METROPOLITAN REGIONAL HOUSING AUTHORITY

INVITES BIDS ON

TENDER DOCUMENT NO. 19-167

Unit Renovation #4

CLOSING DATE:

Wednesday, February 19, 2020

Page 2: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority Tender No. 19-167 Unit Renovation #4

Table of Contents

PAGES

Section One

Scheduled Tour Date

Mandatory Requirements

1

2

Instructions to Bidders 3 - 6

Bid Form 7 - 9

General Conditions of the Contract 10 - 28

Asbestos Disclosure Materials Letter: January 2014 29

Drawings / Sketches

A-0 Sir John Thompson Cover Page 30

A-1 General Notes and Scope of Work 31

A-2 Main Floor Plan- Demolition 32

A-3 Main Floor Plan – New Layout 33

A-4 Project Schedule 34

E-1 Electrical Plan 35

Specifications

Electrical Specifications: PF-2019-170D Sir John Thompson Visitable Unit Coversion

36-51

Resilient Vinyl Sheet Flooring – Supply Section 09 65 16 52-53

Paint Supply and Install Section 08 53 13 54-58

Appendix A Agreement (For Information Purposes Only) 59-61

Appendix B Product Approval Form 62

Total pages for this tender 62

Page 3: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority Tender No. 19-167 Unit Renovation #4

Site Tour (Non-Mandatory -Site Tour)

1. Organized Tour Date

.1 All bidders note:

.1 The tour is scheduled for Thursday, February 13, 2020 at 10:00 AM

2. Site Location Information .1 Property

Sir John Thompson Manor, Unit # 305

.2 Starting Address: START: Front Entrance Sir John Thompson Manor, 7001 Leppert Street, Halifax, Nova Scotia

Tender No. 19-167 Unit Renovation #4 Page 1 of 62

Page 4: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - MANDATORY REQUIREMENTS

The following are the mandatory requirements of a formal bid and failure to meet one or more shall result in the bid being disqualified:

.1 the Bid document shall be signed and witnessed;

.2 if bidders have been requested to provide Bid Security, security shall be provided in Canadian funds in the amount required in one of the following forms only: a certified cheque, a certified bank draft, Government of Canada bearer bonds, or a Surety Bid Bond. No other form of bid security shall be accepted;

.3 all unit prices shall be included in unit price contracts;

.4 the Bid package shall be on Metropolitan Regional Housing Authority documents;

.5 any Bid based on modifying, qualifying or re-writing any of the terms or conditions of the Tender, the General Conditions or the Supplementary Conditions documents shall be disqualified; and,

.6 the Tender Submission shall contain all pages of the Bid Form.

Tender No. 19-167 Unit Renovation #4 Page 2 of 62

Page 5: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - INSTRUCTIONS TO BIDDERS

1. Bid Closing Address

The Bid Closing Address is S u i t e 3 , 3770 Kempt Road, Halifax, Nova Scotia. Bids delivered to the Bid Closing Address must be in a sealed envelope marked “Bid” and bear the name of the bidder and the project “Description of Work”. Bids are to be placed in the Metropolitan Regional Housing Authority Tender Submission Drop Box, located in the front entrance of Suite 3, 3770 Kempt Road, Halifax (door located to the left of Subway). Bids will be received up to 2:00 PM local time and opened at 2:00 PM local time Wednesday, February 19, 2020.

2. Bid Form

Bids shall be submitted on the original Bid Forms as provided by the Metropolitan Regional Housing Authority. These forms must be completely filled out in ink, or by typewriter, with the signatures in longhand, witnessed and shall be signed as follows:

.1 Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will sign where indicated. Insert the words "Sole Proprietor" under titles;

.2 Partnership: Signature of all partners in the presence of a witness or witnesses who will sign where indicated. Insert the word "Partner" against each signature under titles; or,

.3 Limited Company: If the bid is submitted by a Limited Company, the bid must be signed by duly authorized signing officers of the Company in their normal signatures designating against each signature the official capacity in which the signing officer acts. Signatures are to be made in the presence of a witness who will sign where indicated. The Corporate Seal of the Company shall be affixed to the bid. If the bid is signed by Officials other than the President or Secretary-Treasurer of the Company, a copy of the by-law or resolution of the Board of Directors authorizing them to do so must be submitted with the bid.

The completed form shall be without interlineations, alterations, or erasures.

3. Right to Reject

The right to reject any or all Bids or to accept any Bid deemed most satisfactory is reserved by the Metropolitan Regional Housing Authority. The Metropolitan Regional Housing Authority reserves the right to waive any informality in any or all Bids.

The Metropolitan Regional Housing Authority reserves the right to consider the following in the evaluation of tenders:

.1 past experience with the bidder and / or its management, including, but not limited to the following:

.1 compliance with the terms and conditions of past contracts between the Metropolitan Regional Housing Authority or the Government of Nova Scotia and the bidder; and,

.2 timely completion of past tenders awarded to the bidder.

.2 information received in response to enquiries of credit, customer and industry references; and,

.3 the experience and qualifications of the bidders’ senior management and project management.

Tender No. 19-167 Unit Renovation #4 Page 3 of 62

Page 6: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - INSTRUCTIONS TO BIDDERS

4. Modifications to Bids

Modifications may be made to bids by facsimile (fax) message to 902.420.7586 or by email to [email protected], provided the following requirements are met:

.1 modifications must be received at the address indicated in Paragraph 1 of Instructions to Bidder, prior to Bid Closing Time;

.2 modifications made by fax or email shall immediately be followed up by the original document being delivered to the Metropolitan Regional Housing Authority and signed as outlined in Paragraph 2 of Instructions to Bidder; and,

.3 modifications should not include the total original or revised bid amount.

Note: Messages received by telephone shall not be considered.

5. Bid Security

The Bid, together with the Bid Security hereinafter described, must be delivered in a sealed self-addressed envelope. Note:

.1 Bid Security must be in Canadian funds; and,

.2 Bid Security in the form of cash will not be accepted.

6. Bidders’ Responsibility

Bidders will be held to have examined the drawings; to have visited the site; and to have informed themselves as to existing conditions and limitations. Bids shall cover the execution of the whole of the Work as described in the Specifications, as shown on the Drawings / Sketches and as described in any Addendums that may be issued.

7. Registered Contractor / Subcontractors

The Contractor and Subcontractors (whether incorporated or not) shall be individuals or companies registered in the Province of Nova Scotia under the Acts administered by the Registry of Joint Stock Companies. Firms not currently registered shall be required to register as condition of award.

8. Security Deposit

Security deposits shall be based on an amount of not less than ten percent (10%) of the total amount of the Bid.

For bids less than $1,000,000 (one million Canadian dollars), each contractor submitting a Bid must submit the required amount of security deposit in one of the following forms:

.1 a certified cheque or bank draft made payable to the "Metropolitan Regional Housing Authority";

.2 Government of Canada bearer bonds; or,

Tender No. 19-167 Unit Renovation #4 Page 4 of 62

Page 7: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - INSTRUCTIONS TO BIDDERS

.3 a Surety Bid Bond.

For bids of more than $1,000,000 (one million Canadian dollars), each contractor submitting a Bid must submit the required amount of security deposit in the form of a Surety Bid Bond only. This shall be either:

.1 a Bid Bond shall be supplied on, or similar to, t he CCDC Form 220 and shall be signed and sealed by the Bonding Company and the Contractor; or,

.2 a Surety Bond may be submitted, in the amount of ten percent (10%) of the Bid price, and the successful Bidder must deliver, upon winning the award, to the Metropolitan Regional Housing Authority a Performance Bond and a Labour and Material Bond each in the amount of fifty percent (50%) of the amount payable under the Contract.

The Metropolitan Regional Housing Authority may require of any Bidder proof of financial and technical capability to undertake the work for which their Bid is submitted.

A certified cheque or other security, when received, will be retained by the Metropolitan Regional Housing Authority as contract security in accordance with the provisions of Paragraph 5.1 of Instructions to Bidders. Bid security for the three lowest bids will be retained by the Metropolitan Regional Housing Authority until such time as the Metropolitan Regional Housing Authority approves an award of Contract. Bid security for all other bids will be returned immediately following the close of Bid.

9. Agreement

The successful Bidder shall enter into an Agreement with the Metropolitan Regional Housing Authority to deliver such goods and services as outlined within the Tender.

10. Acceptance

The Acceptance letter shall be issued, by:

.1 delivering a letter by hand to the Contractor at either the address as set out in the Bid document, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

11. Construction Safety

Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

Tender No. 19-167 Unit Renovation #4 Page 5 of 62

Page 8: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - INSTRUCTIONS TO BIDDERS

9. Addenda

It is the responsibility of the bidder to periodically check for any addenda issued for this tender.

General questions, please call:

Bruce Chaisson at tel: 902.420.2108 or email: [email protected]

10. Communications

.1 Enquiries shall be directed to [email protected]

Tender No. 19-167 Unit Renovation #4 Page 6 of 62

Page 9: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - BID FORM

TO: METROPOLITAN REGIONAL HOUSING AUTHORITY

FROM:

Contractor's Full Business Name

1. The undersigned Bidder has carefully examined the site of the proposed work described herein, has become familiar with local conditions and the character and extent of the work, has carefully examined every part of the proposed contract and thoroughly understands its stipulations, requirements and provisions, and has carefully examined the following documents, which shall be incorporated into and form part of the Agreement that the Contractor shall enter into with the Metropolitan Regional Housing Authority:

Mandatory Requirements Instructions to Bidders Bid Form General Conditions Asbestos Disclosure Materials Letter: January 2014 Specifications Drawings Appendix A – Agreement (For Information Purposes Only) Addendum No. dated

Addendum No. dated

Addendum No. dated

2. This contract is to provide for the the labor and materials relating to:

Tender No. MET19-167 Unit Renovation #4

3. The undersigned Bidder has determined the quality, quantity and source of supply of all materials

required, has investigated labour conditions, and, has noted that sales taxes are not to be included

in the "Bulk Sum Price" mentioned below in accordance with Paragraph 43 of the General

Conditions of the Contract.

4. The undersigned Bidder agrees:

.1 BULK SUM PRICE: To provide all labour, tools, equipment, materials and incidentals necessary to complete the work in accordance with the Contract and agrees to accept, therefore, as payment in full the "Bulk Sum Price" of

__________________________________________________________________________ ( $ ), and to undertake all changes or extra work required during the period of construction in accordance with the provisions of Article 23 of the General Conditions of the Contract.

Tender No. 19-167 Unit Renovation #4 Page 7 of 62

Page 10: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - BID FORM

.2 if awarded the Contract on this Bid Form, the Bidder is to begin work within ten (10) days of notification of Contract Award and to complete the Work within Sixty (60) days of award.

.3 to use the Subcontractors hereinafter listed on the various phases of the work, and not to change or substitute these subcontractors, excepting under the provisions of Article 41 of the General Conditions of the Contract, without prior written permission of the Project Manager.

.4 please list all subcontractors. Subcontractors will be reviewed as part of the tender evaluation. If needed, include a separate sheet listing Subcontractors.

Subcontractor:

Subcontractor:

Subcontractor:

5. The Bulk Sum Price set out above is made up as follows:

.2 estimated cost of materials; and, $

.3 all other charges including labour, contractors’ profits and overhead $

.4 Total of bulk sum price, excluding taxes $

6. Accompanying this Bid Form, the undersigned Bidder is submitting a Security Deposit in one of the following forms:

.1 a certified cheque or bank draft made payable to the "Metropolitan Regional Housing Authority" in the amount of $ (see Instructions to Bidders);

.2 Government of Canada Bearer Bonds in the amount of $ ; or,

.3 a Surety (Bid) Bond in the amount of $ .

.4 The undersigned Bidder agrees that, if this Bid is accepted within sixty (60) days from the closing date and the undersigned Bidder declines to enter into a contract in accordance with this Bid, then;

.1 if I / we have submitted a security deposit in the form of a certified cheque or Government of Canada Bearer Bonds it shall be forfeited; or

.2 if I / we have submitted a Surety (Bid) Bond, the surety shall be liable in accordance with the terms of the Bond.

7. The Acceptance letter shall be issued at the option of the Metropolitan Regional Housing Authority by;

. 1 delivering a letter by hand to the Contractor at either: the address set out in the Bid Form document, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

8. made without connection with any other person or persons, submitting bids for the same work,

Tender No. 19-167 Unit Renovation #4 Page 8 of 62

Page 11: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority MET19-167 Unit Renovation #4

SECTION ONE - BID FORM

and is in all respects fair and without collusion. Contractor’s Full Business Address

Contractor’s Full Business Name Street Address

City, Province, Postal Code

Contractor’s Signature Business Telephone Number

Contractor’s Name Contractor’s E-mail Address

Signed, Sealed and Delivered on behalf of the Contractor this day of _______________ 2020, in the presence of

Witness’ Title

AFFIX SEAL

Witness’ Signature

Witness’ Name

Tender No. 19-167 Unit Renovation #4 Page 9 of 62

Page 12: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

INDEX

1. Definitions 2. Documents 3. Detail Drawings and Instructions 4. Copies Furnished 5. Shop Drawings 6. Drawings & Specifications of the Work 7. Ownership of Drawings & Models 8. Samples 9. Project Manager and Contractor 10. The Project Manager's Decisions 11. Foreman, Supervision 12. Materials, Appliances, Employees 13. Inspection of Work 14. Correction before Final Payment 15. Deductions for Uncorrected Work 16. Guarantee Warranty 17. Protection of Work and Property 18. Emergencies 19. Contractor's Liability Insurance 20. Fire Insurance 21. Contract Security 22. Cash Allowances 23. Changes in Work 24. Valuation of Changes 25. Claims against Contractor, Subcontractors

of Suppliers

26. Payments 27. Liens 28. Permits, Notices, Laws 29. Patent Fees 30. Use of Premises 31. Cleaning Up 32. Cutting, Patching and Digging 33. Delays 34. Assessments and Damages for Late

Completion 35. Metropolitan Regional Housing

Authority's Right to do Work 36. Owner's Right to Terminate Contract 37. Contractor's Right to Stop Work or

Terminate Contract 38. Mutual Responsibility of Contractors 39. Separate Contracts 40. Assignment 41. Subcontracts 42. Relations of Contractor and Sub-

Contractor 43. Taxes 44. Progress Estimates 45. Workers’ Compensation 46. Discounts and Rebates

Tender No. 19-167 Unit Renovation #4 Page 10 of 62

Page 13: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

1. Definitions

.1 The contract documents consist of the Agreement, the General Conditions of the Contract, the Specifications, Drawings and/or Sketches, including all modifications thereof plus any Addendums incorporated in the documents before their execution. These constitute the Contract when signed by the Metropolitan Regional Housing Authority and Contractor.

.2 The Metropolitan Regional Housing Authority, the Contractor and the Project Manager are those named as such in the Agreement.

.3 The term "Subcontractor" includes only a person, firm or corporation having a contract for the execution of a part or parts of the Work included in the general contract, and a person, firm, or corporation furnishing materials called for in the general contract and worked to a special design according to the plans and specifications, but does not include one who merely furnished material so worked.

.4 Instructions shall be deemed to have been duly given if issued in writing, at the option of the Metropolitan Regional Housing Authority, by either:

.1 forwarding by registered mail a letter to the Contractor, to the last business address known to the Metropolitan Regional Housing Authority, in which case instructions shall be deemed to have been duly given on the day this letter is deposited in the mail, or;

.2 delivering a letter by hand to the Contractor at either the address set out in the Bid Form, the Head Office of the Contractor, or to any officer of the Contractor, in which case acceptance shall be deemed to be the day the letter is delivered.

.5 The term "Work" of the Contractor or Subcontractor includes all labour and materials shown or described in the Contract Specifications or Drawings and/or Sketches plus any Addendums that may have been issued.

.6 The term "Other Contractors" means any person or firm or corporation employed by, or having a contract directly or indirectly with, the Metropolitan Regional Housing Authority otherwise than through the Contractor.

.7 National Building Code, National Research Council of Canada, shall apply unless otherwise indicated in the Drawings and/or Sketches or Project Specifications.

.8 Municipal by-laws shall apply where they supersede CMHC Technical Builder's Bulletin.

.9 The Contract is deemed to be "substantially performed":

.1 when the work or improvement is ready for use or is being used for the purpose intended; and,

.2 when the work to be done under the Contract is capable of completion or correction at a cost of not more than two and one-half percent (2.5%) of the Contract price.

Tender No. 19-167 Unit Renovation #4 Page 11 of 62

Page 14: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

1. Documents

.1 The Contract documents are complementary, and what is called for by anyone shall be binding as if called for by all. The intention of the documents is to include all labour and materials reasonably necessary for the proper execution of the Work. It is not intended, however, that materials or work not covered by or properly inferable from any heading, section or trade in the Specifications shall be supplied unless distinctly so noted on the Drawings and/or Sketches. Descriptions of materials or work in words which so applied having well-known technical or trade meaning shall be held to refer to such recognized standards.

.2 Should the Specifications conflict with the Drawings and/or Sketches, the Specifications shall govern. In the case of discrepancies between Drawings, those of larger scale, or if the scales are the same, those of a later date shall govern. All Drawings and/or Sketches and Specifications shall be interpreted in conformity with the Agreement and those General Conditions of the Contract which shall govern.

2. Detail Drawings and Instructions

.1 The Project Manager shall furnish as necessary for the execution of the Work additional instructions, by means of drawings or otherwise. All such additional instructions shall be consistent with the Contract documents. The Work shall be executed in conformity therewith and the Contractor shall do no work without such additional instructions. In giving such additional instructions, the Project Manager shall have authority to make minor changes in the Work, not inconsistent with the Contract.

.2 The Contractor and the Project Manager, if either so requests, shall jointly prepare a schedule, subject to change from time to time in accordance with the progress of the Work, fixing the dates at which the various detail drawings will be required, and the Project Manager shall furnish them in accordance with the schedule. Under like conditions, a schedule shall be prepared, fixing the dates for the submission of shop drawings, for the beginning of manufacture and installation of materials and for the completion of the various parts of the work.

3. Copies Furnished

.1 In addition to the signed duplicates of the Contract documents, the Metropolitan Regional Housing Authority shall furnish to the Contractor, free of charge, eight (8) copies of all Drawings and/or Sketches and Specifications applicable to the Work.

4. Shop Drawings

.1 The Contractor shall furnish to the Project Manager, at proper times, all shop and setting drawings or diagrams which the Project Manager may deem necessary in order to make clear the work intended or to show its relation to adjacent work of other trades. The Contractor shall make any changes in such drawings or diagrams which the Project Manager may require consistent with the Contract, and shall submit two copies of the revised prints to the Project Manager, one of which shall be returned to the Contractor and the other retained by the Project Manager. When submitting such shop and setting

Tender No. 19-167 Unit Renovation #4 Page 12 of 62

Page 15: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

drawings, the Contractor shall notify the Project Manager in writing of changes made therein from the Project Manager's drawings or specifications. The Project Manager's approval of such drawings, or of the revised drawings, shall not relieve the Contractor from responsibility for errors made by the Contractor therein or for changes made from the Project Manager's drawings or specifications not covered by the Contractor's written notification to the Project Manager. All models and templates submitted shall conform to the spirit and intent of the Contract documents.

1. Drawings and Specifications of the Work

.1 The Contractor shall keep one copy of all Drawings and/or Sketches and Specifications of the Work, in good order, available to the Project Manager and to his/her representatives.

2. Ownership of Drawings and Models

.1 All Drawings and/or Sketches, Specifications and copies thereof and all models furnished by the Project Manager are his/her property. They are not to be used on other work and, with the exception of the signed Contract set of the Drawings and/or Sketches and Specifications, all furnished Drawings and/or Sketches and Specifications are to be returned to him/her upon request on the completion of the Work.

3. Samples

.1 The Contractor shall furnish for the Project Manager's approval such samples as he/she may reasonably require. The Work shall be in accordance with approved samples.

4. Project Manager and Contractor

.1 The Project Manager shall be responsible for administering the Contract, but the Contractor shall have complete control of the Work on site (subject to Paragraph 11 of Section One – General Conditions of the Contract).

5. The Project Manager's Decisions .1 The Project Manager shall decide on questions arising under the contract documents,

whether as to the performance of the Work or the interpretation of the Specifications and Drawings and/or Sketches, but should the Contractor hold such decisions to be at variances with the Contract documents, or to involve changes in work already built, fixed, ordered or in hand, to be in excess of the contract or to be given in error, he/she shall notify the Project Manager in writing before proceeding to carry them out.

6. Foreman, Supervision

.1 The Contractor shall keep on the Work, during its progress, a competent foreman and any necessary assistants, all satisfactory to the Project Manager. The foreman shall not be changed except with the consent of the Project Manager, unless the foreman proves to be unsatisfactory to the Contractor and ceases to be in his/her employ. The foreman shall represent the Contractor in his/her absence and directions on minor matters given to him shall be held to be given to the Contractor. Important directions shall be given in writing

Tender No. 19-167 Unit Renovation #4 Page 13 of 62

Page 16: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

to the Contractor. The Contractor shall give efficient supervision to the Work, using his/her best skill and attention.

7. Materials, Appliances, Employees

.1 Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labour, water, tools, equipment, light and power necessary for the execution of work.

.2 Unless otherwise specified, all materials shall be new. Both workmanship and materials shall be of the quality specified.

.3 The Contractor shall not employ on the Work any unfit person or anyone not skilled in the work assigned to him.

8. Inspection of Work

.1 The Metropolitan Regional Housing Authority or the Project Manager on his/her behalf and their representative shall at all times have access to the Work, wherever it is in preparation or progress, and the Contractor shall provide proper facilities for such access and for inspection.

.2 If the Specifications, the Project Manager's instructions, laws, ordinances or any public authorities require any work to be specially tested or approved, the Contractor shall give the Project Manager timely notice of its readiness for inspection, and if the inspection is by an authority other than the Project Manager, of the date and time fixed for such inspection. Inspections by the Project Manager shall be promptly made. If any work should be covered up without approval or consent of the Project Manager, it must, if required by the Project Manager, be uncovered for examination, and made good at the Contractor's expense.

.3 Re-examination of questioned work may be ordered by the Project Manager. If such works are found in accordance with the Contract, the Metropolitan Regional Housing Authority shall pay the cost of re-examination and replacement. If such works are found not in accordance with the Contract, through the fault of the Contractor, the Contractor shall pay such cost.

9. Correction Before Final Payment

.1 The Contractor shall promptly remove from the premises all material condemned by the Project Manager as failing to conform to the Contract whether incorporated in the Work or not, and the Contractor shall promptly replace and re-execute his/her own work in accordance with the Contract and without expense to the Metropolitan Regional Housing Authority and shall bear the expense of making good all work of other contractors destroyed or damaged by such removal or replacement.

.2 If the Contractor does not remove such condemned materials or work within the time fixed by written notice, the Metropolitan Regional Housing Authority may remove and may store such materials at the expense of the Contractor. If the Contractor does not pay the expense of such removal within five days thereafter, the Metropolitan Regional Housing Authority may, upon ten (10) days' written notice, sell such materials at auction or at

Tender No. 19-167 Unit Renovation #4 Page 14 of 62

Page 17: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

private sale and shall account for the net proceeds thereof, after deducting all costs and expenses incurred in the removal, storage and sale of the material and any other costs and expenses that should have been borne by the Contractor.

10. Deductions for Uncorrected Work

.1 If in the opinion of the Project Manager, it is not expedient to correct defective work or work not done in accordance with the Contract documents, the Metropolitan Regional Housing Authority may deduct from the Contract price the difference in value between the Work as done and that called for by the Contract, the amount of which shall be determined in the first instance by the Project Manager.

11. Guarantee Warranty

.1 Warranty coverage shall be provided by a guarantee warranty on all materials and workmanship for a period of one (1) year from the date of completion. Performance of the Contractor over the one (1) year period shall be guaranteed by the retention by the Metropolitan Regional Housing Authority of one percent (1%) of the contract price, or $2,500 (two thousand, five hundred Canadian dollars), whichever amount is greater.

.2 The Contractor shall in addition to any specific warranty or guarantee called for, warrant and guarantee, for a period of one (1) year from the date of completion, all work performed and called for on the Drawings and/or Sketches and the Specifications, including any additional work approved and accepted as an extra to the Contract. The Contractor shall at his/her own expense, rectify any defects latent or patent that arise, as a result of poor, or improper, workmanship or defective materials, fixtures or apparatus during this one (1) year period. Performance of the Contractor over the one (1) year period shall be guaranteed, by the retention by the Metropolitan Regional Housing Authority of one percent (1%) of the contract price, or $2,500 (two thousand, five hundred Canadian dollars), whichever amount is the greater. Neither the final certificate nor payment thereunder, nor any provisions in the Contract shall relieve the Contractor from the responsibility for faulty materials or workmanship which shall appear during this one (1) year period.

.3 Cracks in plaster, drywall, masonry, stucco, and concrete which occur during the warranty period will be considered defects in workmanship and materials, and shall be rectified at the Contractor's expense including the expense of repainting necessary to complete the finished product. Where touch-up painting does not match existing paint, the entire surface shall be repainted.

.4 Neither the final certificate, nor payment under this contract, nor any provisions in the contract shall relieve the Contractor from responsibility for latent defects in materials or workmanship which appear after this one (1) year warranty period.

.5 In the event that the Contractor places in use certain apparatus, machinery or electrical equipment, prior to the completion date, it shall remain the Contractor's responsibility to maintain the guarantee period as stated above, regardless of the possibility that the manufacturers' guarantee may have expired previously.

Tender No. 19-167 Unit Renovation #4 Page 15 of 62

Page 18: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

.6 Notwithstanding the provisions of this article, if any statute in force in the Province of Nova Scotia creates a more extended liability for faulty materials or workmanship, the provisions of such statutes shall apply.

.7 For the purposes of this article, completion of the project shall be the latter of either the date of project handover, or the date of the certificate of substantial completion.

12. Protection of Work and Property

.1 The Contractor shall maintain continuously adequate protection of all his/her work from damage and shall protect the Metropolitan Regional Housing Authority's property from all injury arising in connection with this Contract. He/She shall make good any such damage or injury, except such as may be directly due to errors in the Contract documents. He/She shall adequately protect adjacent property as required by law and the Contract documents.

13. Emergencies

.1 The Project Manager has authority to stop the progress of the Work whenever, in his/her opinion, such stoppage may be necessary to ensure its proper execution. In an emergency affecting or threatening the safety of life, or of the structure, or of adjoining property, he/she has authority to make such changes and to order such work extra to the Contract or otherwise as may in his/her opinion be necessary.

14. Contractor's Liability Insurance

.1 The Contractor shall maintain such insurance or pay such assessments as will protect him and the Metropolitan Regional Housing Authority from claims under Workers’ Compensation Acts. In addition, the Contractor shall maintain insurance to protect him and the Metropolitan Regional Housing Authority from any other claims for bodily injury or property damage. This insurance coverage shall be Comprehensive General Liability at least as broad as the Insurers Advisory Organization Form GL-2002, including a rider for products and completed operations coverage for one (1) year period following completion of all works. Endorsements must also be provided for Broad Form Property Damage, Cross Liability Clause and thirty (30) days’ notice of any cancellation by registered mail.

.2 The use of explosives must be covered by the policy, if blasting by explosives is required.

.3 The Contactor shall also maintain liability insurance for all owned and non-owned automobiles, either licensed for highway use or unlicensed.

.4 The limits of liability coverage shall be not less than $2,000,000 (two million Canadian dollars) inclusive for bodily injury or property damage per occurrence. Certificates of such insurance showing “HOUSING NOVA SCOTIA and METROPOLITAN REGIONAL HOUSING

AUTHORITY” as named insured shall be filed with the Metropolitan Regional Housing Authority and shall be subject to approval as to adequacy of protection. Such insurance shall be maintained until the Project Manager certifies that the Work is complete.

.5 The Contractor's liability policy shall be endorsed with an undertaking from the insurance company that such insurance shall not be cancelled or changed without twenty-one (21)

Tender No. 19-167 Unit Renovation #4 Page 16 of 62

Page 19: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

days prior notice by registered mail to the Metropolitan Regional Housing Authority.

20. Fire Insurance

.1 The Contractor shall maintain and pay for fire insurance in the joint names of the Metropolitan Regional Housing Authority and the Contractor totalling not less than one hundred percent (100%) of the Contract Award Amount, so that any loss under such policies of insurance will be payable to the Metropolitan Regional Housing Authority and the Contractor as their respective interests appear, and he/she shall furnish a copy of such policy to the Metropolitan Regional Housing Authority. Should a fire loss be sustained, the Contractor shall act on behalf of the Metropolitan Regional Housing Authority and himself for the purpose of adjusting the amount of such loss with the insurance companies. As soon as such adjustment has been satisfactorily completed, the Contractor shall proceed to repair the damage and complete the Work and shall be entitled to receive from the Metropolitan Regional Housing Authority in addition to the total Contract price, the amount at which the Metropolitan Regional Housing Authority's interest has been appraised in the adjustment made with the insurance companies as referred to above, said amount to be paid to the Contractor as the work of restoration proceeds. Any loss or damage by fire which may occur shall not affect the rights and obligations of either party under the Contract documents except that in such event the Contractor shall be entitled to a reasonable extension of time for the performance of the Work. Upon completion of the Work or on occupancy by the Metropolitan Regional Housing Authority, whichever shall first occur, the Contractor's obligation (if any) to maintain the fire insurance shall cease, and the Metropolitan Regional Housing Authority shall assume full responsibility for insuring the whole of the Work against loss or damage by fire. The date of such transfer of responsibility shall be the date on which the Metropolitan Regional Housing Authority is notified of the issue by the Project Manager of this Final Certificate, or the date the Metropolitan Regional Housing Authority occupies the premises, as the case may be.

21. Contract Security

.1 The successful Contactor must submit a Performance Bond and a Labour and Material Bond, each in the amount of fifty percent (50%) of the Contract, such Performance Bond and Labour and Material Bond are to be delivered to the Metropolitan Regional Housing Authority prior to signing of the Contract and shall be on the form enclosed as part of these documents, or to like effect.

.2 Where the contract amount is less than $1,000,000 (one million Canadian dollars), the Metropolitan Regional Housing Authority will accept a certified cheque, bank draft, or Government of Canada Bearer Bonds, in an amount of ten percent (10%) of the Contract price.

.3 If the successful Bidder elects to provide security other than the Performance, Labour and Material Bonds and has provided security in the form of Government of Canada Bearer Bonds, certified cheque, or bank draft, then said security must be fully paid for, assigned to the Metropolitan Regional Housing Authority and deposited with the Metropolitan

Tender No. 19-167 Unit Renovation #4 Page 17 of 62

Page 20: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

Regional Housing Authority in trust. Contracts in excess of $1,000,000 (one million Canadian dollars) can only be secured by Performance, Labour and Material Bonds.

.4 If the Work is taken out of the Contractor's hands, or if the Contract is terminated pursuant to the General Conditions, or if the Contractor is in breach or in default under the Contract, the Metropolitan Regional Housing Authority may negotiate the security deposit, in the case of bonds, or Term Deposit Certificate, or convert the security deposit to its own use, in the case of negotiable security, and the amount realized by the Metropolitan Regional Housing Authority shall be deemed to be a debt payable by the Metropolitan Regional Housing Authority to the Contractor and the Metropolitan Regional Housing Authority shall have the right of set-off against the debt any sum or amount which the Contractor may be liable to pay to the Metropolitan Regional Housing Authority and the balance of the debt, if any, after the right of set-off has been exercised, and if such balance, in the opinion of the Project Manager, is not required for the purposes of the Contract shall be paid by the Metropolitan Regional Housing Authority to the Contractor.

.5 If the Contractor is not in breach of, or default under, the Contract at the time the Project Manager's Interim Certificate of Completion is issued by the Regional or Project Manager, the Metropolitan Regional Housing Authority will return the security deposit to the Contractor. Notwithstanding the above, the Metropolitan Regional Housing Authority, may, under circumstances where it is considered advantageous, release the security deposit to the Contractor prior to one hundred percent (100%) completion but in no event at less than ninety percent (90%) completion. Such a release at less than ninety-five percent (95%) completion of the project shall be submitted to the Metropolitan Regional Housing Authority and have approval.

22. Cash Allowances

.1 The Contractor shall include in the Contract sum all cash allowances mentioned in the Specifications, which allowances shall be expended in whole or in part as the Project Manager shall direct, the amount of the Contract sum adjusted in conformity therewith. The Contract sum includes such sums for expenses and profit on account of such cash allowances as the Contractor requires. The Contractor shall not be required to employ for any such work, persons against whom he/she has a reasonable objection.

23. Changes in Work

.1 The Metropolitan Regional Housing Authority or the Project Manager, without invalidating the Contract, may make changes by altering, adding to, or deducting from the Work, the Contract sum being adjusted accordingly. All such work shall be executed under the conditions of the original Contract except that any claim for extension or reduction of time caused thereby shall be adjusted at the time of ordering such change.

.2 Except as provided in Paragraph 18 of Section One – General Conditions of the Contract, no change shall be made unless it is made pursuant to a written order from the Project Manager, and no claim for an addition to or a deduction from the Contract sum shall be valid unless so order.

Tender No. 19-167 Unit Renovation #4 Page 18 of 62

Page 21: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

24. Valuation of Changes

.1 The valuation of any changes in the Work shall be determined in one or more of the following ways:

.1 by estimate and acceptance in a lump sum, submitted with Subcontractors’ and suppliers' signed quotations and breakdown of estimates for material and labour;

.2 for changes where the individual trade cost is anticipated to be less than $1000 (one thousand Canadian dollars), the requirement for the detailed cost breakdowns may be waived but the individual trade quotation must be supplied;

.3 by unit prices agreed upon or as listed in the Contract; or,

.4 cost of work and percentage or by cost and fixed fee.

.2 In cases of additional work to be paid for under method Paragraph 24.1.3 of Section One – General Conditions of the Contract, the Contractor shall keep and present in such form as the Project Manager may direct, a correct account of the net cost of labour and materials, together with vouchers. The Project Manager shall certify to the amount due to the Contractor including the profit and overhead as described in the Schedule. Pending final determination of value, payments on account of changes shall be made on the Project Manager's certificate.

.3 In determining methods Paragraph 24.1.1 or Paragraph 24.1.3 of Section One – General Conditions of the Contract, the labour costs shall be calculated by the actual estimated hours at an hourly rate calculated as follows:

.1 the hourly labour rate shall be the total payroll costs including hourly wage, statutory contributions to UIC, WCB and CPP and other applicable labour burdens paid directly by the employer such as vacation pay, holiday pay and pension plan;

.2 the Owner reserves the right to verify the payroll costs by independent audit; and,

.3 the following percentages shall apply to the total payroll costs:

.1 small tools/expenditures: five percent (5%) on payroll costs; and,

.2 site supervision: five percent (5%) on payroll costs.

.4 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, the material costs shall be calculated as follows:

.1 Contractor’s net costs, including contractor discounts from suppliers, freight on board (FOB) to the project site, plus applicable taxes.

.5 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, equipment rental costs for major pieces of equipment required shall be at local industry rates.

.6 In determining methods Paragraph 24.1.1 and Paragraph 24.1.3 of Section One – General Conditions of the Contract, overhead and fees shall be calculated as follows:

Tender No. 19-167 Unit Renovation #4 Page 19 of 62

Page 22: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

.1 The cost of any authorized change shall be determined by the net total of labour and material or equipment as outlined in Paragraph 24.3.1, Paragraph 24.3.2 and Paragraph 24.3.3 of Section One – General Conditions of the Contract on which the percentage mark-up shall be determined as follows:

.1 For Each Change Up To $5,000 (Five Thousand Dollars): Subcontractors’ own work - Overhead & Fee: 15% (fifteen percent) total General Contractor’s own work - Overhead & Fee: 15% (fifteen percent) total General Contractor on Subcontractors work: 10% (ten percent) total (No percentage mark-up shall be applied to deductions)

.2 For Each Change Above $5,000 (Five Thousand Dollars): Subcontractors’ own work - Overhead & Fee: 10% (ten percent) total General Contractor’s own work - Overhead & Fee: 10% (ten percent) total General Contractor on Subcontractors work: 8% (eight percent) total (No percentage mark-up shall be applied to deductions)

25. Claims Against Contractor, Subcontractors or Suppliers

.1 The Contractor shall ensure that Subcontractors, suppliers, and all others supplying labour, materials or services to the project are promptly paid. Such payments shall be made at the time payment for the same are made to the Contractor by the Metropolitan Regional Housing Authority.

.2 Should the Metropolitan Regional Housing Authority be advised that a Subcontractor or supplier has not been paid for material, service, or labour provided to the project, the Metropolitan Regional Housing Authority may hold back, in addition to any other holdback stipulated in this Contract, sufficient monies as the Metropolitan Regional Housing Authority deems necessary to make such payments.

.3 This right to hold back additional monies shall apply where:

.1 Contractor, Subcontractors, or suppliers have been adjudged bankrupt;

.2 Contractor, Subcontractors, or suppliers have made a general assignment;

.3 Contractor, Subcontractors, or suppliers have had a receiver appointed;

.4 payment for work is in dispute; and,

.5 for any other reason, payment has not been made.

.4 It is the responsibility of the Contractor, his/her successor, trustee, receiver or assigns to settle all such claims and liens made on the Metropolitan Regional Housing Authority and the Metropolitan Regional Housing Authority shall hold all monies retained until advised by the claimants that the accounts have been settled. If claims are not settled by the Contractor or successors within a reasonable time, the Metropolitan Regional Housing Authority may pay for labour, services and materials claimed, whether supported by liens or not, from any date to any date and to any amount which may be claimed, or the Metropolitan Regional Housing Authority may make application to the courts, to pay any amounts held for such claims into court for the court to determine who should be paid and in what amount. Any monies so paid by the Metropolitan Regional Housing Authority shall

Tender No. 19-167 Unit Renovation #4 Page 20 of 62

Page 23: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

be deducted from any monies that may be due, or that thereafter may become due, to the Contractor or successor.

.5 Before final settlement is made for work executed and materials furnished under the Contract, the Contractor shall furnish evidence, satisfactory to the Metropolitan Regional Housing Authority, that the work and all its parts are free and clear from lawful claims or liens under any law, for labour, services, materials and otherwise. The Contractor must also furnish evidence that no claim exists, in respect to which a claim or lien upon the Work could or might attach. The Contractor shall indemnify and hold harmless the Metropolitan Regional Housing Authority and all his/her property from any kind of liens accruing from labour and services performed and materials supplied in or about the work.

26. Payments

.1 Cash payments equal to percentage stipulated in the agreement of the value of the work done, as valued by the Project Manager, will be made to the Contractor monthly, as the work progresses, on the written Certificate of the Project Manager that the Work, for or on account of which the certificate is granted, has been duly executed to his/her satisfaction, and stating the value of such work as computed by him/her, and insurance policies for the project are in force. The said certificate shall be a condition precedent to the right of the Contractor to be paid the said percentage, or any part thereof. No such monthly payment shall be construed to be an acceptance of any defective work or improper materials.

.2 Whenever the Work is performed completely, according to the Builders Lien Act and according to the plans and specifications and to the satisfaction of the Project Manager, the Project Manager shall make and certify the final estimate for the same. The Metropolitan Regional Housing Authority will then pay to the Contractor after sixty-five ( 65 ) days have expired from the execution of the said final certificate the remainder which shall be found to be due, excepting therefrom such sum or sums as may be lawfully deducted or retained under any of the provisions of the Contract. The written Certificate of the Project Manager certifying to the final completion of the said Work to his/her entire satisfaction shall be a condition precedent to the right of the Contractor to receive or to be paid the balance due, of any part thereof. The right is reserved by the Metropolitan Regional Housing Authority to reject the whole or any part of the Work, should the said certificate be found to be inconsistent with the terms of the Contract, or otherwise improperly given.

.3 The Project Manager's progress certificates, and the payment of progress estimates based upon the same, shall not be construed as an acceptance or approval of the Work but only as temporary advances to the Contractor; and he/she shall be bound, notwithstanding such progress estimates, to well and truly complete, finish and hand over in good condition, and to the entire satisfaction of the Project Manager, by the time specified and in accordance with the terms and conditions of the Specification, the whole of the Work included therein; and all the percentage retained by the Metropolitan Regional Housing Authority shall be retained until the said full and satisfactory completion has been formally certified by the Project Manager.

Tender No. 19-167 Unit Renovation #4 Page 21 of 62

Page 24: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

27. Liens

.1 The Contractor shall be bound by the terms of the Builders Lien Act R.S., c. 277, s. 1; 2004, c. 14, s. 2.

28. Permits, Notices, Laws

.1 The Contractor shall obtain and pay for all necessary permits or licenses required for the execution of the Work (but this shall not include the obtaining of permanent easements).

.2 The Contractor shall give all necessary notices and pay all fees required by law and comply with all laws, ordinances, rules and regulations relating to the Work and to the preservation of the public health and safety and if the Specifications and Drawings are at variance therewith any resulting additional expense incurred by the Contractor shall constitute an addition to the Contract price.

29. Patent Fees

.1 The Contractor shall pay all royalties and license fees and shall save the Metropolitan Regional Housing Authority harmless from loss on account of suits or claims which may arise by reason of the work for infringement of patents.

30. Use of Premises

.1 The Contractor shall confine his/her apparatus, the storage of materials and the operations of his/her workmen to limits indicated by law, ordinances, permits or directions of the Project Manager and shall not unreasonably encumber the premises with his/her materials.

.2 The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety.

.3 The Contractor shall enforce the Project Manager's instructions regarding signs, advertisements, fires and smoking.

31. Cleaning Up

.1 The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by the employees or work, and at the completion of the Work he/she shall remove all his/her rubbish from and about the building and all his/her tools, scaffolding and surplus materials, and shall leave his/her work "Broom Clean" or its equivalent, unless more exactly specified. In case of dispute the Metropolitan Regional Housing Authority may remove the rubbish and charge the cost to the Contractor as the Project Manager shall determine to be just.

32. Cutting, Patching And Digging

.1 The Contractor shall do all cutting, fitting or patching of work that may be required to make parts come together properly and fit to receive or be received by work of other contractors shown, or implied by, the Contract documents and make good, as the Project Manager may direct.

Tender No. 19-167 Unit Renovation #4 Page 22 of 62

Page 25: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

.2 Any cost caused by ill-timed work shall be borne by the party responsible therefore.

.3 The Contractor shall not endanger any existing work by cutting, digging or otherwise and shall not cut or alter the work of any other contactor save with the consent of the Project Manager.

33. Delays

.1 If the Contractor should be delayed in the completion of Work by any act or neglect of the Metropolitan Regional Housing Authority or Project Manager or of any employee of either, or by any other contractor employed by the Metropolitan Regional Housing Authority or by changes ordered in Work, or by strikes, lockouts, fire, unusual delay by common carriers or unavoidable casualties or by any other cause or any kind beyond the Contractor's control or by any cause within the Contractor's control which the Project Manager shall decide as justifying delay, then the time of completion shall be extended for such reasonable time as the Project Manager may decide.

.2 No such extension shall be made for delay occurring more than seven days before claim therefore is made in writing to the Project Manager, provided, however, that in the case of a continuing cause of delay, only one claim shall be necessary.

.3 If no schedule is made under Paragraph 4 of Section One – General Conditions of the Contract, no claim for delay shall be allowed on account of failure to furnish Drawings until two (2) weeks after demand for such Drawings and not then unless such claim be reasonable.

.4 The Project Manager shall not, except by written notice to the Contractor, stop or delay any part of the main Contract work pending decision of proposed changes.

34. Assessments and Damages for Late Completion

.1 The Work of the Contract is completed on schedule provided the Contract is "substantially performed" on or before the date for completion under Article 2.3 in the Agreement attached for information purposes only as Appendix A to this Tender, or the latest revision to this date authorized by change order. Any period of time required for "substantial com-pletion" in excess of the above noted latest date shall be considered a period of delay.

.2 During this period of delay, the Contractor shall be liable to the Metropolitan Regional Housing Authority for damages in an amount equal to the aggregate of:

.1 all salaries, charges, and travelling expenses of Metropolitan Regional Housing Authority staff and outside consultants overseeing the performance of the Work;

.2 the costs incurred by the Metropolitan Regional Housing Authority as a result of the inability to use the completed Work during the period of delay; and,

.3 all other expenses, including interest charges, and damages incurred or sustained by the Metropolitan Regional Housing Authority during the period of delay as a result of the Work not being completed.

.3 The Metropolitan Regional Housing Authority reserves the right to waive, in whole or in part, the amount payable by the Contractor under this article.

Tender No. 19-167 Unit Renovation #4 Page 23 of 62

Page 26: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

35. Metropolitan Regional Housing Authority's Right to do Work

.1 If the Contractor should neglect to prosecute the Work properly or fail to perform any provisions of this Contract, the Metropolitan Regional Housing Authority, after three (3) days' written notice to the Contractor, may without prejudice to any other remedy he/she may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor.

36. Owner's Right to Terminate Contract

.1 If the Contractor should be adjudged as bankrupt, or if he/she should make a general assignment for the benefit of his/her creditors, or if a receiver should be appointed on account of his/her insolvency or if he/she should, except in cases recited in Paragraph 33 of Section One – General Conditions of the Contract, refuse or fail to supply enough properly skilled workmen or proper materials after having received seven (7) days' notice in writing from the Project Manager to supply additional workmen or materials, or if he/she should fail to make prompt payment to subcontractors for material or labour, or persistently disregard laws, ordinances or the instructions of the Project Manager, or otherwise be guilty of a substantial violation of the provisions of the contract then the Metropolitan Regional Housing Authority may, without prejudice to any other right or remedy, by giving the Contractor written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method which may be deemed expedient, but without undue delay or expense. In such case the Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the contract price shall exceed the expense of finishing the Work such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance the Contractor shall pay the difference to the Metropolitan Regional Housing Authority.

Tender No. 19-167 Unit Renovation #4 Page 24 of 62

Page 27: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

37. Contractor's Right to Stop Work or Terminate Contract

.1 If the work should be stopped under an order of any court, or other public authority, through no act or fault of the Contractor or of anyone employed by him, then the Contractor may, upon three (3) days' written notice to the Metropolitan Regional Housing Authority and the Project Manager, stop work or terminate this contract and recover from the Metropolitan Regional Housing Authority payment for all work executed and any loss sustained upon any plant or material with reasonable profit and damages.

38. Mutual Responsibility of Contractors

.1 Should the Contractor suffer damage by any act, neglect or default of any other contractor employed by the Metropolitan Regional Housing Authority upon the Work, the Metropolitan Regional Housing Authority shall be responsible therefore but shall be subrogated to the rights of the damaged Contractor against the contractor causing the damages. The Contractor shall make his/her claim in writing against the Metropolitan Regional Housing Authority within forty-eight (48) hours after the happening of the event causing such damage to the Contractor.

.2 Should the Contactor cause damage to any other contractor on the Work, the Contactor agrees, upon due notice, to settle with such other contractor by agreement if he/she will so settle. If such other contractor sues the Metropolitan Regional Housing Authority on account of any damage alleged to have been so sustained, the Metropolitan Regional Housing Authority shall notify the Contractor, who shall defend such proceedings at his/her own expense and if any judgement against the Metropolitan Regional Housing Authority arises therefrom, the Contractor shall be responsible and shall pay such judgement promptly together with all costs incurred by the Metropolitan Regional Housing Authority.

39. Separate Contracts

.1 The Metropolitan Regional Housing Authority reserves the right to let other contracts in connection with the undertaking of which the Work is a part and the Contractor shall connect properly and co-ordinate his/her work with that of other contractors. If any part of the Contractor's work depends for its proper execution or result upon the work of another contractor, the Contractor shall report promptly to the Project Manager any defects in the Work of such other contractor as may interfere with the proper execution of the Contractor's work. Should the Contractor fail so to inspect and report, he/she shall have no claim against the Metropolitan Regional Housing Authority by reason of the defective or unfinished work of any other contractor except as to latent defects not reasonably noticeable at the time of the commencement of the Contractor's work.

40. Assignment

.1 The Contractor shall not assign the Contract or assign any monies due to accruing under the Contract under any circumstances.

Tender No. 19-167 Unit Renovation #4 Page 25 of 62

Page 28: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

41. Subcontracts

.1 The Contractor must use the Subcontractors listed in the Bid Form. If the change of any names on this list is considered necessary by the Contractor, this request, giving reasons for the change, shall be submitted in writing to the Project Manager and the proposed change will be official after written approval by the Project Manager. If additional Subcontractors are required for the principal parts of the Work, the Contractor shall notify the Project Manager in writing of the names of the Subcontractors proposed and shall not employ any to whom the Project Manager may reasonably object.

.2 If the change of any names on such list is required by the Project Manager, and the Work has to be awarded to a higher bidder, the Contract Price shall be increased by the difference between the two bids.

.3 The Project Manager shall on request furnish to any Subcontractor wherever practicable, evidence of the amounts certified to on his/her account.

42. Relations of Contractor and Subcontractor

.1 The Contractor agrees to bind every Subcontractor by the terms of the General Conditions, Drawings and Specifications as far as applicable to his/her work.

43. Taxes

.1 Harmonized Sales Tax

.1 The Contractor shall not include in the Bid Form Amount Harmonized Sales Tax (HST), but shall pay HST on all materials and services on which the tax is charged. The Contractor shall show the amount of the HST to be paid on the Bulk Sum Price separately.

44. Progress Estimates

.1 Progress claims submitted for payment must be broken down in accordance with the Metropolitan Regional Housing Authority’s standard progress claim form.

.2 Claims for material on site but not installed, must be supported by suppliers’ invoices showing their unit prices, including provincial and municipal taxes. The amount for HST shall also be included separately. When material has been taken from Contractors’ or Subcontractors’ general stock on hand, they shall supply invoices priced at current trade prices without Contractors’ or Subcontractors’ profit.

45. Workers’ Compensation

.1 The Contractor shall carry Workers’ Compensation coverage on all employees engaged under this contract. The Contactor shall supply the Metropolitan Regional Housing Authority with a letter of Good Standing from the Workers’ Compensation Board and their Revenue Canada Business Number prior to the Work commencing.

Tender No. 19-167 Unit Renovation #4 Page 26 of 62

Page 29: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

46. Discounts from Manufacturers / Principal

.1 Suppliers and contractors are expected to pass on discounts or rebates obtained from their principals or manufacturers to Metropolitan Regional Housing Authority while submitting their bids. Examples of such discounts or rebates could come from Efficiency Nova Scotia, manufacturers of goods and equipment, service providers, etc.

.2 Invoice shall identify if rebate was already or not passed onto the contractor. It can be a collective invoice for all items such as multiple pumps, but all items need to be identified separately.

.3 ID Information of each item shall be included on the invoice record: brand and model number, design designation label.

.4 Contractor Equipment Invoice Provisions with Respect to Efficiency Nova Scotia Rebate.

The following provisions apply to products or services which may be eligible for

rebates/incentives through various programs including those offered by Efficiency

Nova Scotia. Eligible products and services may include, but are not limited to:

• Heating equipment (e.g. heat pumps);

• Lighting equipment and technologies;

• High efficiency circulator pumps;

• Insulation (e.g. exterior rigid, attic etc.);

• Windows and doors;

• Heat Recovery Ventilation (HRV);

• Energy Recovery Ventilator (ERV), and

• Air-sealing.

Provision 1: Supplier to Contractor Invoice

The Contractor shall provide a copy of supplier invoices for the following products:

• High-efficiency circulator pumps (i.e. pumps

containing permanent magnet motors and VFD

technologies), and

• Lighting equipment (i.e. bulbs and fixtures).

All eligible product(s) shall be identified on the invoice c/w description

(model/make), quantity, and design designation label. The location in which

the product will be installed shall be identified by the Contractor.

Tender No. 19-167 Unit Renovation #4 Page 27 of 62

Page 30: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

SECTION ONE - GENERAL CONDITIONS OF THE CONTRACT

Provision 2: Quotations/Estimates

At the request of the RHA and/or HNS, the Contractor shall provide

quotations/estimates that show the installed price of all eligible

product(s) and services prior to commencing any work. All eligible

product(s) shall be identified in the quotation/estimate with the following

information:

• Quantity of product(s);

• Manufacturer;

• Model number;

• Material cost per unit;

• Labour as a separate line item, and

• Applicable taxes.

Provision 3: Contractor to Housing Authority Invoice

At the request of the RHA and/or HNS, the Contractor shall provide an

invoice that shows the installed price of all eligible product(s) and

services. All eligible product(s) shall be identified in the invoice with the

details listed under Provision 2.

The Housing Authority and/or Housing Nova Scotia reserve the

right to request invoicing with detailed material and labour

breakdown. Breakdowns may be required by building, or by

residential unit.

-END OF GENERAL CONDITIONS-

Tender No. 19-167 Unit Renovation #4 Page 28 of 62

Page 31: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

MET19-167 Unit Renovation #4

ASBESTOS DISCLOSURE MATERIALS LETTER: JANUARY 2014

January 2014 To Whom It May Concern,

This is to advise that certain building materials used in the construction of apartment buildings,

office buildings and homes between the years 1946-1986 may contain asbestos fibres. Asbestos

may typically be found in drywall filler, texture coats (stucco), floor tiles, tile adhesive, gaskets,

hard board, plaster, ceiling tiles, caulking and seamless flooring. Asbestos can be a hazard if

the fibres in the building material are released or separated from the material or become air

borne. In order for asbestos fibres to be released from this material, it must be sanded or

crumbled into small pieces.

Asbestos is not otherwise poisonous, and it does not off-gas any toxic chemicals. Under normal

conditions of day-to-day usage, these materials do not pose a risk to occupants, as they are not

releasing dust.

As many of the Metropolitan Regional Housing Authority (MRHA) buildings were constructed prior

to 1986, we are advising that asbestos may be present in the building materials. When properly

managed these materials are not a cause for concern.

Typically, if asbestos is found in MRHA buildings it is in the drywall filler (the material used to cover

the seams where two (2) pieces of gyproc meet or the corners of a room or where the ceiling and

walls meet), stucco or plaster. Gyproc itself does not contain asbestos.

The following responsibilities fall upon any contractor whose work may results in the disturbance

of any asbestos-containing or contaminated materials or surfaces:

1. Before commencing work, ensure all contractors employees and supervisory staff have

been informed as to the presence and approximate location of all asbestos-containing

materials that may become subject to disturbance (whether intentional or not);

2. Only workers trained and authorized in Type 1, 2, or 3 asbestos work procedures are

assigned to work involving exposure to material containing asbestos;

3. File with the Metropolitan Regional Housing Authority a signed and executed copy of a

Contractor's Notification & Acknowledgement form as provided at the end of this document;

4. Perform work in such a manner as to avoid the disturbance of any asbestos-containing or

contaminated surfaces or materials other than those materials intentionally contracted to

remove, repair, encapsulate or enclose;

5. Upon discovery of any unidentified asbestos-containing or suspect asbestos-containing

materials, secure the area, suspend all activities that may disturb such materials and do

not proceed with work in the area until it has been determined if the material in question

contains asbestos and written authorization to proceed is obtained from the Metropolitan

Regional Housing Authority;

6. Prior to proceeding with any asbestos disturbance for Type 2 and Type 3 work (i.e. removal,

clean-up or repair) ensure a signed and duly executed Asbestos Work Permit is obtained

from the Metropolitan Regional Housing Authority;

7. Ensure all work that may disturb any asbestos-containing or contaminated surfaces is

completed in accordance with current regulatory requirements; and,

8. As required, provide the Metropolitan Regional Housing Authority with a copy of all

executed Asbestos Waste Transportation Manifests, verifying the safe and proper disposal

of asbestos waste generated.

Tender No. 19-167 Unit Renovation #4 Page 29 of 62

Page 32: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

01/27/20

JK

PR

OJE

CT

MC

SIR JOHN THOMPSON

7001 LEPPERT ST UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

A-0

AS NOTED

SIR JOHN THOMPSON

7001 LEPPERT STREET UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

COVER PAGE

 

Tender No. 19-167 Unit Renovation #4 Page 30 of 62

AutoCAD SHX Text
Drawing Title
AutoCAD SHX Text
Cover Page
AutoCAD SHX Text
A-3
AutoCAD SHX Text
A-4
AutoCAD SHX Text
A-1
AutoCAD SHX Text
A-0
AutoCAD SHX Text
A-2
AutoCAD SHX Text
Main Floor Plan - New Layout
AutoCAD SHX Text
General Notes & Scope of Work
AutoCAD SHX Text
Main Floor Plan - Demolition
AutoCAD SHX Text
Project Schedules
AutoCAD SHX Text
THE CONTRACTOR WILL PROVIDE A WORK PLAN TO THE PROJECT MANAGER THAT COORDINATES PLUMBING, ELECTRICAL, COMMUNICATIONS SHUT-OFFS, DISCONNECTS AND REACTIVATIONS AND ANY TEMPORARY MEASURES REQUIRED FOR THE WORK. THE PROJECT MANAGER SHALL REVIEW AND APPROVE THE WORK PLAN BEFORE ANY WORK COMMENCES. THE CONTRACTOR IS TO PROVIDE A WORK PLAN FOR STAGING, TRANSPORTATION AND REMOVAL OF DEBRIS FROM SITE, CONFLICT OF WORK AREAS AND OCCUPIED TENANT AREAS, ENSURE MEANS OF EGRESS, AND TEMPORARY PROTECTION OF ADJACENT AREAS. THE PROJECT MANAGER SHALL REVIEW AND APPROVE THE WORK PLAN BEFORE ANY WORK COMMENCES.
AutoCAD SHX Text
ALL EXISTING PRODUCTS & WASTE MATERIALS REMOVED AS A RESULT OF THIS CONTRACT, ARE TO BE DISPOSED OF IN A PER AHJ. GUIDELINES OFF SITE UNLESS OTHERWISE DIRECTED.
AutoCAD SHX Text
1)
AutoCAD SHX Text
2)
AutoCAD SHX Text
THE CONTRACTOR SHALL OBTAIN AND PAY FOR ANY AND ALL PERMITS AS REQUIRED BY THE AHJ, LOCAL CODES AND REGULATIONS, AND ARRANGE FOR REQUIRED INSPECTIONS. PROVIDE THE OWNER WITH ALL INSPECTION CERTIFICATES.
AutoCAD SHX Text
3)
AutoCAD SHX Text
ALL DIMENSIONS IN IMPERIAL UNLESS OTHERWISE NOTED. IT IS THE CONTRACTORS RESPONSIBILITY TO CHECK AND VERIFY THAT ALL DIMENSIONS AND SIZES ARE CORRECT, AND TO REPORT IN WRITING ANY ERRORS OR OMISSIONS TO THE PROJECT MANAGER PRIOR TO PROCEEDING WITH THE WORK. DO NOT SCALE DRAWINGS.
AutoCAD SHX Text
4)
AutoCAD SHX Text
READ ALL DRAWINGS IN CONJUNCTION WITH ALL SPECIFICATIONS. APPROVED EQUIVALENTS ARE PERMITTED FOR BIDDING DURING THE TENDER PERIOD. BIDDERS SHALL APPLY TO THE HOUSING AUTHORITY, IN WRITING NOT LATER THAN 4:30 P.M. ON THE 6TH WORKING DAY PRIOR TO TENDER CLOSING DATE FOR PRODUCT ALTERNATE APPROVAL. REQUEST FOR PRODUCT ALTERNATE APPROVAL SHALL INCLUDE ANY AND ALL RELEVANT PRODUCT INFORMATION AND TEST DATA, INCLUDING BUT NOT LIMITED TO, THE TECHNICAL SPECIFICATION SHEET CONTAINING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR SUBMITTING TO DEMONSTRATE FULL COMPLIANCE WITH THE SPECIFICATION AND/OR PRE-APPROVED PRODUCT.
AutoCAD SHX Text
5)
AutoCAD SHX Text
IT IS NOT THE INTENTION OF THESE DRAWINGS AND SPECIFICATIONS TO REITERATE THE CODE. DO ALL WORK IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES AND IN COMPLIANCE WITH ALL REGULATIONS OF AUTHORITIES HAVING JURISDICTION INCLUDING, BUT NOT LIMITED TO THE NATIONAL BUILDING CODE CANADA, NOVA SCOTIA BUILDING CODE REGULATIONS, NATIONAL PLUMBING CODE, AND CANADIAN ELECTRICAL CODE. WHERE THERE IS A CONFLICT AMONGST REFERENCED SPECIFICATIONS, STANDARDS AND CODES, THE MOST STRINGENT WILL APPLY.
AutoCAD SHX Text
6)
AutoCAD SHX Text
ALL NEW MATERIALS, PRODUCTS AND ALL RELATED ACCESSORIES SHALL BE INSTALLED, AS PER SPECIFICATIONS, DRAWINGS AND MANUFACTURER SPECIFICATIONS. CONFLICTS BETWEEN DOCUMENTS AND MANUFACTURERS INSTRUCTIONS SHALL BE REPORTED TO THE PROJECT MANAGER BEFORE WORK BEGINS.
AutoCAD SHX Text
7)
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
FOR THE INTENT OF THIS PROJECT, BUILDING ELEVATIONS AND PLANS ARE PROVIDED FOR REFERENCE ONLY. GENERAL CONTRACTOR RESPONSIBLE FOR VERIFYING INFORMATION AND DIMENSIONS IN THIS PACKAGE WITH CURRENT SITE CONDITIONS.
AutoCAD SHX Text
8)
Page 33: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

01/27/20

JK

PR

OJE

CT

MC

SIR JOHN THOMPSON

7001 LEPPERT ST UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

A-1

AS NOTED

GENERAL NOTES AND SCOPE OF WORK

-

Tender No. 19-167 Unit Renovation #4 Page 31 of 62

AutoCAD SHX Text
1. EXISTING STRUCTURE AND MATERIALS TO REMAIN SHALL BE INSPECTED PRIOR EXISTING STRUCTURE AND MATERIALS TO REMAIN SHALL BE INSPECTED PRIOR TO INSTALLATION OF NEW MATERIALS. CONTRACTOR SHALL REPORT AND DAMAGED OR DETERIORATING MATERIAL TO THE PROJECT MANAGER. 2. REMOVE ALL EXISTING PLUMBING FIXTURES FROM BATHROOM AND PREPARE REMOVE ALL EXISTING PLUMBING FIXTURES FROM BATHROOM AND PREPARE FOR REINSTALLATION 3. RELOCATE ALL EXISTING ELECTRICAL RECEPTACLES/ SWITCHES/ LIGHTS/ ETC RELOCATE ALL EXISTING ELECTRICAL RECEPTACLES/ SWITCHES/ LIGHTS/ ETC AS REQUIRED FOR NEW CONSTRUCTION -SEE ELECTRICAL 4. ALL INTERIOR WALLS PARTITIONS, DOORS AND CABINETRY SHOWN DASHED TO ALL INTERIOR WALLS PARTITIONS, DOORS AND CABINETRY SHOWN DASHED TO BE REMOVED COORDINATE WITH DRAWING A-2. 5. BUILD NEW INTERIOR PARTITIONS AS PER DRAWING A-3 & SCHEDULES A-4 BUILD NEW INTERIOR PARTITIONS AS PER DRAWING A-3 & SCHEDULES A-4 6. MUD, PRIME AND PAINT ALL GYPSUM BOARD AS PER SPECIFICATIONS. MUD, PRIME AND PAINT ALL GYPSUM BOARD AS PER SPECIFICATIONS. 7. INSTALL ALL NEW INTERIOR DOORS, FRAMES AND HARDWARE AS PER INSTALL ALL NEW INTERIOR DOORS, FRAMES AND HARDWARE AS PER SCHEDULE, ALL NEW TRIM AND CASINGS SHALL MATCH QUALITY, DIMENSIONS AND PROFILE OF EXISTING 8. INSTALL NEW FLOORING/ BASEBOARDS AND TRIM AS PER SCHEDULE INSTALL NEW FLOORING/ BASEBOARDS AND TRIM AS PER SCHEDULE 9. RELOCATE EXISTING KITCHEN CABINETRY AS PER PLAN A-3. RELOCATE EXISTING KITCHEN CABINETRY AS PER PLAN A-3. 10. RELOCATE SPRINKLER HEAD AS PER PLAN A-3 RELOCATE SPRINKLER HEAD AS PER PLAN A-3 11. RELOCATE UNIT SUITE ENTRY OPENING AND PROVIDE NEW FIRE RATED DOOR RELOCATE UNIT SUITE ENTRY OPENING AND PROVIDE NEW FIRE RATED DOOR AND FRAME AS PER DRAWING A-3- TO BE VERIFIED ON SITE. 12. PATCH AND REPAIR FIRE RATED WALL ASSEMBLY IN CORRIDOR/UNIT AREAS PATCH AND REPAIR FIRE RATED WALL ASSEMBLY IN CORRIDOR/UNIT AREAS TO MATCH EXISTING CONDITIONS AND ENSURING ALL NEW SEAMS AND PENETRATIONS ARE FIRE SEALED 13. REMOVE EXISTING VINYL TILE FLOORING TO SUBFLOOR IN AREAS AS PER REMOVE EXISTING VINYL TILE FLOORING TO SUBFLOOR IN AREAS AS PER SCHEDULE. PREPARE SURFACES FOR NEW 14. ALL NEW WALL SURFACE FINISHES IN BATHROOM AS PER SCHEDULES ALL NEW WALL SURFACE FINISHES IN BATHROOM AS PER SCHEDULES 15. SUPPLY AND INSTALL NEW BATH TUB SURROUND WALL AS PER PLAN A-3 SUPPLY AND INSTALL NEW BATH TUB SURROUND WALL AS PER PLAN A-3 16. PROVIDE NEW CLOSET SOLUTION IN BEDROOM AS PER 2/A-3 PROVIDE NEW CLOSET SOLUTION IN BEDROOM AS PER 2/A-3
AutoCAD SHX Text
GENERAL CONSTRUCTION SCOPE OF WORK:
AutoCAD SHX Text
REFERENCE STANDARDS: 1. ALL WORK IN THE PROJECT SHALL BE CONDUCTED IN COMPLIANCE WITH THE LATEST ALL WORK IN THE PROJECT SHALL BE CONDUCTED IN COMPLIANCE WITH THE LATEST VERSION OF ALL APPLICABLE CODES, STANDARDS, AND AUTHORITY HAVING JURISDICTION (AHJ) REGULATIONS, NOT LIMITED TO THE FOLLOWING: 2. NATIONAL BUILDING CODE OF CANADA (NBC); NATIONAL BUILDING CODE OF CANADA (NBC); 3. NOVA SCOTIA BUILDING CODE (NSBC); NOVA SCOTIA BUILDING CODE (NSBC); 4. CANADIAN ELECTRICAL CODE (CEC); CANADIAN ELECTRICAL CODE (CEC); 5. NATIONAL FIRE CODE OF CANADA (NFC); NATIONAL FIRE CODE OF CANADA (NFC); 6. ALL APPLICABLE BULLETINS FROM THE NOVA SCOTIA DEPARTMENT OF LABOUR AND ALL APPLICABLE BULLETINS FROM THE NOVA SCOTIA DEPARTMENT OF LABOUR AND ADVANCED EDUCATION; 7. ALL APPLICABLE STANDARDS AND BULLETINS FROM NOVA SCOTIA POWER INC.; ALL APPLICABLE STANDARDS AND BULLETINS FROM NOVA SCOTIA POWER INC.; 8. ALL APPLICABLE STANDARDS FROM UNDERWRITERS LABORATORIES CANADA (ULC); ALL APPLICABLE STANDARDS FROM UNDERWRITERS LABORATORIES CANADA (ULC); 9. ALL APPLICABLE STANDARDS FROM CANADIAN STANDARDS ASSOCIATION (CSA); ALL APPLICABLE STANDARDS FROM CANADIAN STANDARDS ASSOCIATION (CSA); PERMITS: 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED BY THE AHJ, THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED BY THE AHJ, LOCAL CODES AND REGULATIONS, AND ARRANGE FOR REQUIRED INSPECTIONS. WARRANTY: 1. THE CONTRACTOR SHALL PROVIDE WRITTEN WARRANTY OF ALL NEW MATERIALS AND THE CONTRACTOR SHALL PROVIDE WRITTEN WARRANTY OF ALL NEW MATERIALS AND WORKMANSHIP, INCLUDING RE-LOCATED ITEMS, FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE BY THE HNS PROJECT MANAGER. SEE DISCIPLINE SPECIFIC SCOPE FOR ANY VARIANCES. SUBMITTALS: : THE CONTRACTOR SHALL PROVIDE SUBMITTALS FOR THE HOUSING NOVA SCOTIA THE CONTRACTOR SHALL PROVIDE SUBMITTALS FOR THE HOUSING NOVA SCOTIA (HNS) PROJECT MANAGER'S APPROVAL WITHIN FOURTEEN (14) DAYS OF AWARD OF CONTRACT AND PRIOR TO INSTALLATION, INDICATING PRODUCT INFORMATION, PARTICULARLY THE FOLLOWING: 1. FLOOR FINISHES FLOOR FINISHES 2. DOORS AND HARDWARE DOORS AND HARDWARE 3. MILLWORK, CABINETS & HARDWARE. MILLWORK, CABINETS & HARDWARE. 4. BATHROOM FIXTURES AND ACCESSORIES BATHROOM FIXTURES AND ACCESSORIES 5. KITCHEN APPLIANCES AND ACCESSORIES KITCHEN APPLIANCES AND ACCESSORIES CLOSE-OUT SUBMITTALS: : 1. THE CONTRACTOR SHALL SUBMIT TO THE HNS PROJECT MANAGER, THAT INCLUDES THE CONTRACTOR SHALL SUBMIT TO THE HNS PROJECT MANAGER, THAT INCLUDES THE FOLLOWING DOCUMENTS AT MINIMUM: 2. ORIGINAL COPY OF THE OCCUPANCY PERMIT ORIGINAL COPY OF THE OCCUPANCY PERMIT 3. ORIGINAL COPY OF ALL FINAL INSPECTION CERTIFICATES INCLUDING BUT NOT LIMITED ORIGINAL COPY OF ALL FINAL INSPECTION CERTIFICATES INCLUDING BUT NOT LIMITED TO ELECTRICAL AND MECHANICAL. 4. ORIGINAL WRITTEN STATEMENT OF WARRANTY POLICY AND WARRANTY ORIGINAL WRITTEN STATEMENT OF WARRANTY POLICY AND WARRANTY DOCUMENTATION ON ALL INSTALLED PRODUCTS, EQUIPMENT, MATERIALS, AND WORKMANSHIP. 5. OWNER'S MANUAL OF ALL INSTALLED PRODUCTS AND EQUIPMENT. OWNER'S MANUAL OF ALL INSTALLED PRODUCTS AND EQUIPMENT. 6. AS-BUILT- DRAWINGS IDENTIFYING REVISIONS TO THE DRAWINGS AS INSTALLED AND AS-BUILT- DRAWINGS IDENTIFYING REVISIONS TO THE DRAWINGS AS INSTALLED AND DRAWINGS IDENTIFYING REVISIONS TO THE DRAWINGS AS INSTALLED AND INCLUDING ALL APPROVED MODIFICATIONS TO THE CONTRACT DRAWINGS. APPROVED MODIFICATIONS TO THE CONTRACT DRAWINGS. 7. ORIGINAL CERTIFICATION OF TESTING AND COMMISSIONING OF RESIDENTIAL ORIGINAL CERTIFICATION OF TESTING AND COMMISSIONING OF RESIDENTIAL STRUCTURED WIRING SYSTEM AND COMMUNICATIONS INFRASTRUCTURE. SYSTEM AND COMMUNICATIONS INFRASTRUCTURE. 8. ORIGINAL CERTIFICATION OF TESTING AND COMMISSIONING OF RESIDENTIAL ORIGINAL CERTIFICATION OF TESTING AND COMMISSIONING OF RESIDENTIAL MECHANICAL SYSTEMS. 9. ALL CLOSE-OUT SUBMITTALS SHALL BE REVIEWED BY THE HNS PROJECT MANAGER, ALL CLOSE-OUT SUBMITTALS SHALL BE REVIEWED BY THE HNS PROJECT MANAGER, AND SHALL BE SUBJECT TO SUBSEQUENT REVISION BY THE CONTRACTOR (WHEN REQUIRED). 10. THE CONTRACTOR SHALL SUBMIT ALL DOCUMENTATION FOR ONE SET IN A BINDER THE CONTRACTOR SHALL SUBMIT ALL DOCUMENTATION FOR ONE SET IN A BINDER C/W IDENTIFICATION COLOR-CODE DISK CHART. GENERAL REQUIREMENTS: 1. THE CONTRACTOR SHALL PLAN, SCHEDULE, AND PERFORM WORK IN CO-OPERATION THE CONTRACTOR SHALL PLAN, SCHEDULE, AND PERFORM WORK IN CO-OPERATION WITH OTHER TRADES. 2. ALL DRAWINGS, SCOPE, AND SPECIFICATIONS SHALL BE READ IN CONJUNCTION WITH ALL DRAWINGS, SCOPE, AND SPECIFICATIONS SHALL BE READ IN CONJUNCTION WITH THOSE OF OTHER TRADES. 3. THE CONTRACTOR SHALL REVIEW THE CONTENT AND NOTES OF ALL DRAWINGS, THE CONTRACTOR SHALL REVIEW THE CONTENT AND NOTES OF ALL DRAWINGS, SCOPE SPECIFICATIONS AND RELATED WORK SPECIFIED ELSEWHERE FOR THE PROJECT.THE CONTRACTOR SHALL REPORT TO THE PROJECT MANAGER ANY ERRORS OR OMISSIONS BEFORE PROCEEDING. 4. ANY DISCREPANCY BETWEEN MATERIAL DESCRIPTIONS SHALL BE BROUGHT TO THE ANY DISCREPANCY BETWEEN MATERIAL DESCRIPTIONS SHALL BE BROUGHT TO THE ATTENTION OF THE HNS PROJECT MANAGER IMMEDIATELY. 5. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE HNS PROJECT MANAGER FOR THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE HNS PROJECT MANAGER FOR ALL SUBSTITUTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBSTITUTIONS. 6. ALL PRODUCTS, EQUIPMENT, MATERIAL, AND HARDWARE SHALL BE NEW AND ALL PRODUCTS, EQUIPMENT, MATERIAL, AND HARDWARE SHALL BE NEW AND APPROVED FOR ITS INTENDED APPLICATION BY CSA, ULC, AND/OR AHJ APPROVED AGENCY. 7. THE CONTRACTOR SHALL USE PRODUCTS, EQUIPMENT, AND MATERIALS FROM SINGLE THE CONTRACTOR SHALL USE PRODUCTS, EQUIPMENT, AND MATERIALS FROM SINGLE MANUFACTURER, WHERE POSSIBLE. 8. ALL WORK SHALL BE PERFORMED BY LICENSED TRADES PERSONS AND APPRENTICES ALL WORK SHALL BE PERFORMED BY LICENSED TRADES PERSONS AND APPRENTICES REGISTERED WITH THE NOVA SCOTIA DEPARTMENT OF LABOUR AND ADVANCED EDUCATION. 9. ALL EQUIPMENT, MATERIALS, AND HARDWARE SHALL BE INSTALLED IN COMPLIANCE ALL EQUIPMENT, MATERIALS, AND HARDWARE SHALL BE INSTALLED IN COMPLIANCE WITH ALL APPLICABLE CODES, STANDARDS, AHJ REGULATIONS, AND THE MANUFACTURER'S INSTRUCTIONS. 10. THE CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH WALLS, CEILINGS, AND THE CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH WALLS, CEILINGS, AND FLOORS CAUSED BY INSTALLATION OF SYSTEMS FROM ANY TRADE DISCIPLINE TO RESTORE INSULATION RATINGS, AND MAKE WEATHER TIGHT IN COMPLIANCE WITH ALL APPLICABLE CODES, STANDARDS, AHJ REGULATIONS, 11. THE PROPONENT SHALL PROVIDE ASSISTANCE IN SOURCING AND ACCESSING ANY THE PROPONENT SHALL PROVIDE ASSISTANCE IN SOURCING AND ACCESSING ANY AVAILABLE FUNDING PROGRAMS TO ASSIST WITH FINANCING THIS PROJECT, INCLUDING THOSE PROGRAMS WHICH MAY BE OFFERED THROUGH EFFICIENCY NOVA SCOTIA. SUCH ASSISTANCE SHALL INCLUDE PROVIDING QUANTITIES, DATA SHEETS, AND INVOICES FOR MATERIAL AND LABOUR FOR THE CONCERNED MEASURES. 12. THE CONTRACTOR SHALL PROVIDE AT THE DISCRETION OF THE CLIENT A BREAKDOWN THE CONTRACTOR SHALL PROVIDE AT THE DISCRETION OF THE CLIENT A BREAKDOWN OR BREAKOUT OF FULL OR PARTIAL CONSTRUCTION COSTS, INCLUDE BUT NOT LIMITED TO LABOR AND MATERIAL 13. CONTRACTORS ADVISEMENT THAT THIS BUILDING WAS CONSTRUCTED WITH ACM IN CONTRACTORS ADVISEMENT THAT THIS BUILDING WAS CONSTRUCTED WITH ACM IN THE VCT FLOOR TILES REFER TO THE ATTACHED "APPENDIX A" FOR A GUIDE TO THE REFER TO THE ATTACHED "APPENDIX A" FOR A GUIDE TO THE FOR A GUIDE TO THE REMOVAL OF FRIABLE ASBESTOS CONTAINING MATERIAL
Page 34: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

01/27/20

JK

PR

OJE

CT

MC

SIR JOHN THOMPSON

7001 LEPPERT ST UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

A-2

AS NOTED

MAIN FLOOR PLAN - DEMO

1/4"=1'-0"

EXISTING/DEMO FLOOR PLAN

1

Tender No. 19-167 Unit Renovation #4 Page 32 of 62

AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
H
AutoCAD SHX Text
H
AutoCAD SHX Text
H
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
LIVING ROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BATH
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
H
AutoCAD SHX Text
H
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING VINYL ASBESTOS FLOORING TILE AND BASEBOARD TO BE REMOVED TO EXPOSE SUBFLOOR ENSURING SURFACE IS PREPARED TO ACCEPT NEW
AutoCAD SHX Text
DEMOLITION LEGEND: TO BE REMOVED
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
LINE REPRESENTS EXTENT OF FLOOR REMOVAL COORDINATE WITH NEW LAYOUT ON DWG A-3
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
EXISTING DOOR & FRAME REMOVED & DISPOSED
AutoCAD SHX Text
EXISTING SPRINKLER HEAD TO BE RELOCATED. COORDINATE WITH NEW LAYOUT ON DWG A-3
AutoCAD SHX Text
G
AutoCAD SHX Text
ALL EXISTING WASHROOM FIXTURES TO BE REMOVED AND REINSTALLED ONCE NEW PARTITION TYPES ARE INSTALLED. COORDINATE WITH A-3 FOR NEW LOCATIONS
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
EXISTING GYPSUM PARTITION TO BE REMOVED (DASHED LINE) EXISTING SHELF AND ROD TO BE REMOVED AND DISPOSED EXISTING STRUCTURAL BUILT UP WOOD POST FOR BUILT UP (3) 2"X8" WOOD BEAM ABOVE TO REMAIN. CONTRACTOR TO ENSURE ALL NEW WORK COORDINATES WITH CURRENT POST LOCATIONS REMOVE EXISTING DOOR AND FRAME AND RELOCATE TO NEW LOCATION COORDINATE WITH A-3 ALL EXISTING WALL MOUNTED BATHROOM ACCESSORIES SHALL BE REMOVED AND REINSTALLED AS PER PROJECT MANAGERS DIRECTION REMOVE AND RELOCATE EXISTING 3'(W) X 5'-4(H) PLASTIC LAMINATE CABINET COORDINATE WITH A-3 FOR NEW LOCATION
AutoCAD SHX Text
J
AutoCAD SHX Text
EXISTING CARPET TO BE REMOVED TO EXPOSE SUBFLOOR ENSURING SURFACE IS PREPARED TO ACCEPT NEW
AutoCAD SHX Text
EXISTING SUITE ENTRY DOOR & FRAME REMOVED & DISPOSED. REMOVE PORTION OF EXISTING FIRE RATED WALL ASSEMBLY FOR NEW LOCATION OF NEW SUITE DOOR & FRAME. EXISTING OPENING SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING FIRE RATED WALL ASSEMBLY
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
EXISTING INTERIOR GYPSUM WALL TO BE REMOVED
AutoCAD SHX Text
EXISTING INTERIOR GYPSUM WALL TO REMAIN REMOVE BASE BOARDS PREPARE SURFACES FOR NEW FINISH COORDINATE WITH FINISH SCHEDULE
AutoCAD SHX Text
DRAWING LEGEND:
AutoCAD SHX Text
EXISTING FLOOR AND BASE BOARD TO BE REMOVED AND DISPOSED. SEE NOTE ABOVE FOR FLOORING MATERIAL
AutoCAD SHX Text
EXISTING LOCATION OF SPRINKLER HEAD ABOVE
Page 35: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

2

A-3

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

01/27/20

JK

PR

OJE

CT

MC

SIR JOHN THOMPSON

7001 LEPPERT ST UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

A-3

AS NOTED 1 OF 6

MAIN FLOOR PLAN - NEW LAYOUT

1/4"=1'-0"

PROPOSED FLOOR PLAN

1

3/8"=1'-0"

CLOSET INTERIOR ELEVATION

2

Tender No. 19-167 Unit Renovation #4 Page 33 of 62

AutoCAD SHX Text
LIVING ROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BATH
AutoCAD SHX Text
100
AutoCAD SHX Text
101
AutoCAD SHX Text
102
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
B
AutoCAD SHX Text
E
AutoCAD SHX Text
H
AutoCAD SHX Text
W3
AutoCAD SHX Text
W2
AutoCAD SHX Text
W2
AutoCAD SHX Text
W3
AutoCAD SHX Text
W3
AutoCAD SHX Text
A
AutoCAD SHX Text
W1
AutoCAD SHX Text
D
AutoCAD SHX Text
K
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
L
AutoCAD SHX Text
W1
AutoCAD SHX Text
A
AutoCAD SHX Text
NEW VINYL SHEET FLOORING (AS PER SPEC)
AutoCAD SHX Text
NEW WORK LEGEND:
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
VERIFY IN FIELD LOCATION AND COLUMN SIZE, SUPPLY AND INSTALL NEW SUITE FIRE RATED DOOR AND FRAME -SEE SCHEDULE PATCH AND REPAIR EXISTING SUITE ENTRY DOOR OPENING TO MATCH CONSTRUCTION MATERIALS AS EXISTING FIRE RATED ASSEMBLY ENSURING ALL NEW SEAMS ARE SEALED WITH 3M FIRE CAULK 3000WT OR APPROVED EQUAL
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
REINSTALL BATHROOM FIXTURES IN EXISTING LOCATIONS PROVIDE MODIFICATIONS TO EXISTING SUPPLY AND WASTE LINES AS REQUIRED(WATER CLOSET TO BE INSTALLED IN THE SAME LOCATION AS NO " PLYWOOD IS REQUIRED ON THE 34" PLYWOOD IS REQUIRED ON THE BACKSIDE OF WATER CLOSET LINE OF NEW/EXISTING FLOORING TRANSITION CONTRACTOR TO PROVIDE TRANSITION STRIP FROM NEW FLOORING MANUFACTURE NEW DOOR/FRAME AND HARDWARE PRIME AND PAINT (AS PER SPEC) NEW PARTITION WALL TO U/S OF CEILING AND BASE BOARD AS PER SCHEDULE INSTALL RELOCATED SPRINKLER HEAD COORDINATE WITH A-2 REINSTALL EXISTING WALL MOUNTED BATHROOM ACCESSORIES AS PER PROJECT MANAGERS DIRECTION INSTALL RELOCATED CABINETRY FROM EXISTING LOCATION TO NEW. COORDINATE WITH NOTE M ON DRAWING A-2 SUPPLY AND INSTALL NEW TUB WALL KIT. 32"X 60" X 58" HIGH GLOSS WHITE AVONDALE BY MIROLIN MODEL# 39964 (OR APPROVED EQUAL) EXISTING COLUMN TO BE ENCLOSED WITH 2 LAYERS OF TYPE X GYPSUM BOARD (SUB FLOOR TO U/S CEILING) COMPLETE WITH METAL CORNER BEAD. TAPE MUD PRIME AND PAINT (AS PER SPEC)
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
SHELVING 12" DEEP +/-
AutoCAD SHX Text
ALL ADJUSTABLE SHELVING (4) " 34" PAINTED PLYWOOD WITH SOILED WOOD EDGING
AutoCAD SHX Text
3/4" x 3 1/2" MDF SUPPORT STRIPS FOR SIDE SUPPORT FOR SHELF & ROD.
AutoCAD SHX Text
CLOSET ROD
AutoCAD SHX Text
BASE BOARD AS PER SCHEDULE
AutoCAD SHX Text
NEW INTERIOR GYPSUM PARTITION WALL FINISHED AS PER DWG A-7
AutoCAD SHX Text
EXISTING RE-PURPOSED INTERIOR GYPSUM WALL. FINISHES AS PER SCHEDULE
AutoCAD SHX Text
DRAWING LEGEND:
AutoCAD SHX Text
SUPPLY AND INSTALL NEW FLOORING AND BASE AS PER SCHEDULE
AutoCAD SHX Text
LOCATION OF SPRINKLER HEAD ABOVE
Page 36: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

” ”” ”

·

·

·

·

··

·

·

·

·

·

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

01/27/20

JK

PR

OJE

CT

MC

SIR JOHN THOMPSON

7001 LEPPERT ST UNIT 305 VISITABILITY CONVERSION:

HALIFAX, N.S

A-4

AS NOTED

PROJECT SCHEDULES

Tender No. 19-167 Unit Renovation #4 Page 34 of 62

AutoCAD SHX Text
DOOR SCHEDULE
AutoCAD SHX Text
DOOR#
AutoCAD SHX Text
Type
AutoCAD SHX Text
DOOR
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
Width
AutoCAD SHX Text
Hgt
AutoCAD SHX Text
Thk
AutoCAD SHX Text
36 " 80" 1 "34"
AutoCAD SHX Text
Swing
AutoCAD SHX Text
SUITE ENTRY
AutoCAD SHX Text
100
AutoCAD SHX Text
101
AutoCAD SHX Text
102
AutoCAD SHX Text
LEGEND GB = PAINTED GYPSUM BOARD (AS PER SPEC) VB = VINYL BASE COVE (AS PER SPEC)
AutoCAD SHX Text
NOTES: GENERAL CONTRACTOR IS RESPONSIBLE FOR THE SUPPLY AND INSTALL OF 1 CONTINUOUS " MDF SHELF FOR 34" MDF SHELF FOR EACH CLOSET COMPLETE WITH CONTINUOUS LEDGERS AND SUPPORT BRACKETS. HEIGHT OF SHELF NOT TO EXCEED 54"A.F.F. 1 CONTINUOUS CLOSET BAR FOR EACH CLOSET IN THE SCOPE OF WORK SHALL BE MOUNTED NO HIGHER THAN 3'-11" SEE DWG A-5 FOR REQUIREMENTS. ALL CLOSET SPACES SHALL BE FINISHED SAME AS ROOM
AutoCAD SHX Text
WD = WOOD BASE (CLEAR PINE) VS= VINYL SHEET (AS PER SPEC) P = PAINT (AS PER SPEC)
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
36 " 80" 1 "34"
AutoCAD SHX Text
RH
AutoCAD SHX Text
RH
AutoCAD SHX Text
D1
AutoCAD SHX Text
D2
AutoCAD SHX Text
Hardware
AutoCAD SHX Text
H1, H3,
AutoCAD SHX Text
H4, H8, H9
AutoCAD SHX Text
DOOR TYPE: (OR APPROVED EQUALS) D1 - SUITE ENTRY DOOR, FIRE RATED TO MATCH OTHER EXISTING SUITE ENTRY DOORS D2 -SOLID CORE, MASONITE, MOLDED PANEL, 'SAFE 'N SOUND', 2 PANEL SMOOTH, 1 3/8” THICK, 80” HIGH THICK, 80” HIGH HIGH D3 -HOLLOW CORE, MASONITE, MOULDED PANEL, 2 PANEL SMOOTH, 1 3/8” THICK, 80” HIGH THICK, 80” HIGH HIGH LOCKSETS: (OR APPROVED EQUALS) L1 - SCHLAGE, SATURN SERIES LEVER, GRADE 2, KEYED CORE, SATIN CHROME FINISH (626) L2 - SCHLAGE, ELAN SERIES, GRADE 2, DUMMY SET, SATIN CHROME FINISH (626) SCHLAGE, ELAN SERIES, GRADE 2, DUMMY SET, SATIN CHROME FINISH (626) L3 - SCHLAGE SINGLE CYLINDER DEADBOLT, COMMERCIAL, SATIN CHROME HARDWARE: (OR APPROVED EQUALS) H1 - 3" FULL MORTISE BUTT HINGE, 3/4" SCREWS, 3 HINGES PER DOOR (ONWARD1820BCB OR 3" FULL MORTISE BUTT HINGE, 3/4" SCREWS, 3 HINGES PER DOOR (ONWARD1820BCB OR APPROVED EQUAL) H2 - HINGES: 3" FULL MORTISE BUTT HINGE, 3/4" SCREWS, 3 HINGES PER DOOR (ONWARD1820NBB HINGES: 3" FULL MORTISE BUTT HINGE, 3/4" SCREWS, 3 HINGES PER DOOR (ONWARD1820NBB 3" FULL MORTISE BUTT HINGE, 3/4" SCREWS, 3 HINGES PER DOOR (ONWARD1820NBB OR APPROVED EQUAL) LOCKSETS: WEISER "TOLUCA", SATIN NICKEL FINISH (OR APPROVED EQUAL). PRIVACY SET H3 - RIGID DOOR STOP, RICHELIEU, #2163SCV, SATIN CHROME RIGID DOOR STOP, RICHELIEU, #2163SCV, SATIN CHROME H4 - HINGE PIN DOOR STOP, RICHELIEU, #2215BCR, BRUSHED CHROME HINGE PIN DOOR STOP, RICHELIEU, #2215BCR, BRUSHED CHROME H5 - ADJUSTABLE BALL CATCH, RICHELIEU, #5037BCV, BRUSHED CHROME ADJUSTABLE BALL CATCH, RICHELIEU, #5037BCV, BRUSHED CHROME H6 - POCKET DOOR FRAME SYSTEM, RICHELIEU #149150BC1, C/W POCKET DOOR STOP #1476XIP POCKET DOOR FRAME SYSTEM, RICHELIEU #149150BC1, C/W POCKET DOOR STOP #1476XIP POCKET DOOR STOP #1476XIP H7 - DOOR HANDLES, ASSA ABLOY ROCKWOOD RM 3010 NEOMATRIX 12" DOOR HANDLES, ASSA ABLOY ROCKWOOD RM 3010 NEOMATRIX 12" H8 - FROST KING E/O 2"X36" SILVER REINFORCED RUBBER DOOR SWEEPFROST KING E/O 2"X36" SILVER REINFORCED RUBBER DOOR SWEEP
AutoCAD SHX Text
H6, H7
AutoCAD SHX Text
L1, L3
AutoCAD SHX Text
Lockset
AutoCAD SHX Text
POCKET DOOR
AutoCAD SHX Text
Comments
AutoCAD SHX Text
REQUIRES 36" CLEAR OPENING
AutoCAD SHX Text
DOOR TYPE D3
AutoCAD SHX Text
DOOR TYPE D2
AutoCAD SHX Text
DOOR TYPE D1
AutoCAD SHX Text
36" 80" 1 34"
AutoCAD SHX Text
LHR
AutoCAD SHX Text
D3
AutoCAD SHX Text
H1,
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
MATCH OTHER SUITE ENTRY DOORS
AutoCAD SHX Text
RE-USE EXISTING DEAD BOLT,
AutoCAD SHX Text
WALL PARTITION SCHEDULE
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
WALL ASSEMBLIES
AutoCAD SHX Text
TYPICAL PARTITION WALL: 1/2" GYPSUM BOARD 2 x 4 WOOD STUDS @16"o/c 1/2" GYPSUM BOARD
AutoCAD SHX Text
W1
AutoCAD SHX Text
W2
AutoCAD SHX Text
*****ALL BATHROOM WALL FINISHES SHALL INCLUDE " PLYWOOD ON ALL WALL SURFACES EXCEPT FOR THE 34" PLYWOOD ON ALL WALL SURFACES EXCEPT FOR THE WALL SURFACE BEHIND THE WATER CLOSET, NO " PLYWOOD ON SURFACE BEHIND WATER CLOSET ***** 34" PLYWOOD ON SURFACE BEHIND WATER CLOSET *****
AutoCAD SHX Text
SUITE SEPARATION WALL: ( BATHROOM/ADJACENT UNIT/COORIDOOR) 1/2" PROROC MOISTURE RESISTANT GYPSUM BOARD (BATHROOM SIDE) 34" PLYWOOD EXISTING WALL SURFACE
AutoCAD SHX Text
EXISTING INTERIOR WALL
AutoCAD SHX Text
TYPICAL BATHROOM WALL (WOOD): 1/2" PROROC MOISTURE RESISTANT GYPSUM BOARD (BATHROOM SIDE) 34" PLYWOOD 2"X2" WOOD BLOCKING FASTENED TO WALL FRAMING 2"x6" WOOD STUDS @16"o/c 1/2" GYPSUM BOARD
AutoCAD SHX Text
W3
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
EAST
AutoCAD SHX Text
WALLS
AutoCAD SHX Text
WEST
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
BASE BOARD
AutoCAD SHX Text
LIVING RM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
ACCESSIBLE UNIT
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
GB
AutoCAD SHX Text
WB
AutoCAD SHX Text
1
AutoCAD SHX Text
CEILING HEIGHT
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
8'-0"
AutoCAD SHX Text
8'-0"
AutoCAD SHX Text
8'-0"
AutoCAD SHX Text
8'-0"
AutoCAD SHX Text
P
AutoCAD SHX Text
VB
AutoCAD SHX Text
VB
AutoCAD SHX Text
--
AutoCAD SHX Text
--
AutoCAD SHX Text
ALL NEW TRIM AND BASEBOARDS TO MATCH EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
VS
AutoCAD SHX Text
EXISTING/VS
AutoCAD SHX Text
WB
AutoCAD SHX Text
FINISH SCHEDULE
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
--
AutoCAD SHX Text
*****ALL NEW DOORS SHALL BE INSTALLED USING A PRESSED STEEL FRAME PAINTED TO MATCH WALL *****
Page 37: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

DATE:

CHECKED BY:

SHEET NUMBER:

DRAWN BY:

PROJECT NO:

SCALE

PR

OJE

CT

NOVA SCOTIAProperty & Facilities

PF-2019-170D

JAN/29/2020

TK

HNS STAFF

PR

OJE

CT

SIR JOHN THOMPSON

7001 LEPERT ST. UNIT 305 VISITABILITY CONVERSION

HALIFAX, N.S

E-1

AS NOTED1 OF 1

ELECTRICAL PLAN

1/4"=1'-0"

EXISTING/DEMO FLOOR PLAN

1 1/4"=1'-0"

PROPOSED FLOOR PLAN

2

Tender No. 19-167 Unit Renovation #4 Page 35 of 62

AutoCAD SHX Text
LIVING ROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BATH
AutoCAD SHX Text
S
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
GFI
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
IT
AutoCAD SHX Text
S
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
}
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
E-R
AutoCAD SHX Text
SEE NOTE 1
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
LIVING ROOM
AutoCAD SHX Text
BEDROOM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BATH
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
IT
AutoCAD SHX Text
RL
AutoCAD SHX Text
RL
AutoCAD SHX Text
RM
AutoCAD SHX Text
RL
AutoCAD SHX Text
RM
AutoCAD SHX Text
RL
AutoCAD SHX Text
RL
AutoCAD SHX Text
RL
AutoCAD SHX Text
RL
AutoCAD SHX Text
RL
AutoCAD SHX Text
}
AutoCAD SHX Text
RL
AutoCAD SHX Text
R
AutoCAD SHX Text
RL
AutoCAD SHX Text
LEGEND: EXISTING, 120/240V, ELECTRICAL PANEL EXISTING, 15A, 120V, ELECTRICAL RECEPTACLES C/W WALL PLATE EXISTING, 15A, 120V, SINGLE / DOUBLE / MULTI GANG TOGGLE SWITCH C/W WALL PLATE EXISTING, 15A, 120V, RAZOR OUTLET. NEW, 15A, 120V, GFI TYPE, DUPLEX, ELECTRICAL RECEPTACLE C/W WALL PLATE. MTD@ 6" ABOVE SINK EXISTING, CEILING / WALL-MOUNT, LIGHT FIXTURE EXISTING, TELEPHONE OUTLET C/W WALL PLATE EXISTING, INTERCOM SYSTEM. EXISTING ELECTRICAL EQUIPMENT / DEVICE SHALL REMAIN. EXISTING ELECTRICAL EQUIPMENT / DEVICE TO BE REMOVED C/W WIRING. EXISTING ELECTRICAL EQUIPMENT / DEVICE TO BE RELOCATED C/W WIRING & INTERCONNECTIONS. SEE 2/E-1. EXISTING ELECTRICAL EQUIPMENT WHICH REMAINS. EXTEND POWER AND/OR COMMUNICATIONS WIRING & RELEVANT INTERCONNECTIONS TO EXISTING CONTROLS AS PER CONSTRUCTION NOTES. RE-LOCATED EXISTING ELECTRICAL EQUIPMENT / DEVICE. EXTEND POWER & COMMUNICATIONS WIRING & RELEVANT INTERCONNECTIONS TO EXISTING CONTROLS OR CONTROLLED EQUIPMENT.
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
DEMOLITION NOTES: 1. TERMINATE & REMOVE ALL ELECTRICAL EQUIPMENT / DEVICES IN THE RENOVATION AREA C/W TERMINATE & REMOVE ALL ELECTRICAL EQUIPMENT / DEVICES IN THE RENOVATION AREA C/W WIRING TO THE NEAREST JUNCTION BOX. 2. TERMINATE & REMOVE ALL COMMUNICATIONS OUTLETS IN THE RENOVATION AREA C/W WIRING TO TERMINATE & REMOVE ALL COMMUNICATIONS OUTLETS IN THE RENOVATION AREA C/W WIRING TO THE NEAREST JUNCTION BOX. 3. ANY ELECTRICAL OR COMMUNICATIONS EQUIPMENT / DEVICES IN NEED OF TEMPORARY ANY ELECTRICAL OR COMMUNICATIONS EQUIPMENT / DEVICES IN NEED OF TEMPORARY RE-LOCATION DURING THE COURSE OF RENOVATION SHALL BE RE-INSTALLED C/W WIRING IN THE SAME PLACE OR AS APPROVED BY THE PROJECT MANAGER.
AutoCAD SHX Text
E-RL
AutoCAD SHX Text
CONSTRUCTION NOTES: 1. CONNECT THE LIGHT FIXTURE(S) TO THE EXISTING LIGHT SWITCH CONTROLLING OTHER LIGHT CONNECT THE LIGHT FIXTURE(S) TO THE EXISTING LIGHT SWITCH CONTROLLING OTHER LIGHT FIXTURE(S) IN THE BATHROOM. 2. ALL NEW / EXISTING (RE-LOCATED) ELECTRICAL DEVICES SHALL BE POWERED FROM THE NEAREST ALL NEW / EXISTING (RE-LOCATED) ELECTRICAL DEVICES SHALL BE POWERED FROM THE NEAREST EXISTING BRANCH CIRCUITS FEEDINGS ITEMS SIMILAR IN NATURE, IN COMPLIANCE WITH THE MOST RECENT VERSION OF ALL APPLICABLE CODES AND AHJ REGULATIONS. 3. SUPPLY & INSTALL NEW BRANCH CIRCUIT(S), WHERE REQUIRED TO FEED NEW/EXISTING (RE-LOCATED) SUPPLY & INSTALL NEW BRANCH CIRCUIT(S), WHERE REQUIRED TO FEED NEW/EXISTING (RE-LOCATED) DEVICES C/W SIZED CIRCUIT BREAKER(S) AND WIRING TO THE EXISTING ELECTRICAL PANEL. 4. ALL NEW/EXISTING (RE-LOCATED) ELECTRICAL DEVICES SUCH AS SWITCHES, THERMOSTATS, ALL NEW/EXISTING (RE-LOCATED) ELECTRICAL DEVICES SUCH AS SWITCHES, THERMOSTATS, CONTROLLERS, INTERCOM, ETC. WHICH ARE PART OF THIS RENOVATION SHALL BE MOUNTED AT 44" A.F.F., UNLESS NOTED OTHERWISE. ELECTRICAL RECEPTACLES AND COMM. OUTLETS SHALL BE MTD@ 18" A.F.F., UNLESS NOTED OTHERWISE
AutoCAD SHX Text
IT
AutoCAD SHX Text
GFI
AutoCAD SHX Text
R
AutoCAD SHX Text
RM
AutoCAD SHX Text
RL
AutoCAD SHX Text
E-R
Page 38: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Electrical Specifications: PF-2019-170D Sir John Thompson Visitable Unit

Conversion

Part – 1 GENERAL:

1.1. Reference Standards:

1. All work shall be conducted in compliance with the most recent versions of all applicable

codes and standards at the time of tender closing, but not limited to the following:

1. National Building Code of Canada (NBC);

2. Nova Scotia Building Code (NSBC);

3. Canadian Electrical Code (CEC);

4. National Fire Code of Canada (NFC);

5. All applicable bulletins from the Nova Scotia Chief Electrical Inspector, Fire

Marshal’s Office, and Nova Scotia Department of Labour and Advanced Education;

6. All applicable bulletins from Nova Scotia Power Inc.;

7. All applicable standards from Underwriters Laboratories of Canada (ULC);

8. All applicable standards from Canadian Standards Association (CSA);

1.2. Scope of Work:

1. The specifications complement the drawings in describing the supply, installation, and

modification of the electrical system(s). These systems shall include, but not be limited

to the following:

1. 120V lighting system and controls;

2. 120/240V, 1- ø power systems wiring and devices;

3. Communications (Voice/Data/Cable) wiring and devices;

2. The Contractor shall provide all labour, materials, equipment, hardware, tools,

instruments, and consumables as required to deliver a complete, functional, and safe

electrical installation c/w required testing, verification, commissioning, and placing into

service of all electrical equipment and systems including the electrical portions of

systems provided by others;

3. The Contractor shall size (where not provided), supply, and install all materials including

conductors, conduits, junction boxes, electrical boxes, supports, etc. required for all

installed systems/equipment to provide complete, functional, and safe electrical

installation in compliance with all applicable codes, standards, Authority Having

Jurisdiction (AHJ) regulations, and manufacturer’s instructions;

1.3. Definitions:

1. The Project Manager shall be a person designated to represent the Housing Authority

(HA) in all matters dealing with this contract;

2. The Contractor shall be the person / company approved by the HA to render services

under this Contract;

Tender No. 19-167 Unit Renovation #4 Page 36 of 62

Page 39: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

1.4. Contract Materials:

1. All contract materials, equipment, consumables, etc. (unless specified otherwise), shall

be new, best quality, CSA/ULC certified or AHJ approved for intended application, and

supplied via authorized distributors;

1.5. Contract Drawings:

1. No omissions in the drawings and/or specifications are intended and the Contractor shall

give due consideration to this matter. Any work or material referred to in the drawings

and not in the specifications, or vice-versa, shall be provided and installed as though fully

covered in both;

2. Any error or omission shall be referred to the Project Manager whose decision shall be

final;

3. Building dimensions shall not be scaled from the Electrical drawings, but shall be

obtained from Architectural and/or on-site measurements;

1.6. Site Conditions:

1. Prior to submitting the bid, the Contractor shall visit the site and familiarize

himself/herself with all matters which may effect the work. No consideration shall be

given to items arising from the Contractor’s failure to do so;

1.7. Quality Control:

1. For the purpose of uniformity similar materials shall be of one (1) manufacturer (where

feasible);

1.8. Other Trades:

1. The Contractor shall co-operate and investigate with other trades to make maximum use

of the spaces;

2. The Contractor shall co-operate with other Contractors on the site and carry out their

work in a manner, as not to obstruct or hold-up the work of other trades;

1.9. General Requirements:

1. Whenever it is proposed to make a change or changes in the design or type of equipment

called for in the specifications, the Contractor shall estimate the cost (material + labour)

and submit detailed itemized estimate of the costs (material + labour), entering into the

change or substitution, at no cost to the HA. Work shall be conducted only upon approval

from the Project Manager;

2. All power and/or system shutdown shall be coordinated with the Project Manager;

3. The Contractor shall identify and re-use existing spare equipment/material (where

feasible), only if deemed safe for operation and without deficiencies, by the Contractor.

The Contractor shall provide min. one (1) year labour and material warranty for all re-

used material;

Tender No. 19-167 Unit Renovation #4 Page 37 of 62

Page 40: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

4. It shall be the responsibility of the Contractor to contact the Project Manager for

inspections during construction such as above ceiling inspections prior to installation of

ceiling tile or drywall, inspection of devices installed on the walls prior to drywall

construction, etc.;

5. Maintain circuit continuity to existing equipment where disrupted/relocated by

renovation. Re-locate existing electrical equipment (where required) to suit new

construction, upon approval from the Project Manager;

6. At the completion of the project, the Contractor shall test and operate all equipment

installed (new and existing) in the project to ensure it operates as expected and correct

all deficiencies (as required) at that time. Provide written report for the Project Manager

to review at this time;

7. Devices mounted on exterior walls shall be installed in a manner to maintain the integrity

of existing/new vapor barrier;

8. The Contractor shall:

1. Verify the content of the Scope of Work and specifications herein, prior to submitting

the bid. The Contractor shall report any errors or omissions to the Project Manager

prior to submitting the bid;

2. Confirm all existing site conditions, systems, equipment prior, scope of work, and

specifications, prior to submitting the bid;

3. Be notified of any omissions/deficiencies in work, non-conformance issues of work

according to Scope of Work, and non-approval of work by the Project Manager, upon

review of all submittals;

4. Provide for all labour, transportation, materials, tools, and equipment required to

render services stated in the Contract;

5. Bear all losses resulting to him or the HA on account of the amount or character of

work, or because of the nature of the area in or on which the work being done is

different from what was estimated/expected by the Contractor, or account of weather,

elements or other causes;

6. Submit to the Project Manager upon request, a roster of employees (including copies

of documents confirming their qualifications) engaged in providing service(s) under

this Contract. Other person(s) shall be permitted to perform service(s) only with the

written approval of the Project Manager;

7. Ensure that its personnel(s) during the course of the Contract term are expected to

conduct themselves in a polite and professional manner at all times. Discussions with

residents (where applicable) regarding the work shall be limited to only aspects of

the work that bears directly on the residents;

8. Conduct all project work by certified and registered journeypersons with the Nova

Scotia Department of Labour and Advanced Education. If a work specialty being an

unregulated trade is required, then person(s) conducting such work shall have a

minimum of five (5) years’ experience in that specialty with suitable references. If

helpers are required and of whom do not have the specialty’s required experience or

trade certification then written approval shall be obtained from the Project Manager.

Helpers shall be registered apprentices for that trade, if so regulated. Apprentices and

Tender No. 19-167 Unit Renovation #4 Page 38 of 62

Page 41: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

helpers shall be supervised by journeypersons according to all applicable Provincial

Acts & Regulations, including the Provincial Labour Act;

9. Be responsible to ensure the workers conducting all work as part of the Contract are

safety certified with qualified, safety organization registered in Nova Scotia;

10. Seek written approval from the Project Manager, prior to commencing any work that

requires running through the structural members of the building;

11. Inquire with the Project Manger about presence of asbestos, if any in the work area(s)

prior to commencing any work in the Contract term. The Contractor shall be

responsible for notifying their employees and sub-contractors of the presence of

asbestos, if found in the work area(s). The Contractor shall not disturb known or

assumed asbestos containing materials. If the Contractor suspects presence of

asbestos containing material in the building that has not been identified, the

Contractor shall stop all work and notify the issue to the Project Manager

immediately and shall not commence work prior to seeking approval from the Project

Manager. If the Contractor disturbs asbestos containing material identified in the

work area(s), then they shall be responsible for the cost of the clean-up and de-

contamination and shall bear all other induced costs;

1.10. Qualification/References:

1. All work shall be conducted by qualified trade personnel (construction electrician,

communications technician, etc.) registered with the Nova Scotia Department of Labour

and Advanced Education, with Journeyperson certification and with minimum three (3)

years of experience;

2. The Contractor shall provide supervision and sufficiently qualified foreman to ensure

that the work proceeds in a proper and efficient manner;

3. The Contractor and all pertinent sub-trades shall maintain all required qualifications and

certifications to conduct all work stated in the Contract, for the entire duration of the

Contract term;

4. The Contractor shall provide at least three (3) references of projects completed within

the last five (5) years of similar size and complexity c/w location, contact names, contact

details, telephone numbers, etc.;

1.11. Permits and Fees:

1. The Contractor shall obtain all required permits and inspections in compliance with all

applicable codes, standards, and AHJ regulations;

2. Submit to the Nova Scotia Power, Electrical Inspection Department and Supply

Authority, all drawings and specifications required for examination and approval, prior

to commencement of work;

3. The Contractor shall obtain all required certificates of such permits/inspections and shall

pay all charges in connecter therewith;

4. The final certificate of inspection shall be obtained before final payment for work shall

be considered due;

5. Notify the Project Manager of changes required by the AHJ, prior to implementing them;

Tender No. 19-167 Unit Renovation #4 Page 39 of 62

Page 42: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

1.12. Delivery, Storage, Handling, Disposal, and Cleaning:

1. The Contractor shall:

1. Deliver materials in the manufacturer’s original, unopened, undamaged, containers

with identification labels intact;

2. Comply with the manufacturer’s ordering instructions and lead-time requirements to

avoid delays;

3. Coordinate with the Project Manager to find a suitable storage space prior to delivery

of the system equipment to site;

4. Store and handle materials in compliance to the manufacturer’s recommendations to

ensure that their performance requirements are not affected by abrasions, dust,

humidity, or extreme temperatures;

5. Be responsible for loss of materials through theft, breakage, or damage prior to

acceptance of work by the Project Manager;

6. Properly dispose of materials generated out of all work performed within this contract

in compliance with Municipal, Provincial, and Federal regulations;

7. Remove all debris and leave the site neat and tidy, upon completion of work;

1.13. Identification:

1. New typewritten directory shall be provided on the inside of the existing electrical

panel(s), showing the location and loads connected to the branch circuit(s). Existing

panel directories shall be kept on-site for reference;

2. Communications wiring shall be labelled at termination ends at the unit communications

panel as well as the outlet, identifying the area served. Wiring from the unit

communications panel to the main communications panel shall be labelled to identify the

apartment unit. Use best industry standards for labeling;

3. All new electrical equipment such as switchboards, panels, disconnect switches,

transformers, control panels, etc. shall be provided with “lamicoid” nameplates;

4. Lamicoid nameplates shall be 1/8” thick plastic engraving sheet with black letters on

white face for all electrical systems except fire alarm and receptacles fed from generator

circuits which shall have white letters on red face;

5. All junction and/or pull boxes and their respective cover plates shall be colour coded as

per the following:

1. 51 to 240v – Yellow

2. Telephone – Black

3. Ground or bond – Green

4. Data – Blue/White

6. Branch circuit wiring shall be identified by circuit number at both ends at all panel

boards, pull and junction boxes, outlet and equipment connections, and all wiring

devices. Labels shall be Panduit PLD-1 or PDL-2 as required. Labels shall be installed

in such a manner as to present area with information in “flagged” position;

Tender No. 19-167 Unit Renovation #4 Page 40 of 62

Page 43: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

7. All electrical distribution equipment shall have ARC flash labels installed to meet AHJ

requirements;

8. Identify conduit at 50’ intervals or where they enter walls, ceiling, or floors;

1.14. Cutting and Patching:

1. Cutting and patching shall be performed by skilled trades’ personnel. Make every effort

to minimize cutting and patching;

2. Excavation and backfilling for electrical, controls, and communications cabling as well

as cutting and patching of all penetrations shall be the responsibility of the General

Contractor;

1.15. Fire Stopping:

1. Where conduits and/or cables pass through fire separations and sound rated separations

including floors, walls, membranes, etc., provide a metallic sleeve or core drill to 1”

radius larger than the conduit or cable. Construct a ceramic fiber insulation dam(s) as

required and fill the penetration with 3M “Putty 303” or 3M “Caulk CP25”. A minimum

of 2” of putty or caulk shall be required. Installation shall be in strict compliance with

manufacturer’s instructions and ULC requirements;

1.16. Submittals:

1. General:

1. All electronic submittals shall be in PDF format and of adequate clarity as deemed

by the Project Manager, else re-submission shall be required;

2. All submittals shall be reviewed and stamped by the Contractor to confirm the

accuracy of the information submitted;

3. Maintain project “As-Built” record drawings and accurately record significant

deviations from the Contract documents, caused by the site conditions or change in

the Contract. Mark changes on White prints in “Red”. At the completion of the

project and prior to final inspection, neatly transfer “As-Built” corrections and

notations to a clean set of drawings and submit to the engineer for review;

2. Shop Drawings:

1. The Contractor shall prepare shop drawings showing in detail the design and

construction of all equipment, panels, cabinets, lighting fixtures, wiring devices, etc.

One (1) hard copy and one (1) electronic copy in PDF format of such drawings shall

be submitted to the Project Manager for review and approval prior to ordering and

any execution of work;

2. All shop drawings, other than standard manufacturer’s datasheets, shall bear the

stamp of a Nova Scotia registered Professional Engineer, who shall be fully

responsible for the engineering content of such drawings;

3. Prior to submission, the Contractor shall carefully check all shop drawings to ensure

that they comply with the drawings and specifications in both intent and detail. No

Tender No. 19-167 Unit Renovation #4 Page 41 of 62

Page 44: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

consideration shall be given to shop drawings submitted without this approval and

review from the Contractor;

3. Closeout Submittals:

1. The Contractor shall provide one (1) original hard copy and one (1) electronic copy

in PDF format of the following document set which shall include but not be limited

to:

1. Utility interim/final electrical inspection report;

2. Operations & Maintenance manuals for all new equipment supplied & installed

within the Contract;

3. System testing, verification, and commissioning report(s) for all new equipment

supplied & installed within the Contract;

4. Written statement of warranty policy and warranty documents from the

manufacturer and the Contractor for all materials and labour provided within the

Contract;

5. “As-Built” drawings;

1.17. Warranty:

1. The Contractor shall:

1. Provide minimum one (1) year of written warranty (unless indicated otherwise) on

all equipment, materials, and labour provided under the Contract to maintain the

system in full operation, from the date of acceptance by the Project Manager;

2. Provide free of charge, product firmware, and software upgrades throughout the

warranty period for any product feature enhancements available to equipment

installed in the Contract;

3. Replace equipment or component found to be defective within the warranty period at

no cost to the HA, including equipment, material, and labour;

4. Ensure the warranty covers all system performance difficulties and adjustments

during the warranty period at no cost to the HA. Any service and correction work

shall continue by the Contractor as part of the warranty until the Project Manager is

satisfied that the system works as intended;

Part – 2 PRODUCTS:

2.1. General:

1. All material, equipment, devices, etc., provided and installed under this Contract, shall

be new, of best available quality, and listed by CSA/ULC and/or AHJ approved agency,

for its intended application;

2. All material, equipment, devices, software, hardware, etc. provided and installed under

this Contract, shall be non-proprietary type i.e. all items supplied and installed within

this Contract shall be serviceable by qualified third-party Contractors;

Tender No. 19-167 Unit Renovation #4 Page 42 of 62

Page 45: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

3. The Contractor may provide alternate product/material/equipment, only upon written

approval from the Project Manager;

2.2. Conduits:

1. Thin wall type “EMT” conduit shall conform to the most recent revision of CSA C22.2

No. 83, galvanized, sized as per CEC requirements;

2. Flexible galvanized steel liquid tight conduit shall conform to the most recent revision of

CSA C22.2 No. 56, sized as per CEC requirements;

3. All spare conduit runs shall contain a propylene pull cord to accommodate future

installations;

4. Surface mount conduit systems shall be provided for surface mount device boxes;

2.3. Wire and Cables:

1. All wires and cables shall be in compliance with the most recent CSA, Electrical and

Electronic Manufacturers of Canada (EEMAC), the Insulated Power Cable Engineers

Association (IPCEA), and the American Society of Testing Materials (ASTM) standards;

2. Wring on circuits exceeding 50V to ground shall be soft drawn stranded copper of 98%

conductivity (rated at 600V) and of full size and AWG gauge. Insulation shall be cross-

linked Polyethylene RW90 rated 600V. Minimum wire size for lights and power systems

shall be No. 12 AWG, unless specified / required otherwise. Wiring shall be colour coded

as follows:

1. Phase A – Red

2. Phase B – Black

3. Phase C – Blue

4. Neutral – White

5. Ground – Green

3. AC90 cables shall be soft drawn solid copper of 98% conductivity and of full size and

AWG gauge. Outer armor shall be of interlocking aluminum. Colour coding shall be as

follows:

1. Phase conductors – Black or Red

2. Neutral conductors – White

3. Ground conductors – Bare

4. Current carrying neutral conductors for all systems rated 600V or less, shall have RW90

– XLPE type insulation rated accordingly;

5. NMD cables shall not be permitted for installation for this project;

2.4. Outlet boxes, conduit boxes, and fittings:

1. Outlet boxes for use in dry concealed construction shall be one piece, galvanized, pressed

steel, where wire fill dictates larger boxes for outlets use suitably sized square boxes with

raised “tile ring” style extension;

2. Provide blank cover plates for boxes without wiring devices;

Tender No. 19-167 Unit Renovation #4 Page 43 of 62

Page 46: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

3. Provide combination boxes with barriers where outlets for more than one (1) system are

grouped;

2.5. Wiring devices:

1. Switches:

1. Line voltage switches shall be:

1. Commercial Grade;

2. Toggle type;

3. Flush mounted (where possible);

4. AC rated;

5. Switch handles shall be white c/w compatible cover/wall plates;

6. Acceptable manufacturers: Leviton, Lutron, Hubbell, or Approved Equal;

2. Standard duplex receptacles shall be:

1. Ratings and configurations (5-15R/5-20R) as noted on the drawing;

2. AC rated;

3. Specification grade;

4. Tamper Resistant;

5. U-ground;

6. Parallel slots with double wiping contacts;

7. Back and side wire terminals c/w ground terminal;

8. Break-off features for split wiring;

9. Compatible for back wiring of #10 AWG conductors;

10. One piece body;

11. Shall be standard or GFCI / AFCI type in compliance with the most recent version of

CEC and AHJ regulations;

12. Provided with compatible wall/cover plates;

13. Acceptable manufacturers: Hubbell, Leviton, Lutron, or Approved Equal;

3. Cover/Wall Plates:

1. Indoor:

1. Type 302 stainless steel for surface/flush mounted devices in

mechanical/electrical/communications room and relevant corridor(s);

2. Plastic/Nylon wall plates for surface/flush mounted devices in all other areas;

3. Single and multi-gang plates to match devices and boxes;

4. Acceptable manufacturers: Leviton, Hubbell, or Approved Equal;

2. Outdoor:

1. Black PVC weatherproof for surface/flush mounted devices, designed for outdoor

use c/w gasket and weatherproof, extra-duty marked/rated, receptacle covers;

2. Acceptable manufacturers: Leviton, Hubbell, or Approved Equal;

Tender No. 19-167 Unit Renovation #4 Page 44 of 62

Page 47: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

4. Equipment from the same manufacturer shall be used for the entire Project.

2.6. Wire and box connectors (0-1000V):

1. Use spring type pressure wire connectors for all branch circuit wiring sized #10 AWG

and smaller. Current carrying parts shall be copper or copper alloy c/w an appropriately

sized insulating cap. Cap shall completely fit or cover all enclosed conductors as

required;

2. Joints for all other wiring shall be made using T&B colour keyed compression type

connectors, 54000 series, and TBM series compression tools. Approved manufacturers

are Hubbell, Pass & Seymour, and Leviton;

2.7. Circuit Breakers:

1. Circuit breakers shall:

1. Be bolt-on/snap-on type, as compatible with the existing electrical panel(s);

2. Multi-pole breakers shall have single handle. Tie-bars shall not be permitted;

3. Quick Make-Quick Break type for manual and automatic operation. They shall be

suitable for inverse-time thermal and instantaneous magnetic operation;

4. Have de-ionizing arc chambers;

5. Be trip-free of operating handles on overloads with a definite indication when

tripping has taken place;

6. Have interrupting ratings in compliance with the most recent version of applicable

CSA and EMMAC standards;

2. Mini-type circuit breakers shall not be acceptable;

3. Shall be GFCI / AFCI or combination type as required for compliance with the most

recent version of the CEC and AHJ regulations;

4. Approved Manufacturers: Same as the existing electrical panel(s);

2.8. Panelboards:

1. Re-use existing;

2.9. Supporting devices:

1. Supporting of electrical systems raceway shall be independent of any non-electrical

support systems;

2. Supply all required inserts, rods, channels, brackets, etc., to form a support system

capable of carrying at least twice the weight of equipment or material supported;

3. In concrete, use cast-in threaded inserts wherever possible. Should additional inserts be

required, use a “red-head” type insert capable of carrying at least 500lbs.;

4. All hanger rods shall be 3/8” diameter standard mild steel, cut to required lengths and

threaded;

5. Supports for all conduit work shall be one-hole steel pipe straps; uni-strut or equal, with

necessary fittings; caddy clips or equal, approved for their intended application;

Tender No. 19-167 Unit Renovation #4 Page 45 of 62

Page 48: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

6. Fastening devices for cabinets, boxes, supports, etc. shall be nut and bolt;

7. Fastening devices for outlet boxes shall be nut and bolt, ram-set, expansion shields,

wedge anchors, or caddy clips. Size and number shall suit the application;

2.10. Lighting:

1. All light fixtures shall be compatible to respective ceiling and wall type(s). Required

manufacturer approved fittings and/or mounting accessories shall be provided;

2. Colour Temperature of all lamps used in the project shall suit application and be

compatible with other existing and/or new light fixtures in the area within line-of-sight,

where not specified;

3. On completion of the project, provide at least 10% spare lamps for each type of fixture

installed in the project;

Part – 3 EXECUTION:

3.1. General:

1. All equipment, products, devices, materials, etc., installed in the project shall be in

compliance with the most recent version of applicable codes, standards, AHJ regulations,

and manufacturer’s instructions;

3.2. Conduits:

1. Thin wall type “EMT” shall be used for all branch circuit wiring and all systems where

exposed;

2. All concealed and exposed conduits shall be kept parallel to building lines;

3. Flexible conduit, not smaller than 3/8” I.D. or flexible armoured cable with separate

ground conductor c/w insulating anti-shorts shall be used between lighting fixtures and

their respective junction boxes, and where “EMT” conduit cannot be used, such as in

cabinet work;

4. Liquid tight flexible conduit, not smaller than 3/8” I.D. shall be used for connections to

all vibrating equipment and/or mechanical equipment;

5. Conduits shall not be run directly between outlets on opposite sides of a common

partition, to prevent sound transmission;

6. Set screw steel connectors c/w insulated throats shall be utilized;

7. Provide appropriate fittings, couplings, bushings, connectors, accessories, and supports

for each conduit system as required to provide a complete installation;

8. Install cabling and conduits so as to conserve headroom and not interfere with work of

other trades;

9. Where practicable all installation shall be concealed;

10. Use steel fittings and couplings on EMT. Die cast fittings shall not be permitted;

11. Install bonding conductor in compliance with the most recent version of CEC, in all

conduit systems;

12. Use EMT for all wiring including telecommunications and low voltage, unless specified

otherwise;

Tender No. 19-167 Unit Renovation #4 Page 46 of 62

Page 49: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

13. Use rain tight connectors and couplings on all vertical runs of exposed conduit runs

terminating into the top of electrical equipment with drip shields and hoods to safeguard

against possible infiltration of water into the electrical equipment;

14. EMT shall be used for all panel feeds in the electrical room;

15. Where raceway is exposed to the exterior, it shall be PVC with expansion joints as

required;

16. Do not locate conduits less than 3” parallel to steam or hot water lines with minimum of

1” at crossovers;

3.3. Wire and Cables:

1. All circuits shall be run to ensure that the voltage drop in no case exceeds 3% of the line

voltage;

2. Where pulling wires in conduit, use of a manufacturer approved lubricant shall only be

permitted;

3. Tye-wrapping of the neutral conductor with its respective phase conductors shall be made

at the closest point of entry “within” all panel boards, pull boxes, junction boxes, outlet

boxes, etc.;

4. All Teck cables shall be terminated with proper teck connectors;

5. All types of “armoured” cables shall be installed concealed, parallel, and perpendicular

to building lines and shall be adequately secured to the building structure at not less than

60” intervals or as per CEC (whichever more stringent), in such manner as to ensure they

are protected from potential mechanical damage. Install independent supports for cabling

in ceiling spaces, and do not use that of other trades. Do not secure cables to mechanical

systems piping, ducts, or suspended ceiling support wires. The laying of “un-supported”

cables directly atop the ceiling grid system is strictly prohibited;

6. Bonding and grounding conductors shall always be copper;

7. Aluminum Conductor Material (ACM) wiring shall not be used in any part of the

building’s distribution system downstream from the main incoming circuit breaker;

8. AC90 cable may be used for all branch circuit wiring where concealed in dry construction

in ceilings and wall runs parallel to building lines and secured in compliance with the

CEC;

9. Test all wiring, included in the contract, to ensure there are no shorts or grounded

conductors;

10. Provide separate neutrals for all circuits feeding receptacles adjacent to voice/data

outlets;

3.4. Outlet boxes, conduit boxes, and fittings:

1. When installing flush boxes in metal drywall partitions, where grouping of multiple

device boxes is required, support the box between the studs with a box mounting bracket.

Caddy RBS series box mounting brackets or Caddy SGB series box brackets or equal

shall be approved for this application. Where a single flush box is installed, this box may

be supported by the wall stud without any additional support required.

Tender No. 19-167 Unit Renovation #4 Page 47 of 62

Page 50: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

2. Wiring installed on any exposed type surfaces shall always be completely installed in

raceways as per following guidelines:

1. Use EMT conduit in unfinished areas

2. Use aesthetic type surface raceway in finished areas where it is impossible to conceal

conduits.

3. Ceiling mounted conduit/raceway shall be secured directly to overhead structure

and/or related structural steel as high as possible in the ceiling space, and as close as

practicable to the underside of the deck.

4. Wall mounted conduit/raceway shall be secured directly to, or directly on, exposed

walls.

5. AC90 and/or other types of systems pliable cables shall not be installed on exposed

walls and/or ceilings without conduit/raceway. This applies to all systems, including

controls wiring.

3. At each receptacle, provide and install a standard pressed steel outlet box unless

specifically noted otherwise. Boxes shall not be mounted back to back, but separated by

a minimum of 12”, to prevent noise transmission;

4. In centering outlets, the Contractor is cautioned to allow for radiation, pipes, ducts, etc.,

and for variation in arrangement and thickness of finishes, etc.;

5. Cast type “FS” or “FD” boxes shall be utilized for all surface wiring of devices installed

lower than 8” A.F.F. (regardless of system type involved) c/w matching steel type “FS”

metal device plates unless specifically indicated otherwise. Cover plates shall be

specifically made for FS & FD boxes and shall utilize four (4) point fastening;

6. Flush installed 4” square, or 4-11/16” square box being used as a junction or pull box

that requires a blank metal cover plate shall have an appropriately sized, square welded

one or two gang “tile ring” installed on the same. This permits the use of standard, one

or two gang (blank) metal finish cover plate to be used instead of custom made oversized

cover plate;

7. Condulet fittings (LB, LL, LR) and their respective covers/plates shall be painted (colour

coded) and where concealed, have their locations identified with appropriate colour

coded self adhering discs applied directly to T-bar splines and/or access opening frames

in same manner as required for identifying concealed junction and/or pull boxes;

8. The use of either, corner pulling “ells” or corner pulling “elbows” in lieu of acceptable

“condulet” fittings shall be strictly prohibited;

9. Gang boxes where wiring devices are grouped;

10. Support boxes independently of connecting conduits;

11. All outlet boxes mounted on the exterior walls shall have vapor seals installed around

them and sealed to the box to provide a continuous vapor barrier;

3.5. Wiring devices:

1. Switches:

Tender No. 19-167 Unit Renovation #4 Page 48 of 62

Page 51: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

1. All switches and their wall/cover plates shall be installed plumb, with switch handle

in the “UP” position, when the switch is closed. Pig-tail branch circuit conductors

shall be used for connection to switches in multi-gang outlets;

2. Unless indicated otherwise, mounting height of all switches shall be 48” above the

finished floor;

3. All switches shall be of one (1) manufacturer, throughout the project;

4. Device “Leveller and Retainer” is an approved accessory for securing devices to flush

installed device boxes. This is practicable where an enlarged opening around a box

has been made, preventing device “ears” from coming into direct contact with finish

wall as is intended;

5. Single gang adjustable “Box Extension” is an approved accessory for extending

single gang box openings a minimum of 7/8”. Their use is acceptable in non-

combustible type walls where front edges of boxes have not been installed greater

than 1-1/8” or ¼” from finish wall surface. Refer to appropriate CEC rule;

6. Switches shall be ganged under single plate where feasible c/w line/low voltage

compartments;

2. Receptacles:

1. All receptacles and their wall plates shall be installed plumb with long axis in vertical

position, U-ground terminal on the top. Pigtail branch circuit conductors shall be

used for connection to receptacles in cases where more than one (1) phase conductor

or neutral conductor exist in the outlet box;

2. Unless otherwise indicated, mounting height of all receptacles shall be 18” A.F.F.;

3. All receptacles shall be of single manufacturer throughout the project;

4. Above each receptacle, mount an engraved lamicoid nameplate (Black letters on

white background) indicating the panel board and circuit number (e.g. A-1, 3).

Secure to wall with contact cement.

5. All vertically installed 125V, 15A, U-ground receptacles shall be installed with U-

ground connection oriented to the upper or top side;

6. All horizontally installed 125V, U-ground receptacles shall be installed with their

neutral termination bolts located on the tip side;

7. “Pig Tail” type leads shall be installed on conductors in all device or outlet boxes

where feeding through to other receptacles. “Daisy Chain” or looping through of

conductors from one device to another shall not be acceptable. Provide separate pig

tail conductor leads for final termination to each receptacle for phase, neutral, and

bond conductors;

8. All receptacles shall be polarity tested;

9. Receptacles requiring GFCI protection shall be fed from a GFCI circuit breaker or

other CEC approved method;

10. Flush-mount devices wherever possible. Surface mounted receptacles shall be

permitted only where indicated or on existing cast concrete walls. Surface devices

shall be installed in cast FS or FD boxes;

11. Do not use sectional boxes;

Tender No. 19-167 Unit Renovation #4 Page 49 of 62

Page 52: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

12. Make all connections including grounding and bonding;

13. Receptacles shall be ganged under single plate, where feasible c/w line/low voltage

compartments;

3.6. Wire and box connectors (0-1000V):

1. All connections shall be made electrically and mechanically secure;

3.7. Panelboards:

1. A typed directory under transparent cover shall be provided shall be provided on the

inside of each panel showing the location and load controlled to each circuit;

2. Wiring in the panelboards shall extend beyond the respective breakers, forming a 6” /

152mm loop before returning to connect the breaker terminals, so there will be flexibility

for reconnecting within the panel. Wiring shall be secured using best industry practice

means to present a neat workmanlike appearance;

3. Conduct Megger Test to check for short circuits;

4. Upon completion of the project, the Contractor shall measure total phase currents for all

the phases of applicable panel(s) under normal loads and rework circuiting to ensure a

balanced system. These measurements shall be completed with the panel under full-load

operation, including mechanical systems. ‘As-built’ record drawings shall reflect all

revisions made;

3.8. Supporting devices:

1. Secure all equipment such that no distortion or undue stress is caused in any components;

2. Supporting of electrical systems raceway shall be independent of any non-electrical

systems supports;

3. Support of any equipment shall not rely on the strength of plaster or plasterboard

construction;

4. Use of ty-wraps for supporting purposes is strictly prohibited;

3.9. Lighting:

1. All light fixtures shall be installed in compliance with manufacturer recommended

clearances, all applicable codes, standards, and AHJ regulations;

2. Install all light fixtures in such a manner that their attachment to the ceiling and wall,

shall be secure in all respects. Approved type of independent supports shall be provided

to avoid surface distortion due to weight of the fixtures (where required);

3. Fixtures shall not be hung directly from plasterboard ceilings/walls/floors, but shall

derive their support from channels mounted independently in the relevant space;

4. Any supporting angles, channels, etc., required to secure adequately and support the

fixtures shall be provided and installed by the Contractor;

5. Multiple light switches along the same wall space shall be installed in compatible gang-

box;

6. Successfully demonstrate lighting controls;

Tender No. 19-167 Unit Renovation #4 Page 50 of 62

Page 53: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

3.10. Grounding and Bonding:

1. All grounding and bonding requirements shall be in compliance with all applicable CEC

codes and AHJ regulations, whichever is more stringent;

2. All equipment and exposed non-current-carrying metal conduits and parts shall be

permanently and effectively grounded to meet all applicable requirements of the most

recent version of the CEC;

3. The feed bonding conductor shall be secured (wrapped around unbroken) to the

grounding screw of each outlet/box, before connecting to the other grounding conductors,

and/or providing a pig-tail lead for device terminations;

4. All ground wires shall be twisted together with a screw-on type wire connector, and then

placed in rear of outlet box in such a manner as to minimize obstructions;

5. All conduits for all electrical systems shall contain a minimum #12 AWG copper bond

wire. Bonding jumpers shall be permitted for conduit stubbed into a T-bar ceiling. All

metallic conduit stubs shall be bonded regardless of length;

3.11. Testing:

1. Insulate and conceal work only after testing and approval by AHJ or Project Manager.

Conduct tests in presence of AHJ or Project Manager or person authorized by Project

Manager. All test results shall be recorded on appropriate typewritten forms and be

signed and dated by person carrying out the test as well as the AHJ or Project Manager

or person authorized by the Project Manager;

2. Costs for re-testing, making good, replacing defective material or equipment, and

repairing joints using new material shall be borne by the Contractor;

3. Prior to tests, isolate all equipment or components that are not intended to be tested, nor

designed to withstand test pressures or test medium;

END OF SPECIFICATIONS

Tender No. 19-167 Unit Renovation #4 Page 51 of 62

Page 54: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

MRHA Resilient Vinyl Sheet Flooring Section 09 65 16 Unit Renovation #4 SUPPLY Page 1 of 2 MET19-167 Single Units and Houses Revised November 2017

1

PART 1 GENERAL 1.1 Reference Standards .1 Materials are to be certified in accordance with the applicable and the latest applicable edition of codes and standards. .2 ASTM F925 – 13 Standard Test Method for Resistance to Chemicals of Resilient Flooring .3 ASTM F1303, Standard Specification for Sheet Vinyl Flooring With Backing .4 ASTM F1913, Standard Specification for Vinyl Sheet Floor Covering Without Backing .5 CAN/ULC-S102.2, Standard Method of Test for Surface Burning Characteristics of Flooring, Floor Covering and Miscellaneous Materials and Assemblies .6 ASTM F 970, Standard Test Method for Measuring Recovery Properties of Floor Coverings after Static Loading– 500 PSI .7 ASTM E 648, Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source, Class I .8 FloorScore certified, or shall be LEED certified. 1.2 Submittals .1 Submit two duplicate sample pieces of sheet material for each color selected by Project Manager .2 Manufacturers product data, maintenance and installation instructions 1.3 Approved Equal .1 Bidders shall apply to the Housing Authority, in writing not later than 4:30 p.m. on the 6th working day prior to Tender Closing Date for product approval. .2 Request for approval shall include a technical specification sheet demonstrating compliance with this specification. 1.4 Warranty

.1 Minimum 10 years

1.5 Delivery, Storage and Handling .1 Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer .2 Deliver, unload and place material as directed by Housing Authority

Tender No. 19-167 Unit Renovation #4 Page 52 of 62

Page 55: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

MRHA Resilient Vinyl Sheet Flooring Section 09 65 16 Unit Renovation #4 SUPPLY Page 2 of 2 MET19-167 Single Units and Houses Revised November 2017

2

PART 2 PRODUCTS

2.1 Materials .1 Minimum overall thickness: 2.0 mm (80 mils) .2 Minimum Wear Layer thickness: 0.25 mm (10 mils) .3 Urethane Top Coat, PVC Wear Layer, Low Gloss, No-Wax finish Type 1, Grade 3. .4 Provide underlayment per flooring manufacturer’s instructions, as required for job. .5 Product to be supplied in widths to minimize number of seams .6 Minimum colour selection: 10 .7 Sheet flooring shall be labelled with manufacturer’s name and flooring type .8 Backing shall be non-foamed plastic, Class C 2.2 Approved Products (Residential) .1 Tarkett FiberFloor Fresh Start Collection .2 Armstrong Cushionstep Good .1 Alternate products will be considered during the prescribed time period at tender. See Approved Equal Section 1.3. PART 3 - EXECUTION SEE INSTALLATION SPECIFICATION

END OF SECTION

Tender No. 19-167 Unit Renovation #4 Page 53 of 62

Page 56: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

__________________________________________________________________________________ MRHA Paint Section 08 53 13 Unit Renovation #4 Supply & Install Page 1 of 5 MET19-167 Revised December 2019 __________________________________________________________________________________

1

PART 1 GENERAL

1.1 Section Include .1 Surface preparation and field painting of exposed interior items and surfaces.

.2 Surface preparation and field painting of exposed exterior items and surfaces.

1.2 References

.1 American Society for Testing and Materials (ASTM) D 16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications.

1.3 Submittals

.1 Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns.

1.4 Product Alternates

.1 Bidders shall apply to the Housing Authority, in writing not later than 4:30 p.m. on the 6th working day prior to Tender Closing Date for product alternate approval.

.2 Request for product approval shall include technical specification sheet containing

complete product data. It is the responsibility of the contractor submitting to demonstrate compliance with this specification

1.2 Certification

.1 Product shall be an MPI (Master Painters Institute) approved product, and have an MPI number for the appropriate classification of paint.

1.3 Quality Assurance .1 Installer Qualifications:

.1 Installer Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.

.2 Obtain block fillers and primers for each coating system from the same

manufacturer as the finish coats.

.3 Paint exposed surfaces. If an item or a surface is not specifically mentioned, paint the item or surface the same as similar adjacent materials or surfaces. If a color of finish is not indicated, Architect will select from standard colors and finishes available.

.4 Do not paint prefinished items, concealed surfaces, finished metal surfaces,

operating parts, and labels.

Tender No. 19-167 Unit Renovation #4 Page 54 of 62

Page 57: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

__________________________________________________________________________________ MRHA Paint Section 08 53 13 Unit Renovation #4 Supply & Install Page 2 of 5 MET19-167 Revised December 2019 __________________________________________________________________________________

2

.2 Supplier Requirements:

.1 The Housing Authority reserves the right to request samples of each of the paints and primer prior to awarding the tender. Samples shall be examined by Housing Authority Reps for coverage, stain blocking ability (for primer), quality of coverage (with two coats of paint) and extent of paint splatter.

.2 Supplier shall provide Manufacturer recommendations for paint application

(materials & techniques). 1.4 Delivery Storage and Handling

.1 Deliver materials to Project site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label:

.2 Store materials not in use in tightly covered containers in a well-ventilated area at a

minimum ambient temperature of 45 deg F (7 deg C). Maintain storage containers in a clean condition, free of foreign materials and residue.

1.5 Project Conditions

.1 Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

1.6 Extra Materials

.1 Furnish extra paint materials from the same production run as the materials applied and in the quantities described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to Owner. Furnish Owner with 1 gal (3.8 l) of each material and color applied.

PART 2 PRODUCTS

2.1 General

.1 Material Compatibility: Provide block fillers, primers, sealers, and finish-coat materials that are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

.2 Product must have a Master Painters Institute (MPI) product approval

.3 Product shall be non-flammable

.4 Product shall have a flash point not less than 90deg C

.5 Product shall also follow ASTM D3960-5 and Canadian regulations for maximum allowable VOC levels

.6 Product shall be water soluble, and shall be manufactured of an acrylic base, and may include latex, vinyl and/ or copolymer additives.

.7 When painting over new/unfinished surfaces and materials apply manufacturers recommended primer and sealer.

Tender No. 19-167 Unit Renovation #4 Page 55 of 62

Page 58: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

__________________________________________________________________________________ MRHA Paint Section 08 53 13 Unit Renovation #4 Supply & Install Page 3 of 5 MET19-167 Revised December 2019 __________________________________________________________________________________

3

2.2 Materials

.1 Interior Wall Paint:

.1 Product shall be have an Eggshell finish (MPI gloss level 2 or 3). VOC levels shall be 100 g/L or less, or have an MPI VOC range classification of E2 or E3. Solids by volume shall be minimum 34%. .2 Approved products:

. .1 PPG Paints Speedhide 6-411 .2 Benjamin Moore EcoSpec WB F374 .3 Benjamin Moore Ultra Spec 500 K538 .4 Dulux Ultra Zero VOC 97900 .5 Glidden Pro 20044 .6 Beauti-Tone Natura Interior Latex Eggshell 500-series .7 Sherwin Williams ProMar 200 Zero VOC (B20W02651,

B20W02653) .8 Sico Expert 833-6XX .9 Behr Pro i300 Interior Eggshell #330

.2 Interior Ceiling Paint:

.1 Product shall have a Flat finish (MPI gloss level 1). Ceilings: VOC levels shall be 50 g/L or less, or have an MPI VOC range classification of E3. Volume Solids shall be minimum 32% .2 Approved Products

.1 Benjamin Moore Ultra Spec K536

.2 Dulux Ultra Zero VOC 97500

.3 PPG Paints Speedhide 6-70

.4 SICO Performa 610-550

.5 Behr Pro i300 Interior Dead Flat #PR310

.3 Interior Trim:

.1 Product shall have a semi-gloss finish . VOC levels shall be 100 g/L or less, or have an MPI VOC range classification of E2 or E3. Product shall be have a semi-gloss finish (MPI gloss level 5). Solids by volume shall be minimum 33%.

.2 Approved products:

.1 Benjamin Moore Ultra Spec K539

.2 Benjamin Moore Eco Spec WB F376

.3 Dulux Lifemaster 59211

.4 PPG Paints Speedhide 6-500

.5 Sherwin Williams ProMar 200 Zero VOC Interior Latex Semi-Gloss (B31W04651, B31W04653)

.6 Sico Ecosource 857-6XX

.7 Behr Pro i300 Interior Semi-Gloss #PR370

Tender No. 19-167 Unit Renovation #4 Page 56 of 62

Page 59: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

__________________________________________________________________________________ MRHA Paint Section 08 53 13 Unit Renovation #4 Supply & Install Page 4 of 5 MET19-167 Revised December 2019 __________________________________________________________________________________

4

.4 Exterior:

.1 Product shall have a semi-gloss finish (MPI gloss level 5). VOC levels shall be 150 g/L or less, or have an MPI VOC range classification of E2 or E3. Solids by volume shall be minimum 33%. .2 Approved products:

.1 Benjamin Moore Ben K543

.2 Benjamin Moore Ultra Spec Ext K449

.3 PPG Paints Sun Proof 78-45

.4 Dulux Weatherguard 1550

.5 Sico Expert 977-6XX

.6 Behr Pro i300 Exterior Semi-Gloss #5850

.5 Exterior Floor:

.1 Product shall have a satin finish. VOC levels shall be 150 g/L or less, or have an MPI VOC range classification of E2 or E3. Solids by volume shall be minimum 31%. .2 Approved products:

.1 Benjamin Moore Floor & Patio Enamel K122

.2 PPG Paints Porch & Floor Enamel 3-510 Series

.3 ICI Dulux X-Pert 247010

.4 Behr Premium Plus Porch & Floor Paint 6050

.5 Para Ultra 1600

.6 SICO Int/Ext for Floors

.7 Sherwin Williams ArmoSeal Tread-Plex B90 Series PART 3 EXECUTION 3.1 Examination & Preparation

.1 Protect areas not to be painted including but not limited to furniture, appliances and tenant personal property by providing adequate covering with drop cloths, polyethylene film and masking. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and painting. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.

.3 Clean and prepare surfaces to be painted according to manufacturer's written

instructions for each particular substrate condition and as specified. Examine drywall surfaces, remove and repair picture hangers, nail holes, cracks, “nail pops” and other minor defects using patching compound, and sand smooth. Said areas are to be primed using the appropriate wall or ceiling paint. All surfaces to be painted shall be clear of dust and dry. Surfaces painted with defects shall be repaired and repainted at Contractor’s expense.

Tender No. 19-167 Unit Renovation #4 Page 57 of 62

Page 60: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

__________________________________________________________________________________ MRHA Paint Section 08 53 13 Unit Renovation #4 Supply & Install Page 5 of 5 MET19-167 Revised December 2019 __________________________________________________________________________________

5

.3 Wood trim areas to be painted should have nail holes, cracks and other minimal faults

filled with putty, and should be sanded to a smooth surface. Peeling paint shall be scraped & sanded smooth. A primer coat of trim paint is to be applied to the sanded areas.

.5 Commencement of work shall be construed as acceptance of conditions.

3.2 Application

.1 Prime all areas to be painted with one coat of stain blocking primer.

.2 Apply one coat of paint in accordance with manufacturer’s recommendations to all

surfaces that were previously painted. Apply two finish coats of paint to all newly installed & primed surfaces.

.3 Apply coatings by brush, roller, spray, or other applicators per manufacturer's written

instructions

.3 Painted surface shall receive full coverage and be free of brush marks, sags, streaks, runs, voids or pinholes.

3.3 Cleaning .1 Remove rubbish and waste from site daily.

.2 All paint splatter is to be completely removed from all surfaces, furnishings, appliances

and tenant belongings. .3 Protect work of other trades, whether being painted or not, against damage from

painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Project Manager.

.4 Provide "Wet Paint" signs to protect newly painted finishes. After completing painting

operations, remove temporary protective wrappings provided by others to protect their work.

.5 After work of other trades is complete, touch up and restore damaged or defaced

painted surfaces.

END OF SECTION

Tender No. 19-167 Unit Renovation #4 Page 58 of 62

Page 61: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

Contract No. < ## > < Tender Title >

APPENDIX A – AGREEMENT (FOR INFORMATION PURPOSES ONLY)

THIS AGREEMENT made in Duplicate this __th day of ______, 2017

BETWEEN METROPOLITAN REGIONAL HOUSING AUTHORITY, of the

Province of Nova Scotia on behalf of Her Majesty the Queen in Right of the Province, pursuant to the Housing Act, Revised Statutes of Nova Scotia, 1989, Chapter 211, (Hereinafter called the "Metropolitan Regional Housing Authority") of the One Part

- and –

< BID WINNER’S FULL LEGAL BUSINESS NAME >

(Hereinafter called the "Contractor") of the Other Part

AGREEMENT WITNESSETH:

That the Contractor and the Metropolitan Regional Housing Authority for the consideration hereinafter expressed, undertake and agree as follows:

ARTICLE 1

The General Conditions of Contract and any Addendums as issued as part of the Tender are to be read herewith and form part of this agreement as fully and completely as though all the stipulations thereof have been embodied herein.

ARTICLE 2

The Contractor undertakes and agrees:

.1 to provide all the materials and to perform all the work shown as described in the Specifications,

the Drawings and/or Sketches and any Addendums forming the Tender Document titled

TENDER No. < ## > < TENDER TITLE >

which have been signed in duplicate for identification by, or on behalf of, both the parties, and which were prepared by METROPOLITAN REGIONAL HOUSING AUTHORITY acting as and herein (and in the General Conditions) entitled the "Project Manager”;

.2 to do and fulfil everything indicated by the Agreement and the General Conditions of the Contract

and the Specifications and the Drawings and/or Sketches; and,

.3 to complete substantially all the Work not later than < Date >.

Tender No. 19-167 Unit Renovation #4 Page 59 of 62

Page 62: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

Contract No. < ## > < Tender Title >

APPENDIX A – AGREEMENT (FOR INFORMATION PURPOSES ONLY)

ARTICLE 3 The Metropolitan Regional Housing Authority undertakes and agrees:

.1 to pay the Contractor in lawful money of Canada for the performance of the Contract

< Written Dollar Amount of Winning Bid > DOLLARS and _____ CENTS

( $ < Numerical Dollar Amount > ), plus applicable taxes, subject to additions and deductions as provided in the General Conditions of the Contract.

.2 to make payments on account thereof upon the Project Manager's certificate ( and when the

Metropolitan Regional Housing Authority is satisfied that payments due to Subcontractors have been made ) as follows: .1 within a reasonable time of receipt by the Metropolitan Regional Housing Authority of a

bona fide claim for payments, ninety percent ( 90% ) of the value, proportional to the amount of the Contract, of labour and materials incorporated in the work or materials on the site to be incorporated in the work, as estimated by the Contractor and approved by the Project Manager less the aggregate of previous payments;

.2 the ten percent (10%) of the value of the work, service and materials shall be retained by the

Metropolitan Regional Housing Authority for a period of sixty-five ( 65 ) days after the Metropolitan Regional Housing Authority is of the opinion that the Contract is substantially performed, as defined in the General Conditions;

.3 sixty-five ( 65 ) days after the Contract is substantially performed, the Metropolitan Regional

Housing Authority may reduce the amount retained to two and one-half percent ( 2.5% ) of the value of the work, services and materials, or the Metropolitan Regional Housing Authority may retain the full ten percent ( 10% ), until all required work is performed completely, as determined by the Metropolitan Regional Housing Authority;

.4 notwithstanding the foregoing, the Metropolitan Regional Housing Authority shall be entitled

to retain the warranty for a period of one ( 1 ) year, which sum is calculated as one percent ( 1% ) of the contract price or two thousand five hundred Canadian dollars ( $2,500.00 ), whichever is greater; and,

.5 also notwithstanding the foregoing, the Metropolitan Regional Housing Authority is entitled to

make other deductions as provided in the General Conditions of the Contract. .3 if on account of climatic or other conditions reasonably beyond the Contractor's control, there are

items of work that cannot readily be completed, the payment in full for the work which has been completed shall not be delayed on account thereof, but the Metropolitan Regional Housing Authority may withhold a sufficient and reasonable sum until the uncompleted work is finished and such sum as will in the opinion of the Metropolitan Regional Housing Authority adequately protect the Metropolitan Regional Housing Authority.

ARTICLE 4

The Contractor and the Metropolitan Regional Housing Authority for themselves, their successors,

Tender No. 19-167 Unit Renovation #4 Page 60 of 62

Page 63: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

Contract No. < ## > < Tender Title >

APPENDIX A – AGREEMENT (FOR INFORMATION PURPOSES ONLY)

executors, administrators and assigns, hereby undertake and agree to the full performance of the covenants contained herein and in the General Conditions of the Contract, and that this Agreement with the General Conditions of the Contract, the Specifications, Drawings and/or Sketches and any issued Addendums as outlined in the Tender documents constitute the Contract, and that the following is an exact enumeration of the Specifications, Drawings and/or Sketches and Addendums issued. Specifications:

< Exactly as in the Tender > Drawings/Sketches:

< Exactly as in the Tender > Addendums:

Addendum #< ## >, Issued < Day >, < Date >, < Subject > Addendum #< ## >, Issued < Day >, < Date >, < Subject > Addendum #< ## >, Issued < Day >, < Date >, < Subject > Addendum #< ## >, Issued < Day >, < Date >, < Subject >

ARTICLE 5

.1 If and whenever the Metropolitan Regional Housing Authority desires to give notice to the Contractor under or in connection with this Agreement or the General Conditions of the Contract, such notice will be effectively given if sent by Registered or Certified Mail, or delivered by hand to the Contractor at _< Full Company Address Including Postal Code > and will be considered as having been so given at either (a) the time the deposit thereof in the Post Office or (b) the time delivered by hand.

.2 The Contractor has furnished, and the Metropolitan Regional Housing Authority accepts, a

Performance Bond and Labour and Material Bond as security for the due fulfilment of the Contract.

IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and year first above written.

SIGNED, SEALED AND DELIVERED in the presence of ( ( ( ( ( ( WITNESS CONTRACTOR ( ( ( ( ( ( WITNESS METROPOLITAN REGIONAL HOUSING AUTHORITY

Tender No. 19-167 Unit Renovation #4 Page 61 of 62

Page 64: METROPOLITAN REGIONAL HOUSING AUTHORITY INVITES BIDS … · Tender No. 19-167 Unit Renovation #4 Table of Contents PAGES Section One Scheduled Tour Date Mandatory Requirements 1 2

Metropolitan Regional Housing Authority

Tender No. 19-167 Unit Renovation #4

APPENDIX B – Request for Product Approval

REQUEST FOR PRODUCT APPROVAL Note: 1 Sheet Per Product

To: [email protected]

Date: Number of Pages

(including cover sheet)

Re: Tender Number MET19-167 Closing date and time:

(description of work/goods)

A request for approval for the following product has been received from the named supplier for this Bid. Attached is the information package received in support of this request.

Company Name: Address: Phone & E-mail Contact Person

Date Request Made Product Attachments:

□ product samples being forwarded separately

Please advise by (date) of the results of the evaluation