2
MEWAT ENGINEERING COLLEGE Haryana Waqf Board (Home and Administration of Justice Department, Government of Haryana) Nuh, Haryana-122107, Phone: 8398888557, 9050260966, [email protected], www.mecw.ac.in MECW/CE/2017-41 Apr 27th, 2017 NOTICE SUBMISSION OF REPORT FOR 8 TH SEMESTER STUDENTS FOR COURSE CE- 402-F INDUSTRIAL TRAINING/INSTITUTIONAL PROJECT WORK Civil Engg students of 8 th semester are supposed to submit report for course CE-402F industrial training/institutional project work to the concerned teacher as assigned in the Time-Table. Please complete and submit the above said report in survey Lab by the end of 01-5-2017.The format will be same as prescribed by MDU and Mewat Engg. College. Note: Below said form is needed to be submitted along with industrial training/institutional project report. Mr. Nadeem A Khan, AP, CE deptt., Mewat Engineering College(Wakf), Nuh Enclosed: 1 . Six Month Industrial Training Session 2017-18 (B.Tech 8th Semester) Evaluation Report of Student :CC to 1. Director ,MECW 2. Departmental File ,MECW 3. Notice Board ,MECW

MEWAT ENGINEERING COLLEGE Haryana Waqf …mecw.ac.in/uploads/notifications/Training_Report_Notice.pdfMEWAT ENGINEERING COLLEGE Haryana Waqf Board (Home and Administration of Justice

  • Upload
    vunhi

  • View
    238

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEWAT ENGINEERING COLLEGE Haryana Waqf …mecw.ac.in/uploads/notifications/Training_Report_Notice.pdfMEWAT ENGINEERING COLLEGE Haryana Waqf Board (Home and Administration of Justice

MEWAT ENGINEERING COLLEGE Haryana Waqf Board

(Home and Administration of Justice Department, Government of Haryana)

Nuh, Haryana-122107, Phone: 8398888557, 9050260966, [email protected], www.mecw.ac.in

MECW/CE/2017-41 Apr 27th, 2017

NOTICE

SUBMISSION OF REPORT FOR 8TH SEMESTER STUDENTS FOR COURSE CE- 402-F INDUSTRIAL TRAINING/INSTITUTIONAL PROJECT WORK

Civil Engg students of 8th semester are supposed to submit report for course CE-402F industrial training/institutional project work to the concerned teacher as assigned in the Time-Table. Please complete and submit the above said report in survey Lab by the end of 01-5-2017.The format will be same as prescribed by MDU and Mewat Engg. College. Note: Below said form is needed to be submitted along with industrial training/institutional project report.

Mr. Nadeem A Khan, AP, CE deptt., Mewat Engineering College(Wakf), Nuh

Enclosed: 1 . Six Month Industrial Training Session 2017-18 (B.Tech 8th Semester) Evaluation Report of Student :CC to 1. Director ,MECW 2. Departmental File ,MECW 3. Notice Board ,MECW

Page 2: MEWAT ENGINEERING COLLEGE Haryana Waqf …mecw.ac.in/uploads/notifications/Training_Report_Notice.pdfMEWAT ENGINEERING COLLEGE Haryana Waqf Board (Home and Administration of Justice

MEWAT ENGINEERING COLLEGE Haryana Waqf Board

(Home and Administration of Justice Department, Government of Haryana)

Nuh, Haryana-122107, Phone: 8398888557, 9050260966, [email protected], www.mecw.ac.in

Six Month Industrial Training Session 2017-18 (B.Tech 8th Semester) Evaluation Report of Student

To be filled by Company / Industry/Institution

Name: ……………………………….......... Father’s Name……………………………………………

Company/Institute Name………………………………………………………………………………

Company/Institute Id……………………. Candidate Job Profile/Course………………………….

Project Title: ……………………………….Department Allotted…………………………………….

Performance of Candidate (Please fill below details): Attendance

(10) Behavior

(10) Communication

Skill (5) Sincerity

(5)

Performance (20)

Grand Total (50)

Remark:……………………………………………………………………………………………..........

Signature of Candidate Authorized sign from Company Authorizes person

To be filled by Allotted Guide/ Supervisor

Project Title: ………………………………Department Allotted……………………………………..

Project Status: Live/Not Live Presentation Date:……………………………………….. Presentation Status: ………………… If repeat (Next Date for Presentation):………………….

Latest CV status: Softcopy: Submitted/ Not Submitted Hardcopy: ……………………

Performance of Candidate (Please fill below details): Project Report

(20)

Presentation of Project(20)

Behavior during

Training (10)

Meeting /Correspondence

(10)

Project Performance

(40)

Grand Total (100)

Remark:………………………………………………………………………………………………

Signature of Guide: ……………….. Verifying Authority……………..Guide /Supervisor Name:………………..

Coordinator