  • PROYECTO: CONSTRUCCION DE LOCAL COMUNAL DE USO MULTIPLE Y GRADERIAS

    BARRIO:PEDREGAL BAJO, DISTRITO: HUARAZ, PROVINCIA: HUARAZ, DEPARTAMENTO: ANCASH

    Largo(M) Ancho(M) Alto(M)

    01.00.00 LOCAL COMUNAL

    01.01.00 OBRAS PROVISIONALES

    01.01.01 GUARDIANIA 1 1.00 glb 1.00

    01.02.00 OBRAS PRELIMINARES

    01.02.01 LIMPIEZA DE TERRENO MANUAL

    1 12.00 9.34 112.08 m2 112.08

    01.02.02 TRAZO, NIVELACION Y REPLANTEO 1 12.00 9.34 112.08 m2 112.08

    01.03.00 MOVIMIENTO DE TIERRAS

    01.03.01 EXCAVACIN DE ZANJA PARA CIMIENTOS HASTA H = 1.0M

    m3 27.61

    Eje A-A entre 1y2 1 4.53 0.60 1.00 2.72

    Eje A-A entre 2y3 1 1.21 0.60 1.00 0.73

    EjeB-B entre 1 y 2 1 4.53 0.60 1.00 2.72

    Eje B-B entre 2 y 3 1 1.21 0.60 1.00 0.73

    Eje C-C entre 1 y 2 1 4.53 0.60 1.00 2.72

    Eje C-C entre 2Y3 1 1.21 0.60 1.00 0.73

    Eje D-D entre 1 y 2 1 4.53 0.60 1.00 2.72

    Eje D-D entre 2Y3 1 1.21 0.60 1.00 0.73

    Eje 1-1 entre AyB 1 2.20 0.60 1.00 1.32

    Eje 1-1 entre ByC 1 2.60 0.60 1.00 1.56

    Eje 1-1 entre CyD 1 2.60 0.60 1.00 1.56

    Eje 2-2 entre AyB 1 2.20 0.60 1.00 1.32

    Eje 2-2 entre ByC 1 2.60 0.60 1.00 1.56

    Eje 2-2 entre CyD 1 1.75 0.60 1.00 1.05

    Eje 3-3 entre AyB 1 2.65 0.60 1.00 1.59

    PLANILLA DE METRADOS

    ITEM DESCRIPCION UNIDADDIMENSIONES

    PARCIAL TOTALCANTIDAD

    Vice ministerio de Vivienda y Urbanismo

    Programa Integral de Mejoramiento de Barrios y Pueblos

    MUNICIPALIDAD PROVINCIAL

    HUARAZ

    GDUR DEEO

    COMPONENTES: LOCAL COMUNAL, GRADERIA Y ACABADO DE LOSA DEPORTIVA PROYECTO: MEJORAMIENTO INTEGRAL DEL BARRIO URBANO MARGINAL DE PEDREGAL BAJO CIUDAD DE HUARAZ

    VOLUMEN: IV

  • Eje 3-3 entre ByC 1 2.90 0.60 1.00 1.74

    Eje 3-3 entre CyD 1 1.65 0.60 1.00 0.99

    Eje X-X entre 2y3 1 2.34 0.40 0.60 0.56

    Eje Y-Y entre Cy D 1 0.97 0.60 1.00 0.58

    01.03.02 EXCAVACION PARA ZAPATAS H = 1.70 T.N.

    m3 40.39

    8 1.50 1.50 1.70 3.83 30.60

    4 1.20 1.20 1.70 2.45 9.79

    01.03.03 NIVELACION Y APISONADO INTERIOR MANUAL 1 102.90 m2 102.90

    01.03.04 ELIMINACION DE MATERIAL EXCEDENTE 1 85.002 m3 85.00

    01.04.00 CONCRETO SIMPLE

    01.04.01 SOLADO DE CONCRETO E= 0.10M. (ZAPATAS)

    m3 2.38

    4 1.20 1.20 0.10 0.14 0.58

    8 1.50 1.50 0.10 0.23 1.80

    01.04.02 CIMIENTO CORRIDO MEZCLA 1:10, CEMENTO : HORMIGON + 30% PIEDRA GRANDE m3 24.83

    Eje A-A entre 1y2 1 6.18 0.60 0.60 2.22 2.22

    Eje A-A entre 2y3 1 3.16 0.60 0.60 1.14 1.14

    EjeB-B entre 1 y 2 1 6.18 0.60 0.60 2.22 2.22

    Eje B-B entre 2 y 3 1 3.16 0.60 0.60 1.14 1.14

    Eje C-C entre 1 y 2 1 6.18 0.60 0.60 2.22 2.22

    Eje C-C entre 2Y3 1 3.16 0.60 0.60 1.14 1.14

    Eje D-D entre 1 y 2 1 6.18 0.60 0.60 2.22 2.22

    Eje D-D entre 2Y3 1 3.16 0.60 0.60 1.14 1.14

    Eje 1-1 entre AyB 1 3.48 0.60 0.60 1.25 1.25

    Eje 1-1 entre ByC 1 3.50 0.60 0.60 1.26 1.26

    Eje 1-1 entre CyD 1 2.63 0.60 0.60 0.95 0.95

    Eje 2-2 entre AyB 1 3.48 0.60 0.60 1.25 1.25

    Eje 2-2 entre ByC 1 3.50 0.60 0.60 1.26 1.26

    Eje 2-2 entre CyD 1 2.63 0.60 0.60 0.95 0.95

    Eje 3-3 entre AyB 1 3.48 0.60 0.60 1.25 1.25

    Eje 3-3 entre ByC 1 3.50 0.60 0.60 1.26 1.26

    Eje 3-3 entre CyD 1 2.63 0.60 0.60 0.95 0.95

    Eje X-X entre 2y3 1 2.71 0.40 0.60 0.65 0.65

    Eje Y-Y entre Cy D 1 0.97 0.60 0.60 0.35 0.35

    01.04.03 SOBRECIMIENTOS C:H (1:8 + 25% PM) m3 2.42

    Eje A-A entre 1y2 1 5.73 0.15 0.30 0.26 0.26

  • Eje A-A entre 2y3 1 2.71 0.15 0.30 0.12 0.12

    Eje B-B entre 2 y 3 1 2.71 0.15 0.30 0.12 0.12

    Eje C-C entre 2Y3 1 2.71 0.15 0.30 0.12 0.12

    Eje D-D entre 1 y 2 1 5.73 0.15 0.30 0.26 0.26

    Eje D-D entre 2Y3 1 2.71 0.15 0.30 0.12 0.12

    Eje 1-1 entre AyB 1 4.00 0.15 0.30 0.18 0.18

    Eje 1-1 entre ByC 1 1.80 0.15 0.30 0.08 0.08

    Eje 1-1 entre CyD 1 3.00 0.15 0.30 0.14 0.14

    Eje 2-2 entre AyB 1 3.10 0.15 0.30 0.14 0.14

    Eje 2-2 entre ByC 1 2.90 0.15 0.30 0.13 0.13

    Eje 2-2 entre CyD 1 1.26 0.15 0.30 0.06 0.06

    Eje 3-3 entre AyB 1 4.00 0.15 0.30 0.18 0.18

    Eje 3-3 entre ByC 1 3.80 0.15 0.30 0.17 0.17

    Eje 3-3 entre CyD 1 3.00 0.15 0.30 0.14 0.14

    Eje X-X entre 2y3 1 3.01 0.15 0.30 0.14 0.14

    Eje Y-Y entre Cy D 1 1.64 0.15 0.30 0.07 0.07

    01.04.04 ENCOFRADO Y DESENCOFRADO, EN SOBRECIMIENTO m2 32.29

    Eje A-A entre 1y2 2 5.73 0.30 1.72 3.44

    Eje A-A entre 2y3 2 2.71 0.30 0.81 1.63

    Eje B-B entre 2 y 3 2 2.71 0.30 0.81 1.63

    Eje C-C entre 2Y3 2 2.71 0.30 0.81 1.63

    Eje D-D entre 1 y 2 2 5.73 0.30 1.72 3.44

    Eje D-D entre 2Y3 2 2.71 0.30 0.81 1.63

    Eje 1-1 entre AyB 2 4.00 0.30 1.20 2.40

    Eje 1-1 entre ByC 2 1.80 0.30 0.54 1.08

    Eje 1-1 entre CyD 2 3.00 0.30 0.90 1.80

    Eje 2-2 entre AyB 2 3.10 0.30 0.93 1.86

    Eje 2-2 entre ByC 2 2.90 0.30 0.87 1.74

    Eje 2-2 entre CyD 2 1.26 0.30 0.38 0.76

    Eje 3-3 entre AyB 2 4.00 0.30 1.20 2.40

    Eje 3-3 entre ByC 2 3.80 0.30 1.14 2.28

    Eje 3-3 entre CyD 2 3.00 0.30 0.90 1.80

    Eje X-X entre 2y3 2 3.01 0.30 0.90 1.81

    Eje Y-Y entre Cy D 2 1.64 0.30 0.49 0.98

    01.05.00 CONCRETO ARMADO

    01.05.01 ACERO FY=4200 KG/CM2, EN ZAPATAS kg 239.52

    Z1 4 14.26 57.04

    Z2 8 22.81 182.48

  • 01.05.02 CONCRETO F'C=210 KG/CM2. PARA ZAPATAS m3 14.26

    Z1 4 1.20 1.20 0.60 0.86 3.46

    Z2 8 1.50 1.50 0.60 1.35 10.80

    01.05.03 ACERO FY=4200 KG/CM2, EN VIGAS DE CIMENTACION kg 613.00

    N long kg/m

    4 6.00 6.80 0.994 40.56 162.22

    4 34.00 1.18 0.557 22.35 89.39

    3 4.00 12.52 0.994 49.78 149.34

    3 63.00 1.08 0.557 37.90 113.69

    4 4.00 3.31 0.994 13.16 52.64

    4 19.00 1.08 0.557 11.43 45.72

    01.05.04 ENCOFRADO Y DESENCOFRADO, EN VIGA DE CIMENTACION m2 52.97

    Eje A-A entre 1y2 2 5.73 0.40 2.29 4.58

    Eje A-A entre 2y3 2 2.71 0.40 1.08 2.17

    Eje B-B entre 1y2 2 5.73 0.40 2.29 4.58

    Eje B-B entre 2 y 3 2 2.71 0.40 1.08 2.17

    Eje C-C entre 1y3 2 5.73 0.40 2.29 4.58

    Eje C-C entre 2Y3 2 2.71 0.40 1.08 2.17

    Eje D-D entre 1 y 2 2 5.73 0.40 2.29 4.58

    Eje D-D entre 2Y3 2 2.71 0.40 1.08 2.17

    Eje 1-1 entre AyB 2 4.00 0.40 1.60 3.20

    Eje 1-1 entre ByC 2 3.80 0.40 1.52 3.04

    Eje 1-1 entre CyD 2 3.00 0.40 1.20 2.40

    Eje 2-2 entre AyB 2 4.00 0.40 1.60 3.20

    Eje 2-2 entre ByC 2 3.85 0.40 1.54 3.08

    Eje 2-2 entre CyD 2 3.00 0.40 1.20 2.40

    Eje 3-3 entre AyB 2 4.00 0.40 1.60 3.20

    Eje 3-3 entre ByC 2 3.80 0.40 1.52 3.04

    Eje 3-3 entre CyD 2 3.00 0.40 1.20 2.40

    01.05.05 CONCRETO F'C=210 KG/CM2, EN VIGA DE CIMENTACION m3 26.48

    Eje A-A entre 1y2 1 5.73 0.25 0.40 2.29 2.29

    Eje A-A entre 2y3 1 2.71 0.20 0.40 1.08 1.08

    Eje B-B entre 1y2 1 5.73 0.25 0.40 2.29 2.29

    Eje B-B entre 2 y 3 1 2.71 0.20 0.40 1.08 1.08

    Eje C-C entre 1y3 1 5.73 0.25 0.40 2.29 2.29

    Eje C-C entre 2Y3 1 2.71 0.20 0.40 1.08 1.08

    Eje D-D entre 1 y 2 1 5.73 0.25 0.40 2.29 2.29

    Eje D-D entre 2Y3 1 2.71 0.20 0.40 1.08 1.08

    Eje 1-1 entre AyB 1 4.00 0.20 0.40 1.60 1.60

  • Eje 1-1 entre ByC 1 3.80 0.20 0.40 1.52 1.52

    Eje 1-1 entre CyD 1 3.00 0.20 0.40 1.20 1.20

    Eje 2-2 entre AyB 1 4.00 0.20 0.40 1.60 1.60

    Eje 2-2 entre ByC 1 3.85 0.20 0.40 1.54 1.54

    Eje 2-2 entre CyD 1 3.00 0.20 0.40 1.20 1.20

    Eje 3-3 entre AyB 1 4.00 0.20 0.40 1.60 1.60

    Eje 3-3 entre ByC 1 3.80 0.20 0.40 1.52 1.52

    Eje 3-3 entre CyD 1 3.00 0.20 0.40 1.20 1.20

    01.05.06 ACERO FY=4200 KG/CM2 PARA COLUMNAS kg 794.90

    C1 2 50.31 100.61

    C2 6 59.90 359.39

    C3 4 69.49 277.96

    C4 2 28.47 56.94

    01.05.07 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 45.02

    C1 8 0.30 2.68 0.80 6.43

    C2 24 0.30 2.68 0.80 19.30

    C3 16 0.30 2.68 0.80 12.86

    C4 8 0.30 2.68 0.80 6.43

    01.05.08 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3 4.48

    C1 2 0.30 0.30 3.83 0.34 0.69

    C2 6 0.30 0.30 3.83 0.34 2.07

    C3 4 0.30 0.30 3.83 0.34 1.38

    C4 2 0.30 0.15 3.83 0.17 0.34

    01.05.09 ACERO FY=4200 KG/CM2, EN VIGAS kg 1,306.55

    N long kg/m

    V-1 3 3.00 12.52 0.994 37.33 112.00

    3 3.00 12.52 1.552 58.29 174.88

    3 71.00 1.70 0.557 67.23 201.69

    4 3.00 3.83 0.994 11.42 45.68

    4 3.00 3.83 1.552 17.83 71.33

    4 27.00 1.70 0.557 25.57 102.27

    V-2 4 4.00 7.35 0.994 29.22 116.89

    4 4.00 7.35 1.552 45.63 182.52

    4 45.00 1.80 0.557 45.12 180.47

    VS 2 4.00 12.52 0.557 27.89 55.79

    3 67.00 0.70 0.448 21.01 63.03

    01.05.10 ENCOFRADO Y DESENCOFRADO, EN VIGAS m2 118.07

  • 3 10.80 0.30 3.24 9.72

    6 10.80 0.45 4.86 29.16

    4 2.71 0.30 0.45 0.81 3.25

    8 2.71 0.45 1.22 9.76

    4 6.53 0.30 1.96 7.84

    8 6.53 0.50 3.27 26.12

    2 0.30 0.50 0.00

    3 19.53 0.15 2.93 8.79

    6 19.53 0.20 3.91 23.44

    01.05.11 CONCRETO F'C=210 KG/CM2. EN VIGAS m3 10.83

    3 12.00 0.30 0.45 1.62 4.86

    4 2.71 0.30 0.45 0.37 1.46

    4 6.53 0.30 0.50 0.98 3.92

    1 19.53 0.15 0.20 0.59 0.59

    01.05.12 ACERO FY = 4200 KG/CM2, EN LOSAS ALIGERADAS kg 292.23

    N long kg/m

    1 3.00 11.82 0.99 35.25 35.25

    1 3.00 8.44 0.56 14.10 14.10

    1 10.00 10.42 0.99 103.57 103.57

    1 10.00 7.29 0.56 40.61 40.61

    1 6.00 11.82 0.99 70.49 70.49

    1 6.00 8.44 0.56 28.21 28.21

    01.05.13 LADRILLO DE ARCILLA HUECO 15x30x30 PROV. Y COLOCADO und 808.38

    n lad/m2 Area

    1 8.33 97.01 808.38

    01.05.14 ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS m2 97.01

    Area

    1 97.01 97.01

    01.05.15 CONCRETO F'C=175 KG/CM2. PARA LOSAS ALIGERADA m3 8.49

    m3/m2 Area

    1 0.09 97.01 8.49

    01.05.16 ENCOFRADO Y DESENCOFRADO, EN ESCALERA m2 68.91

    fonfo 1 4.14 1.20 4.96 4.96

    lateral 2 0.50 0.15 0.08 0.15

    2 4.14 0.20 0.83 1.66

    2 0.26 0.20 0.05 0.10

    26 0.02 0.57 14.79

    contrapisos 15 0.18 1.20 3.15 47.25

  • 01.05.17 ACERO ESTRUCTURAL, EN ESCALERA kg 94.29

    N long kg/m

    - 1 6.75 5.66 0.994 37.98 37.98

    1 6.75 2.14 0.994 14.36 14.36

    1 6.75 2.20 0.994 14.76 14.76

    - 1 5.60 1.01 0.557 3.15 3.15

    1 5.60 0.99 0.557 3.09 3.09

    1 18.36 1.15 0.557 11.76 11.76

    1 6.92 1.15 0.557 4.43 4.43

    1 7.44 1.15 0.557 4.77 4.77

    01.05.18 CONCRETO F'C=210 KG/CM2, EN ESCALERA m3 1.95

    1 0.97 1.20 0.50 0.58 0.58

    1 3.94 1.20 0.20 0.95 0.95

    1 0.35 1.20 0.20 0.08 0.08

    area

    13 0.02 1.20 0.03 0.34

    01.06 ALBAILERIA

    01.06.01 MURO SOGA LADRILLO DE ARCILLA KING KONG 8X14X24 m2 113.88

    AREA TOTAL DE MUROS SIN DESCONTAR VANOS 1 55.06 2.40 132.14

    AREA DE VANOS 18.27

    VENTANAS 4 1.80 1.20 2.16

    1 1.14 1.20 1.37

    2 1.00 0.40 0.40

    PUERTAS 1 2.00 2.10 4.20

    2 0.90 2.10 3.78

    2 0.80 2.10 3.36

    2 0.75 2.00 3.00

    01.07 REVOQUES Y ENLUCIDOS

    01.07.01 TARRAJEO INTERIOR C/MORTERO 1:5 x 1.5 CM (INC. COLUMNAS EMPOT.) m2 177.80

    Eje A-A entre 1y3 1 9.34 2.40 22.42 22.42

    Eje D-D entre 1y3 1 9.19 2.40 22.06 22.06

    Eje 1-1 entre A y D 1 9.70 2.40 19.02 19.02

    Eje 2-2 entre A y D 1 15.39 2.40 36.94 36.94

    Eje 3-3 entre A y D 1 11.68 2.40 22.91 22.91

    Eje B-B entre 2y3 1 6.47 2.40 15.53 15.53

    Eje C-C entre 2y3 1 6.02 2.40 14.45 14.45

    Eje X-X entre 2y3 1 6.62 2.40 15.89 15.89

    Eje y-y entre C y D 1 3.58 2.40 8.59 8.59

  • 01.07.02 TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM.(INC.COLUMNAS EMPOT) m2 108.48

    Eje 1-1 entre A y D 1 12.00 2.93 38.11 38.11

    Eje 3-3 entre A y D 1 12.00 2.93 39.08 39.08

    Eje A-A y D-D entre 1y3 1 9.34 2.93 31.29 31.29

    01.07.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. 1 63.84 63.84 m 63.84

    01.07.04 TARRAJEO EN VIGAS m2 188.02

    Eje A-B-C-D entre 1y2 4 5.73 0.50 2.87 11.46

    2 5.73 0.15 0.86 1.72

    Eje A-B-C-D entre 2 y3 4 2.71 0.45 1.22 4.88

    Eje 1-2-3 entre A y D 3 10.80 0.45 4.86 14.58

    Eje D-D entre 1y3 1 9.19 2.40 22.06 22.06

    Eje 1-1 entre A y D 1 9.70 2.40 19.02 19.02

    Eje 2-2 entre A y D 1 15.39 2.40 36.94 36.94

    Eje 3-3 entre A y D 1 11.68 2.40 22.91 22.91

    Eje B-B entre 2y3 1 6.47 2.40 15.53 15.53

    Eje C-C entre 2y3 1 6.02 2.40 14.45 14.45

    Eje X-X entre 2y3 1 6.62 2.40 15.89 15.89

    Eje y-y entre C y D 1 3.58 2.40 8.59 8.59

    01.07.06 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1 m2 102.89

    Area

    saln de uso multiple 1 68.96 68.96 68.96

    oficina dirigencial 1 12.57 12.57 12.57

    oficina de actividades 1 11.98 11.98 11.98

    bao 2 4.69 4.69 9.38

    01.08 PISOS Y PAVIMENTOS

    01.08.01 FALSO PISO DE CONCRETO H=10CM 1 102.89 m2 102.89

    01.08.02 ACABADO PULIDO Y BRUADO DE PISO E=2" 1 93.51 m2 93.51

    01.08.03 BASE PARA VEREDA 1 1.71 2.00 3.42 m2 3.42

    01.08.04 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 0.81

    2 1.71 0.15 0.26 0.51

    1 2.00 0.15 0.30 0.30

    01.08.05 CONCRETO F'C= 140 KG/CM2 EN VEREDAS 1 1.71 2.00 0.15 0.51 m3 0.51

    01.08.06 PISO DE LOSEA CERAMICA DE 0.30 x 0.30 CM m2

    Area 22.22

    2 11.11 11.11 22.22

    01.09 ZOCALOS

  • 01.09.01 ZOCALO DE CEMENTO, H=0.10M 1 56.86 56.86 m 56.86

    01.09.02 ZOCALO DE MAYOLICA 20 X 30 cm (SERVICIOS HIGIENICOS) 2 10.16 10.16 m 20.33

    01.10 CARPINTERIA DE MADERA

    01.10.01 PUERTA MADERA CEDRO m2 14.34

    1 5.40 2.10 11.34 11.34

    1 1.50 2.00 3.00 3.00

    01.11 CARPINTERIA METALICA

    01.11.01 VENTANA METALICA m2 10.81

    1 8.34 1.20 10.01 10.01

    1 2.00 0.40 0.80 0.80

    01.12 CERRAJERIA

    01.12.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 2 GOLPES 1 1.00 und 1.00

    01.12.02 CERRADURA PARA PUERTA INTERIOR, TIPO BOLA 4 4.00 und 4.00

    01.12.03 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" 22 22.00 pza 22.00

    01.13 VIDRIOS, CRISTALES Y SIMILARES

    01.13.01 VIDRIO SEMIDOBLE INCOLORO 1 116.29 p2 116.29

    01.14 PINTURA

    01.14.01 PINTURA LATEX EN MURO EXTERIOR 1 33.34 2.93 87.28 m2 87.28

    01.14.02 PINTURA LATEX EN MURO INTERIOR 1 74.82 2.40 169.16 m2 169.16

    01.14.03 PINTURA LATEX EN COLUMNAS 1 5.55 2.40 13.32 m2 13.32

    01.14.04 PINTURA LATEX EN VIGAS m2 57.56

    1 11.46 0.50 5.73 5.73

    1 32.16 0.45 14.47 14.47

    1 3.40 0.15 0.51 0.51

    4 11.46 0.50 5.73 22.92

    1 11.46 0.15 1.72 1.72

    1 35.56 0.15 5.33 5.33

    2 11.46 0.30 3.44 6.88

    01.14.05 PINTURA LATEX EN CIELO RASO 2 MANOS 1 102.89 m2 102.89

    01.15 INSTALACIONES ELECTRICAS

    01.15.01 TUBERIAS PVC SEL PESADO (ELECTRICAS) D=20 mm 1 48.55 48.55 m 48.55

    01.15.02 TUBERIAS PVC SEL PESADO (ELECTRICAS) D=25 mm 1 2.50 2.50 m 2.50

    01.15.03 CABLE ELECTRICO NYY 40 MM2. 1 4.25 4.25 m 4.25

    01.15.04 CABLE ELECTRICO NYY 16 MM2. 1 4.25 4.25 m 4.25

    01.15.05 CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2. 1 252.93 252.93 m 252.93

    01.15.06 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL 16 16.00 und 16.00

    01.15.07 SUMINISTRO E INST. INTERRUPTOR BAKELITA DOBLE 4 4.00 und 4.00

    01.15.08 SUMINISTRO E INST. INTERRUPTOR BAKELITA SIMPLE 2 2.00 und 2.00

    01.15.09 SUMINISTRO E INST. TOMACORRIENTE BAKELITA DOBLE 17 17.00 und 17.00

    01.15.10 TABLERO GENERAL CAJA METALICA 1 1.00 und 1.00

  • 01.15.11 TABLEROS DE DISTRIBUCION CAJA METALICA 1 1.00 pza 1.00

    01.15.12 POZO A TIERRA 1 1.00 und 1.00

    01.16 APARATOS SANITARIOS Y ACCESORIOS

    01.16.01 INODORO TANQUE BAJO BLANCO 2 2.00 und 2.00

    01.16.02 LAVATORIO DE PARED BLANCO 1 LLAVE 3 3.00 und 3.00

    01.16.03 URINARIO 1 1.00 und 1.00

    01.17 SISTEMA DE DESAGUE

    01.17.01 SALIDA DESAGUE TUBERIA PVC SAL 2" 4 4.00 pto 4.00

    01.17.02 SALIDA DESAGUE TUBERIA PVC SAL 4" 2 2.00 pto 2.00

    01.17.03 SALIDA DE DESAGUE PARA SUMIDERO 2 2.00 pto 2.00

    01.17.04 SALIDA DE PVC SAL 2" PARA VENTILACION 1 4.00 pto 4.00

    01.17.05 TUBERIA DE PVC SAL SP 4" 1 17.36 17.36 m 17.36

    01.17.06 TUBERIA DE PVC SAL SP 2" 1 18.24 18.24 m 18.24

    01.17.07 SUMIDERO DE BRONCE D=2" 2 und

    01.17.08 REGISTRO DE BRONCE D=2" PROVICION Y COLOCACION 2 2.00 und 2.00

    01.17.09 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC GLb 1.00

    YEE SIMPLE 4" 2 2.00 und 2.00

    YEE SIMPLE 2" 4 4.00 und 4.00

    CRUZ DE 4"x 2" 1 1.00 und 1.00

    01.17.10 CAJA C 12" x 24" DE REGISTRO DE DESAGUE C/TAPA DE CONCRETO 1 1.00 und 1.00

    01.18 SISTEMA DE AGUA FRIA

    01.18.01 SALIDA DE AGUA FRIA CON TUBERIA PVC-SAP 1/2" 6 6.00 pto 6.00

    01.18.02 TUBERIA PVC SAP SP C-10 1/2" 1 11.15 11.15 m 11.15

    01.18.03 TUBERIA PVC SAP SP C-10 3/4" 1 10.62 10.62 m 10.62

    01.18.04 VALVULA COMPUERTA DE BRONCE DE 1/2" 1 1.00 und 1.00

    01.18.05 CAJA DE REGISTRO DE AGUA 12" X 24" 1 1.00 und 1.00

    02.10.00. VARIOS

    02.10.01. FLETE ( LOCAL COMUNAL :HUARAZ - PEDREGAL) 1.00 1.00 GLB 1.00