DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASI

PART A: HVACCONTENTS1. A. B. C. D. E. F. G. GENERAL : PROJECT DESCRIPTION

2. MECHANICAL SYSTEM DESCRIPTION : DESIGN OBJECTIVES GENERAL REQUIREMENTS DESIGN CRITERIA COOLING LOAD DESIGN PARAMETERS MAIN PLANT DESCRIPTION FACILITY FLOORS MECHANICAL VENTILATION SYSTEM 3. REFERENCE STANDARDS AND DOCUMENTS 4. ANNEXURES

1

DESIGN CONCEPT REPORT M.E.P. SERVICES

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASIGENERAL A. t Description Projec

1. Project is a deluxe hotel located at prime upcoming location in city of Varanasi. The building is designed by renowned Architect M/s. Identity Architects & Interior Designers. 2. tower building. The building consists of basement, ground + seven hotel

3. The services are distributed over basement, service floor and service areas on guest floors. The mechanical ventilation fans for various service areas are being planned in respective areas. The air handling units for public areas are being planned in respective area with separate mechanical rooms, guest floor common areas shall be catered through dedicated air handling unit envisaged to be in service areas of guest floor. Individual Guest Room shall be catered through the fan coil unit provided in the respective room. 4. The mechanical and service areas are being planned with adequate slab loading to have vibration free floors while access to services areas is also given utmost important with provisions of loading and unloading of heavy equipments.

MECHANICAL SYSTEM DESCRIPTION A. Design ObjectivesDESIGN CONCEPT REPORT M.E.P. SERVICES

2

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASI1. 2. To evolve sustainable and energy efficient design and engineering of HVAC system To develop and engineer integrated and cost effective building intelligence system.

B.

General Requirements1. Air conditioning & Ventilation systems to be designed & installed in accordance with the latest recommendations of ASHRAE and in confirmation with the latest International Building code, all local and National codes and the requirement of agencies exercising jurisdiction over work at the project. 2. All piping systems shall be complete with hangers, anchors, guides, valves, insulation, etc. 3. All duct systems shall be complete with hangers, volume dampers, fire dampers, smoke dampers, filters, diffusers, grilles, registers, insulation, etc. 4. All equipment shall be complete with vibration isolation, starters, control wiring, painting, insulation, etc. 5. All systems shall be fully tested and balanced. 6. The entire installations, commissioning and performance evaluation procedures shall be predetermined and documented.

C.

Design Criteria1. The building is expected to be catered with varied need of air conditioning being multi facility. The systems are conceptualized to cater such needs with inherent features mentioned in subsequent Para.

2. The systems provided for this project shall meet the following parameters while satisfying all local design weather conditions and code requirements. Inside Design : As described in subsequent para.

3

DESIGN CONCEPT REPORT M.E.P. SERVICES

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASI Ventilation Rate for Air conditioning Working Cycle Operational Diversity Occupancy Equipment and Lighting load Ventilation Rate for Mechanical Areas : Public Area toilets Guest Room Toilet STP Back of House Areas AC plant Room and Pump Room All other mechanical areas Kitchen and Laundry Elevator Machine Room and Other User specific service areas 3. : : : : 50 cfm / WC 50 CFM 35 ACH : 10 ACH : : : ASHRAE 62.1 standard 2007 24 hours for guest areas : 80%

As per cooling load summary sheet : As per cooling load summary sheet

10 ACH : : : 6 ACH As per users requirement As per equipment Operating Parameters

Basic Consideration for cooling load calculation shall be as follows.

4

DESIGN CONCEPT REPORT M.E.P. SERVICES

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASISite : VARANASI (UP STATE)

Latitude Mean sea level AMBIENT CONDITIONS SUMMER (May) Dry Bulb Temperature Wet Bulb Temperature Relative Humidity WINTER (January) Dry Bulb Temperature Wet Bulb Temperature Relative Humidity MONSOON (July) Dry Bulb Temperature Wet Bulb Temperature Relative Humidity SPACE DESIGN CONDITIONS All Year Round Dry Bulb Temperature Wet Bulb Temperature

: :

25 20' north 76 meters.

: :

: 109F (42.78C) 76F (24.44C) 21%

: :

50F (10C) 47F (8.33C) : 80%

: :

94F (34.44C) 83F (28.33C) : 64%

: :5

74 F (23.3C) for Guest Rooms and Public area 63.1F (16.3C)DESIGN CONCEPT REPORT M.E.P. SERVICES

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASIRelative Humidity : NMT 55%

D. E. F. G. H.

Cooling Load Estimation Summary Sheet : Monthly Average Cooling Load Profile Capital Cost Analysis of various system Alternatives Yearly Operating Cost Analysis Monthly Operating Cost Analysis I. Mechanical Ventilation Systemso o

As per enclosed Annexure : : As per enclosed Annexure As per enclosed Annexure

:

As per enclosed Annexure : As per enclosed Annexure

The mechanical Ventilation systems are being considered to be designed for removal of heat and provide moderate dust free working environment. The systems are designed based on the adequate no. of air changes per hour however areas with higher heat dissipation could be considered for designing with restricted temperature rise over ambient temperature. Considering Varanasi Weather conditions we propose to install the evaporative cooling system to supply the fresh air to mechanical areas with greater heat dissipation like Pump Room and AC Plant Room.

o

6

DESIGN CONCEPT REPORT M.E.P. SERVICES

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASIoSR. NO

The special emphasis is given to mechanical ventilation of STP area with higher air changes per hour.HEAT LOAD(TR) CFM LEVEL Toilet ventilationAREA (SQ.FT) shall consist of cabinet type exhaust fans located at terrace level to system OCCUPANCY LOAD(KW) cater theLVL-31 respective zone. 385 19232 5.0 125.07 51672 EQUIPMENT

PARTICULARS

o

28 SPA 29 Sky Lobby 30 Restaurant

LVL-32 LVL-33

19232 19232

385 385 385

5.0 5.0 5.0

125.07 125.07 125.07

51672 51672 51672

LVL-34 19232 31 Restaurant 3. STANDARDS & ) TOTAL-HOTEL Public Areas( LVL -31 TO 34CODES 76928

1540

20.0

500.28125.07

20668851672

LVL-35 19232 385 5.0 32 Family Meeting Area Following STANDARDS) & CODES will be applicable for the project. TOTAL-FAMILY MEETING ( LVL - 35 19232 385 5.0 LVL-38 33 Apartment 1 ANSI/ASHRAE STANDARD 34-2001 10520 : 1. To 5 & Lobby LVL-39 10520 34 Apartment 1 To 5 & Lobby LVL-40 Apartment 1 To 5 & Lobby 10520 35 LVL-41 10520 36 Apartment 1 To 5 & Lobby 2. ANSI/ASHRAE STANDARD 41.1-86-2001 : LVL-42 10520 37 Apartment 1 To 5 & Lobby LVL-43 10520 : 38 Apartment 1 ARI 5 & Lobby 3. To 110-2002 LVL-44 10520 39 Apartment 1 To 5 & Lobby LVL-45 10520 40 Apartment 1 To 5 & Lobby LVL-46 10520 41 Apartment 1 To 5 & Lobby 4. ASHRAE 1991 LVL-47 10520 : 42 Apartment 1 To 5 & Lobby LVL-48 10520 43 Apartment 1 To 5 & Lobby LVL-49 10520 44 Apartment 1 To 5 & Lobby LVL-50 10520 : 45 Apartment 1 ASME STANDARD PTC 19.2-1987 PART II 5. To 5 & Lobby TOTAL-LONG LEASED APRT.( LVL -38 TO 50) 136760

46 PENT HOUSE 1 To 4 & Lobby 47 48 49 50 51 52 53

LVL-53 LVL-54 LVL-55 LVL-56 LVL-57 LVL-58 LVL-59 LVL-60

PENT HOUSE 1 To 4 & Lobby 60038 6. IEC STANDARD PENT HOUSE 1 To 4 & Lobby PENT HOUSE 1 To 4 & LobbyRP 31.1 7. ISA STANDARD PENT HOUSE 1 To 4 & Lobby PENT HOUSE 1 To 4 & Lobby PENT HOUSE 1 To 4 & Lobby PENT HOUSE 1 To 4 & LobbyTOTAL-PENT HOUSES( LVL -53 TO 60)

7981 5540 : 7981 5540 : 7981 5540 7981 5540 54084

125.07 51672 73 5.0 58.82 Number designation & safety 28073 classification of 73 5.0 58.82 28073 refrigerants 73 5.0 58.82 28073 73 5.0 58.82 28073 Measurements guide 73 5.0 58.82 28073 73 conditioning & refrigerating equipment 5.0 58.82 28073 Air 73 5.0 58.82 28073 73 5.0 58.82 28073 nameplate voltages 73 5.0 58.82 28073 Terminology of Heating Ventilation Air 73 5.0 58.82 28073 73 5.0 58.82 28073 conditioning & Refrigeration. 73 5.0 58.82 28073 73 5.0 58.82 28073 Instruments & apparatus pressure 949 65.0 764.66 364949 measurements 53.35 58 4.5 25610 41 Standard voltages 5.3 29.52 13370 IEC 58 4.5 53.35 25610 41 5.3 29.52 13370 Recommended Practice, Specification, 58 4.5 53.35 25610 41 5.3 29.52 13370 58 4.5 53.35 25610 7 41 5.3 29.52 13370 396 39.0 331.48 155920

DESIGN CONCEPT REPORT M.E.P. SERVICES

GRAND TOTAL

726148 7784 275.0 4197.58 1841560

DESIGN BRIEF ON MEP SERVICES FOR UPCOMING 5 STAR HOTEL AT VARANASI8. SMACNA -1990 9. SMACNA- 1985 10. SMACNA- 1985 13. SMACNA-1989 14. SMACNA- 1989 15. SMACNA- 1977 16. ANSI/ASHRAE/52.1-1992 : : : : : : : Installation, & Calibration of Flow meters HVAC Systems-Duct Design HVAC air duct leakage test manual HVAC duct construction standards-Metal & flexible I edition HVAC duct system inspection guide Rectangular industries duct construction Round industries duct construction Gravimetric & Duct spot procedure for testing air cleaning devices used in general ventilation for removing particulate matter 17. BS 6540, Part 1 18. ANSI/ASHRAE 55-1992 19. CTI-ATC 105-1990 : : Methods of test for atmospheric dust spot efficiency & synthetic dust weig