Meter of Phase Plan

Embed Size (px)

Citation preview

  • 8/18/2019 Meter of Phase Plan

    1/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

    DESIGN AIR PASS No. 01

    PROYECTO:  AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y

    SANEAMIENTO DEL CASERÍO FARO BAJO DISTRITO DE SOROCHUCO

    CELENDIN - CAJAMARCA

    Length (L) = 35.00 m.Pipe diameter (s) = 1 in. ESPECIFICACIONE

    Class of pipe (s) = 7.5

    Number of pipes = 1

    Pipe eight per ml = 0.!5 "g.#m.

    ire diameter =  3#$ pulg.   1# ! 5 %&esist. to the 'able brea = $010.00 g.#m.   3# * 5 %Cable eight per ml = 0.53 g.#m. 1 5 %+,erload per meter = $0.00 g.#m. 1 1# * 5 %-afet Coeffi'ient = ! 1 1# ! 5 %

    ! 5 !.3*7

    /i,en dimensions ! 1# ! 5 !.0*  b 'a = 1.!0 m. 3 5 *.30!

    Prof. Ca = 1.!0 m. * 5 7.055h 'a = 0.0 m. 2 5 15.!!7

    o4er dimensions $ 5 !5.225 = 1.70 m. 10 5 32.301d = 0.30 m. 1! 5 52.*07

    6imensions apatah8 = 0.20 m.b8 = 0.20 m.

    prof. = 0.$0 m.

    ater ,olume = 0.017

    eight of 4ater = 1000.00

    otal 4eight of pipe = $.1 "g.otal 4eight of ater = 17.1$ "g.otal 4eight of 'able = 1$.3$ "g. Lotal +,erload = !$00.00 "g.+9L = !$**.*7 "g.

    (h ca = profun!

    #EI$%T TOTAL (P&o&a'" = )**+93 -+

    eight to be supported b gi,en ( = !$**.*7 "g.

    /i,en ,olume = 1.30eight gi,en 'on'rete (Pd) = 3110.*0 "g.

    * DATOS 

    T./O PC1. PARA FL.IOS A PR

    IAETRONOINAL

    (Pu'-+"

    LON$+(4&5+"

    CLASE 6 PSI

    PESO (7- 8&uo"

    % La Norma :'ni'a Peruana e;igtubos deben ser en CL9-? 10.

    % odos los tubos se fabri'an 'on(?C) @ simple presion (-P)

    * CÁLCULOS 

    m3

    "g.#m3

    m3

    b 'a

          P     r     o      f .

         '     a

  • 8/18/2019 Meter of Phase Plan

    2/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

    P P5 = O++: Th; !c; ;ar &h; run& of A!r Pa55

    R P&o&a' = O++ : Th; ca'; 5uppor&5

  • 8/18/2019 Meter of Phase Plan

    3/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

    03.00.00 METRADO PASE AÉREO Nº 01

    1. LABPA?9 6? ?&&?N+

     91 = 1.** (6ado) 9! = 0.*$ (apata)

    AT = +92

    !. &9+ &?PL9N?+

    3. ?DC9E9CAFN B9NG9L

    E1 = 3.17 (6ado)

    E! = 1.02 (apata)T = >+22

    *.

    E1 = !.5 (6ado)

    E! = 0.31 (orre)

    E3 = 0.5$ (apata)

    6?-P. = 0.17

    T = 3+)

    5. ?NC+H&96+ 6?-?NC+H&96+

     9 = *.0$

    2.

     9'ero I 3#$> = 1$.* m. 10.30 "g. (orre) 9'ero I 1#*> = 30.$ m. 2.7$ "g. (orre) 9'ero I 3#$> = 1!.* m. 2.* "g. (apata)

    To&+ Ac;ro ? 3@* = 30+* 4+ 6+2 -+

    To&+ Ac;ro ? @> = 30+* 4+ )+66) -+

    To&a' = 2>+02 -+

    7. 9&&9J?+ 6? -GP?&HACA?- 6? C+LGBN9-

     9 = *.17

    $.

    6ist.#P:ndolas = 1.50 m.otal P:ndolas = !* und.

    Longitud = 2!.*0 m. (P:ndolas)

    Longitud = 3.00 m. (Cable prin'ipal)

    m!

    m!

    42

    m3

    m3

    43

    C+NC&?+ HKC= 175 "g#'m!

    m3

    m3

    m3

    m3

    43

    m!

     9C?&+ (f=*!00 g#'m!)

    m!

    C9L? 6? 9C?&+ AP+ +9 Ø 3#$>

  • 8/18/2019 Meter of Phase Plan

    4/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

    To&a' 2)+90 4+

    .

    Longitud = 35.00 m.

    10.

    Longitud = 35.00 m.11. ?BPL96+?-

    1!. PL9C9- B?MLAC9- 1#*>

    13.

    1*.

    G?&9 PEC Ø 1> CL9-? 10

    G?&9 HO/O Ø 1 1#! >

    GNAFN GNAE?&-9L PEC -9P Ø 1>

     969P96+&?- PEC -9P Ø 1>

  • 8/18/2019 Meter of Phase Plan

    5/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

     

    S TECNICAS NTP 399,002

    % 0.7$3 %% 1.007 %

    % 1.!73 1.200

    1.2*0 1.$13 !.52

    1.$$* !.3$! 3.3*3

    !.$$1 3.75! 5.311

    *.1*$ 5.51! 7.$*7

    2.1$5 $.0!3 11.52!

    10.!10 13.!$ 1.!12

    !!.37 !.005 *1.*3

    37.70 *.120 70.2!!

    5.0!! 72.51 10.$$

    $!.53! 107.3*1 153.$*0

      "

      SION CON EPALE ESPI$A CAPANA

    CLASE 6+0 PSI

    CLASE 00 PSI

    CLASE 200 PSI

    PESO (7- 8&uo"

    PESO (7- 8&uo"

    PESO (7- 8&uo"

      1> los

    istema de empalme espiga % 'ampana

    b 'a

          P     r     o      f .

         '     a

  • 8/18/2019 Meter of Phase Plan

    6/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

  • 8/18/2019 Meter of Phase Plan

    7/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

     

    +92

    +92

    >+22

    3+)

    >+0*

    2>+02 -+

    >+6

    2)+90 4+

    42

    42

    43

    43

    42

    42

  • 8/18/2019 Meter of Phase Plan

    8/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLERURAL EN EL DISTRITO DE SAN PABLO”

     ________________________________________________________________________________________________________________________  __________________ 

    3+00 4+

    3+00 4+

    2 un+

    2 un+

    un+

    2 un+

  • 8/18/2019 Meter of Phase Plan

    9/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLE RURAL EN EL DISTRITO DE SANPABLO”

     ______________________________________________________________________________________________________________

    RESUMEN METRADO PASES AÉREOS 

    PROYECTO: AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y

    SANEAMIENTO DEL CASERÍO FARO BAJO DISTRITO DE SOROCHUCO

    CELENDIN - CAJAMARCA

    03+0+00 TRA/ABOS PRELIINARES

    03.01.01 LABPA?9 6? ?&&?N+

    03.01.0! &9+ &?PL9N?+

    03+02+00 OIIENTO E TIERRAS

    03.0!.01 ?DC9E9CAFN B9NG9L

    03+03+00 CONCRETO ARAO

    03.03.01

    03.03.0! ?NC+H&96+ 6?-?NC+H&96+

    03.03.03

    03.03.0* 9&&9J?+ 6? -GP?&HACA?- 6? C+LGBN9-

    03+0>+00 ACCESORIOS

    03.0*.01

    03.0*.0! G?&9 PEC I 1> CL9-? 10

    03.0*.03 G?&9 HO/O I 1 1#! >

    03.0*.0* ?BPL96+&?-

    03.0*.05 PL9C9- B?MLAC9- 1#*>

    03.0*.02

    03.0*.07

    C+NC&?+ HKC= 175 "g#'m!

     9C?&+ (f=*!00 g#'m!)

    C9L? 6? 9C?&+ AP+ +9 Ø 3#$>

    GNAFN GNAE?&-9L PEC -9P Ø 1>

     969P96+&?- PEC -9P Ø 1>

  • 8/18/2019 Meter of Phase Plan

    10/12

  • 8/18/2019 Meter of Phase Plan

    11/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLE RURAL EN EL DISTRITO DE SANPABLO”

     ______________________________________________________________________________________________________________

    +92

    +92 42

    >+22

    3+)

    >+0*

    2>+02 -+

    >+6

    2)+90 4+

    3+00

    3+00 4+

    2 un+

    2 un+

    un+

    2 un+

    42

    43

    43

    42

    42

  • 8/18/2019 Meter of Phase Plan

    12/12

      “CONSTRUCCIÓN DE SISTEMAS DE AGUA POTABLE RURAL EN EL DISTRITO DE SANPABLO”

     ______________________________________________________________________________________________________________