    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 1 of 20

    Approval

    Name Position Signature/Date

    Compiled

    byDocument

    Author

    Bill

    KreykesAdam

    Graves

    Network Program

    Planning Manager,

    Timetables

    Endorsed by(Author)

    Bill Kreykes Manager,Timetables

    Approval Norm Grady NetworkPlanning andDevelopmentManager

    Style Definition: Heading 3 Char:Font: 11 pt, Not Bold, Font color: Auto

    Style Definition ... [1]

    Style Definition ... [2]

    Style Definition ... [3]

    Style Definition ... [4]

    Style Definition ... [5]

    Style Definition ... [6]

    Style Definition ... [7]

    Style Definition ... [8]

    Style Definition ... [9]

    Style Definition ... [10]

    Style Definition: Heading 3: Font: 11pt, Not Bold, Font color: Auto, Linespacing: Multiple 1.15 li, Outlinenumbered + Level: 3 + NumberingStyle: 1, 2, 3, + Start at: 1 +

    Alignment: Left + Aligned at: 0 cm +Tab after: 1.27 cm + Indent at: 1.27cm

    Style Definition: Heading 2: Font: 11pt, Font color: Auto, Space Before: 10pt, Line spacing: Multiple 1.15 li,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0 cm+ Tab after: 1.27 cm + Indent at:1.27 cm

    Style Definition: Heading 1: Font: 12pt, Font color: Auto, Space Before: 8pt, Line spacing: Multiple 1.15 li,Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:0 + Alignment: Left + Aligned at: 0 cm+ Tab after: 1.27 cm + Indent at:

    1.27 cm

    Style Definition: Normal: Indent:Left: 1.27 cm, Space Before: 6 pt,

    After: 6 pt, Line spacing: Multiple 1.15li

    Formatted: Font: 12 pt, Underline

    Formatted: Heading 1

    Formatted: Font: Not Bold

    Formatted: Normal, Left

    Formatted Table

    Formatted: Table Heading

    Formatted: Font: Not Bold

    Formatted: Font: Not Bold

    Formatted: Font: Not Bold

    Formatted: Table Heading, Left

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    2/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 2 of 20

    Document

    Endorsers

    Scott Short

    Manager Network

    Scheduling and

    Strategy

    Karen WilsonCommercial

    Contracts Manager

    Approving

    ManagerRobb van Toledo

    Manager NetworkPlanning and

    Development

    Amendment Record

    Approval Date Vers ion Descript ion

    xx April 2011 01

    1. Initial issue under MTM. Replace CONNEX documentcml-8.13-pr-469

    2. Revised the responsibilities of various positions.

    3. Reviewed and revised the Reference section.

    4. Revised the format of the procedure.

    5. Updated the Protocol with new SQE documentationnumbering system

    6. The Commercial Department has submitted an

    Access Arrangement Renewal to the Essential Services

    Commission on 31 March 2011. This revision will

    incorporate any changes made in the submission.

    10/08/2012 02

    1.6. Reviewed and revised the protocol following a peerreview.

    7. Changed the frequency of the Protocol Committeemeetings.

    8. Commercial Department has submitted the revisedprotocol to the Essential Services Commission forapproval and this revision incorporates changes (ifany) made by the Essential Services Commission.

    Formatted: Font: 12 pt

    Formatted: Heading 2

    Formatted: Font: 12 pt, Underline

    Formatted: Font: Not Bold

    Formatted: Normal, Left

    Formatted Table

    Formatted: Table Text, Left

    Formatted: Table Text, No bullets ornumbering

    Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    3/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 3 of 20

    Table of Contents

    1. Purpo se and Scope ..................................................................................................... 42. Definition ...................................................................................................................... 43. Occupation Commit tee ............................................................................................... 64. Functions of Occupation Committee ......................................................................... 65. Meetings o f the Occupations Committ ee: ................................................................. 76. Noti ce Of Track Occupations ..................................................................................... 76.1. Contents of Notice of Track Occupation ........................................................................ 7

    6.2. Types of Track Occupations .......................................................................................... 7

    6.3. Consideration of Notice of Track Occupation ................................................................ 8

    7. Implementat ion of Track Occupation ........................................................................ 97.1. Operator's Agreement .................................................................................................... 9

    7.2. Track Occupation Management ..................................................................................... 9

    8. Regulat ions and Safeworkin g Ar rangement ........................................................... 109. Cancellation of Approved Track Occupations ........................................................ 1010. Job Titl es and Posi tio n Names ................................................................................. 1111. References .................................................................................................................. 1112. Documents ................................................................................................................. 1112.1. Minutes of meetings ..................................................................................................... 11

    12.2. Schedules of Train Paths ............................................................................................. 11

    13. Note ............................................................................................................................. 11

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    4/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 4 of 20

    1.Purpose and Scope Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    5/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 5 of 20

    1. Purpose

    1.1. This procedure describes the processes by which all Track Occupations (other than

    Mandatory Occupations) are planned and implemented on the Access Provider's

    Network. It This procedure describes the implementation of the Train Operating

    Protocol, Scheduling to the Track Access Agreement and the representation of the

    Track Occupation Protocol Committee.

    2. Scope

    2.1. The scope of this procedure highlights the objective of the Track Occupation process

    and associated procedures to maximise the essential work that can be carried out

    within a Track Occupation, whilstwhile avoiding or minimising the delay to Services

    and hence to reduce the severity and number of Track Occupations required.

    2.Definition

    3. Abbreviations and Acronyms

    PTV: Public Transport Victoria - a statutory department established under the

    Transport Act - formerly the Department of Transport (DoT).

    VLP: V/Line Pty Ltd, Bourke Street, Melbourne. It is the regional public transport

    operator in the State of Victoria.

    4. Definitions

    Access Agreement: An agreement between an Operator and the Access Provider

    pursuant to which the Operator is given access to the Access Provider's Network.

    Access Provider: Metro Trains Melbourne (MTM).

    Director:The Director of Public Transport under the Transport Act.

    Lease Agreement:The lease titled Infrastructure Lease Train between the

    Director, VicTrack and the Access Provider dated 31 August 2009, as amended.

    Mandatory Occupation :A Track Occupation by the lessor of the Access Provider's

    Network occurring pursuant to the Lease Agreement.

    Formatted

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted

    Formatted

    Formatted: Font: Arial

    Formatted

    Formatted

    Formatted: Bullets and Numbering

    Formatted: Font: Bold

    Formatted: Font: Bold

    Formatted: Font: 11 pt

    Formatted: Font: 11 pt

    Formatted: Font: Bold

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    6/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 6 of 20

    Metropolitan Master Timetable:In relation to the Access Provider's Network, the

    timetable showing all Scheduled Train Paths for Trains on the Network, as amended

    from time to time by the Access Provider.

    Network: In relation to the Access Provider, the land and infrastructure leased by the

    Access Provider under its Lease Agreement from time to time, including all rail trackand support infrastructure, electrical infrastructure for traction and other power

    including overhead lines and lighting systems, signalling systems for regulating and

    control of traffic, communication systems for operational and administrative purposes

    including passenger information, bridges, culverts, pedestrian overpasses and

    underpasses, equipment relating to car parks and control centres for the control of

    power, signalling and traffic operations, but excluding:

    Formatted: Font: Bold

    Formatted: Font: Italic

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    7/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 7 of 20

    buildings

    Buildings (including stations, platforms, stops, advertising hoarding, sheds and

    shelters);

    carCar parks;

    terminalsTerminals, storage and receival facilities;

    workshopsWorkshops, locomotive depots and fuel points; and

    privatePrivate sidings that are not leased to the Access Provider, but includes

    any infrastructure leased to the Access Provider which passes through, or is

    immediately adjacent to, any of the infrastructure or facilities referred to in

    paragraphs (a) to (e) above.

    Operator: A person operatingTrainstrains on the Access Provider's Network, other

    than the Access Provider.

    DoT: Department of Transport, a statutory department established under the

    Transport Act.

    Rolling Stock: Any vehicle that operates on or /uses a railway track including a

    locomotive, light inspection vehicle, road/rail vehicle, trolley, carriage, diesel multiple

    unit and wagon (but does not include a vehicle designed to operate both on and off a

    railway track when the vehicle is not operating on a railway track).

    Scheduled Train Paths:In relation to the Access Provider's Network, an Operator's

    or the Access Provider's Train Paths on the Network set out in the Metropolitan

    Master Working Timetable, as those Scheduled Train Paths are permanently varied

    from time to time.

    Service:A service for the carrying of freight or passengers by railway provided by the

    Access Provider or an Operator on the Access Provider's Network.

    Track Occupation: In relation toAbsolute Occupation of a defined section ofthe

    Access Provider's Network, access in order to carry out inspections, repairs,

    Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +

    Not at 2.54 cm

    Formatted: Left

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    8/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 8 of 20

    maintenance, up-grade work, improvements, additions or any other works which

    could interfere with the Access Provider's or an Operator's Services on the Network.

    Train:Rolling Stock coupled together to operate as a single unit.

    TrainPath:The particular time interval, including an entry time and day and an exit

    time and day, through which aTraintrainmay travel over a segment of the AccessProvider's Network from an origin to a destination and may include stopping points.

    5. VLP: V/Line Pty Ltd , Bourke Street,Roles and Responsibili ties

    The Manager - Network Planning and Development, Metro Trains Melbourne. It is

    (MTM), and any party seeking access to theregional public transport operatorMTM

    Network are responsible to ensure all roles and responsibilities identified in the State

    of Victoria.

    Formatted: Indent: Left: 0 cm

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    9/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 9 of 20

    this procedure are undertaken.

    Copies of documents are available electronically within MTMs organisation and to

    third parties on request to the Manager - Network Planning and Development. All

    parties shall ensure their hard copy of this procedure is at the latest, correct, version.

    Suspected errors and omissions or requests for change shall be reported to the

    Manager - Network Planning and Development.

    6. Process

    6.1. Occupation Protocol Committee

    Metro must have an OccupationsOccupation Protocol Committee comprising:

    Chairperson of the Committee

    Program Planning ManagerAccess/Scheduling- Operations, Metro Trains; or

    delegates;

    Members of the Committee:

    Representatives of Metro infrastructure divisions;

    One representative of each Operator;

    MetroTrainsTrains Rail Safety representative

    Optional Committee Attendees (as requested by the Chair)

    Representatives of Metro Infrastructure divisions

    MTM Project Managers for selected major projects, and;.

    Rail Safety Officer, Metro Trains.

    6.2. Functions of Occupation Protocol Committee

    TheOccupationsOccupation Protocol Committee is a forum to enable the Access

    Provider to liaise with Operators in relation to proposed Track Occupations and Track

    Occupations generally so as to:. The Occupation Protocol Committee is not to be

    confused with the MTM Occupations Committee, or T-12+Planning Forum, which

    provide an internal forum for the planning and management of the integrated

    Formatted: Font: 11 pt

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Keep lines together, Tabstops: 1.27 cm, List tab + Not at 2.54cm

    Formatted: Font: 11 pt

    Formatted: Indent: Left: 0 cm, Right:

    -0.19 cm, Keep with next, Keep linestogether, Tab stops: 1.27 cm, Left

    Formatted: Indent: Left: 1.9 cm,Keep with next, Keep lines together

    Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54cm + Indent at: 2.54 cm, Keep withnext, Keep lines together

    Formatted: Indent: Left: 1.9 cm

    Formatted: Bullets and Numbering

    Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54cm + Indent at: 2.54 cm

    Formatted: Bulleted + Level: 1 +Aligned at: 1.9 cm + Tab after: 2.54

    cm + Indent at: 2.54 cmFormatted: Bullets and Numbering

    Formatted: Font: 11 pt

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Font: 11 pt

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    10/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 10 of 20

    Occupations Schedule. The function of the Occupation Protocol Committee is

    explained in section 6.2.1 6.2.3.

    6.2.1. Enable Operators to communicate their interests in Track Occupation planning and

    implementation to the Access Provider.

    6.2.2. Facilitate agreement being reached between the Access Provider and an Operator onany aspect of a planned Track Occupation where the Operator's Access Agreement

    provides that the Operator's agreement is required in relation to that aspect of the

    planned Track Occupation before it can be implemented; and.

    6.2.3. Otherwise facilitate agreement between the Access Provider and all Operators on

    matters relating to Track Occupations including the following (recognising that such

    matters are ultimately in at the discretion of the Access Provider, subject to any

    Access Agreement):

    theThe number of Track Occupations taken on any line section in any one year;

    theThe timing of Track Occupations and amendments made to the Operator's

    Scheduled Train Paths as a consequence of Track Occupations;

    leadThe times for requesting Track Occupations and providing detailed works

    plans for Track Occupations.

    Formatted

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 3 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9

    cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

    Formatted

    Formatted

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 3 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

    Formatted

    Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tabafter: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm

    Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tabafter: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm

    Formatted: Normal, Indent: Left:1.27 cm, Space Before: 0 pt, Bulleted+ Level: 1 + Aligned at: 1.9 cm + Tab

    after: 2.54 cm + Indent at: 2.54 cm,Tab stops: 1.9 cm, List tab + Not at2.54 cm

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    11/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 11 of 20

    6.3. Meetings of the OccupationsOccupation Protocol Committee:

    The Occupations Committee will meet weekly at a time and place advised by the

    Access Provider to all members of the Occupations Committee.

    The Occupation Protocol Committee will meet on a frequency to be determined by

    the membership but at intervals not greater than monthly. The recommended

    frequency is fortnightly. Any urgent or important matters will continue to be

    communicated via email.

    6.4. Notice OfofTrack Occupations

    Subject to section 6.2, If the Access Provider wishes to have a Track Occupation on

    the relevant Access Provider's Network, the Access Provider must notify each

    Operatorwho haswith access pursuant to Scheduled Train Paths to any part of the

    Network which is the subject of the proposed Track Occupation a reasonable timeprior to the Track Occupation being implemented (or if relevant lead times for all

    Track Occupations have been agreed by the OccupationsOccupation Protocol

    Committee, in accordance with such agreed lead times).

    6.5. Contents of Notice of Track Occupation

    Any notice of a Track Occupation must specify:

    the areaArea of the proposed Track Occupation (the boundaries of which are not

    necessarily limited to the work site and may extend to signalling boundaries or

    locations whereTrainstrains can switch to another track or route);

    the timingTiming of the proposed Track Occupation; and

    the conditionsConditions under which the relevant works will be carried out as

    listed in section 6.2 below.:

    6.2.Types of Track Occupations

    Formatted: Font: 11 pt

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Font: 11 pt

    Formatted: Font: 11 pt

    Formatted: Font: 11 pt

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 2 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Font: 11 pt

    Formatted: Font: 11 pt

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm

    Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    12/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 12 of 20

    Infrastructure work may be carried out under any of the following conditions:

    6.2.1.Under Own Protection (Non-Occupation)

    Infrastructure work may be performed between Scheduled Train Paths. It is common

    for work to be done in this manner without affecting Train running, however,at times,

    some delays may arise from reducing speed through or around the work site.

    (i) Closedown Track Occupation

    A Closedown Track Occupation is a major prolonged Track Occupation that

    impacts onServices conducted at the following times:

    Formatted: Bullets and Numbering

    Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left

    Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    13/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 13 of 20

    Trains arriving or /departing from Richmond Station or North Melbourne

    Station between 0701 hours and 0930 hours; or

    Trains arriving or /departing Richmond Station or North Melbourne

    Station between 1501 hours and 1900 hours.

    (ii) Total Track Occupation and All Lines Closed

    A Total Track Occupation is a Track Occupation of all tracks, or the track on

    single lines, with no alternative route around the work site.

    (iii) Diversion

    A Diversion occurs when Track Occupations occur in multiple track areas,

    (i.e. 2two or more tracks) where alternative routing can be set up around the

    work site using unaffected adjacent tracks.

    (iv) Re-routing

    Re-routing occurs when it becomes necessary to operateTrainstrains via an

    alternative rail corridor to reach their normal destinations. This may arise

    from a Track Occupation closing all lines or where there is insufficient track

    capacity to divert allTrainstrains past the work site, hence requiring some

    Trainstrains to be re-routed.

    6.2.6.Booking Out (Non Occupation)

    This process is applied for urgent or short notice work and involves the supervisor of

    the works arranging with signallers to re-route Trains or to prevent Trains proceeding

    whilst works are in progress.

    In each case the impact to Services will vary and where a Track Occupation is

    necessary the impact will depend on any specific conditions which may apply to the

    Track Occupation.

    Formatted: Indent: Left: 2.86 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 3.49 cm, List tab+ Not at 2.54 cm

    Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left

    Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left

    Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Tab stops:2.86 cm, Left

    Formatted: Indent: Left: 2.86 cm,Tab stops: 2.86 cm, Left

    Formatted: Heading 4, Indent: Left:1.9 cm, Space Before: 0 pt, Keep linestogether, Tab stops: 2.86 cm, Left

    Formatted: Indent: Left: 2.86 cm,Keep with next, Keep lines together,Tab stops: 2.86 cm, Left

    Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    14/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 14 of 20

    6.6. Consideration of Notice of Track Occupation

    Any notice of/change to a Track Occupation must be reviewed and discussed at a

    subsequent meeting of the OccupationsOccupation Protocol Committee.

    Formatted: Font: 11 pt

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Left

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    15/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 15 of 20

    7. Implementation of Track Occupation

    7.1. Operator's Agreement

    The Access Provider may only implement a Track Occupation:

    If permitted, and on the conditions set, by any relevant Access Agreement; and

    On the conditions (if any) to which it and all Operators affected by the Track

    Occupation have agreed to in the OccupationsOccupation Protocol Committee in

    accordance with Function ofOccupationsOccupation Protocol Committee.

    7.2. Track Occupation Management

    The management of With respect toTrack Occupations on the Access Provider'sNetwork is provided by the Manager, Access/Scheduling and the Manager, Rail

    Safety of, the Access Provider, who are is responsible for the following:items outlined

    in sections 7.2.1 7.2.8.

    7.2.1. To document and maintain current Track Occupation requests and approved Track

    Occupations;.

    7.2.2. To determineTraintrain movements to and /from Track Occupation sites in

    conjunction with the affected Operators;.

    7.2.3. To arrange with Operators for worksTraintrainand track machine movements

    associated with the Track Occupation;.

    7.2.4. To maintain a works order registration system;.

    Formatted: Font: Arial, 12 pt

    Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Tab stops: Not at 1.27 cm

    Formatted: Font: 11 pt

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted: Left, Indent: Left: 1.27cm, Bulleted + Level: 1 + Aligned at:1.9 cm + Tab after: 2.54 cm + Indentat: 2.54 cm, Tab stops: 1.9 cm, Listtab + Not at 2.54 cm

    Formatted: Font: 11 pt

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted

    Formatted ... [11]

    Formatted

    Formatted

    Formatted ... [12]

    FormattedFormatted

    Formatted

    Formatted

    Formatted ... [13]

    Formatted

    Formatted

    Formatted

    Formatted ... [14]

    Formatted

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    16/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 16 of 20

    7.2.5. To determine safe workingSafeWorking requirements of a Track Occupation and

    obtain all necessary approvals;.

    7.2.6. To undertake the necessary steps for any Variations to timetables required due to a

    Track Occupation;

    7.2.7. To prepare and issue the necessaryTraintrainnotices and circulars; and.

    7.2.8. To record key performance indicators, (e.g. overruns, cancelled Track Occupations

    and Train delays).

    Formatted

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

    Formatted

    Formatted

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

    Formatted

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +

    Numbering Style: 1, 2, 3, + Start at:

    1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

    Formatted

    Formatted

    Formatted: Heading 2, Indent: Left:0 cm, Hanging: 1.27 cm, Space Before:0 pt, Outline numbered + Level: 3 +

    Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.9cm + Tab after: 3.81 cm + Indent at:2.79 cm, Tab stops: Not at 3.81 cm

    Formatted

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    17/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 17 of 20

    8. Regulations and SafeworkingSafeWorking Arrangement

    8.1. The safety of rail traffic and workers within work sites under altered Train

    operationsOperations is essential and all works and Track Occupations must be

    conducted in accordance with any Law from time to time and any safety requirements

    as they arise.

    8.2. The Manager, Rail Safety of the Access Provider is responsible for determining all

    safeworkingSafeWorkingrequirements applying to each Track Occupation on the

    Access Provider's Network and will arrange for their publication and distribution to the

    relevant parties.

    8.3. Applicable regulations and special instructions relating to Train operationsOperations

    affecting a Track Occupation on the Access Provider's Network, as well as site

    protection requirements for infrastructure workers, must be set out in the special

    circulars and issued to the relevant parties by the Manager, Rail Safety of the Access

    Provider.

    8.4. The Access Provider's Manager, Rail Safety must determine all

    safeworkingSafeWorkingrequirements applying to a Track Occupation and must

    issue to all relevant persons involved in a Track Occupation a special circular

    specifying all the applicable safeworkingSafeWorkingrequirements (including any

    applicable regulations, special instructions and site protection requirements for

    infrastructure workers).

    9. Cancellation of Approved Track Occupations

    9.1. The Access Provider may cancel a Track Occupation of which notice has been given

    under this Protocol only if extreme circumstances require the cancellation and:

    The works manager has informed the respective MTM Occupations Management

    team and, if cancellation is to occur after the O circular has been issued, the

    works manager must also inform the Access Providers Senior Network Controller

    (METROL, Current Operations)

    Notice is given to each affected Operator; and

    Formatted: Font: 12 pt

    Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Keep lines together, Tab

    stops: Not at 1.27 cm

    Formatted: Font: 12 pt

    Formatted

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Keep lines together, Tabstops: 1.27 cm, List tab + Not at 2.54cm

    Formatted

    Formatted

    Formatted

    Formatted

    Formatted: Indent: Left: 0 cm,Hanging: 1.27 cm, Space Before: 0 pt,Outline numbered + Level: 2 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 1.27cm + Tab after: 2.54 cm + Indent at:2.03 cm, Tab stops: 1.27 cm, List tab+ Not at 2.54 cm

    Formatted

    Formatted

    Formatted

    Formatted

    Formatted ... [15]

    Formatted

    FormattedFormatted

    Formatted

    Formatted ... [16]

    Formatted

    Formatted

    Formatted

    Formatted: Font: 12 pt

    Formatted ... [17]

    Formatted

    Formatted ... [18]

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    18/22

    Metropol itan Railway Network

    Track Occupation Protocol

    L1-XXX-XXX-

    XXXRevision: 02

    Effective from xx April

    2011

    Page 18 of 20

    If VLP is an affected Operator and is not given notice of the cancellation ator

    /earlier than midday on the day which is eight days before the day of the

    cancelled Track Occupation, the Access Provider agrees to reimburse VLP for

    any direct costs incurred by such parties in planning for alternative means of

    transport for their passengers for the period of the planned Track Occupation

    upon proof of such costs being incurred being provided.

    If an occupation is to be cancelled at late notice, the works manager must inform the

    respective Projects or Infrastructure Occupations Management. If this occurs after the

    O circular has been issued, the works manager must also inform METROL and MTM

    operations.

    9.2 Parties responsible for a Track Occupation or other parties undertaking

    supplementary works within a Track Occupation must ensure the appropriate

    resourcing of their activities is made, including the supply of locomotives and

    Traintrain crews to undertake the planned works.

    Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm

    Formatted: Normal, Indent: Hanging:1.27 cm, Right: -0.19 cm, SpaceBefore: 0 pt

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    19/22

    METROPOLITAN RAILWAY NETWORK

    TRACK OCCUPATION PROTOCOL

    L2-NPD-PRO-001 Version: 1 Effective from: 10/08/2012

    Approving Manager: Manager Network Planning andDevelopment

    Approval Date: 10/08/2012 Next Review Date 31/07/2013

    PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 19of20

    Formatted: Font: 8 pt

    If a Track Occupation is disrupted whilstwhile it is in force due to the works

    not proceeding as planned or an Operator's request, due to an unrelated disruption,

    theAccess Providers Senior TrainNetwork Controller (METROL) responsible for the

    site of the planned Track Occupation, is to be notified. A decision must then be made

    by theAccess Provider s SeniorTrainNetwork Controller(METROL) in

    accordance with the Train Operating Protocol to cancel the balance of the Track

    Occupation or, with the concurrenceagreementfrom affected Operators, continue to

    run the Track Occupation but with an extended Variation to the timetable for the

    affected Trainstrains.

    10. Job Titles and Posit ion Names

    A reference to a position or title refers also to any replacement for that position or title

    or any person fulfilling substantially the same role.

    11.References

    11. Records and Enquiry

    Nil.

    12. Related Documents

    To assist in the application of this Protocol, reference may be made to the following

    documents:

    Train Operating Protocol;

    1994 Book of Rules & Operating Procedures 1994;

    Addenda to the Metropolitan Master Working Timetable;

    Metropolitan Master Working Timetable.

    12.Documents

    12.1.Minutes of meetings

    12.2.Schedules of Train Paths

    13.Note

    Formatted: Bottom: 1.5 cm, Headerdistance from edge: 1 cm, Footerdistance from edge: 0.8 cm

    Formatted: Normal, Space Before: 0pt

    Formatted: Font: Bold

    Formatted: Font: Bold

    Formatted: Font: Bold

    Formatted: Font: 12 pt

    Formatted: Indent: Hanging: 1.27cm, Space Before: 6 pt, Don't addspace between paragraphs of the samestyle, Outline numbered + Level: 1 +Numbering Style: 1, 2, 3, + Start at:1 + Alignment: Left + Aligned at: 0.63cm + Tab after: 1.27 cm + Indent at:1.27 cm, Keep lines together, Tabstops: Not at 1.27 cm

    Formatted: Keep with next, Keep linestogether

    Formatted: Bullets and Numbering

    Formatted: Indent: Left: 1.27 cm,Bulleted + Level: 1 + Aligned at: 1.9cm + Tab after: 2.54 cm + Indent at:2.54 cm, Tab stops: 1.9 cm, List tab +Not at 2.54 cm

    Formatted: Bullets and Numbering

    Formatted: Bullets and Numbering

    Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    20/22

    METROPOLITAN RAILWAY NETWORK

    TRACK OCCUPATION PROTOCOL

    L2-NPD-PRO-001 Version: 1 Effective from: 10/08/2012

    Approving Manager: Manager Network Planning andDevelopment

    Approval Date: 10/08/2012 Next Review Date 31/07/2013

    PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 20of20

    Formatted: Font: 8 pt

    13.1.This version 1 of the protocol updated the changes in responsibilities and the documentdocument is re-formatted to align with the Metros new SQE documentationrequirement.

    13.2.The review and amendment of this Protocol must align with the Access ArrangementRenewal carried out the Commercial Department with Essential ServicesCommission. Therefore, any future review / amendment on this Protocol internallyinternally must check and confirm with Commercial Department.

    - End of Document -

    L1-PRJ -PRO-003: Occupations Management Procedure.

    13. References and Legislation

    Nil.

    Formatted: Bullets and Numbering

    Formatted: Bullets and Numbering

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    21/22

    Page 1: [1] Style Definition gwen.vivian

    Bullets 1: Indent: Left: 0.63 cm, Hanging: 0.63 cm, Tab stops: 1.27 cm, List tab +Not at 1

    cm

    Page 1: [2] Style Definition gwen.vivian

    Comment Subject: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing:

    Multiple 1.15 li

    Page 1: [3] Style Definition gwen.vivian

    Comment Text: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing:

    Multiple 1.15 li

    Page 1: [4] Style Definition gwen.vivian

    Balloon Text: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing: Multiple

    1.15 li

    Page 1: [5] Style Definition gwen.vivian

    TOC 1: Font: Arial Bold, 10 pt, Bold, Indent: Left: 1.27 cm, Space Before: 3 pt, After: 3 pt,

    Line spacing: Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm, Right,Leader: +Not at

    0.85 cm + 16.98 cm

    Page 1: [6] Style Definition gwen.vivian

    TOC 2: Font: 10 pt, Do not check spelling or grammar, Indent: Left: 1.27 cm, Space Before:

    0 pt, After: 0 pt, Line spacing: Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm,

    Right,Leader: +Not at 2.12 cm + 16.98 cm

    Page 1: [7] Style Definition gwen.vivian

    TOC 3: Font: 10 pt, Indent: Left: 1.27 cm, Space Before: 0 pt, After: 0 pt, Line spacing:

    Multiple 1.15 li, Tab stops: 2.5 cm, Left + 15.98 cm, Right,Leader:

    Page 1: [8] Style Definition gwen.vivian

    Footer: Font: Arial Narrow, 8 pt, Centered, Space Before: 0 pt, After: 0 pt

    Page 1: [9] Style Definition gwen.vivian

    Header: Indent: Left: 1.27 cm, Space Before: 6 pt, After: 6 pt, Line spacing: Multiple 1.15 li

    Page 1: [10] Style Definition gwen.vivian

    Heading 4: Font: 11 pt, Not Bold, Underline, Space Before: 6 pt, Line spacing: Multiple 1.15

    li, Outline numbered +Level: 4 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left

    +Aligned at: 0 cm +Indent at: 0 cm

    Page 15: [11] Formatted Author

    Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +

    Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +

    Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm

  • 7/28/2019 Metro Track Occupation Protocol (Marked Up) October 2012 20121003

    22/22

    Page 15: [12] Formatted Author

    Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +

    Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +

    Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm

    Page 15: [13] Formatted Author

    Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +

    Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +

    Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm

    Page 15: [14] Formatted Author

    Heading 2, Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +

    Level: 3 +Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left +Aligned at: 1.9 cm +

    Tab after: 3.81 cm +Indent at: 2.79 cm, Tab stops: Not at 3.81 cm

    Page 17: [15] Formatted Author

    Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +

    Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:

    2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not

    Page 17: [16] Formatted Author

    Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +

    Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:

    2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not

    Page 17: [17] Formatted Author

    Indent: Hanging: 1.27 cm, Space Before: 6 pt, Don't add space between paragraphs of the

    same style, Outline numbered +Level: 1 +Numbering Style: 1, 2, 3, + Start at: 1 +

    Alignment: Left +Aligned at: 0.63 cm +Tab after: 1.27 cm +Indent at: 1.27

    Page 17: [18] Formatted Author

    Indent: Left: 0 cm, Hanging: 1.27 cm, Space Before: 0 pt, Outline numbered +Level: 2 +

    Numbering Style: 1, 2, 3, +Start at: 1 +Alignment: Left + Aligned at: 1.27 cm +Tab after:

    2.54 cm +Indent at: 2.03 cm, Tab stops: 1.27 cm, List tab + Not