13
Metrology of the Stave250 Assembly Jig (Tim)

Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Embed Size (px)

DESCRIPTION

Procedure Measure PH2 and define as (0,0) – 4 point: DIA=0.043 / CIRC=0.001 Measure PH1 and define PH2-PH1 as primary axis – 4 point: DIA = / CIRC=0.001 – Distance PH1-PH2 = Measure front edge of 14 Vee-blocks at 4 points along length (See plot) and reconstruct line of best fit – Y= x10 -4 X Measure Tooling ball – ( , ): DIA=8.207 / CIRC=0.011

Citation preview

Page 1: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Metrology of the Stave250 Assembly Jig

(Tim)

Page 2: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

What do we need to measure?

Page 3: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Procedure• Measure PH2 and define as (0,0)

– 4 point: DIA=0.043 / CIRC=0.001

• Measure PH1 and define PH2-PH1 as primary axis– 4 point: DIA = 0.063 / CIRC=0.001– Distance PH1-PH2 = 1247.520

• Measure front edge of 14 Vee-blocks at 4 points along length (See plot) and reconstruct line of best fit– Y=-42.228 + 1.5738x10-4 X

• Measure Tooling ball – (1248.586,-119.685): DIA=8.207 / CIRC=0.011

Page 4: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Vee Blocks

-200 0 200 400 600 800 1000 1200 1400-43

-42.75

-42.5

-42.25

-42

-41.75

-41.5

-41.25

-41

f(x) = 0.000157382449975012 x − 42.2282247148167R² = 0.538518351391159

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH

1)

Page 5: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

CAD Analysis

Page 6: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

CAD Analysis

Page 7: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Comparison with SmartScope• Procedure

– Mount jig on Smartscope & reconstruct lines along the edges of the Vee blocks (sub-stage illumination). Construct datum axis

– Measure tooling ball as a composite of 3 sub-circles• Diameter = 8.209 / CIRC = 0.0186

– Measure PH1 as a composite of 3 sub-circles• Diameter = 0.0287 / CIRC = 0.0015

– Measure distance from Tooling ball to PH1 parallel to Vee-block datum axis• 1.0765 – Diameter/2 = -3.028

– Measure PH1 offset to Vee-block axis• 42.040

Page 8: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Vee-blocks (CMM vs SmartScope)

-200 0 200 400 600 800 1000 1200 1400-0.5

-0.25

0

0.25

0.5

-0.5

-0.25

0

0.25

0.5

CMM (Corr)SmartScope

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Resid

ual (

Smar

tsco

pe)

Page 9: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

CMM Survey with Back-lighting

• Pin-holes and tooling ball measured with back-lighting to try and improve measurement– Hi-tec torch (Wifi/3G enabled)

• Results– Pin-holes • 0.028 / 0.030 mm with 4-point circularity of 0.001mm

– Tooling ball• 8.205mm with 20-point circularity of 0.025mm

Page 10: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Comparison of CMM Vee-block alignments

-200 0 200 400 600 800 1000 1200 1400-42.5

-42.3

-42.1

-41.9

-41.7

-41.5

Back-lit SurveyFront-lit Survey

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Page 11: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Survey with 4mm dowels (CMM#3)• 4mm dowels

held into Vee blocks with tool-makers clamps.

• Inner edge of dowels reconstructed using back illumination via reflection from aluminium.

Page 12: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Comparison of Vee-block surveys

• NB 4mm dowel data offset by +3.40 mm

-200 0 200 400 600 800 1000 1200 1400-42.5

-42.3

-42.1

-41.9

-41.7

-41.5

Back-lit Survey

Front-lit Survey

4mm dowels

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Page 13: Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

SummaryParameter CMM CMM #2 CMM#3 SmartScope

Ref Offset Y1 42.032 42.036 45.472 42.040

Ref Offset Y2 42.228 42.229 45.649

Dim Y1 to Y2 1247.520 1247.522 1247.522

Ref Offset X1 3.053 3.057 3.055 3.028