MICE at STFC-RAL e International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the desired performance for a Neutrino Factory; -- Place it in a muon beam and measure its performance in various modes of operation and beam conditions, thereby

MICE at STFC-RAL The International M uon I onization C ooling E xperiment

  • Upload
    kamala

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

MICE at STFC-RAL The International M uon I onization C ooling E xperiment. -- Design, engineer and build a section of cooling channel capable of giving the desired performance for a Neutrino Factory; - PowerPoint PPT Presentation

Citation preview

Page 1: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE at STFC-RAL The International Muon Ionization Cooling Experiment

-- Design, engineer and build a section of cooling channel capable of giving the desired performance for a Neutrino Factory;-- Place it in a muon beam and measure its performance in various modes of operation and beam conditions, thereby investigating the limits and practicality of cooling.

Page 2: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Neutrino Factory

MICE is one of the critical R&D experimentstowards neutrino factories and muon colliders

MICE

MANY CHALLENGES!MUON COOLING HIGH INTENSITY NEUTRINO FACTORY

HIGH LUMINOSITY MUON COLLIDER

With the growing importance of neutrino physics+ the existence of a light Higgs (125 GeV)physics could be turning this way very fast!

Cooling and more generally the initial chain capture, buncher, phase rotation and coolingrely on complex beam dynamics and technology, such as High gradient (~>16 MV/m) RF cavities embedded in strong (>2T) solenoidal magnetic field

Page 3: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Similar to radiation damping in an electron storage ring: muon momentum is reduced in all directions by going through liquid hydrogen absorbers, and restored longitudinally by acceleration in RF cavities. Thus transverse emittance is reduced progressively.

Because of a) the production of muons by pion decay and b) the short muon lifetime, ionization cooling is only practical solution to produce high brilliance muon beams

COOLING -- Principle is straightforward…

Transverse:

Page 4: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Emittance exchange involves ionizationvarying in space which cancels the dispersion of energies in the beam.

This can be used to reduce the energy spread and is of particular interest for

+ - H (125)

since the Higgs is very narrow (~4.2 MeV)

COOLING -- Principle is straightforward…

Longitudinal:

Page 5: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Similar to radiation damping in an electron storage ring: muon momentum is reduced in all directions by going through liquid hydrogen absorbers, and restored longitudinally by acceleration in RF cavities. Thus transverse emittance is reduced progressively.

Because of a) the production of muons by pion decay and b) the short muon lifetime, ionization cooling is only practical solution to produce high brilliance muon beams

Emittance exchange involves ionizationvarying in space which cancels the dispersion of energies in the beam. This can be used to reduce the energyspread and is of particular interest for + - H (125) since the Higgs is very narrow (~5MeV)

COOLING -- Principle is straightforward…

Transverse:

Longitudinal:

Practical realization is not!

MICE cooling channel (4D cooling)

6D candidate cooling lattices

Page 6: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

6

MICE the Muon Ionization Cooling Experiment

Particle by particle measurement, then accumulate few 105 muons [ (in- out)/in ] = 10-3

Measure input particle x,x’,y,y’, t, t’=E/Pz

input emittance in

Measure output particle x,x’,y,y’, t, t’=E/Pz

output emittance outCOOLING CHANNEL

Page 7: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 7

Progress success scope for MICE

Facilities based on muon storage rings have been advocated for several physicsapplications of great interest with discovery potential A. nuSTORM: 1011 /s storage ring: (<1%) e e x-sections and sterile search B. neutrino factory: 1014 /s storage ring precision study of CPviolation, unitarity C. Precision muon collider Higgs factory studies of X(125.5), H/A system (if there) ultra-precise measurements of any new particles in 50-1000 GeV range

D. High energy muon collider: the most powerful envisaged machine to search the high energy frontier

For B C D the high intensity muons beams are generated and prepared in a powerful magnetic ‘bottle’, from the target solenoid all the way to the last stages of cooling. This magnetic ‘bottle’ consists of continuous magnetic field lines generated by a string of axial coils and solenoids. This is the key to high intensity muon beams

MICE is such a magnetic ‘bottle’, from the diffuser to the end of the experiment. Cooling is the aim of the experiment but the lessons learned extend beyond that.(all the front end of the neutrino factory and muon collider)

MICE was designed to test the concept in stages with important results at each step

Page 8: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

8STEP VI

MICE STEPS

Both for funding and science reasons MICE is executed in Steps …. Originally we had 6 StepsWe will probably only have 3 steps step I, step IV, step VI

COMPLETED, EMR run in Q2 2013

Q2 2014 till Q4 2015

Aim: Q3 2018

Possible stop-over Q3 2017

Page 9: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

9

Incoming muon beam

VariableDiffuser

Beam PIDTOF 0, TOF 1

Cherenkovs

Trackers 1 & 2

Liquid Hydrogen absorbers 1,2,3

Downstreamparticle ID: TOF 2, KL

EMR

RF cavities RF power

Spectrometer solenoid 1

Spectrometer solenoid 2

Coupling Coils 1&2

Focus coils

MICE Collaboration across the planet

Page 10: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

10

Incoming muon beam

VariableDiffuser

Beam PIDTOF 0, TOF 1

Cherenkovs

Trackers 1 & 2

Liquid Hydrogen absorbers 1,2,3

Downstreamparticle ID: TOF 2, KL

EMR

RF cavities RF power

Spectrometer solenoid 1

Spectrometer solenoid 2

Coupling Coils 1&2

Focus coils

MICE Collaboration across the planet

MICE is now completely engineered !

Page 11: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Completed and published! Main results: -- It all works! (target, magnets, PPS, DAQ, det..) -- TOF resolution s: 50 ps and 1cm -- ~100 muons per second Beam commissionning

M.Bogomilov et al. [MICE Collaboration], The MICE Muon Beam on ISIS and the beam-line instrumentation of the Muon Ionization Cooling Experiment, JINST 7, P05009 (2012) [arXiv:1203.4089 [physics.acc-ph]].

Page 12: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Paper in editorial processMain results: can generate emittance vs momentum matrix can reconstruct momentum with TOF can measure emittance using space points

Data

MC

y (mm) vs x (mm) x (mrad) vs x (mm) y (mrad) vs y (mm)

-- first measts of emittance particle by particle with the TOFs

Beam commissionning

Page 13: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

Paper in editorial processMain results: -- beam composition can be measured using TOF + KL+CKOV -- intensive use of pion + muon beam tunes

e

muon tune PD2 = 0.5 PD1

pion tune PD2 = PD1

1. Template of KL pulse height in pion beam

beam composition

e

» 99% » 1%

Page 14: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 14

Step IV1. The MICE step IV program will provide a number of important physics and methodological results:

-- Liquid hydrogen absorber realisation and safe routine operation -- engineering test of beamline made of several magnetically connected components-- understanding of propagation of (imperfect) beam through the magnetic bottle -- complete particle detector system; calibrations of emittance measurement to 10-3

-- measurement of 6D emittance change (observation of normalized emittance cooling)-- validation of simulation codes-- limited possibility to test the longitudinal cooling with the wedge absorbers-- correlated precision measurements of multiple scattering and energy loss straggling. These measurements will constitute a textbook contribution to experimental particle physics, and will be essential for reliable simulation of the performance of neutrino factory and muon collider.

Page 15: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

No absorberAlignmentOptics studies

Solid absorber(s)LiH PlasticC, Al, Cu

LiH Wedge absorberEmittance exchange

Liq H2 absorber(full/empty)

Multiple scatteringEnergy loss Cooling

STEP IV EXPERIMENTS (2014-2015)NB timing of Liq H2 will depend on timing w.r.t. 6 month ISIS shut-down Aug’14 to Feb’15

Page 16: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

16

Make this a photograph by the end of 2013!

LH2 system

diffuser

FOCUS COIL

EMR

Tracker 2

STEP IV

Tracker 1

Spectrometer Solenoid 2Spectrometer Solenoid 1

Page 17: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 17

2. The MUCOOL program at Fermilab

RF in magnetic field

-- will provide demonstration of the combined magnet and RF hardware that are required for a realistic cooling channel.

-- can operate up to 21MV/m

-- The U.S. effort presently has a major emphasis on preparing a prototype coupling coil magnet which can be tested with a 201 MHz RF cavity in the MuCool Test Area at Fermilab.

-- Upon successful completion of that test, it is anticipated that production hardware can be completed for the MICE beamline. (modified if necessary)

Page 18: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 18

Step V

-- More difficult magnetic situation with one large ‘coupling’ coil

-- operation in magnetic field of 4-cavity RF module (normally up to 8MV/m, on special arrangement up to 12 or 16)

-- verification of understanding of energy loss and RF acceleration for particles up to large amplitudes and over all phases

-- First measurement of usable ionization cooling

Page 19: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 19

STEP VI

-- operation of channel with all magnetic couplings in place.

-- full cooling cell allowing all optics configurations: flip, non-flip etc…

-- exact replenishment of energy possible

-- significant and measurable longitudinal heating

-- precise measurement of equilibrium emittance of various configurations

-- detailed and precise verification of simulation codes

The relative risks (and associated expenses) of step VI wrt Step V have been considered minor wrt to the extra time needed (18 months delay to step VI) and we have agreed (with MPB support) that the baseline option is to skip step V

Page 20: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

20STEP VI

Aim: 2018

STEP VI

Coupling coil (Harbin China)

20 RF cavities (Berkeley)

absorber windows (Mississippi)

Liq H2 absorber (KEK)

AFC Magnet(RAL/Oxford)

RF Amplifier (Daresbury)

RF Couplers(Berkeley)

Berylium Windows (Berkeley)

MICE construction: world-wide team effort! Aim: MICE step VI in 2018

Page 21: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 21

It will have generated experience and know-how, bridging sometimes painfully a significant gap between the neutrino factory and muon

collider dreams … and reality.

This « acid test » will set future developments on firmer ground

MICE legacy

MICE will have achieved the first demonstration of ionization cooling and tested essential concepts for production of intense muon beams

Once step VI is complete a powerful Cooling Test Facility is in place with

-- a quality muon beam -- 8MW of 200 MHz RF power-- 23MV of acceleration-- infrastructure for 70 litres of liquid Hydrogen absorbers-- instrumentation for precision 6D emittance measurements-- a number of available magnets and associated infrastructure-- and… a number of people who have made (most of) the mistakes already

a formidable asset that could be used for e.g. a 6D cooling experiment

Page 22: MICE at STFC-RAL  The  International  M uon  I onization  C ooling  E xperiment

MICE Project Board IV 31-10-2012 Alain Blondel 22

Concluding notes on schedule (as introduction to afternoon discussions)

1. There is great progress all over MICE (LH2, DAQ, FC, publications)

2. We have had progress+setback in the schedule with the Spectrometer solenoid – SS1 has reached full field -- but is not operational yet!

3. MICE (UK+US) have produced a resource loaded schedule to step VI. This is big progress! We understand schedule slippage.

4. This places Step VI at the limit of timeliness in 2018 Still step VI and its experimental richness and thourough testing abilities is the goal of the experiment. We could consider having a stop-over at stepV – but only if we absolutely have to – now is *not* the moment to decide.

5. There are a few ideas on how to improve the schedule within the envelope.

6. There are many risks to the schedule most of which related to the scarce manpower and resources. Any glitch leads to delays.

7. The most efficient solution remains application of appropriate and well targeted influx of manpower: highly beneficial and we believe economical in the long run.

8. The MICE team remains proudly dedicated to achieving the first demonstration of ionization cooling.