Rev Prepared Sign Off Checked Sign Off Approved Sign Off Date of Issue Comments
1 F. Johnson
I. Sargent
E. Rollings
19/02/2015
2 F. Johnson
I. Sargent
E. Rollings
01/04/2015 Consultation response. Minor spelling and grammar changes. Removal of consultation table.
Construction Method Statement: HDD Marine Works Page 1 of 26
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
MeyGen Tidal Energy Project Phase 1
Construction Method Statement:
HDD Marine Works
This document contains proprietary information belonging to MeyGen Ltd. and/or affiliated companies and shall be used only for the purpose for which it was supplied. It shall not be copied, reproduced, disclosed or otherwise used, nor shall such information be furnished in whole or in part to third parties, except in accordance with the terms of any agreement under which it was supplied or with the prior consent of MeyGen Ltd. and shall be returned upon request.
Project Title/ Location MeyGen Tidal Energy Project, Phase 1a. Inner Sound.
Date: 01/04/2015
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 2 of 26
Table of Contents
Executive Summary ................................................................................................................ 3
1 Introduction .................................................................................................................. 4
2 Scope of Construction method statement ................................................................... 5
3 Communication, Roles and Responsibilities ............................................................... 6
3.1 Responsibilities and Ownership ....................................................................................... 6
3.2 Organisation Chart and Reporting ................................................................................... 6
3.3 MeyGen - Ecological Clerk of Works ............................................................................... 8
3.4 Principal Contractor – James Fisher Marine Services ..................................................... 8
3.5 Contractors .................................................................................................................... 10
3.6 Communication .............................................................................................................. 11
3.7 Reporting ....................................................................................................................... 12
3.8 Training .......................................................................................................................... 13
4 Programme ................................................................................................................ 14
5 Construction Methods and Procedures ..................................................................... 15
5.1 HDD Works .................................................................................................................... 15
5.2 HDD Marine Works ........................................................................................................ 16
5.3 Environmental Mitigation ................................................................................................ 19
6 Emergency Preparedness and Response ................................................................. 22
7 Licences and Legal Requirements ............................................................................ 23
8 Linkages with Other Strategies and SHE Management Systems ............................. 23
9 CMS Review and Consultation .................................................................................. 23
10 List of Abbreviations .................................................................................................. 25
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 3 of 26
EXECUTIVE SUMMARY
This Construction Method Statement (CMS) has been prepared by MeyGen Ltd. to set out the proposed method for discharging the Condition 9 of the Section 36 Consent for the Development.
The document details the construction methods proposed for the Development, how construction related mitigation detailed in the Environmental Management Plan is to be delivered, the construction procedures and good working practices for installing the Development, how this document integrates with the wider environmental management of the Development, and how communication will be maintained between the Principal Contractor and MeyGen Ltd. on this Development.
The CMS presented within this document is to satisfy Condition 9 and enable construction of the Development to progress, subject to the CMS being implemented.
The CMS will be submitted to the licensing authority and consulted on by SNH, SEPA, MCA, the Planning Authority, NLB, and any such other advisors as may be required at the discretion of the Scottish Ministers, and will be used, where appropriate, to inform the discharge of other Conditions within the Section 36 Consent which refer to it.
THIS DOCUMENT ONLY CONSIDERS HDD MARINE WORKS. FURTHER CONSTRUCTION WORKS WILL BE DOCUMENTED IN SEPARATE CMS SUBMITTED FOR CONSULTATION AND APPROVAL PRIOR TO THAT PHASE COMMENCING.
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 4 of 26
1 INTRODUCTION
The MeyGen Tidal Energy Project Phase 1 (“the Development”) received consent under Section 36 of the Electricity Act 1989 from the Scottish Ministers on 9th October 2013 (“the S.36 Consent”). This Construction Method Statement (CMS) is prepared to enable Condition 9 of the S.36 Consent (“the Condition”) to be discharged. Condition 9 states:
The Company must, prior to the Commencement of the Development, submit to the Scottish Ministers a Construction Method Statement (“CMS”), in writing, endorsed by the Ecological Clerk of Works, as referred to in Condition 10 of this consent, to the Scottish Ministers for their approval, following consultation with SNH, the Scottish Environment Protection Agency, the Maritime and Coastguard Agency, the Planning Authority, Northern Lighthouse Board, and any such other advisors as may be required at the discretion of the Scottish Ministers. Unless otherwise agreed in writing by the Scottish Ministers, construction of the Development must proceed in accordance with the approved CMS. The CMS must include, but is not limited to, the following information: a) Commencement dates; b) Working methods including the scope, frequency and hours of operations; c) Duration and Phasing Information of key elements of construction, for
example– turbine structures, foundations, turbine locations, inter-array cabling and land fall cabling;
d) Details of the location of the turbines, grid export cable(s), method of installation (including techniques and equipment) and depth of cable laying and cable landing sites;
e) Details of mitigation measures to prevent adverse impacts to species and habitats during construction;
f) Details of how all contractors and sub-contractors will be made aware of environmental sensitivities, what requirements they are expected to adhere to and how chains of command will work;
g) Confirmation of reporting mechanisms used to provide Scottish Ministers and relevant consultees with regular updates on construction activity, including any environmental issues encountered and how these have been addressed;
h) Vessel specification, routing, including location of vessel ports; and i) Pollution prevention measures including contingency plans.
The CMS must, so far as is reasonably practicable, be consistent with the Environmental Management Plan, the Project Environmental Monitoring Programme, the Vessel Management Plan and the Navigational Safety Plan.
Reason: To ensure the appropriate construction management of the Development, taking into account mitigation measures to protect the environment and other users of the marine area.
This document sets out the proposed CMS that MeyGen Ltd, intends to undertake, to allow the Condition to be discharged.
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 5 of 26
2 SCOPE OF CONSTRUCTION METHOD STATEMENT
Phase 1a of the Development is a 6MW, 4 tidal turbines initial phase to be installed and operatives under the restriction placed on the Development by Condition 2 of the S.36 Consent.
This document is the CMS for the marine works associated with the Horizontal Directional Drilling (HDD) Works for Phase 1a only (“HDD Marine Works”).
Given the Phase 1a programme for construction works associated with Phase 1a it has been agreed with the licensing authority that the CMS and other related consent documents for the installation of the Phase 1a infrastructure (4 x Tidal Turbine Generators (TTG), 4 x Gravity-base Turbine Support Structures (TSS) and Turbine Subsea Cables (TSC) can be submitted at a later date “the Construction Works”. MeyGen Ltd. will produce and update relevant documents for these construction works; these will be submitted and get approval prior to commencement of these works.
The CMS forms part of a suite of documents related to the consent conditions that MeyGen Ltd. seek to discharge:
Environmental Management Plan (EMP) (S.36 Consent, Condition 11) including Marine Pollution Contingency Plan (Marine Licence, Condition 3.2.13), Reporting Protocol for the Discovery of Marine Archaeology (S.36 Consent, Condition 16);
Vessel Management Plan (VMP) (S.36 Consent, Condition 14); and
Navigation Safety Plan (NSP) (S.36 Consent, Condition 17).
The CMS is in accordance with the construction methods assessed in the Environmental Statement (ES) and Supplementary Environmental Information Statement (SEIS) and includes details of how the construction related mitigation steps documented in the EMP are to be delivered. The EMP commits MeyGen Ltd. to safeguarding the environment through the identification, avoidance and mitigation of the potential negative environmental impacts associated with the development, construction and operation of the tidal array. The CMP will be an integral element of the EMP.
The CMS contains the following sections:
Roles and Responsibilities;
Programme;
Construction Methods and Procedures (including mitigation);
Emergency Preparedness and Response;
Licences and Legal Requirements;
Linkages with Other Conditions;
Linkages with Other Strategies and SHE Management Systems;
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 6 of 26
CMS Review and Consultation; and
Technical Appendices Containing Detailed Construction Methodologies.
3 COMMUNICATION, ROLES AND RESPONSIBILITIES
This section details the project team roles, responsibilities and lines of communication during the construction and operation of the Development.
3.1 Responsibilities and Ownership
The Principal Contractor (PC) will have the ultimate responsibility for ensuring the implementation of the CMS.
The Ecological Clerk of Works (ECoW) will provide quality assurance and approval of any version of the CMS.
Any updates to the CMS by the PC will require the ECoW to check compliance with current legislation, consent conditions and related documents. Updated CMS will then be submitted to Scottish Ministers for approval.
3.2 Organisation Chart and Reporting
The organisational chart for the HDD Marine Works is below in . This includes how communication as part of the CMS will be conducted in normal working procedures and in the case of emergencies.
The organisation chart presents the key interfaces, lines of communication and responsibilities with regards to the flow of requirements and provision of mitigating actions across the HDD Marine Works.
Details are provided in the Table 1 below for contacts relevant to the delivery of this plan. These details may change and the CMS will be updated when necessary.
Name Role Organisation Telephone Mobile
Ian Sargent Project Manager
James Fisher Marine Services
01565 658812 +447584 293680
Stan Groundwater
Marine Coordinator
James Fisher Marine Services
01565658824 +44 7747 843712
Tony Blackshaw HSE Advisor James Fisher Marine Services
01565 658817 +447824 150124
Ed Rollings ECoW MeyGen Ltd +441316599662 +447825 414402
Fraser Johnson Marine Package Manager
MeyGen Ltd +441316599672 +447787 518373
Table 1 Contact Details
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 7 of 26
Figure 1 Project Organogram
Constru
3.3 M
3.4 P
3.4.1
uction Metho
MeyGen - E
Review and
Review / co
Review / c
where nece
Inspect th
implementa
Audit PC p
Ensure co
legislation
10).
Review env
Report com
regulatory a
Notify the li
Notify the li
Provide Tra
3.2.2.1)
Notify the li
Ensuring a
Condition 1
Principal Co
Project Ma
Facilitate d
Oversee th
project.
Review and
VMP and N
Monitor th
overview of
Ensure tha
Implementa
project mee
Review an
where nece
Ensure tha
od Stateme
cological C
d approve a
omment on
comment on
essary with
he site
ation/operat
rocedures,
ompliance
and require
vironmental
mpliance a
authorities.
icensing au
icensing au
ansport Au
icensing au
any protecte
10)
ontractor –
nager
isseminatio
he implemen
d approve a
NSP.
e environm
f incidents,
at environm
ation of the
etings.
d approve
essary with
at all enviro
ent: HDD Ma
Clerk of Wo
all consent r
content of S
n Risk Asse
respect to e
/ vessel
tion of all en
inspections
with appr
ements and
l incidents /
nd incident
thority of ve
thority of th
dit Sheets
thority of de
ed species
– James Fis
on of specifi
ntation and
all consent
mental perf
inspections
mental con
Works and
Risk Asse
respect to e
onmental in
arine Works
orks
related docu
Site Inducti
essments a
environmen
on a
nvironmenta
s, investigat
rove conse
d address a
/ near misse
ts to the l
essel details
he commenc
for works
eposits by M
s licenses a
sher Marine
c environm
review of e
related doc
formance o
s and audits
nsiderations
d to include
essments a
environmen
cidents are
s
uments (S3
ons and To
and Method
ntal impacts
regular b
al mitigation
tion and rep
ent related
any shortfall
es and PC i
icensing au
s (ML Cond
cement dat
to the licen
MHWS (ML
are in plac
e Services
ental requir
environmen
cuments, in
of the pro
s.
form an
environme
nd Method
ntal impacts
e reported t
P
MEY-1A-4Construct
36 Condition
oolbox Talks
d Statemen
s and contro
basis to
n measures
porting.
d documen
ls with the
nvestigation
uthority and
dition 3.1.3)
e (ML Cond
nsing autho
Condition 3
ce for the D
rements to t
ntal procedu
cluding, but
oject throug
integral pa
ntal reviews
Statement
s and mitiga
to the ECoW
Page 8 of 26
40-HSE-00tionMethodS
n 10).
s.
nts (RAMS)
ols.
ensure e
s.
nts, enviro
PC (S36 C
ns
d other ne
dition 3.2.1.
ority (ML C
3.2.2.2)
Developme
the project
ures throug
t exhaustive
gh maintain
art of Des
ws as part of
ts (RAMS)
ation.
W and Me
6
1-D-StatementH
as and
effective
nmental
Condition
ecessary
4)
Condition
ent (S36
team.
hout the
e, CMS,
ning an
ign and
f regular
as and
yGen in
HDD
Constr
3.4.2
Key role
ruction Meth
accordance(where req
Review enregulatory b
Ensure thaenvironmen
Implement relations an
Produce w
ECoW.
Ensure co
confirm th
undertake
HSE Adviso
es and resp
Verify comp
Prepare, im
with the Pr
Fisher Mar
Advise the
Review Ris
with respec
Approve To
effective en
and commu
Provide su
matters tha
Audit contr
have under
Ensure suit
monitoring
Inspect an
implementa
Ensure com
Provide ins
be address
hod Statem
e detailed uired) as so
nvironmentabodies on a
at arrangemntal issues
and maintand complain
eekly and m
ontractors
hat they a
n suitable
or
ponsibilities
pliance with
mplement, r
roject Mana
ine Service
project team
sk Assessm
ct to environ
oolbox Talk
nvironmenta
unicate ass
upport to th
at may arise
ractors to c
rtaken suita
table consid
(particularly
nd audit th
ation / opera
mpliance wi
spection rep
sed
ment: HDD M
reporting reoon as poss
al matters a regular ba
ents for liaiis appropria
ain a projecnts.
monthly rep
are appro
are suitab
environme
of the HSE
h relevant le
review and
agement Te
s procedure
m on enviro
ments and M
nmental imp
ks and Site
al managem
ociated less
he Marine
e.
onfirm that
able environ
deration is
y with respe
he site /
ation of any
th environm
ports to the
Marine Work
equirementsible.
with the asis and as
ison with Pate and mai
ct communic
ports and su
oved, oper
bly qualifie
ental trainin
E Advisor in
egislation.
update co
eam) in acc
es and curr
onmental re
Method State
pacts and m
e / Vessel I
ment, spec
sons learnt
Coordinato
they are s
nmental train
given to th
ect to highe
vessels on
y environme
mental requi
project ma
ks
ts and the
ECoW anper project
roject respeintained.
cations stra
ubmit to Me
rates a Sa
ed in the
ng to cove
clude, but a
nsent relate
cordance w
ent legislati
elated decis
ements (RA
mitigation.
Inductions a
cific works a
.
or and wor
suitably qua
ning to cove
e period an
er risk areas
n a regula
ental mitigat
irements an
anagement
MEY-1A-4Constructio
respective
nd MeyGerequiremen
ective regul
ategy to ma
eyGen Pac
afety Mana
ir line of
r tasks to b
are not limite
ed docume
with consen
on.
ion making
AMS) as an
and ensure
and Site / V
kforce on
alified in the
er tasks to b
nd frequenc
s).
ar basis to
tion measur
nd address
detailing an
0-HSE-001onMethodS
Page 9 of
e regulatory
en and resnts.
latory bodie
nage projec
kage Mana
agement S
work and
be underta
ed to the fo
ents (in con
nt condition
nd where ne
e content p
Vessel sen
any enviro
eir line of w
be undertak
cy of enviro
o ensure e
res.
any shortfa
ny issues th
-D-StatementHD
f 26
y bodies
spective
es on all
ct public
ager and
System,
d have
aken.
ollowing:
njunction
, James
ecessary
romotes
nsitivities
onmental
work and
ken.
nmental
effective
alls.
hat must
DD
Constr
3.4.3
3.5 C
3.5.1
ruction Meth
Undertake
the root/dire
Monitor ha
aspects an
environmen
Marine Coo
Responsibl
site HSE du
Ensure tha
Undertake
communica
Monitor and
Production
stakeholde
Responsibl
notices.
Liaise with
Implement
related doc
Coordinatin
personnel m
Emergency
Produce da
Manager a
Keep Trans
part of the w
Keep audit
deposited b
Contractors
Vessel Mas
Overriding navigation
Dedicated w
The person
Adhere to
hod Statem
investigatio
ect cause a
azardous ob
nd impacts
ntal impacts
ordinator
le for all co
uring constr
t all contrac
Toolbox T
ate associat
d dissemina
of marine
r list.
le for colla
port author
/ operate e
cuments at t
ng, ensurin
movements
y response
aily reports
nd ECoW.
sport Audit
works
t reports st
below MHW
s
ster
authority of the vesse
watch-keep
ns present o
IMO Interna
ment: HDD M
ons into en
and present
bservations
s and initia
s and reduc
onstruction
ruction oper
ctors have r
Talks to pr
ted lessons
ate weather
safety ale
ating, comm
rities.
environmen
the site / ve
ng complian
s offshore.
coordinatio
s and subm
Sheets for
tating the n
WS under th
and respoel and matt
per on board
on board mu
ational Reg
Marine Work
nvironmenta
t the finding
s and incide
ate actions
ce risk in a t
operations
rations.
received an
romote effe
s learnt.
r information
erts includin
municating
tal mitigatio
essel.
nce for an
n.
mit to the P
all materia
nature and
e authority
nsibility to ters related
d the vesse
ust adhere
gulations for
ks
al incidents
s, recomme
ents trends
as require
timely and e
s Marine Co
d understoo
ective envi
n and forec
ng issuing N
and respo
on measure
d recording
PC Project
ls listed in t
quantity o
of the licen
make decto HSE.
el, or nomina
to the Vess
r the Preve
MEY-1A-4Constructio
or near m
endations a
s in relation
ed to minim
effective ma
oordination
od the Site /
ironmental
asts
Notice to M
nding to st
es as appro
g all vesse
Manager,
the licence
of all substa
ce.
cisions with
ate suitable
sel Master’s
ntion of Co
0-HSE-001onMethodS
Page 10 o
isses to de
and lessons
n to enviro
mise the p
anner.
including
/ Vessel ind
manageme
Mariners to
statutory na
oved in the
el moveme
MeyGen P
to be depo
ances and
h respect
e qualified d
s instruction
ollisions at S
-D-StatementHD
of 26
etermine
learnt.
nmental
potential
vessel /
duction.
ent and
agreed
avigation
consent
nts and
Package
osited as
objects
to safe
eputy.
s.
Sea and
DD
Constr
3.5.2
3.6 C
EnvironVessel
MeetingSafety, Securityand ProDaily siRisk AsStatemeToolboxenvironmitigatioSite / V
3.6.1
The PCcommuenviron
The ECan openVessel on thosadditionof the w
ruction Meth
UK Merchqualified cr
Ensure tha
All Other S
To understa
To conductthe ProjectProject Ma
To report asoon as po
Communica
nmental issin Table 2.
g/briefing Health, Envy and Qualiogress Meete team brie
ssessment/Ment briefingx Talks inclumental pracon measureessel Induc
SHESQ an
C shall convnicate, dismental arra
CoW and ren invitation shall nominse contractnal meetingworks.
hod Statem
ant Shippirew and per
t all contrac
taff
and and im
t their work t and to ranager.
all environmossible.
ation
ues will be
vironment, ty (SHESQ
eting efs Method s uding ctices and es ction
Tab
d Progress
vene weeklyscuss and angements,
epresentativto attend t
nate a persotors behalfs at interva
ment: HDD M
ng legislatrsonnel on b
ctors have r
plement pro
with a viewaise any en
ental incide
e formally c
Freq
) Wee
DailyEach
Befominiper wOn fsite is un
ble 2 Comm
Meeting
y Site / Vesconsult anprocedures
ves from Mehese weekon to attendf. SHESQals dictated
Marine Work
tion includiboard.
received an
ocedures re
w to eliminatnvironmenta
ents to the M
communicat
quency ekly
y h job task
ore mobilisamum of oneweek first attendaBEFORE a
ndertaken
munication
ssel meetingny changes and overa
eyGen and ly Site / Ve
d these meeQ and Prog
by the requ
ks
ng ensurin
d understoo
elevant to th
ting/reducinal concerns
Marine Coo
ted through
ation, or a e
ance at any work
and Meeti
gs with all ce in conditall environm
other intereessel meetinetings with tgress Meetuirements o
MEY-1A-4Constructio
ng appropr
od the vess
heir role as
ng the enviros with Mar
rdinator and
h the arran
AttendeesSee parag
All work pAll membeparty All Site / V
All personVessel
ngs
contractors ions, work
mental perfo
ested Thirdngs. Each cthe approprings shall f the contra
0-HSE-001onMethodS
Page 11 o
riately train
sel induction
laid out.
ronmental imrine Coordi
d Vessel M
ngements o
s graph below
parties ers of the w
Vessel pers
ns attending
on Site / Vking practicormance.
d Parties shcontractor oriate authoribe augme
act or at key
-D-StatementHD
of 26
ned and
n.
mpact of nator or
aster as
on Site /
w
working
onnel
g Site /
Vessel to ces and
hall have on Site / ity to act nted by y stages
DD
Constr
Minutescopies s
3.6.2
Extraormay arorganisany ide
3.6.3
Daily sicontrac
3.6.4
These involvedand rev
3.6.5
Inductioawarenenvironunderst
3.6.6
Site / VSafety place toas newof envir
3.7 R
The PC
ruction Meth
s of all sucsupplied to
Extraordina
rdinary meerise during sed by the Hntified issue
Daily site te
te team mectors. Any e
Risk Asses
briefings wd in the tasviewed.
Site / Vesse
ons, conducess for persmental prtanding.
Site / Vesse
Vessel noticand Enviroo highlight asletters andronmental m
Reporting
C will comm
Details of aDetails andDetails of aincidents; Any other pTransport A
Audit repor
below MHW
hod Statem
h meetingseach contra
ary meeting
etings wouldthe projec
HSE Advisoes.
eam meetin
eetings will nvironment
ssment / Me
will take placsk. Environm
el induction
cted beforesonnel regaotection a
el notice bo
ce boards wonmental issawareness d posters wmatters.
unicate the
audits and ind statistics foany pending
pertinent enAudit Sheet
rts for the
WS.
ment: HDD M
s shall be pactor on Sit
s
d be held in t such as or with the a
ngs
take place al concern
ethod Statem
ce before emental requ
ns
e anyone coarding Site /rrangemen
oards
will contain rsues. The of environm
will also be p
following to
nspections;or environm
g and actual
nvironmentas; and
nature and
Marine Work
produced ante / Vessel,
order to deenvironmenaim of ensu
at the Onsshall be ad
ment briefin
each constuirements a
ommences / Vessel rults. The i
relevant SitSite / Vessmental hazaposted on n
o the ECoW
mental incidl enforceme
al issues ide
d quantity o
ks
nd held on the CDM C
eal with spental incidenuring a time
hore / Offshdressed at
ngs
ruction tasknd mitigatio
work on thes, emergenductions
te / Vessel sel will alsoards. Other notice board
W and contra
ents and neent action in
entified;
of all subst
MEY-1A-4Constructio
file for recCo-ordinator
ecial environnts. These ely respons
hore site bethis meeting
k and attenon measure
he project aency respon
include a
informationo have appr
communicds to comm
actors on S
ear misses; n respect of
tances and
0-HSE-001onMethodS
Page 12 o
cord purposr and ECoW
nmental issmeetings s
se and reso
etween the g.
nded by alles will be in
are utilised nse procedu test to
n relating toropriate sig
cations medmunicate aw
ite / Vessel
f any enviro
objects de
-D-StatementHD
of 26
ses, with W.
ues that shall be lution to
PC and
directly structed
to raise ures and
confirm
o Health, gnage in dia, such wareness
:
nmental
eposited
DD
Constr
The PC
3.7.1
The Ma
The EC
3.8 T
The puknowled
In ordefollowin
ruction Meth
C will provide
Daily logs aWeekly proMonthly repenvironmenstatistics, trany of the c
External Co
arine Coord
Documentifor the DevEmergencycommunicaEmergency
CoW is resp
NotificationReporting m
o Det
o Det
o Detenv
o Any
o Tra
o Auddep
Meeting wiand Receiving, third parties
raining
urpose of dge to succ
r to ensure ng environm
hod Statem
e these in:
and reports ogress repoports (additntal commraining delivconsents re
ommunicati
inator is res
ng, issuing,velopment; ay Responseation and ry Response
onsible for:
n to the licenmonthly to t
ails of audit
ails and sta
ails of anyvironmental
y other perti
nsport Audi
dit reports posited belo
th the licen
documentis.
environmencessfully imp
that the enmental trainin
ment: HDD M
when consrts tionally, conitments anvered, envirelated docum
on
sponsible fo
, communicand e Co-operareporting p
e Co-operati
nsing authothe licensing
ts and inspe
atistics for e
y pending incidents;
nent enviro
it Sheets; a
for the naw MHWS.
sing author
ng and res
ntal trainingplement the
nvironmentang Table 3
Marine Work
struction act
nfirming thend mitigatioronmental inments)
or:
cating and r
tion Procedprotocols foion Plan (N
ority detailedg authority
ections;
environment
and actual
onmental iss
nd
ature and q
rity and stat
sponding to
g is to ene environme
al mitigationin will be re
ks
tivities are t
e status of ton measurenitiatives un
responding
dures are ior such an SP).
d in the cononce works
tal incidents
enforceme
sues identif
quantity of
tutory agen
any enviro
nsure that ental require
n measuresequired.
MEY-1A-4Constructio
aking place
the project,es, monthlndertaken, a
to statutory
n place forevent can
sent condits have comm
s and near m
ent action
ied;
all substa
cies and th
onmental co
all site peements of th
s are implem
0-HSE-001onMethodS
Page 13 o
e on site / ve
, implemently and cumamendmen
y navigation
r such evenn be found
ion; menced wit
misses;
in respect
ances and
he local com
ommunicati
ersonnel hahe project.
mented on
-D-StatementHD
of 26
essels;
tation of mulative ts to the
n notices
nts. The d in the
th:
of any
objects
mmunity;
ion from
ave the
site, the
DD
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 14 of 26
Any person working on the site/vessel will be competent and trained sufficiently to undertake their work in a safe and efficient manner. Each Contractor will ensure that their personnel maintain the necessary level of competence for their work & will maintain the training records on site & make them available for review and audit.
Training Target Persons Induction (which will include environmental aspects such as environmental sensitivities and controls, pollution prevention, waste management, emergency preparedness and response and include shipboard operations under STCW requirements)
All persons attending Site / Vessel (Site / Vessel personnel, contractors on Site / Vessel, and visitors)
Environmental Toolbox Talks Toolbox talks will be carried out at a minimum of one per week appropriate to the construction works being carried out on Site / Vessel at that time. All persons carrying out work on site (site personnel, contractors on site) shall attend.
Environmental Bulletins / Legislation Briefings / Best Practice Briefings
All persons carrying out work on Site / Vessel (Site / Vessel personnel, contractors on Site / Vessel) shall attend.
Job specific training e.g. IOSH Working with Environmental
Responsibilities / IOSH Managing Environmental Responsibilities.
Use of Pollution Prevention Equipment. Site Waste Management.
As identified for personnel with environmental responsibilities
Project specific information, including relevant elements of: the EMP, CMS, NSP, VMP Consent Conditions
Briefed out and available for reference to all Site / Vessel staff.
Table 3 Training
Any person working on the Site / Vessel will be competent and trained sufficiently to undertake their work in a safe and efficient manner. Each Contractor will ensure that their personnel maintain the necessary level of competence for their work & will maintain the training records on site & make them available for review and audit. Records of training will be maintained and made available for inspection.
4 PROGRAMME
The high level programme for the HDD Marine Works in shown in Figure 2. The Programme is subject to change and will be regularly updated during the course of the Development.
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 15 of 26
Figure 2 HDD Marine Works Programme
5 CONSTRUCTION METHODS AND PROCEDURES
5.1 HDD Works
4 x HDD Bores are to be drilled from the onshore Ness of Quoys Power Conversion Centre to target exit locations on the seabed (Figure 3). The HDD bores are drilled using at 16’ (406mm) drill bit. As the drilling is undertaken, the exact location of the drill head is monitored as it proceeds along its path and provide real-time information as to its location and depth. This will be achieved using a Real-Time Constant Rate Gyroscope based guidance system which is impervious to magnetic interference.
During the drilling process, drilling fluid (bentonite mud) is pumped down the inside of the drill string where it cools the guidance system and drilling motor. The drilling fluid then flows out of the drill bit via nozzles and flushes drilled cuttings back to surface as it flows up the annulus. The drilling fluid also lubricates and supports the borehole. Before the drill is punched out onto the seabed the drill string will be pulled from the bore and re-run performing a ‘wiper trip’ to condition the drilling mud and remove cuttings from the bore. When the drill punches out onto the seabed drilling muds will immediately stop cycling; a small amount of bentonite and cuttings will be released into the marine environment (bentonite will flocculate on contact with salt water).
As described in the EMP (Marine Pollution Contingency Plan) a small amount of bentonite drilling mud and cuttings will be released into the marine environment. As stated in Marine Licence Condition 3.1.9 any drill cuttings associated with the use of water-based drilling muds situated within the outer boundary of the works need not be removed from the seabed.
Constr
5.2 H
Construshall no
The foll
5.2.1
ruction Meth
HDD Marine
uction methot be limited
Identifying
Cut the ‘bu
ConnectingHDD liner;
Fit a seal to
owing sequ
Pre-mobilis
No less thalicensing aless than 2
The PC wil
hod Statem
Fig
e Works
hods and pd to) the follo
the exit po
llnose’ from
g and discoand
o the end of
uence outlin
sation
an one monuthority, in 4 hours bef
l confirm:
ment: HDD M
gure 3 HDD
rocedures fowing:
int of the 4
m the HDD li
onnecting e
f the HDD li
nes the HDD
nth prior to writing, the
fore comme
Marine Work
D Marine W
for the HD
x HDD bore
iner;
equipment t
iner to prev
D Marine W
commencee date of cencement (M
ks
orks Locat
D Marine W
es on the se
to the drill s
vent debris e
Works proces
ement of wcommencemML 3.2.1.4)
MEY-1A-4Constructio
tion
Works will
eabed;
string to cle
entering.
ss.
works the ECment and co
HDD site lo
0-HSE-001onMethodS
Page 16 o
be set out
ean and pr
CoW will nonfirm this
ocation
-D-StatementHD
of 26
for (but
rove the
otify the date no
DD
Constr
5.2.2
5.2.3
The HDspecificto ensu
ruction Meth
1. the ves
2. vessel m
3. vessel
4. vessel o
to be usedauthority, in3.1.3)
Notice to Mthe works,
Weather foconditions.
Mobilisation
All commun
Inventoriesthe vessel.
Vessel envthe EMP (R
Vessel will (MEY-1A-4
Vessel and
DD Marine cation). There the vess
hod Statem
sel,
master,
IMO numbe
owner and
d on the won writing, no
Mariners wilan example
orecasts will
n
nications an
s for all tool
vironmental RHK-1A-40-
leave selec40-HSE-003
d Moorings
Works will e vessel willsel hold stat
ment: HDD M
er, and
operator
orks to the o less than
ll be issuede is provided
l be reviewe
nd meetings
ls, materials
mitigation m-HSE-D-001
cted port an3-D-VesselM
utilise a sin be anchorion during t
Marine Work
ECoW, so72 hours p
d a minimumd in Append
ed at regula
s will be hel
s and liquid
measures w1-Environm
nd transit toManagemen
ngle 26m Mred within athe subsea
ks
that the Eprior to com
m of 2 weedix A of the
ar intervals
ld as per Se
ds will be c
will be checkentalManag
o site on thntPlanHDD)
Multi-cat vea 4 point tem
dive work.
MEY-1A-4Constructio
ECoW can nmmencemen
eks prior to NSP.
to ensure t
ection 3.6.
completed b
ked to ensugementPlan
e route des)
ssel (see tmporary mo
0-HSE-001onMethodS
Page 17 o
notify the lnt of the wo
commence
the appropr
before load
ure complianHDD).
scribed in t
he VMP foooring arran
-D-StatementHD
of 26
icensing orks (ML
ement of
riate site
ing onto
nce with
he VMP
r vessel ngement
DD
Constr
Details Navigat
5.2.4
The divassembtaken.
A helme'rockfall
This dicontinu
5.2.5
The HDthe HDD
a)
ruction Meth
of the navigtionSafetyP
HDD Bore
ve is requirebly at the se
et camera wl' that may c
ve will be e.
HDD Bore
DD bore lineD bore liner
Cut off thepolyethylenvessel deck
hod Statem
Fig
gation safetPlanHDD).
1 Dive 1
ed to confireabed on a
will be usedcompromise
undertake
1 Dive 2a, 2
er will be pr has been
e cable ducne pipe, usk for safe d
ment: HDD M
gure 4 HDD
ty measure
rm the drilletight line so
to enable de cable duc
n at the f
2b and 2c
pushed throinstalled a d
ct bull noseing a pneuisposal.
Marine Work
D Marine W
e are contain
ed exit locao that a GP
drilling persct installation
first availab
ough the HDdive is requ
e. This invoumatic saw.
ks
orks Locat
ned in the N
tion. A marPS reading
sonnel to iden operation
ble slack ti
DD bore frouired to perf
olves sawin. The bull n
MEY-1A-4Constructio
tion
NSP (MEY-
rker buoy isof the buoy
entify any ps.
de before
om onshoreorm the foll
ng through nose will be
0-HSE-001onMethodS
Page 18 o
-1A-40-HSE
s tied to they on surface
potential iss
drilling op
e to offshorowing tasks
a 315mm e recovered
-D-StatementHD
of 26
E-002-D-
e drilling e can be
ues with
erations
re. Once s:
SDR-11 d to the
DD
Constr
b)
c)
These davailab
5.2.6
5.2.7
For HDmooringMarine
The moSubmar
5.2.8
Should pushedwill be u
5.3 E
The EMMarine These a
ruction Meth
The drillingsite, trailingBrush, (5mrope.
The drillingdraw rope, behind the
The divers to temporaphase of th
dives shall ility of a sui
Demobilisa
The vesselcorrectly m
Check tools
Return to p
At port, waccordanceManageme
HDD Bores
DD Bores 2g and demoWorks for H
ooring sprerine Cable.
Contingenc
the drilling away by thundertaken
Environmen
MP describeWorks. Th
are summa
hod Statem
g team will g a draw ro
mm larger th
g team will pbrushing amandrel fro
will then bory seal off t
he installatio
be undertaktable period
ation from B
l will disconarked and l
s, materials
port via the r
waste matere with the went Plan inc
s 2, 3, 4
, 3, 4, the obilising fromHDD Bore 4
ead will rem
cy Diving
g operation he drilling ain accorda
ntal Mitigat
es the mitigese have brised below
ment: HDD M
then pumpope. The dhan ID), and
pull the bruand provingom the seab
olt a Viking the end of ton
ken in accod of calm we
ore 1
nnect from lit (see NSP
s and liquids
route descr
rials and liwaste manaluded in the
procedure m the moor4 the vessel
main in po
create loosassembly, dnce with the
tion
gation meabeen taken
w.
Marine Work
a foam pigivers will u
d a 230mm
ush and mag it. A seconbed.
Johnson Athe HDD bo
ordance witheather, calm
the moorinP for further
s are all on
ribed in the
iquids will agement plae EMP)
will be repring spread l will be dem
osition to a
se material divers may e Waste Ma
asures and from the m
ks
g down thenclip the foMandrel, (
ndrel back nd draw rop
Aquagrip coore liner and
h the progam seas and
ng spread, r details),
board and
VMP.
be taken an. (James
peated with that is left
mobilised an
id the insta
at the seabe required
anagement
methodolomitigation de
MEY-1A-4Constructio
e cable ductoam pig an10% less th
through thepe will be t
nnector to td left in situ
mme (Figurgood visibi
ensure that
accounted f
onshore anFisher Mari
the vesselin-situ. On nd return to
allation wor
abed exit pod to assist iPlan (see E
gies to be escribed in
0-HSE-001onMethodS
Page 19 o
ct from the d attach a hat ID), to t
e cable ductrailed into t
the cable du ready for
re 2), subjeility.
t the moori
for on inven
nd disposeine Service
l mobilisingcompletion
o port.
rks of the
oint that cain its removEMP)
used for ththe ES an
-D-StatementHD
of 26
onshore 267mm he draw
ct on the the duct
uct stub the next
ct to the
ings are
ntories.
ed of in s Waste
g to site, of HDD
Turbine
annot be val. This
he HDD nd SEIS.
DD
Constr
5.3.1
Navigat
Navigatprocedu
Marine
Mitigatiounder th
Pollutio
Mitigatiospills anrequirem
Invasive
A short Scotlanlisted in
Waste M
Waste mrequirem
5.3.2
Navigat
Navigatprocedu
Marine
ruction Meth
Vessels
tion Safety
tion safety nures of and
Mammals
on measurehe procedu
Training of of marine mProvision otherefore toMaintenancany interacrecord manundertakingcurious aboengaged in
on Preventio
on measurend objects oments of the
e Non-Nativ
non-nativend for each vn the manag
Manageme
managemements of the
Moorings
tion Safety
tion safety nures of and
Mammals
hod Statem
notices, wato meet the
es detailed res of and t
all on site /mammals anof advice to o be avoidece of a daily
ction will be ny approachg HDD Marout any in wn marine wo
on
es detailed overboard we Marine Po
ve Species
managemevessel arrivgement plan
nt
nt will be coe Waste Ma
notices, wato meet the
ment: HDD M
rnings and e requireme
for the proteto meet the
/ on vessel pnd their legstaff detailid; and y marine manoted. It is
hes by mariine Works.
water constrorks.
for the prevwill be condollution Con
Manageme
ent report wval on site an in the EM
onducted unanagement
rnings and e requireme
Marine Work
demarcatioents of the N
ected of marequiremen
personnel rislative protng the type
ammal log bs important tne mamma Marine ma
ruction work
vention of mucted unde
ntingency P
ent
will be providand used in P.
nder the proPlan in the
demarcatioents of the N
ks
ons will be cNSP.
arine mammnts of the E
regarding thtection; s of activity
by the Princto make cle
als to the veammals are ks, regularly
marine polluter the procePlan in the E
ded by the PHDD Marin
ocedures ofe EMP.
ons will be cNSP.
MEY-1A-4Constructio
conducted u
mal species MP and VM
he importan
y potentially
cipal Contraear that suchssels and pintelligent a
y approachi
tion from oidures of an
EMP.
Principal Cone Works, in
f and to mee
conducted u
0-HSE-001onMethodS
Page 20 o
under the
will be conMP. These i
ce and sen
disturbing,
actor, into wh a log is lik
personnel and naturalng vessels
l and chemnd to meet t
ontractor toncluding the
et the
under the
-D-StatementHD
of 26
ducted nclude:
sitivity
and
which kely to
ly
ical he
Marine e details
DD
Constr
Mitigatiounder th
Pollutio
Mitigatiospills anrequirem
Archaeo
A reporthe accmonitorMarine
5.3.3
Navigat
Navigatprocedu
Marine
Mitigatiounder th
ruction Meth
on measurehe procedu
Training of of marine mProvision otherefore toMaintenancany interacrecord manundertakingcurious aboengaged in
on Preventio
on measurend objects oments of the
ology
rting protococidental discring. Full dArchaeolog
Dive Activit
tion Safety
tion safety nures of and
Mammals
on measurehe procedu
Training of of marine mProvision otherefore toMaintenancany interacrecord manundertaking
hod Statem
es detailed res of and t
all on site /mammals anof advice to o be avoidece of a daily
ction will be ny approachg HDD Marout any in wn marine wo
on
es detailed overboard we Marine Po
ol for the dcovery of metails and gy are in the
ty
notices, wato meet the
es detailed res of and t
all on site /mammals anof advice to o be avoidece of a daily
ction will be ny approachg HDD Mar
ment: HDD M
for the proteto meet the
/ on vessel pnd their legstaff detailid; and y marine manoted. It is
hes by mariine Works.
water constrorks.
for the prevwill be condollution Con
iscovery of marine culturequiremen
e EMP.
rnings and e requireme
for the proteto meet the
/ on vessel pnd their legstaff detailid; and y marine manoted. It is
hes by mariine Works.
Marine Work
ected of marequiremen
personnel rislative protng the type
ammal log bs important tne mamma Marine ma
ruction work
vention of mucted unde
ntingency P
marine arcural materiants of the
demarcatioents of the N
ected of marequiremen
personnel rislative protng the type
ammal log bs important tne mamma Marine ma
ks
arine mammnts of the E
regarding thtection; s of activity
by the Princto make cle
als to the veammals are ks, regularly
marine polluter the procePlan in the E
chaeology hal during deReporting P
ons will be cNSP.
arine mammnts of the E
regarding thtection; s of activity
by the Princto make cle
als to the veammals are
MEY-1A-4Constructio
mal species MP and VM
he importan
y potentially
cipal Contraear that suchssels and pintelligent a
y approachi
tion from oidures of an
EMP.
has been prevelopmentProtocol fo
conducted u
mal species MP and VM
he importan
y potentially
cipal Contraear that suchssels and pintelligent a
0-HSE-001onMethodS
Page 21 o
will be conMP. These i
ce and sen
disturbing,
actor, into wh a log is lik
personnel and naturalng vessels
l and chemnd to meet t
roduced to t, maintenanr the Disco
under the
will be conMP. These i
ce and sen
disturbing,
actor, into wh a log is lik
personnel and natural
-D-StatementHD
of 26
ducted nclude:
sitivity
and
which kely to
ly
ical he
address nce and overy of
ducted nclude:
sitivity
and
which kely to
ly
DD
Constr
Pollutio
Mitigatiospills anrequirem
Archaeo
A reporthe accmonitorMarine
5.3.4
No altedives ar
6 EM
Pollutiobe adhe
Emergespecific
These p
ruction Meth
curious aboengaged in
on Preventio
on measurend objects oments of the
ology
rting protococidental discring. Full dArchaeolog
Alternatives
ernative mitre required.
MERGENC
on preventioered to at a
ency Respocally to the w
procedures
Man OverbGeneral MOFire & ExplPersonnel Serious InjuMedical AdRequest foEvacuationAdverse WEnvironmeClean up aSpill NotificSpill DocumImmediate Clean-up aSpill notificaSpill DocumLocation an
hod Statem
out any in wn marine wo
on
es detailed overboard we Marine Po
ol for the dcovery of metails and gy are in the
s
tigation met.
CY PREPA
on measurell times on v
onse Proceworks being
include:
board OB Proceduosion Injury or Meury or Illnes
dvice r medical a
n of a sick oWeather Proc
ntal Responctions spec
cation mentation actions
actions ation
mentation nd Content
ment: HDD M
water constrorks.
for the prevwill be condollution Con
iscovery of marine culturequiremen
e EMP.
thods are r
AREDNESS
s included vessels and
edures are g executed,
ure
edical Evacss
ssistance r injured pecedure nse Plan cific to haza
of a Spill K
Marine Work
ruction work
vention of mucted unde
ntingency P
marine arcural materiants of the
required for
S AND RE
in the EMPd working at
an intrinsithe ERCoP
cuation
erson from a
rdous mate
it
ks
ks, regularly
marine polluter the procePlan in the E
chaeology hal during deReporting P
r the HDD
SPONSE
P (Marine Pot quayside.
ic part of tP is detailed
a vessel
erials
MEY-1A-4Constructio
y approachi
tion from oidures of an
EMP.
has been prevelopmentProtocol fo
Marine Wo
ollution Con
the Scope d in the NSP
0-HSE-001onMethodS
Page 22 o
ng vessels
l and chemnd to meet t
roduced to t, maintenanr the Disco
orks if cont
ntingency P
of Works P.
-D-StatementHD
of 26
ical he
address nce and overy of
tingency
Plan) will
relating
DD
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 23 of 26
Post incident reporting Training
7 LICENCES AND LEGAL REQUIREMENTS
Licence / Consent Legislation Granted
Section 36 Consent Electricity Act 1989 09/10/2013
Marine Licence (licence number 04577/14/0)
Marine (Scotland) Act 2010 31/01/2014
Decommissioning Programme Energy Act 2005 xx
Table 4 Consent
8 LINKAGES WITH OTHER STRATEGIES AND SHE MANAGEMENT SYSTEMS
The NSP complies with the Principal Contractor’s Construction Phase Health and Safety Plan (under the Construction (Design and Management) Regulations 2007) and their Health, Safety and Environment Manual.
9 CMS REVIEW AND CONSULTATION
Under Condition 9 of the Section 36 the CMS will be reviewed and commented on by the licensing authority and SNH, SEPA, MCA, NLB, the planning authority and any other such advisors that may be required at the discretion of the Scottish Ministers. The CMS must be approved by the licensing authority.
The CMS will be submitted to the licensing authority for distribution to the stakeholders and for approval.
Any changes the CMS deemed necessary (working methods or procedures) must be reviewed and approved by the ECoW before it is submitted for approval to the licensing authority (Figure 5).
Version control will be conducted by the revision review block on the front page of the CMS.
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 24 of 26
Figure 5 CMS Change Process
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 25 of 26
10 LIST OF ABBREVIATIONS
Abbreviation
CDM Construction (Design and Management) Regulations 2007
CMS Construction Method Statement
COSHH Control of Substance Hazardous to Health
ECoW Ecological Clerk of Works
EIA Environmental Impact Assessment
EMP Environmental Management Plan
ERCoP Emergency Response Co-operation Plan
ERP Emergency Response Procedures
EPS European Protected Species
ES Environmental Statement
HDD Horizontal Directional Drilling
HSE Health, Safety and Environment
IOSH Institute of Occupational Safety and Health
JNCC Joint Nature Conservation Committee
NSP Navigation Safety Plan
MCA Maritime Coastguard Agency
MHWS Mean High Water Springs
ML Marine Licence under the Marine (Sotland) Act 2010
MLWS Mean Low Water Springs
MMO Marine Mammal Observer
PC Principal Contractor – James Fisher Marine Services
Construction Method Statement: HDD Marine Works
MEY-1A-40-HSE-001-D-ConstructionMethodStatementHDD
Page 26 of 26
PEMP Project Environmental Monitoring Programme
RAMS Risk Assessments and Method Statements
SAC Special Area of Conservation
SCIMS Seal Corkscrew Injury Monitoring Scheme
SEIS Supplementary Environmental Information Statement
SEPA Scottish Environment Protection Agency
SHESQ Safety, Health, Environment, Security and Quality
SNCA Statutory Nature Conservation Agency
SNH Scottish Natural Heritage
SPA Special Protected Area
STCW International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978
S36 Section 36 of the Electricity Act 1989
TSC Turbine Submarine Cable
TSS Turbine Support Structure
TTG Tidal Turbine Generator
VMP Vessel Management Plan