway Corridor Management Plan

Page 2: Michener’s Chesapeake Scenic Byway Corridor Management Plan

…What are the Steps Involved in Creating a CMP?

1. Vision and Goals (May 2010)Public Workshop - June 22 and 24

Are we headed in the right direction?2. Preservation and Conservation (July 15)3. Enhancement Strategies (Sept 23)4. Heritage Tourism Strategies (Oct 21)5. Interpretive Development (Nov 18)6. Road and Right-of-way (February 9, 2011) Public Workshop - Did we get it right?

(July 26, 27 and August 4)7. Draft Plan Review and Implementation

www.lardnerklein.com/mcsb_index.htm

Michener’s Chesapeake Country Scenic Byway

Page 3: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 4: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 5: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 6: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 7: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 8: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 9: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake Country Scenic Byway

Page 10: Michener’s Chesapeake Scenic Byway Corridor Management Plan

… existing interpretive themes

Telling the Byway’s Story

Page 11: Michener’s Chesapeake Scenic Byway Corridor Management Plan

… some of these stories are told in your small museums

Telling the Byway’s Story

Page 12: Michener’s Chesapeake Scenic Byway Corridor Management Plan

“Emerging Sites”

Telling the Byway’s Story

Page 13: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Five Goals for the Byway

Michener’s Chesapeake Country Scenic Byway

Preserve and conserve the character of the Byway’s historic sites, landscapes, towns and shorelines.

Provide a distinctive and compelling travel experience Use the Byway as tool to extend visitor stays Expanding the range of things to see and do on the

Eastern Shore for both visitors and residents Accommodates the wide range of needs for all

roadway users while maintaining the character defining features of the Byway context.

Page 14: Michener’s Chesapeake Scenic Byway Corridor Management Plan

GOAL 1: Preserving and Conserving the Byway’s Character

Preserve and conserve the character of the Byway

Page 15: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Goal: provide a distinctive and compelling travel experience

GOAL 2: Enhancing the Byway

Page 16: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Destinations in Communities

GOAL 2: Enhancing the Byway

Page 17: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Visitor Facilities: Destinations at the End of Branches

GOAL 2: Enhancing the Byway

Page 18: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Opportunities for Enhancement …

Industrial and Commercial Sites

12

Page 19: Michener’s Chesapeake Scenic Byway Corridor Management Plan

GOAL 3: Marketing Heritage, Nature-based, and Agri-tourism

Goal: Use the Byway as tool to extend visitor stays

Page 20: Michener’s Chesapeake Scenic Byway Corridor Management Plan

GOAL 4: Telling the Byway’s Stories

Goal: Expand the range of visitor facilities

Page 21: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Michener’s Chesapeake and Other Supporting Stories

GOAL 4: Telling the Byway’s Stories

Page 22: Michener’s Chesapeake Scenic Byway Corridor Management Plan

• Set the Stage for Flexibility• Select Relevant Guidelines• Improve Safety AND Preserve

Character Defining Features

GOAL 5: Traveling the Byway

Goal: Accommodate roadway users while maintaining character

Page 23: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Traffic Speed and Traffic Safety Issues along the Byway

GOAL 5: Traveling the Byway

Page 24: Michener’s Chesapeake Scenic Byway Corridor Management Plan

SAFETY: Where does this apply?

Transportation Strategies

Intersections• MD 213 and US 50• Mathewstown Rd and

US 50• Maryland Ave. and US

50

Transitions to Towns• St. Michaels• Race St., Cambridge• Vienna• Federalsburg• Denton

Page 25: Michener’s Chesapeake Scenic Byway Corridor Management Plan

• First, slow travel speeds, maintain existing pavement

• Focus efforts for additional pavement in areas with greatest need

• Where additional pavement width is needed, carefully insert alterations to blend with existing topographic and drainage patterns

• In wooded areas, minimizing cut and fill sections in critical root zones

• Where additional pavement width is needed, consider the potential impact on operating speeds

• Where all else fails,, utilize the “share the road” signage noted above or pavement marking system

GOAL 5: Traveling the Byway

Pedestrians and Bicycles on the Byway

Page 26: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Wayfinding

GOAL 5: Traveling the Byway

Page 27: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Byway Enhancements – Black Walnut Point as a destination

GOAL 5: Traveling the Byway

Page 28: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Byway Enhancements – Concept Study for Bellevue Park

GOAL 5: Traveling the Byway

Page 29: Michener’s Chesapeake Scenic Byway Corridor Management Plan

Byway Enhancements along Public Right-of-Way

GOAL 5: Traveling the Byway

Page 30: Michener’s Chesapeake Scenic Byway Corridor Management Plan

…What are the Next Steps

1. Interpretive Plan - funded 2. Route marking replacement signs (fewer

signs and coordinated with TAC signs) - funded

3. Establish nine-county coordinating committee (working through heritage areas and tourism offices)

4. Reference CMP in Comprehensive Plans in each jurisdiction – this will help in pursuing outside funding

5. Pursue outside funding for high priority projects

www.lardnerklein.com/mcsb_index.htm

Michener’s Chesapeake Country Scenic Byway