32
Michael Nuiten Business Development Manager

Michael Nuiten Business Development Manager · Founded in Philips (1909) ... Poland . Hongkong . India . Singapore . Indonesia (Batam) Melbourne . CHARGED BY HELIOX … CE REFERENCE

Embed Size (px)

Citation preview

Michael Nuiten Business Development Manager

WORLD WIDE

Headquarters

Development facilities

Manufacturing

Local office/Service location

Founded in Philips (1909) Independent since 2009

The Netherlands (HQ-Best)

UK (London)

Slovakia

Poland

Hongkong

India

Singapore

Indonesia (Batam)

Melbourne

CHARGED BY HELIOX …

CE REFERENCE

Heliox

PUBLIC TRANSPORT Global Market Leader

Foto: OV magazine

Heliox

MARINE

Heliox

PORT EQUIPMENT

Heliox

MINING

Heliox Products & Services

IEC 15118 (EN61851-23/24 / DIN 70121) For both CCS & Pantograph

STANDARDISATION FAST CHARGING

Interoperability

Foto: OV magazine

Temperature -10 to 55 °C (-30 °C option) Charging Standards IEC61851-1/23/24; DIN 70121 / ISO15118 Output Voltage Range 460-790Vdc Power factor Unity Efficiency >97% Network connection GSM / 3G modem / OCPP / OSCP* Protection IP55 Operational noise level <55 dBA

Depot Charging 2x30kW | 50kW | 150kW

Opportunity Charging 300kW | 450kW | 600kW

Temperature -10 to 55 °C (-30 °C option) Liquid Cooling Charging Standards IEC61851-1/23/24; DIN 70121 / ISO15118 Output Voltage Range 460-790Vdc Power factor Unity Efficiency >97% Network connection GSM / 3G modem / OCPP / OSCP* Protection IP54; IP55 Operational noise level <35 dBA

Designed and available for a full lifecycle o Change proposal o Life cycle management o Track & Trace o Availability o Robustness o Reliability

Foto: OV magazine

Real-time insights and control o Energy consumption o Charging sessions o Availability o Soft-reset o Payment & billing o Open Source (OCPP)

Service & Maintenance

o 1st level o 2nd level o 3th level o Remote monitoring o Local service o Local storage

Heliox Reference projects

Reference Germany Köln (Cologne) o 8 x 18m articulated buses o 1.1MW installed power

Reference Nordic Copenhagen o 2 x 13 m buses o 700kW installed power

Reference Nordic Helsinki o 12 x 12 m buses o 3 MW installed power

Reference Luxembourg Differdange o 6 x 12 m buses o 900kW installed power

Reference NL Limburg/Wadden

o 2 e-bus operations o ~30 x 10/12m busses o 5 MW Installed base (Q4 2016)

Reference NL Eindhoven o Largest full operation e-bus project in

Europe o 43 x 18m e-busses o Depot charging @ 30 kW o Opportunity Charging @ 450 kW o 4 MW Installed base (Q4 2016) o Roof-mounted pantograph for depot &

opportunity charging

Large scale depot charging Eindhoven o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in

Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging

Grid Connection Available? Eindhoven o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in

Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging

Desgin Award Eindhoven

o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in

Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging

Smart Charging Eindhoven

o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in

Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging

o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in

Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging

Smart Charging Eindhoven

o ISO15118 o CCS Type 2 o Mode 4 communication o 200-1000V o 350kW Fast charging

Future of Car Charging

Car charging times

Charger kWMinutes to 100% SOC

80% kW Battery

350 4,11 24 30350 5,49 32 40350 6,86 40 50350 8,23 48 60350 10,97 64 80

Heliox 350kW Water-cooled CCS

Michael Nuiten M: +31 6 46 393 009 E: [email protected] I: www.heliox.nl/automotive