Upload
scott-huskey
View
201
Download
0
Embed Size (px)
Citation preview
INTRODUCTION PRESENTATION
A Professional Reliable Oilfield Service
Company
SAFETY DEPARTMENT
Safety Team members are certified instructors for Smith
Driving, Safety In Motion and CPR/1st Aid.
PROS Inc. holds weekly Safety Meetings and
encourages employees to present topics to share with
group.
BBS Facilitator heads up 5 BBS teams led by 8 BBS
captains.
Daily site audits are performed and daily activities are
shared with management.
EE visit list- every employee is audited a minimum of
once per month.
Safety Department consists of Full Time members
HSE Manager Pam Keesbery w/ Mesa for 2 ½ years
MAN HOURS
2013 T.R.I.R. = 0
2014 T.R.I.R. = 0
2015 T.R.I.R. = 0
Excellent ISNworld rating
NEW HIRE TRAINING
REQUIREMENTS
Smith Driving
CPR/1st Aid
Safety in Motion
Vehicle & Trailer Training
New Hire Orientation
Training in all departments
Weekly Progress Reports from Mentor
Daily Activity Reports from Mentor
GPS
Vehicle Inspections
Speed and Behavior
Monitoring
Journey Management
Maintenance Tracking
Weekly Management
Vehicle Audits
Daily Vehicle Checks
by Safety Dept.
FLEET MANAGEMENT
EQUIPMENT AND SERVICESSection 1 Personnel Rates
~Flowback ~Design & Construction
~Exploration Well Testing ~ ASME Welding
~Production Well Testing ~Shop Services
~Instrumentation ~Specialty Services
~Sampling ~ConsultingSectio
n
16 Sampling
Sectio
n
17 Special Equipment and Services
Sectio
n
18 Air Compressors
Section 2 Two Phase Test Separators Sectio
n
19 Generators and Light Plants
Section 3 Three Phase Test Separators Sectio
n
20 Fluid Level and Dynamometer Services
Section 4 Four Phase & UBD Separators Sectio
n
21 Data Acquisitions Units
Section 5 Gas Scrubbers Sectio
n
22 Pumps Chemical & Transfer
Section 6 Line Heaters Sectio
n
23 Vapor Recovery
Section 7 Flare Systems Sectio
n
24 Safety Systems
Section 8 Pipe Packages Sectio
n
26 Meter Proving
Section 9 Choke Manifolds Sectio
n
27 Sand Separators
Section 10 Laboratory Sectio
n
28 Communication Equipment
Section 11 Liquid Meters Sectio
n
50 Transportation
EARLY PRODUCTION FACILITIES
2-PHASE WELL TEST SEPARATOR220# - 250# UNITS
Capacities:
Gas 2 MMCFD
Liquid 3,000 BPD
Max Pressure 245#
Max Temp 250°F
2-PHASE WELL TEST SEPARATOR500# UNIT
Capacities:
Gas 10 MMCFD
Liquid 3,000 BPD
Max Pressure 480#
Max Temp 350°F
2-PHASE WELL TEST SEPARATOR STANDARD
TEMPERATURE SERVICE 500# UNIT
2-PHASE WELL TEST SEPARATOR HOT SERVICE
UPGRADED 500# UNIT
3-PHASE SEPARATORS
1440#
275#
300#
WELL TESTING AUTOMATION
ADVANTAGES
Elimination of data entry errors and typos.
More data to view for engineer(s) over test
period
Quicker references
Real time reporting
Reducing the number of personnel on location,
therefore reducing labor cost and safety
exposure
Trending throughout test period
24/7 customer access to data
Cloud hosting capabilities allowing data to be
directed to your data base
EQUIPMENT IMPROVEMENT
Data Automation collection and “Real Time” viewing
500# 3-PHASE SEPARATORS
With self-
contained
Remote data
auction
system
Capacities:
Gas 10 MMCFD
Liquid 8,000 BPD
Max Pressure
480#
Max Temp 350°F
500# 3-PHASE SEPARATOR IN FIELD
500# SEPARATOR AND FLARE SCRUBBER
WIRELESS WELL HEAD AND CASING
PRESSURES
CUSTOMER QUICK LOGON REPORT
REPORT PAGE IN CVS FILE
Date Stamp GLR GOR
Instant
Gas Flow
(MCF/D)
Instant
Tubing
(PSI)
Instant
Casing
(PSI)
Instant
Tubing
Temp (ºF) Instant DP (PSI)
Instant
Gas
Temp
(ºF)
Instant
Flow
Line
(PSI)
Instant
Vessel
Pressure
(PSI)
Instant
Vessel
Temp (ºF)
Instant
Probe Cut
%
4/15/2015 10:33 0.067771554 0.832651556 117 100.156 27.31421 141.3617 3.741892338 165 84 99.11530304 175.3201 5.328532
4/15/2015 10:30 0.067813314 0.833393514 114 100.815 27.25404 141.8499 3.773587227 165 84 98.77373505 174.5267 5.340739
4/15/2015 10:27 0.067608841 0.831372201 117 101.923 27.78836 142.0091 3.628477335 166 84 99.20012665 173.6231 5.322428
4/15/2015 10:24 0.06761191 0.831836522 113 102.069 27.87638 141.7962 8.217744827 166 86 100.6220856 172.8518 5.29191
4/15/2015 10:21 0.067614295 0.832197845 110 102.078 27.43493 141.7455 3.977771759 166 84 100.0013428 172.3669 5.450606
4/15/2015 10:18 0.067616463 0.832525969 117 99.916 28.09326 142.083 3.375916243 165 90 98.02230072 172.2347 5.438398
4/15/2015 10:15 0.067413285 0.830703855 115 100.476 28.76249 142.9224 1.755753279 166 80 97.17047882 172.3669 5.267495
4/15/2015 10:12 0.067416564 0.831201613 121 101.184 29.65861 143.6267 5.408758163 166 58 102.0127487 172.5653 5.261391
4/15/2015 10:09 0.067423485 0.831593215 98 97.7781 28.73165 143.4763 1.538809061 166 78 97.56375885 172.8297 5.389569
4/15/2015 10:06 0.067432553 0.832089007 103 99.588 29.52023 143.8262 9.73039341 166 55 97.30620575 173.1383 5.218665
4/15/2015 10:03 0.067232035 0.829950154 111 101.683 30.27439 144.2948 2.512476444 166 58 99.63179779 173.3807 5.218665
4/15/2015 10:00 0.067239724 0.830411971 116 100.439 30.45561 144.3109 1.293504119 166 84 98.96656799 173.5129 5.371258
4/15/2015 9:57 0.130457625 0.830846071 108 99.2909 30.37134 144.0424 1.00984633 165 87 96.7240448 173.6893 5.200354
4/15/2015 9:54 0.130477086 0.831636071 113 101.809 30.5666 143.7927 12.90866566 165 56 101.4293518 173.9758 5.352947
4/15/2015 9:51 0.130486354 0.832012475 111 99.9605 29.8942 143.7129 3.417025805 163 81 97.25141144 174.5267 5.346843
4/15/2015 9:48 0.130094811 0.829942703 113 99.402 30.73756 144.0344 4.066752434 163 82 97.66395569 175.1438 5.224769
4/15/2015 9:45 0.130105525 0.830379248 109 99.7952 30.63505 144.1664 3.126255274 163 61 97.43569183 175.6948 5.304117
4/15/2015 9:42 0.13011615 0.83081156 104 99.9181 31.69004 144.4878 3.350617409 161 59 100.9306717 176.3119 5.401776
4/15/2015 9:39 0.130127266 0.831265032 107 100.293 30.3231 143.6032 3.305140018 161 58 99.40726471 176.951 5.633717
4/15/2015 9:36 0.129732981 0.829085529 118 98.8649 29.62917 141.9337 3.555825949 160 61 98.11941528 177.5681 5.444502
4/15/2015 9:33 0.129742652 0.829481125 118 98.465 32.01892 140.6558 2.386821985 159 81 100.0774994 178.2954 5.597095
4/15/2015 9:30 0.129754379 0.829959869 117 98.4331 31.5663 139.9788 8.669595718 160 57 96.91569519 179.0668 5.786309
“FUTURE” CUSTOMER QUICK LOCATOR
Se
p ASe
p B
Se
p CSe
p D
Se
p E
TANK REPORT PAGE
TANK REPORT PAGE
ENVIRONMENTAL/SAFER OPERATIONPSH BY-PASS SYSTEM
Utilizing PROS
PSH BYPASS
SYSTEM Reduces The
Risk Of PSV Release
Bypass valve is a Full
Port 3-way valve
ENVIRONMENTAL/SAFER OPERATIONPSH BYPASS SYSTEM
PSH
Stick Pilot
ESD
Button
INSTRUMENTATION AND CALIBRATIONS
Reducing human
errors as much as
possible, using
continuous
electronic
monitoring
Barton Gas
Recorder
As back-up to
electronic recorder
METERS
Each Separator has a
liquid meter with a
sampler, sampling
every 3/10 of a bbl.
Gas measurement is
obtained by Daniel
Senior Orifice fitting
DUAL TANK GRAVIMETRIC PROVER
Able to prove on sites without disrupting the testing
process.Prover Capacities:
AWT’s Calibrations
Wet LACTS
Gross Meters
Coriolis meters
Turbine Meters
Positive Displacement
Meters
V-cone Meters
Max Rate: 8,000 BPD
Max Pressure: 300#
Max Temp: 350°F
WELL TEST DATA ACCURACYHIGH WATER CUT & HIGH VOLUME, MULTI JAR SAMPLING
ENVIRONMENTALLY SAFECONTAINMENT, TRANSPORTING & RECYCLING
All PROS equipment brought on to any property is equipped and/or accompanied with drip pans and/or a similar
types of containment devices where there is a potential for drips, leaks and/or releases while rigging up and down.
Drip pans/devices will be emptied into approved containers and taken to a customer approved location,. The fluids
will be transported safely to the applicable location for recycling.
Where leaks and/or spills may occur, attempts will be made immediately to eliminate them by improved operational
and/or maintenance practices.
All spills meeting the criteria of Notification Procedures will be immediately reported to the appropriate Safety
Department and/or Personnel.
All spills and/or releases will be addressed in a timely manner with a high priority placed on reducing the exposure
to the public and to the environment, habitat ,surface ground and equipment.
Cleanup shall include restoration of the impacted area to pre-spill/release condition.
FM-3000 FLUID MONITOR
Measures fluid level in Real Time• Used to collect fluid levels for data collection with
automated test separator.
•Sends fluid level measurement to the VFD via
Bluetooth wireless communications.
• Adjusts the pump’s RPM to maintain any preset fluid
level.
FM-3000 FLUID MONITOR
Measures fluid
level in Real Time
Fluid levels data
collection pairs up well
test data
with automated test
separator.
CHOKE MANIFOLD'S
15,000psi WP
10,000psi WP NACE Plug
Catcher
FLOW IRON AND PIPE PACKAGES
2”, 3”, 1502 15,000psi Pipe
2”, 3”, 4” Figure 200 Line Pipe
4”, 6” 8” Flanged Pipe
3 1/16” 15,000# Flanged Pipe
All Size Valves, screwed or flanged
All types Crossovers to 15,000psi
NACE Pipe and Valves
HYDRO TESTING
• Pipe Color Code Banding
• Both Electronic and Barton Chart Recording
• Choke Manifold, Flow Line Pipe Testing
• Max testing pressure 20,000#
• Pressure Vessel testing
• UT Inspection and visual inspection
• Field Testing Services
• Flow lines and Casing Integrity
BOP & ACCUMULATOR INSPECTION TESTING
SERVICES AND REPAIRServicing:
• TIW Safety Valves (FOSV)
• KANA
• Cameron Townsend
• NL Shaffer
• Integrated
• Hydril
• Field Testing Services
BOP INSPECTION AND SERVICES BOP Accumulator Inspection, Servicing and Repair
BOP Inspection, Servicing and Repair
Accumulator Hand Pump and Automated Service and
Repair
BOP Trailer and Accumulator Manufacturing
PORTABLE 400 BBL. WASH TANKS
ZERO - VOC SEPARATORS
Sizes: 10’x20’ & 8’x20’ S/S
Working Pressure: 120 PSI @ 350F
Max Liquid Production: 32000 BPDG with 4
Minute Retention
Time
Max Gas Production: 20 MMCFD
Pump Power: 480 volt 3-phase
Pump Jet Rate: 3500 BPD/
12,000BPD
Inlet connections (2): 1ea. 2” 1502
1ea. 3” 1502
or 2 ea. 3” 1502
Liquid Outlet: 4” 150# flg.
Gas Outlet 4” 150# flg.
Sand Dump: 4” 150# flg.
Foot Print: 11’ X 11’
Overall Height: 31’
ZERO - VOC SEPARATORS ON 6 WELL PAD
FLOW LINE RIG UP SERVICES
FLOWBACK TANK MONITORING
Features:
• Telephones Flowback Technician
on High Level Alarms
• Telephones Flowback Technician
when flow rates exceed projected
rates
• Remote login to view tank levels
• No personnel on tanks for
measurement is required during
operation
FLOWBACK TANK MONITORING & REAL TIME
REPORTING ON TANK LEVELS ADVANTAGES Features
• Quick Wireless installation setup in 5-15
minutes for each tank
• Easy Installation for one man
• Monitors up to 8 tanks on one location
• Monitors Oil and Water levels in each
tank
• No open hatches to gauge tanks
exposing personnel to gasses, therefore
maintaining 0-VOC conditions
• Tank Levels can be set with a High Level
Alarm and High-High Level Alarm with
(light and auditable)Optional Features
• Monitors LEL levels at theft hatch
• Monitors H2S levels at theft hatch
• Can be setup to call appropriate
personnel on any alarms
in conjunction with the flowback technician
TEST LAB
Lab Room contains: a Gas Gravitometer
(Ranarex) for gas gravities, Centrifuge for
running cuts, other analysis: CO2, H2S,
Chlorides, Resistivity's, PH and % of
Basic Sediment
GAS SCRUBBERGas Scrubber on
Early Production
Facilities
SOUR GAS TREATMENT TOWERS
LAND FLARES
A.P.C.D. Permitted Portable Land Flares
40’ TANK FLARE ENCLOSED FLARES
Rated 3 million MCFD
VAPOR RECOVERY UNITS
Variable Frequency
Drives
AERIAL COOLERS
ASME CODE SHOP
• VESSEL ALTERATIONS
• VESSEL REPAIRS
• ASME CODE VESSELS BUILT to SPEC
• VESSEL FIELD REPAIRS
• ASME CODE CALCS
• CAD DESIGN
• U STAMP, R STAMP, S STAMP
• B31.1, B31.3, 1104 PIPING
• FABRICATION
ASME CODE STAMPS
DESIGN AND CAD
ASME CODE SHOP
ASME CODE SHOP
DILUENT SKIDS
MODULAR SKID PACKAGES