24
MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE: April 21, 2016 SUBJECT: Circulation of Votes Formal Interpretation Ballot No. 2 (Low Voltage) Sections 1.4, 3.3.15, 3.3.15.1, 8.1 thru 8.4, Table 8.4.1, 8.5, 8.11, and Annex E In accordance with Section 6.3.4(c) of the Regulations Governing the Development of NFPA Standards, attached are the preliminary ballot results for your review. These results include explanation of “yes” “no” and “abstain” votes with comments. The preliminary results of balloting are as follows: Ballot No. 2 (Low Voltage) 30 Members Eligible to Vote 11 Ballots Not Returned (Grizard, Harrison, Kennedy, IV, Krempasky, Li, McKinney, Sandu, Thomas, Till, Weng, Wilcheck) 10 No, this FI should not be processed 9 Yes, this FI should be processed The answer to the question as this FI should be processed was: _ 7 Yes _ 2 No 0 Abstentions To change your vote, the change must be received at NFPA prior to April 28, 2016. Members who did not return their ballots initially may do so now. As noted on the ballot form, please return the ballots to Sarah Caldwell at [email protected] or via fax to (617) 984-7110. You may also mail your ballots to Sarah Caldwell, NFPA, 1 Batterymarch Park, Quincy, MA, 02169. Attachments

MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:

MEMORANDUM

TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems

FROM: Kelly Carey, Project Administrator

DATE: April 21, 2016

SUBJECT: Circulation of Votes – Formal Interpretation Ballot No. 2 (Low Voltage)

Sections 1.4, 3.3.15, 3.3.15.1, 8.1 thru 8.4, Table 8.4.1, 8.5, 8.11, and Annex E

In accordance with Section 6.3.4(c) of the Regulations Governing the Development of NFPA

Standards, attached are the preliminary ballot results for your review. These results include

explanation of “yes” “no” and “abstain” votes with comments.

The preliminary results of balloting are as follows:

Ballot No. 2 (Low Voltage)

30 Members Eligible to Vote 11 Ballots Not Returned (Grizard, Harrison, Kennedy, IV, Krempasky, Li, McKinney, Sandu,

Thomas, Till, Weng, Wilcheck)

10 No, this FI should not be processed

9 Yes, this FI should be processed

The answer to the question as this FI should be processed was:

_ 7 Yes

_ 2 No

0 Abstentions

To change your vote, the change must be received at NFPA prior to April 28, 2016. Members

who did not return their ballots initially may do so now. As noted on the ballot form, please

return the ballots to Sarah Caldwell at [email protected] or via fax to (617) 984-7110. You

may also mail your ballots to Sarah Caldwell, NFPA, 1 Batterymarch Park, Quincy, MA, 02169.

Attachments

Page 2: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 3: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 4: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 5: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 6: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 7: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 8: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 9: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 10: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 11: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 12: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 13: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 14: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 15: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 16: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 17: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 18: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 19: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 20: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 21: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 22: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 23: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE:
Page 24: MEMORANDUM TO: FROM: Project Administrator · MEMORANDUM TO: Technical Committee on Fixed Guideway Transit and Passenger Rail Systems FROM: Kelly Carey, Project Administrator DATE: