10
Company Profile

Metro Millennium Infos copy - Part 1_3

Embed Size (px)

Citation preview

Page 1: Metro Millennium Infos copy - Part 1_3

Company Profile

Page 2: Metro Millennium Infos copy - Part 1_3

The Millennium Group of Companies, a Bumiputra owned group was established in 1996 to serve the government’s call for Bumiputra’s participation in the Building Services and Construction Industry.

Metro Millennium Sdn. Bhd. has extensive experience in Engineering, Procurement, Construction, Commissioning (EPCC) Solutions Provider for Building Services, Infrastructure, Mechanical, Electrical, Plumbing Services, for new construction as well as retrofitting of plant and equipment for prestigious project like district cooling plant, airport, transit, hospitals, hotels, commercial, shopping complex, government, office & residential buildings, factories, warehouse, indoor stadiums, and universities, colleges & etc.

It is the Group’s vision to continue being a total solution provider in all selected business segments by setting a new quality standard in our products & services. To constantly seek innovative products develop locally and overseas to enhance our ability to deliver value to our customer.

Introduction

Page 3: Metro Millennium Infos copy - Part 1_3

Corporate Info

Name Of Company : METRO MILLENNIUM SDN BHD (386990-X)

Type Of Company : Private Limited

Date Of Incorporation : 10 May 1996

Board Of Directors : En. Syed Sadiq Albar Bin Syed Hamid

(Chief Executive Officer)

Mr. Casey Tan Kim Chai

(Chief Operating Officer)

In Malaysia :

1. Metro Millennium Sdn. Bhd. (386990-X)

(Engineering, Procurement & Contracting Administration)

In Qatar :

4. Millennium Engineering & Trading WLL

(Engineering, Contracting and Trading In Qatar)

Page 4: Metro Millennium Infos copy - Part 1_3

- Proven performance and reliability since 1996.

- ISO 9001:2008 Certified with Provision of Engineering, Procurement and Contract Administration (EPC), Building Services Facilities Management (Heating, Ventilation & Air Conditioning), Plumbing & Sanitary, Fire Protection, Electrical Services, etc. and Hospital Facilities Services.

- Delivered project in time with advanced engineered, cost & energy efficiency.

- Completed design & build, turnkey project from design, costing, installation, testing & commissioning until project close-out.

- Diversified capabilities in heating, air- conditioning, refrigeration, mechanical ventilation, fire risk & safety , smoke management , indoor air quality & pollution control, medical gas, process piping and plumbing sanitary system.

Our Strength & Capability

Page 5: Metro Millennium Infos copy - Part 1_3

- Specialty Contractor (SC)

- Design Review & Evaluation (DRE)

- Value Engineering (VE)

- Performance Based Design (PBD)

- Computerized Simulation (CFD)

- Building Information Modeling (BIM)

- Green & Sustainable Construction (GSC)

- Energy Efficiency (EE)

- Total Solution Provider (TSP)

Our Business Approach

Page 6: Metro Millennium Infos copy - Part 1_3

Our Management

The founders of the company. He has over 25 years of experience in conducting business in Malaysia’s construction, building

services industry. Practical entrepreneur focusing on effective and proficient design review & evaluation concept, for

ultimate cost and time efficiency. His main responsibility is to actively pursuing business development on Engineering, Procurement

and Contract Administration (EPC) for construction, building services, facilities management, healthcare & medical and infrastructure services.

Member of American Society of Heating, Refrigeration and Air-Conditioning Engineers Incorporated. Member of Malaysian Institute of Management Member of Malaysian Air Conditioning & Refrigeration Association (MARCA).

Casey Tan Kim ChaiCert. (ACMV & Refrigeration), Cert. (Society of Eng.)Dip. (Elect. Eng.), Dip. (Gen. Mgmt)Director of Millennium Group of CompaniesChief Operation Officer

Syed Sadiq Albar Bin Syed HamidBA (Hons.) In BusinessDirector of Millennium Group of CompaniesChief Executive Officer

Appointed as the Group Chief Executive Officer on 1st July 2004

More than 10 years of experience in the field of marketing, board development, business development and corporate administration management.

He is leading the Group’s in strategic planning, marketing, positioning and overall organization management for sustainability and excel in the industry

His expertise also includes knowledge in information technology solutions and corporate incubation processes.

His current and previous portfolios have granted him the edge in combining local expertise with his international networks to lead and grow the team excelling to new business heights.

Others directorship :

i. Director of Kalmar (Malaysia) Sdn Bhd (Total Port Logistic Company)

ii. Directors of Budi Halus Sdn Bhd (Subsidiary of Bertam Alliance Berhad)

Page 7: Metro Millennium Infos copy - Part 1_3

Our Management

Experienced in office and human resources management, financial control, business administration and ISO QMS establishment and implementation.

Hands-on practicing in the hotel industry, banking, engineering and construction organizations.

In-charge for the establishment, implementation and maintenance of Group’s ISO 9001:2000 Quality Management System and the successful upgrading of ISO 9001:2008 standard.

The Group’s overall administration, HR, financial control, business development and corporate planning towards achieving of effective team management.

Lim Wai LeeBach. In Business Administration (1st Class Hons)Executive Director

Dr. Leong PoonPhD (Fire Eng), MEngSci, BE (Civil, Hons), MIEAust, CPEng, NPER, SFS, ATS, FSE(Aust, M’sia, S’pore)

Fire Safety & Tunnel Ventilation Specialist

• More than 25 years experiences in the area of fire research and application in buildings.• Thereafter. He gained his Master in Engineering Science, also from Monash University in the area of fire risk and subsequently completed a PhD on the characterization of fire behaviour and occupant movement in buildings for assessing fire and life safety in buildings. • Leong’s early years was with BHP Research where he spent about 12 years assisting with the development of engineering design solutions for fire resistance of structures and modelling using complex fire and risk assessment methodologies for determining fire safety levels in buildings. • He was seconded to Victoria University on numerous occasions where he became significantly involved in the development of fire risk models. • In the last ten years, Leong’s interest on fire safety has extended to road & rail tunnels and underground stations. • He has written a number of papers on this topic, with a special focus on tunnel fire risk. • He is currently a member of a number of committees in fire safety, including FP-023 Standards Australia, Tunnel fire safety committee. • Leong is also a registered Fire Safety Engineer (FSE) with FSSD.

Page 8: Metro Millennium Infos copy - Part 1_3

Chung Chiew WaiBachelor of Electronic Engineering (1st Class Hons)Member of Board of Engineers Malaysia (BEM)Member of Institution of Engineers Malaysia (IEM)Operation Manager Posses more than 14 years of experience in senior management position Vast working experience in project management, sales, operation and maintenance arena He is taking charge of the organisation day-to-day project management and operation to ensure

timely deliveries and quality outputs

Nadia Zong MBA, B.Sc. Engineering, Associate AccountantFellow Membership of IFA (Institute of Financial Accountant-U.K)Diploma in IFRSFinance & Account Divisional Manager Posses more than 19 years of experience in Corporate Accounting and Finance practicing,

Corporate Budgeting and Hedging Approaches, Strategic Planning, M&A, Joint Venture establishment and business modeling. .

Experienced in ERP system development and implementation. Well verse with Chinese GAAP and International accounting principle.

Her goal is to lead the company towards financial success and sustainability.

Our Management

Page 9: Metro Millennium Infos copy - Part 1_3

• Posses more than 7 years experiences in building services and 4 years overseas experiences in and handled Tunnel Ventilation installation in Al Salam Street Road and Tunnel for Abu Dhabi Road & Transport Authority and Burj Dubai Development for Emaar Properties in Dubai.

• Strong technical knowledge and hands-on experience in air-conditioning, mechanical ventilation and plumbing sanitary system.

• Posses applicable knowledge of standard like British Standard, ASHRAE, ASTM, SMACNA, DW-143 & 144, BSRIA, NFPA, UL Standard, Uniform Plumbing Code (UPC), International Plumbing Code (IPC), National Plumbing Code (NPC).

• Submission of technical proposal, materials, drawing, standard details, method of statement and design coordination between MEP, architectural and structural services.

• Preparation of as-built drawing, testing & commissioning data sheets, project handover documentation, O&M and training manual.

 

Jeff Chan Hon. Degree in Bachelor of Mechanical Engineering Manager

Posses more than 18 years of vast working experience in building and construction industry, major in MEP services, site execution and budget monitoring.

He is leading the Group’s Contracting team in feasibility Pre & Post contract administration.

In-charge for Group’s bidding, contracting, award, claims, and project cost control. His professionalism and sincere approach is essential towards overall quality project

deliveries and organisation growth.Kee Seng YongCert . in Electronic EngineeringContract Divisional Manager

Strong technical background in electrical design, mechanical and plumbing Services

More than 9 years of cross-cultural work experience in Malaysia and Middle East countries, in project management roles

He is leading the project team in overall project management, budget and work program planning and monitoring, project execution, quality control, testing & commissioning, documentation compliances, & etc. for successful project completion and hand over.

Deric LimBachelor in Electrical & Electronics Engineering Project Manager

Page 10: Metro Millennium Infos copy - Part 1_3

Tai Chern ChoonDip. In Mechanical EngineeringConstruction Manager Specialized in Plumbing Sanitary and Fire Fighting Engineering Services

Posses more than 15 years of site experience in handling physical site work execution for defect maintenance.

He is leading the Plumbing Sanitary and Fire Fighting project team for design consultation, quantities take off, project planning, work execution, monitoring, Testing & Commissioning, project deliveries and after sales services.

Woo Wai MunBachelor in Mechanical Engineering Facility Manager Academic knowledge and tactical hands on experience in operation maintenance, installation and repair.

Handling of major equipment preventing maintenance, and periodic servicing program

Data compilation, report generating and system performance evaluation and analysis for optimum output and energy saving exercise.

Choo Wai TeckSite Manager Posses more than 15 years of hands on experience in site management

Specialized in Electrical, ELV and BMS system and services

Excellent people handling skills to leverage human asset for optimum Team work and site output