Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
STATE OF MAINE DEPARTMENT OF AGRICULTURE, CONSERVATION & FORESTRY
LAND USE PLANNING COMMISSION 22 STATE HOUSE STATION
AUGUSTA, MAINE 04333-0022 JANET T. MILLS
GOVERNOR
AMANDA E. BEAL COMMISSIONER
SAMANTHA HORN ACTING EXECUTIVE DIRECTOR
HARLOW BUILDING, 4TH FLOOR PHONE: 207-287-2631 WWW.MAINE.GOV/DACF/LUPC FAX: 207-287-7439
Memorandum To: LUPC Commissioners
From: Stacie Beyer, Acting Planning Manager
Naomi Kirk-Lawlor, Senior Planner
Date: September 27, 2019
Re: Weyerhaeuser Petition to Terminate Moosehead Region Concept Plan
Introduction
On September 23, Weyerhaeuser submitted a petition to terminate the Moosehead Region Concept Plan (MRCP) and rezone those lands to Protection and Management subdistricts. The former Land Use Regulation Commission approved the 380,074 acre MRCP in 2009. The Plan was designed to permanently conserve over 390,000 acres both in the plan area and in a separate parcel known as the Roaches Pond Tract. Another 16,910 acres were designated for development of up to 2,025 residential and short term housing units (MRCP, Sub-Chapter IV, Section 10.28,B). The plan language requires that the Commission designate replacement zoning for all of the Plan Area lands prior to approving termination. Weyerhaeuser explains the rationale for terminating in a cover letter, which is attached to this memo. It is also worth noting that the MRCP imposes restrictions on harvesting in the development areas that were designed to retain vegetation to screen future development. It appears that Weyerhaeuser intends to primarily conduct forestry operations, and in that context the restrictions are no longer necessary.
Effect of the Proposed Termination and Rezoning
Substantial public benefits have already been realized from the MRCP and those benefits will continue in perpetuity. They include:
• Permanent conservation of over 390,000 acres • Permanent hiking trail easements totaling 121 acres, and $1 million to construct trails • Easements for 81 miles of ITS snowmobile trails • Donation of 25 acres for affordable housing
LUPC Commissioners September 27, 2019 Page 2 of 3
On the 16,910 acres that were not conserved and were included in development areas, any special development rights and responsibilities will terminate with the end of the MRCP. Public benefits that would have been triggered by the future exercise of those development rights will no longer be required because the development rights themselves will be terminated. These include various fees, funds, and deed covenants.
One notable outstanding issue is that the MRCP entitled the Bureau of Parks and Lands to 50 acres of donated land, with the locations to be worked out with Weyerhaeuser. The BPL and Weyerhaeuser report that they are in substantial agreement on a modified package of donations, including some land and some additional road easements, that will best serve the public’s interest in accessing important easement area recreation assets in perpetuity. The agreement between the BPL and Weyerhaeuser resolves the only major outstanding MRCP obligation that staff have identified.
Planning Needs in the Region
The Moosehead region is identified in the Comprehensive Land Use Plan as a region with special planning needs (CLUP, Section 4.6.E). If the MRCP had not been proposed, the Commission would likely have begun regional planning in the 2000’s. However, the MRCP covers such a dominant land area in the region, that the Commission chose not to initiate a separate regional planning process. Weyerhaeuser’s petition to terminate does not change the fact that there are now substantial conserved lands and recreation assets in the region, but it does raise the question of how best to plan for the future on the remaining lands that are neither conserved nor in government ownership.
The Moosehead region has, in the last several years, undertaken several high-quality visioning and economic development planning processes1. The community is in a good position to use that information for a future regional land use planning project. The community may feel that the best way forward would be to work with the LUPC to prospectively zone some development areas in appropriate places in a comprehensive way, rather than dealing with zoning petitions for developments on an individual basis.
Before the MRCP can be terminated, the Commission must evaluate Weyerhaeuser’s petition to rezone to management and protection subdistricts. This process will include opportunity for public comment. Separately, a regional land use planning project could be undertaken in collaboration with the community. Exactly what the planning process looks like can be guided by the community.
What Will Happen Upon Termination of the MRCP?
The vast majority of the plan area is within the conservation easement. Timber harvesting and some recreational uses, guided by the terms that easement, will remain the dominant activities within the conservation easement area. With the exception of one operating sporting camp (~4 acres, proposed D-GN) Weyerhaeuser’s petition would return the remaining 16,910 acres to management and protection zoning, similar to most of the LUPC service area.
1 For example, the Moosehead Lake Region Branding Initiative (Moosehead Lake Economic Development Corp.) and the Moosehead Lake Regional Plan (Future IQ).
LUPC Commissioners September 27, 2019 Page 3 of 3
If the termination is approved, and protection and management zoning is in place, a future landowner could petition for rezoning or apply for permits for development on those lands, consistent with the Commission’s current rules. As rezoning is a discretionary act, the Commission has substantial control over the outcome in a rezoning process, thus leaving little risk that there will be inappropriate rezonings as a result of the termination and before a regional planning process concludes.
However, there are some types of development that are allowed with a permit in the General Management (M-GN) subdistrict. It would be best if any substantial development were delayed until the conclusion of the regional planning process. To limit any risk in this regard, LUPC staff have spoken with Weyerhaeuser. The company has agreed that they will not apply for permits for development for a reasonable period of time to allow for a regional planning process.
Next Steps and Staff Recommendation
Staff will evaluate the petition for completeness and bring it to the Commission for a decision about holding a hearing. Public hearings on rezonings are required if five or more persons request one. It seems likely that there will be substantial interest among members of the public in holding a hearing, so the Commission could choose to instruct the staff today to schedule a public hearing when the petition is complete and ready for hearing.
Staff recommend that the LUPC ask Weyerhaeuser to confirm in writing their commitment to finishing the 50 acre donation process with the BPL, and their commitment to not file any proposals for development for some reasonable period of time. Based on an estimate of how long it would take to complete regional planning, staff suggests that a commitment to hold off until the end of the regional planning process, or Jan 1, 2022, whichever comes first, would be appropriate.
Staff further recommend that the Commissioners direct staff to spend time this winter in consultation with local individuals and organizations scoping out what type and extent of regional planning would be most appropriate and welcome locally. Staff’s preliminary thought is that the geographic extent might include the areas within a few miles of the lake from Lily Bay around the south end of the lake and up to Rockwood or Tomhegan. However, that may change based on local consultations, especially given the significant amount of visioning and planning the local community has already accomplished. Following those consultations, a regional planning process could begin in spring or summer of 2020.
With the above recommendations in place, staff feel that a termination process that anticipates reverting to primarily management and protection subdistricts could be done responsibly.
Attachments: Cover Letter from Weyerhaeuser Summary map of MRCP
Rockwood
Brassua Lake
FletcherPondEast
Kennebec RiverWest Outlet
Moosehead WildlandsConcept Plan
Leith Pond
Mud Pond LutherPond
MuskratPondFish Pond
Center Pond
Canada FallsLake
TomheganPond
NorthwestCove
Moosehead Lake
Kokadjo
Spencer Bay
First Roach Pond
Second Roach Pond
Trout Pond
Fourth RoachPond
Third RoachPond
BeaverPond
Penobscot Pond
Second WestBranch Pond
First WestBranch Pond
Big LyfordPond
ProngPond
RumPond
LowerWilson Pond
UpperWilson Pond
BeaverCove
MudPond
Kennebec RiverEast Outlet
IndianPond
MountainViewPond
BurnhamPond
Chase StreamPond
Ellis Pond
HorseshoePond
Long Pond
DemoPond
Lily B
ay R
oad
KnightsPond
Fogg Pond
RoderiquePond
Bluff Pond
Long Bog
Fourth WestBranch Pond
CranberryPond
NotchPond
BrownPond
HedgehogPond
Horseshoe Pond
FoggPond
MountainPond
Little IndianPond
LongPond
RoundPond
IslandPond
MudPond
Dead StreamPond
FlatironPond
SquirtgunFlowage Knights
Pond
Little ChaseStream Pond
Ten ThousandAcre Pond
ChubPond
Chase StreamPond
MiseryPond
Upper MiseryPond
Cold StreamPond
OtterPond
Little OtterPond
ScribnerPond
FletcherPondWest
LostPond
JewettPond
LuckyPond
SpencerPond Lazy Tom
Bog
IndianPond
Long Pond
SecretPond
DipperPond
Horseshoe Pond
Lower Paradise Pond
Smith Pond
Upper Paradise Pond
M i s e r y G o r e T w p
M i s e r y G o r e T w p
S a p l i n gS a p l i n gT w pT w p
M i s e r y T w pM i s e r y T w p
B i g M o o s e T w pB i g M o o s e T w p
I n d i a nI n d i a nS t r e a m T w pS t r e a m T w p
M o o s e h e a d J u n c t i o n T w pM o o s e h e a d J u n c t i o n T w p
S h i r l e yS h i r l e y
S q u a r e t o w n T w pS q u a r e t o w n T w p
M o x i e G o r eM o x i e G o r e
E a s t M o x i e T w pE a s t M o x i e T w p
W e s t F o r k s P l tW e s t F o r k s P l t
J o h n s o nJ o h n s o nM o u n t a i nM o u n t a i n
T w pT w p
P a r l i n P o n d T w pP a r l i n P o n d T w p
L o n g P o n d T w pL o n g P o n d T w p
J a c k m a nJ a c k m a n
B a l d M o u n t a i n T w pB a l d M o u n t a i n T w p
T h o r n d i k e T w pT h o r n d i k e T w p
B r a s s u a T w pB r a s s u a T w pK i n e oK i n e o T w p T w p
T o m h e g a n T w pT o m h e g a n T w p
L i t t l e WL i t t l e W T w p T w p
B i g W T w pB i g W T w p
W e s t M i d d l e s e xW e s t M i d d l e s e xC a n a l G r a n tC a n a l G r a n t
S o l d i e r t o w n T w p T 2 R 3 N B K PS o l d i e r t o w n T w p T 2 R 3 N B K P
A l d e r B r o o k T w pA l d e r B r o o k T w p
P r e n t i s s T w p T 4 R 4 N B K PP r e n t i s s T w p T 4 R 4 N B K P
P i t t s t o n A c a d e m y G r a n tP i t t s t o n A c a d e m y G r a n tP l y m o u t h T w pP l y m o u t h T w p S e b o o m o o k T w pS e b o o m o o k T w p
R o c k w o o d R o c k w o o d S t r i p S t r i pT 2 R 1 N B K PT 2 R 1 N B K P
R o c k w o o d R o c k w o o d S t r i p S t r i pT 2 R 2 N B K PT 2 R 2 N B K P
G r e e n v i l l eG r e e n v i l l e
T 7 R 9 N W PT 7 R 9 N W P
B o w d o i n C o l l e g eB o w d o i n C o l l e g eG r a n t E a s t T w pG r a n t E a s t T w p
T B R 1 1 W E L ST B R 1 1 W E L S
T A R 1 1T A R 1 1 W E L S W E L S
T 1 R 1 1 W E L ST 1 R 1 1 W E L S
S h a w t o w nS h a w t o w nT w pT w p
S p e n c e r B a y T w pS p e n c e r B a y T w pT 1 R 1 3 W E L ST 1 R 1 3 W E L S
T X R 1 4T X R 1 4W E L SW E L S
T 2 R 1 3 W E L ST 2 R 1 3 W E L S
T 2 R 1 2 W E L ST 2 R 1 2 W E L S
D a y s A c a d e m yD a y s A c a d e m y G r a n t T w p G r a n t T w p
B e a v e r C o v eB e a v e r C o v e
E l l i o t t s v i l l e T w pE l l i o t t s v i l l e T w p
B o w d o i n C o l l e g eB o w d o i n C o l l e g eG r a n t W e s t T w pG r a n t W e s t T w p
E a s t M i d d l e s e xE a s t M i d d l e s e xC a n a l G r a n t T w pC a n a l G r a n t T w p
T 1 R 1 2 W E L ST 1 R 1 2 W E L S
M o o s eM o o s e R i v e r R i v e r
T a u n t o n &T a u n t o n &R a y n h a mR a y n h a m
T w pT w p
C h a s e C h a s eS t r e a m T w pS t r e a m T w p
L i l y B a y T w pL i l y B a y T w p
F r e n c h t o w n T w pF r e n c h t o w n T w p
S a n d w i c h A c a d e m yS a n d w i c h A c a d e m yG r a n tG r a n t
201
6 15
156
156
D-MH-RT
D-MH-CI
D-MH-RS1!
!
!
!
!
!
!
!
!
!
!
!
D-MH-RS1
D-MH-RS1
D-MH-RS1
D-MH-RS1D-MH-RS1
D-MH-RS1
D-MH-RS1
D-MH-RT
D-MH-RT
D-MH-PR
D-MH-RS2
D-MH-PR
D-MH-RS1
D-MH-RS1
D-MH-RT
D-MH-RS1
£¤201
CONCEPT PLANforPLUM CREEK'SLANDSin theMOOSEHEAD LAKE REGION
Concept Plan Summary
0 3 6Miles
500 Ac100 Ac10 Ac
LegendResource Plan Protection (P-RP) Subdistrict
Private, State, Federal Land in Conservation
Moosehead Region Conservation Easement
Roaches Pond Tract
No Disturbance Area
Residential Development Zone (D-MH-RS1)
Residential/Resort Optional Zone (D-MH-RS2)
Primitive Resort Development Zone (D-MH-PR)
Resort Development Zone (D-MH-RT)
Commercial Industrial Development Zone (D-MH-CI)
Mapped Sand and Gravel Aquifer
Major Road (Public)
Minor Road (Public or Private)
Approximate Moosehead-to-Mahoosucs Trail
âââââââââ â
âââ
ITS Snowmobile Trail
Existing Public ITS Snowmobile Trail
Railroad
Roaches Pond Tract
Map 2Note:This map does not depict any Protection Subdistricts. TheOfficial Land Use Guidance Maps show all Protection Subdistricts within the Concept Plan Area.