Avenues Phase 2 March 2013
MEP STRATEGY
Avenues Phase 2 March 2013
MECHANICAL INSTALLATIONS
Avenues Phase 2 March 2013
MECHANICAL INSTALLATIONS
• List of Mechanical Standards• HEAT LOAD CLACULATIONS• MECHANICAL REQUIREMENTS
(Architectural Space Allocation)• MECHANICAL SERVICES LOCATIONS
Avenues Phase 2 March 2013
List of Mechanical Standards
Services Title Edition
Air Conditioning
Ashrae Handbook Fundamentals 2009
Ashrae Handbook - HVAC Application 2011
Ashrae Handbook - HVAC systems & Equipment 2012
Ashrae Handbook - Refrigeration 2010
Ashrae Std 62 - Ventilation For Acceptable Indoor Air Quality 2010
NFPA 101- Safety life From Fire in building and Structures 2012
NFPA 90A – Installation of Air Conditioning and Ventilating Systems. 2012
NFPA 70 – National Electric Code. 2011
NFPA 92 – Smoke Control Systems. 2012
DW144 – Specification for Sheet Metal Ductworks. 1998
SMACNA – Standards for Ductworks. 2005
International Building Code 2012
Drainage
BSEN 12056-1-2000 Gravity Drainage System Inside Buildings, Part 1 : General and Performance Requirements. 2000
BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 2 : Sanitary Pipe work Layout and Calculation. 2000
BSEN 12056-2-2000 Gravity Drainage System Inside Buildings, Part 3 : Roof Drainage, Layout and Calculation. 2000
BSEN 752, 2008 Drainage & Sewer Systems Outside Buildings. 2008
Plumbing Engineering Services Design Guide 2002
ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4 2001
International Plumbing Code. 2012
Local Codes and Ordinances in Dubai – UAE. 2011
Local Civil Defense Regulations and Requirements. -
Avenues Phase 2 March 2013
List of Mechanical Standards
Services Title Edition
Water Supply
British Standards BS 6700-Design, installation, testing and maintenance of services supplying water for domestic use within buildings and their Cartilages 2006
Plumbing Engineering Services Design Guide. 2002
International Plumbing Code. 2012
ASPE: American Society of plumbing Engineer volume 1, 2, 3 & 4 2001
Local Codes and Ordinances in Dubai – UAE. 2011
Local Civil Defense Regulations and Requirements. -
Fire Fighting
NFPA 10 – Standard for the Installation of Portable Fire Extinguishers 2013
NFPA 13 – Standard for the Installation of Sprinkler Systems 2013
NFPA 14 – Standard for the Installation of Standpipe and Hose Systems 2013
NFPA 20 – Standard for the Installation of Stationary Pumps 2013
NFPA 101 – Safety to Life from Fire in Building and Structures 2012
NFPA 90A – Installation of Air Conditioning and Ventilating Systems 2012NFPA 70 – National Electric Code 2011NFPA 92 – Smoke Control Systems 2012UAE Fire Code 2011
Local Civil Defence Regulations and Requirements -
LPG - Gas Distribution
IMC- Ineternational Mechanical Code 2012
IFGC - International Fuel Gas Code 2012
NFPA 54 - National Fuel Gas Code 2012
NFPA 58 - Liquefied Petroleum Gas Code 2011
NFPA 59 2012
Avenues Phase 2 March 2013
Building # DESCRIPTION Floors
Number
of floors
AREA (SQ.FT) / FL
AREA (SQ.MTR)/FL
Total BUA ( SQ.MTR)
Occ. Laod as per Ashrea
62.1Est .TCL (W)
Building 01 Anchor STORE GF + 1 2 40,239.84 3,738.40 7,476.80 15 1,495,360.71
Building 02 Retail GF 1 12,669.50 1,177.03 1,177.03 15 235,406.87
Building 03 Retail GF 1 12,287.69 1,141.56 1,141.56 15 228,312.69
Building 04 Retail GF 1 17,978.08 1,670.22 1,670.22 15 334,043.53
Building 05 Retail GF 1 16,622.90 1,544.32 1,544.32 15 308,863.36
Building 06 Retail GF 1 19,505.71 1,812.14 1,812.14 15 362,427.70
Building 07 Retail GF 1 36,872.97 3,425.61 3,425.61 15 685,121.85
Building 08 Retail Gf 1 21,037.96 1,954.49 1,954.49 15 390,897.85
Building 09 F&B / RESTAURANT GF 1 3,621.55 336.45 336.45 70 84,113.12
Building 10 F&B / RESTAURANT Gf 1 3,621.55 336.45 336.45 70 84,113.12
Building 11 F&B / RESTAURANT GF 1 3,621.55 336.45 336.45 70 84,113.12
Building 12 F&B / RESTAURANT GF 1 3,622.14 336.51 336.51 70 84,126.87
Building 13 Anchor GF 1 24,228.32 2,250.88 2,250.88 15 450,176.78
Building 14
F&B / RESTAURANT GF 1 3,954.95 367.43 367.43 70 91,856.61
F&B / RESTAURANT GF 1 4,592.48 426.66 426.66 70 106,663.86
F&B / RESTAURANT GF 1 4,642.31 431.28 431.28 70 107,821.11
F&B / RESTAURANT GF 1 4,402.93 409.05 409.05 70 102,261.35
SPA MEZZ 1 29,367.78 2,728.36 2,728.36 25 682,088.79
Building 15 Anchor ( Leisure) GF+1 2 23,321.83 2,166.67 4,333.34 100 866,667.19
Building 16cinema GF 1 131,175.84 12,186.63 12,186.63 50 3,046,657.24
cinema MEZZ 1 11,012.94 1,023.14 1,023.14 50 255,783.88
TOTAL TOTAL 428,400.80 39,799.72 45,704.79 10,086,877.61
Public alleys DESCRIPTION Floor
s Height
AREA (SQ.FT) / FL
AREA (SQ.MTR)/FL
Total BUA ( SQ.MTR)
Occ. Laod
Est .TCL (W)
The Courtyards Internal Walk B01-B13 GF 1 95,477.12
8,870.11
8,870.11
40 1,596,620.00
Stone Axis Pedestal Main Walk GF 3 45,067.09
4,186.87
4,186.87
40 1,256,060.40
Fine Dinning Courtyards Internal Walk B14 GF 1 10,542.94
979.47
979.47
40
176,304.75
TOTAL TOTAL
151,087.15 14,036.45
14,036.45
3,028,985.15
HEAT LOAD CALCULATIONS
Avenues Phase 2 March 2013
OVERALL COOLING LOADCOOLED AREA (SQ.MTR) TOTAL COOLING (KW)
45,704.79 10,090.00
14,036.45 3,030.00
Total preliminary Estimated cooling load 13,120.00
Avenues Phase 2 March 2013
Mechanical Requirements - Architectural space Allocation
Services Ref. Code
Item Location QTYVolume
Capacity (m3)
Shaft Dimension
(m x m)
Area (m2)
Room Dimension
Notes
Fire Fighting
1 Water Tank Basement
level1 740.00 - 200 - H= 3900mm (water level )
2
Pump Room
Basement level / option
11 -
1000x1000( access for
civil defence - Direct from
GF)
180 20000 x 9000 refer to sketch #1
3Parking
Area / option 2
1 -
1000x1000( access for
civil defense - Direct from
GF)
126 14000 x 9000 refer to sketch #2
4Parking
Area /option 3
1 -
1000x1000( access for
civil defence - Direct from
GF)
153 17000 x 9000 refer to sketch #3
Water Distribution
5 Raw Water Tank Basement
level1 750.00
2 nos - 1000 x 800
(side access opening )
200 -
H= 3900 mm ( water level )
location refer to sketch #4
(reference Dubai Water req- attached )
6 Booster Pump Room Basement
level1 - - 81 9000 x 9000
4 set of pump to deliver for 4 project zone
IrrigationSystem
7 Irrigation tank Basement
level1 45 - 12 4000 x 3000
Approximate irrigated Area of 1400 m2
8 Irrigation Pump Room Basement
level1 - - 15 5000 x 3000 -
Drainage System
9Black water Pit & Sub Pump
Room Basement
level4 -
Pit dim ( 1500 x 1500 )
4000 x 3000 Depth 2000 mm
10Parking gray Water Pit & Sub
Pump RoomBasement
level4 -
Pit dim ( 1500 x 1500 )
- 4000 x 3000 Depth 2000 mm
Avenues Phase 2 March 2013
S/S
-1
S/S - 3
S/S
- 4
DWT
BPR
FWT
FPR
DWT BPR
BSP
BSP
BSP
BSP
GSP
GSP
GSP
GSP
MECHANICAL SERVICES LOCATIONS
Avenues Phase 2 March 2013
ELECTRICAL INSTALLATIONS
Avenues Phase 2 March 2013
ELECTRICAL INSTALLATIONS
• POWER DELIVERY METHODOLOGY• LOAD ASSUMPTIONS• LOAD CLACULATIONS• AREA ALLOCATION PER S/S• RMU LOCATIONS• S/S LOCATIONS IN BASEMENT• ROOM SIZES FOR S/S (3 OPTIONS)• ELECTRICAL REQUIREMENTS
(Architectural Space Allocation)
Avenues Phase 2 March 2013
POWER DELIVERY METHODOLOGY
DEWA NETWORK RMU ROOM TRANSFORMERS
DIFFERENT LOADS DISTRIBUTION PANELS MAIN LV PANELS(LIGHT & POWER) SMDBS & DBS
Avenues Phase 2 March 2013
LOAD ASSUMPTIONS
F&B LIG
HT
AREA RATIO 60% 40% TOTAL Front of Shop KitchenAREA 100 m2 60 m2 24 m2Load KW W / m2 W / m2
LIGHT 2.28 30 20POWER 49.20 20 2000COOLING 8.40 40 250TOTAL 59.88 KW
598.8
Watts / SQR.MTR
F&B
RESTURANT
AREA RATIO 60% 40%
TOTAL Front of Shop Kitchen
AREA 300 m2 180 m2 72 m2
Load KW W / m2 W / m2
LIGHT 5.04 20 20
POWER 61.20 20 800
COOLING 25.20 40 250
TOTAL 91.44 KW
304.8
Watts / SQR.MTR
Avenues Phase 2 March 2013
LOAD ASSUMPTIONS
TYPE ANCHOR / RETAIL ENTERTAINMENT ANCHOR SPA
UNIT W / m2 W / m2 W / m2
LIGHT 50 30 10
POWER 60 100 300
COOLING 40 40 40
TOTAL 150 170 350
Avenues Phase 2 March 2013
LOAD CALCULATIONS
• BASED ON DESIGN BRIEF
Avenues Phase 2 March 2013
LOAD ASSUMPTIONS
TYPE KW (E)
COOLING VIA CHILLER 6,560
COOLING VIA DX 7,497
+40 W/M2
Avenues Phase 2 March 2013
LOAD CALCULATIONS
• BASED ON DESIGN BRIEF
Avenues Phase 2 March 2013
LOAD CALCULATIONS
• BASED ON DIFFERENT COOLING OPTIONS
CHILLERS OPTION 21,647.06
DX OPTION 22,584.20
TRF = 20
TRF = 19
Chillers only 7 Transformers
7 Nos. @ 950KW+
13 Nos. @ 1200KW
19 Nos. @ 1200KW
Avenues Phase 2 March 2013
CHILLER•Maintenance by
Client•Electricity cost by
client vs. billing tenants (BTU Meters)
•Available cooling load is limited by Chiller Capacity
Direct-Expansion (DX)•Machines are
maintained by tenants
•Electricity Cost is passed to tenants
•Cooling load can increase as much of spare electricity is available.
WHICH WAY TO GO ?
Avenues Phase 2 March 2013
LOAD CALCULATIONS• IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD – EXAMPLE 1
GLA (sq.m.)
F&B Designation
Brand 1Electrica
lW/m2
47 QS Fast KFC 220.00 4,677.87
47 QS Fresh Taco Bell 220.00 4,651.16
110 Casual Nordsee 220.00 1,993.66
30 QS Fast BKK 50.00 1,648.53
91QS Fast
Pizza Hut Express 150.00 1,645.10
38 Coffee Costa 60.00 1,560.87
35 QS Fast Wild Peeta 50.00 1,412.03
53 Coffee Armani 70.00 1,330.55
53 Coffee Fauchon 70.00 1,330.55
46 QS Fast Shawarmerize It 50.00 1,089.56
48 QS Fast Hattam 50.00 1,048.22
50 QS Fast India 50.00 1,006.44
62 Impulse Bateel 60.00 974.34
65 Coffee Caribou 60.00 917.99
57 QS Fast Subway 50.00 881.68
57 QS Fast Al Safar 50.00 875.35
26 Impulse Dunkin Donuts 22.00 840.34
73 Coffee Starbucks 60.00 817.44
989 M2TOTAL AREA
1,594 W/M2
AVERAGE W/M2
18 Units
Avenues Phase 2 March 2013
LOAD CALCULATIONS
• IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD – EXAMPLE 2
GLA (sq.m.)
F&B Designation
Brand 1Electrica
lW/m2
57 QS Fast Al Safar 50.00 875.35
26 Impulse Dunkin Donuts 22.00 840.34
73 Coffee Starbucks 60.00 817.44
63 QS Fast Fat Burger 50.00 797.58
28 Impulse 40 Fruits 22.00 787.12
136 Casual Nandos 100.00 735.29
83 Coffee Coffee House 60.00 720.55
100 Ethnic Casual Ottolenghi 70.00 697.42
72 QS Fast Pad Thai 50.00 690.70
104 Ethnic Casual Nova 70.00 672.43
77 QS Fresh India Palace 50.00 646.50
79 QS Fast Panda Chinese 50.00 635.73
111 Ethnic Casual Yo Sushi 70.00 633.08
1,010 M2TOTAL AREA
734 W/M2
AVERAGE W/M2
13 Units
Avenues Phase 2 March 2013
• IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD – EXAMPLE 1
LOAD CALCULATIONS
F & B 9,476.00 SQ.MTR 10 /50 /100 UNITS ?
SIZE / QTY USE LOAD
@ 700 W/M2
569 KW / UNIT
114KW / UNIT
57 KW / UNIT
SO
Avenues Phase 2 March 2013
`
AREA ALLOCATION PER S/S
S/S-1
S/S-2S/S-4
B06
B05
B07
B04
B03
B09B08
B01
B02
S/S-3B10
RMU-2 RMU-4
RMU-3
RMU-1
`
Avenues Phase 2 March 2013
S/S
- 1
S/S
-1
S/S - 2 S/S - 3
S/S
- 4
S/S LOCATIONS IN BASEMENT
Avenues Phase 2 March 2013
ROOM SIZES IN BASEMENT - OPTION 1
TRANSFORMER ROOM162 m2
LV ROOM126 m2
GENERATORROOM24 m2
36 Mtr. (9x4)
9 M
tr.
8 Mtr.
4.5
Mtr.
4 Nos.
Avenues Phase 2 March 2013
ROOM SIZES IN BASEMENT - OPTION 2
TRANSFORMER ROOM162 m2
LV ROOM135 m2
18 Mtr. (9x2)
9 M
tr.
GENERATORROOM27 m2
9 Mtr.
18 M
tr.
4 Nos.
Avenues Phase 2 March 2013
ROOM SIZES IN BASEMENT - OPTION
TRANSFORMER ROOM81 m2
LV ROOM81 m2
18 Mtr. (9x2)
9 M
tr.
GE
NE
RA
TO
RR
OO
M40
.5 m
2
4.5 Mtr.
<4 Nos.
Avenues Phase 2 March 2013
ELECTRICAL REQUIREMENTS - Architectural Space Allocation
Services Item Location QTYMinimum Volume
Capacity (m3)
Shaft Dimension (m x
m)
Min. Area (m2)
Minimum Height (m) Notes
HV Rooms
RMU ROOM-1
GROUND LEVEL
1 N/A N/A 38 3.1
SUBJECT TO DEWA APPROVAL
RMU ROOM-2 1 N/A N/A 38 3.1
RMU ROOM-3 1 N/A N/A 38 3.1
RMU ROOM-4 1 N/A N/A 38 3.1
Transformer
Rooms
TRANSFORMER ROOM-1
BASEMENT LEVEL
1 N/A N/A 148 3.1
SUBJECT TO DEWA APPROVAL
TRANSFORMER ROOM-2 1 N/A N/A 148 3.1
TRANSFORMER ROOM-3 1 N/A N/A 148 3.1
TRANSFORMER ROOM-4 1 N/A N/A 148 3.1
Avenues Phase 2 March 2013
ELECTRICAL Requirements - Architectural Space Allocation
Services Item Location QtyMinimum Volume
Capacity (m3)
Shaft Dimension
(m x m)
Minimum Area (m2)
Minimum Height (m) Notes
LV Rooms
LOW VOLTAGE PANELS ROOM-1
ADJACENT TO TRANSFORME
R ROOM
1 N/A N/A 125 3.5
SUBJECT TO DEWA APPROVAL
LOW VOLTAGE PANELS ROOM-2 1 N/A N/A 125 3.5
LOW VOLTAGE PANELS ROOM-3 1 N/A N/A 125 3.5
LOW VOLTAGE PANELS ROOM-4 1 N/A N/A 125 3.5
Generator
Rooms
GENERATOR ROOM-1
ADJACENT TO TRANSFORME
R ROOM-2 1 N/A N/A 24 3.5
Room includes Diesel Tank Good for 8 hoursGENERATOR ROOM-2
ADJACENT TO TRANSFORME
R ROOM-3 1 N/A N/A 24 3.5
GENERATOR ROOM-3ADJACENT TO TRANSFORME
R ROOM-41 N/A N/A 24 3.5