MEYDENBAUER BAY PARK & LAND USE PLAN September 2008 EDAW - 08100030.01 BELLEVUE, WASHINGTON Perteet Lake Washington Boulevard Main Street 100th Avenue NE 99th Avenue NE Downtown Park Wildwood Park ALTERNATIVE 1: EDUCATIONAL EMPHASIS 0 50’ 100’ 200’ 300’ Scale: 1” = 100’ - 0” Park Program Elements Fully day-lighted stream with interpretive/education nodes along adjacent pedestrian path Ravine enhancements (Contiguous canopy forested areas to be retained and enhanced; invasive plants removed) Relocated Wetland (Incorporation of wetlands with the stream/shoreline delta to form a contiguous surface water structure) Water detention features (bioswales) Upper viewing terrace (+/- 10 short-term parking spaces) Surface parking lot (15 to 25 spaces) Playground (for school-aged children) Grass picnic area with shade structure Youth Environmental Education Center: restrooms, gathering space, outdoor education green, and terraced gardens Waterfront pathway with pedestrian and emergency vehicle access Restrooms (with green roof and interpretive/educational signage) Short-term marina parking (10 to 15 spaces) and dropoff area Removal of Piers 2 and 3 Public dock with viewing platform and 14 transient moorage slips Integrated ADA accessible terraced walkway with stormwater feature Whaling Building: Historical/Cultural Maritime Center Enhanced hillside woodland (Removal of invasive species, preservation of significant trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline (improved nearshore habitat and addition of native riparian vegetation, including overhanging plants and woody debris) Trail connects Lake-to-Lake Trail system Yacht Club Site Subsections Ravine Corridor Upper Terrace Shoreline Kite Parcel NE 1st Street Meydenbauer Way SE 101st Avenue SE 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 A’ A Marina Program Existing Alternative 1 Pier Removal NA Removes Piers 2 & 3 Permanent Long-term Moorage 87 slips 18 to 28 slips Not in Service/Transient 25 slips 14 slips South side of floating pier People Propelled Vessels (PPV) No facilities Up to 15 PPV slips South side of floating pier and at beach Boat Storage No facilities Limited potential on land 16 17 18 19 20 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 R U S K R U S K B’ B

MEYDENBAUER BAY PARK & LAND USE PLAN BELLEVUE, …...trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEYDENBAUER BAY PARK & LAND USE PLAN BELLEVUE, …...trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline

MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON

Perteet

Lake Washington Boulevard

Main Street

100t

h A

venu

e N

E

99th

Ave

nue

NE Downtown Park

Wildwood Park

ALTERNATIVE 1:

EDUCATIONAL EMPHASIS

0 50’ 100’ 200’ 300’

Scale: 1” = 100’ - 0”

Park Program Elements

Fully day-lighted stream with interpretive/education nodes along adjacentpedestrian path

Ravine enhancements (Contiguous canopy forested areas to be retained and enhanced; invasive plants removed)

Relocated Wetland (Incorporation of wetlands with the stream/shoreline delta to form a contiguous surface water structure)

Water detention features (bioswales)

Upper viewing terrace (+/- 10 short-term parking spaces)

Surface parking lot (15 to 25 spaces)

Playground (for school-aged children)

Grass picnic area with shade structure

Youth Environmental Education Center: restrooms, gathering space, outdooreducation green, and terraced gardens

Waterfront pathway with pedestrian and emergency vehicle access

Restrooms (with green roof and interpretive/educational signage)

Short-term marina parking (10 to 15 spaces) and dropoff area

Removal of Piers 2 and 3

Public dock with viewing platform and 14 transient moorage slips

Integrated ADA accessible terraced walkway with stormwater feature

Whaling Building: Historical/Cultural Maritime Center

Enhanced hillside woodland (Removal of invasive species, preservation of significant trees, and planting of native forbs, shrubs and trees)

Artificial swim beach with people propelled vessel launch

Softened shoreline (improved nearshore habitat and addition of native riparianvegetation, including overhanging plants and woody debris)

Trail connects Lake-to-Lake Trail system

Yacht Club

Site Subsections

Ravine Corridor

Upper Terrace

Shoreline

Kite Parcel

NE 1st Street

Meydenbauer Way SE

101s

t Ave

nue

SE

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

A’

A

Marina Program Existing Alternative 1

Pier Removal NA Removes Piers 2 & 3

Permanent Long-term Moorage 87 slips 18 to 28 slips

Not in Service/Transient 25 slips 14 slips South side of floating pier

People Propelled Vessels (PPV) No facilities Up to 15 PPV slips South side of floating pier and at beach

Boat Storage No facilities Limited potential on land

16

17

18

19

20

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

R

U

S

K

R

U

S

K

B’

B

Page 2: MEYDENBAUER BAY PARK & LAND USE PLAN BELLEVUE, …...trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline

MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON

Perteet

Lake WashingtonBoulevard

Enhanced Hillside Woodland

WalkParking Lot

WaterfrontPathway

Shoreline Enhancement

Sidewalk

Enhanced Hillside Woodland

ALTERNATIVE 1:

EDUCATIONAL EMPHASISRavine Corridor

Upper Terrace

Key Map

Lake Washington Boulevard

99th

Ave

nue

NE

0 25’ 50’ 100’ 150’

Scale: 1” = 50’ - 0”

0 10’ 20’ 40’ 60’

Scale: 1” = 20’ - 0”

Section A - A’

A

C

A

C

B

B

A’

01

01

02

03

04

Fully day-lighted stream

Interpretive/education nodes along adjacent pedestrian path

Ravine enhancements (Contiguous canopy forested areas to beretained and enhanced; invasive plants removed)

Water detention features (bioswales)

Upper viewing terrace (+/- 10 short-term parking spaces)

Surface parking lot (15 to 25 spaces)

Youth Environmental Education Center: restrooms, gathering space

Outdoor education green

Terraced gardens

Enhanced hillside woodland (Removal of invasive species, preservation of signi� cant trees, and planting of native forbs, shrubs and trees)

02

03

05

06

07

01

02

03

01

02

03

04

05

06

07

Page 3: MEYDENBAUER BAY PARK & LAND USE PLAN BELLEVUE, …...trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline

MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON

Perteet

ALTERNATIVE 1:

EDUCATIONAL EMPHASIS

Shoreline

Kite Parcel

Key Map

Lake Washington Boulevard

A

A

0 25’ 50’ 100’ 150’

Scale: 1” = 50’ - 0”Yacht Club

B

01

01

B

Relocated Wetland (Incorporation of wetlands with the stream/shoreline delta to form a contiguous surface water structure)

Playground (for school-aged children)

Grass picnic area with shade structure

Waterfront pathway with pedestrian and emergency vehicle access

Restrooms (with green roof and interpretive/educational signage)

Short-term marina parking (10 to 15 spaces) and dropoff area

Removal of Piers 2 and 3

Public dock with viewing platform and 14 transient moorage slips

Whaling Building: Historical/Cultural Maritime Center

Artificial swim beach with people propelled vessel launch

Softened shoreline (improved nearshore habitat and addition of native riparian vegetation, including overhanging plants and woody debris)

Trail connects Lake-to-Lake Trail system

Integrated ADA accessible terraced walkway

Stormwater feature02

02

03

04

05

06

07

08

09

10

11

12

01

02

01

02

03

04

05

06

07

08

09

10

11

12

Page 4: MEYDENBAUER BAY PARK & LAND USE PLAN BELLEVUE, …...trees, and planting of native forbs, shrubs and trees) Artificial swim beach with people propelled vessel launch Softened shoreline

Meydenbauer bay Park & land use Plan september 2008edaW - 08100030.01bellevue, WasHInGTOn

Perteet

alTernaTIve 1:

eduCaTIOnal eMPHasIs

lake Washingtonboulevard

sidewalkstormwater

Feature

stormwaterFeature

stormwaterFeature

stormwaterFeature

Walk

Walk

Walk

Walk

Walk

Walk

Walk

shoreline enhancement

WaterfrontPathway

landscapearea

landscapearea

landscapearea

landscape areaneighboring

Condoaccesss

section b - b’

0 10’ 20’ 40’ 60’

scale: 1” = 20’ - 0”