This agenda is subject to revision up to 72 hours prior to the meeting.
To: All Members, Transportation Policy Board From: Kevin Wolff, Chair and Sid Martinez, Director Subject: Online Transportation Policy Board Meeting Notice and Agenda
The next meeting of the MPO Transportation Policy Board is scheduled for Monday, December 14, 2020 at 1:30 p.m.
Due to COVID-19 restrictions, this will be an online meeting.
Internet access to the meeting is through the MPO’s website at www.alamoareampo.org/committees/online
Access code: 146 982 6720#
Individuals without internet access can access the meeting audio only via phone by calling 1-844-992-4726 and entering the access code: 146 982 6720#
If you have issues accessing the meeting please call 210-227-8651.
The following agenda items will be discussed and action will be taken as appropriate. Items may be taken out of the order shown.
Citizens to be Heard: Speakers will be allowed up to three (3) minutes each to address the Transportation Policy Board under the Citizens to be Heard agenda item. All speakers must
state their names and any organizations they represent.
Agenda: 1. Roll Call 2. Recognition of Service to the Alamo Area MPO: Chair Kevin Wolff, Mario Jorge and
Chico Rodriguez 3. Director’s Report – MPO (Martinez)
a. The FY 2023-2026 TIP Call for Projects is underway; information is available on the MPO’s website at www.alamoareampo.org/callforprojects The website will be updated as new information becomes available
b. The January meeting will return to its regular date on Monday, January 25, 2021 at 1:30 p.m. via Webex
c. The MPO Office will be closed on Friday, December 25; Friday, January 1; and Monday, January 18, 2021
Alamo Area MPO meetings are accessible to persons with disabilities. To arrange for special assistance or an
interpreter, please call 210-227-8651 or TDD 1-800-735-2989 (Relay Texas) at least five working days in advance. Las reuniones son accesibles a personas con discapacidad. Si usted necesita asistencia especial o un intérprete, llame al
(210) 227-8651 o al TDD 1-800-662-4954 (Relay Texas) con cinco días hábiles de anticipación. Please provide any written comments on any agenda items within three days prior to the meeting, to the MPO at:
825 South Saint Mary’s Street • San Antonio, Texas 78205
(210) 227-8651 (210) 227-9321 TTD 1 (800) 735-2989
www.alamoareampo.orgo
Memorandum December 4, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 1 of 337
Transportation Policy Board December 14, 2020 4. Citizens to be Heard Consent Agenda: All items under the Consent Agenda are acted upon collectively unless opposition is presented, in which case, the contested item will be considered, discussed and appropriate action taken separately. 5. Approval of the October 26, 2020 Meeting Minutes 6. Action on the Contract Award for Subtask 3.4 Subregional Planning Study – MPO
(Blazosky) Items for Individual Discussion and Appropriate Action: 7. Discussion and Appropriate Action on the FY 2022 Unified Transportation Program
Project Scoring and Prioritization – TxDOT (Geiger) 8. Discussion and Appropriate Action on Revisions to the Metropolitan Transportation Plan
and the FY 2021-2024 Transportation Improvement Program – MPO (Geiger) 9. Discussion and Appropriate Action on Documents Related to Transportation Conformity -
MPO (Blazosky)
a. Metropolitan Transportation Plan (“Mobility 2045”) Project List b. FY 2021-2024 Transportation Improvement Program c. 2020 Transportation Conformity Document 10. Discussion and Appropriate Action on Performance Measures and Target Setting – MPO
(Pawlik / Hall)
a. PM 1: Safety b. PM 2: Bridge/Pavement Condition c. PM 3: Roadway System Performance
11. Monthly Status Reports
a. Alamo Regional Mobility Authority/Bexar County (Renee Green) b. Air Quality Issues (Diane Rath) c. City of San Antonio (Razi Hosseini) d. San Antonio Mobility Coalition (Vic Boyer) e. Texas Department of Transportation (Mario Jorge) f. VIA Metropolitan Transit (Jeff Arndt) g. Others
Alamo Area MPO meetings are accessible to persons with disabilities. To arrange for special assistance or an
interpreter, please call 210-227-8651 or TDD 1-800-735-2989 (Relay Texas) at least five working days in advance. Las reuniones son accesibles a personas con discapacidad. Si usted necesita asistencia especial o un intérprete, llame al
(210) 227-8651 o al TDD 1-800-662-4954 (Relay Texas) con cinco días hábiles de anticipación. Please provide any written comments on any agenda items within three days prior to the meeting, to the MPO at:
825 South Saint Mary’s Street • San Antonio, Texas 78205
(210) 227-8651 (210) 227-9321 TTD 1 (800) 735-2989
www.alamoareampo.orgo
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 2 of 337
Transportation Policy Board December 14, 2020 12. Executive Session - Pursuant to Chapter 551, Subchapter D, Texas Government Code
At any time during the meeting of the MPO Transportation Policy Board, the Board reserves the right to adjourn into executive Session at any time to discuss any of the matters listed on the posted agenda, as authorized by Texas Government Code Section 551.071 (consultation with attorney), Section 551.072 (deliberations about real property), Section 551.074 (personnel matters), and Section 551.086 (economic development)
Adjourn
Alamo Area MPO meetings are accessible to persons with disabilities. To arrange for special assistance or an interpreter, please call 210-227-8651 or TDD 1-800-735-2989 (Relay Texas) at least five working days in advance.
Las reuniones son accesibles a personas con discapacidad. Si usted necesita asistencia especial o un intérprete, llame al (210) 227-8651 o al TDD 1-800-662-4954 (Relay Texas) con cinco días hábiles de anticipación.
Please provide any written comments on any agenda items within three days prior to the meeting, to the MPO at:
825 South Saint Mary’s Street • San Antonio, Texas 78205
(210) 227-8651 (210) 227-9321 TTD 1 (800) 735-2989
www.alamoareampo.orgo
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 3 of 337
Transportation Policy Board December 14, 2020
1. Roll Call
Commissioner Kevin A. Wolff (Chair) Bexar County 210-335-2613
Ms. Jordana Matthews Advanced Transportation District 210-362-2000
Mr. Michael J. Lynd, Jr. Alamo Regional Mobility Authority 210-335-7065
Commissioner Tommy Calvert Bexar County 210-335-2614 Commissioner Sergio “Chico” Rodriguez Bexar County 210-335-2611
Ms. Renee Green, P.E. Bexar County 210-335-6700 Councilman Shane Hines City of New Braunfels 830-214-5938
Councilwoman Shirley Gonzales City of San Antonio, District 5 210-207-7043 Councilwoman Melissa Cabello Havrda City of San Antonio, District 6 210-207-7065
Councilman Clayton Perry City of San Antonio, District 10 210-207-7276
Councilwoman Ana Sandoval City of San Antonio, District 7 210-207-7044
Mr. Razi Hosseini, P.E. City of San Antonio 210-207-8022
Ms. Bridgett White City of San Antonio 210-207-0147
Vacant City of Seguin Commissioner Kevin Webb Comal County 830-221-1100
Mayor Chris Riley [Leon Valley] Greater Bexar County Council of Cities 210-684-1391 Judge Kyle Kutscher Guadalupe County 830-303-8857
Commissioner Christina Bergmann Kendall County Geographic Area 830-331-8254
Councilman Kevin Hadas [Selma] Northeast Partnership 210-651-6661 Mr. Mario Jorge, P.E. Texas Department of Transportation 210-615-5803
Mr. Ezra Johnson VIA Metropolitan Transit 210-362-2000 Ex-Officio Members Mr. Greg P. Wood Federal Highway Administration
Mr. Nick Page Texas Department of Transportation Mr. Jeff Arndt VIA Metropolitan Transit Ms. Diane Rath Alamo Area Council of Governments Mr. Vic Boyer San Antonio Mobility Coalition
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 4 of 337
Transportation Policy Board December 14, 2020
2. Recognition of Service to the Alamo Area MPO: Chair Kevin Wolff, Mario
Jorge, and Chico Rodriguez
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 5 of 337
Transportation Policy Board December 14, 2020
3. Director’s Report
a. The FY 2023-2026 TIP Call for Projects is underway; information is available on the MPO’s website at www.alamoareampo.org/callforprojects The website will be updated as new information becomes available
b. The January meeting will return to its regular date on Monday, January 25, 2021
at 1:30 p.m. via Webex c. The MPO Office will be closed on Friday, December 25; Friday, January 1; and
Monday, January 18, 2021
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 6 of 337
Transportation Policy Board December 14, 2020
4. Citizens to Be Heard
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 7 of 337
Transportation Policy Board December 14, 2020
5. Approval of the October 26, 2020 Meeting Minutes Issue
The October 26, 2020 meeting minutes are attached for your review. Action Requested
A motion to approve the October 26, 2020 meeting minutes.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 8 of 337
1. Roll Call Members Present:
Ms. Jordana Matthews Advanced Transportation District Ms. Renee Green, P.E. Bexar County Councilmember Shane Hines City of New Braunfels Councilwoman Melissa Cabello Havrda City of San Antonio Councilwoman Shirley Gonzales City of San Antonio Councilman Clayton Perry City of San Antonio Councilwoman Ana E. Sandoval City of San Antonio Mr. Razi Hosseini, P.E. City of San Antonio Ms. Bridgett White City of San Antonio Mayor Don Keil City of Seguin Commissioner Kevin Webb (Vice Chair) Comal County Mayor Chris Riley Greater Bexar County Council of Cities Judge Kyle Kutscher Guadalupe County Commissioner Christina Bergmann Kendall County Geographic Area Councilman Kevin Hadas Northeast Partnership Mr. Jonathan Bean, P.E. Texas Department of Transportation Mr. Ezra Johnson VIA Metropolitan Transit
Members Absent:
Mr. Michael J. Lynd, Jr. Alamo Regional Mobility Authority Commissioner Tommy Calvert Bexar County Commissioner Sergio “Chico” Rodriguez Bexar County Commissioner Kevin Wolff (Chair) Bexar County Others Present:
Ms. Diane Rath Alamo Area Council of Governments Mr. Frank Garza Davidson Troilo Ream & Garza
Mr. Isidro “Sid” Martinez Metropolitan Planning Organization Mr. Vic Boyer San Antonio Mobility Coalition
Mr. Jeff Arndt VIA Metropolitan Transit
Vice Chair Kevin Webb called the meeting to order at 1:35 p.m.
Transportation Policy Board Meeting Minutes October 26, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 9 of 337
Transportation Policy Board October 26, 2020
2
2. Director’s Report
a. The FY 2023-2026 TIP Call for Projects is underway; information is available on the MPO’s website at www.alamoareampo.org/callforprojects. The website will be updated as new information becomes available.
b. The MPO Office will be closed on Monday, September 7 for the Labor Day holiday. c. Listing of CY 2021 and CY 2022 TPB meetings is attached. Meetings will likely
continue to be online, at least through Fall/Winter. 3. Citizens to be Heard
MPO staff read a resignation letter from a PMAC committee member. Consent Agenda: All items under the Consent Agenda are acted upon collectively unless opposition is presented, in which case the contested item will be considered, discussed and appropriate action taken separately. 4. Approval of the September 28, 2020 Meeting Minutes 5. Action on Roadway and Transit Amendments to the Metropolitan Transportation
Plan and the Transportation Improvement Program
Mayor Chris Riley moved and Ms. Jordana Mathews seconded to approve the Consent Agenda The motion passed unanimously.
Items for Individual Discussion and Appropriate Action 6. Discussion and Appropriate Action on Revisions to Policy 2: Public Participation
Plan
Councilwoman Ana E. Sandoval moved and Councilman Kevin Hadas seconded to approve the revisions to Policy 2: Public Participation Plan. The motion passed unanimously.
7. Discussion and Appropriate Action on MPO FY 2020 Staff Updates
For information and discussion only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 10 of 337
Transportation Policy Board October 26, 2020
3
8. Monthly Status Reports
a. Alamo Regional Mobility Authority (Renee Green) b. Air Quality Issues (Diane Rath) c. City of San Antonio (Razi Hosseini) d. San Antonio Mobility Coalition (Vic Boyer) e. Texas Department of Transportation (Mario Jorge) f. VIA Metropolitan Transit (Jeff Arndt) g. Others
For information and discussion only.
9. Executive Session - Pursuant to Chapter 551, Subchapter D, Texas Government
Code
This item was not considered.
10. Adjourn
There being no further business, the meeting was adjourned at 2:37 p.m. _______________________________________ Commissioner Kevin Webb, Vice Chair Transportation Policy Board
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 11 of 337
Transportation Policy Board December 14, 2020
6. Action on the Contract Award for Subtask 3.4 Subregional Planning Study Purpose
The purpose of this agenda item is to take action on the contract award for Subtask 3.4 Subregional Planning Study.
Issue
On Monday, September 14, 2020, the MPO issued a request for proposals (RFP) for the Subregional Planning Study. This study was approved by the Transportation Policy Board for inclusion in the FY 2020-2021 Unified Planning Work Program on June 24, 2019. Notification of the RFP was e-mailed to 20 transportation planning, engineering, and data collection firms and was advertised in the San Antonio Express-News and the Texas Register. Proposals were due to the MPO by noon on Friday, October 16, 2020 and were received from the following six teams:
Freese and Nichols, Inc Cambridge Systematics Legacy Engineering Group Poznecki-Camarillo, Inc
Jacobs
Poznecki-Camarillo, Inc
Poznecki-Camarillo, Inc K Friese + Associates Cambridge Systematics
RS&H
Kittleson Engineering Alliance Transportation Group Transcend Engineers and Planners
TJKM Transportation Consultants
HDR
WSP MIG Poznecki-Camarillo, Inc Cambridge Systematics
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 12 of 337
Subregional Planning Study to RS&H.A motion to award the contract for Subtask 3.4
Action Requested
contract be awarded to RS&H.consultant selection committee recommended the Subregional Planning Study were conducted on Wednesday, December 2, 2020. Based on consensus, the interview three teams: Freese and Nichols, RS&H and WSP. Virtual interviews review the proposal scores. Based on the proposal scores, the committee opted to The consultant selection committee met virtually on Friday, November 6, 2020 to
VIA Metropolitan Transit - 1 representative Texas Department of Transportation (San Antonio District) – 1 representative City of Seguin/Guadalupe County – 1 representative City of San Antonio – 1 representative City of New Braunfels/Comal County – 1 representative Capital Area MPO – 1 representative Bexar County – 1 representative Alamo Area MPO – 1 representative
Transportation Policy Board on June 22, 2020. Members are as follows:The consultant selection committee composition was approved by the
Transportation Policy Board December 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 13 of 337
Subregional Planning Study Proposal Scores (out of 100 points)November 6, 2020
Subregional Planning Study Freese and Nichols Jacobs Poznecki-Camarillo RS&H
TJKM
Transportation
Consultants
WSP
AAMPO 93.50 88.75 90.75 91.50 74.75 91.75
Ordinal Ranking: 1 5 4 3 6 2
Bexar County 86.00 88.50 80.75 88.25 76.00 88.50
Ordinal Ranking: 4 1 5 3 6 1
CAMPO 91.50 81.00 80.50 68.75 47.75 75.75
Ordinal Ranking: 1 2 3 5 6 4
City of New Braunfels/Comal County 81.50 75.00 83.00 85.00 57.50 84.50
Ordinal Ranking: 4 5 3 1 6 2
City of San Antonio 82.50 65.75 58.75 74.25 46.50 87.75
Ordinal Ranking: 2 4 5 3 6 1
City of Seguin/Guadalupe County 84.00 83.50 77.75 80.75 72.00 84.25
Ordinal Ranking: 2 3 5 4 6 1
TxDOT San Antonio District 87.50 86.00 90.25 82.25 75.00 88.25
Ordinal Ranking: 3 4 1 5 6 2
VIA Metropolitan Transit 82.50 90.00 93.50 95.00 55.00 93.50
Ordinal Ranking: 5 4 2 1 6 2
Average 86.13 82.31 81.91 83.22 63.06 86.78
Average Ordinal Ranking: 2.75 3.50 3.50 3.13 6.00 1.88
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 14 of 337
Subregional Planning StudyInterview Scores (out of 70 points)
Subregional Planning StudyFreese and
NicholsRS&H WSP
AAMPO 41 45 52
Ordinal Ranking: 3 2 1
Bexar County 56 63 61
Ordinal Ranking: 3 1 2
City of New Braunfels/Comal County 55 59 57
Ordinal Ranking: 3 1 2
City of San Antonio 48 55 53
Ordinal Ranking: 3 1 2
City of Seguin/Guadalupe County 60 62 63
Ordinal Ranking: 3 2 1
TxDOT San Antonio District 53 60 57
Ordinal Ranking: 3 1 2
VIA Metropolitan Transit 48 57 57
Ordinal Ranking: 3 1 1
Average 52 57 57
Average Ordinal Ranking: 3.0 1.3 1.6
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 15 of 337
Transportation Policy Board December 14, 2020
7. Discussion and Appropriate Action on the FY 2022 Unified Transportation Program Project Scoring and Prioritization
Purpose
The purpose of this agenda item is to review the draft FY 2022 Unified Transportation Program (UTP) project scoring and prioritization project process.
Issue The UTP is a ten-year planning document that is developed annually and is approved by the Texas Transportation Commission. The UTP authorizes highway and other projects for construction, development and planning. The UTP is neither a budget nor a guarantee that projects will or can be built. However, it is a critical tool in guiding transportation project development within the long-range planning context. A multiagency workgroup met on December 1st to provide direction on the project scoring and prioritization process. The draft presentation is attached.
Action Requested
For information and discussion only. Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 16 of 337
FY 2022Unified Transportation Program
Project Scoring and Prioritization
Transportation Policy BoardDecember 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 17 of 337
FY 2022 Unified Transportation Program
• The Unified Transportation Program (UTP)– a ten-year planning document– developed annually– approved by the Texas Transportation Commission– authorizes highway and other projects for
construction, development and planning– neither a budget nor a guarantee that projects will or
can be built– is a critical tool in guiding transportation project
development within the long-range planning context
2
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 18 of 337
• Funding categories– Category 2 Metro Corridor– Category 4 Connectivity– Category 12 Commission Strategic Funding / Clear Lanes
• NOT MPO funding categories– Category 5 Congestion Mitigation & Air Quality
Improvement– Category 7 Surface Transportation Block Grant– Category 9 Transportation Alternatives
3
FY 2022 Unified Transportation Program
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 19 of 337
Project Lists
4
0 5 10 15 20 25 30 35 40+
TIP
UTP
MTP
Years
$10.8B
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 20 of 337
• Bexar County: David Wegmann
• Comal County: Tom Hornseth
• City of New Braunfels: Garry Ford
• City of San Antonio: Marc Jacobson, Marco Hinojosa
• City of Seguin: David Rabago
• TxDOT: Clayton Ripps, Mark Mosley, Darcie Schipull
• VIA: Manjiri Akalkotkar
5
Multiagency Work GroupMet on December 1, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 21 of 337
• Added Capacity and Operational Projects
• Expressway and Arterial Projects
Project Stratification
Note: Project cost is not being considered; the focus is on technical scoring
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 22 of 337
–40% Congestion (maximum 400 points)
• 2017 base year volume/capacity ratio
• Difference in 2045 No Build and 2017 base year volume/capacity ratio
• Congestion Management System score
–40% Safety (maximum 400 points)
• Crash rate (per 100 million vehicle miles of travel)
–20% Statewide Freight Network (maximum 200 points)
7
Added Capacity Project Scoring
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 23 of 337
–45% Safety (maximum 450 points)
• Crash rate per million entering vehicles or
• Crash rate (per 100 million vehicle miles of travel)
–30% Congestion (maximum 300 points)
• 2045 No Build volume / capacity ratio
–25% Impact of improvement (maximum 250 points)
• Regional, corridor, subarea, or local
8
Operational Project Scoring
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 24 of 337
9
Project Scoring Spreadsheet (excerpt)
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 25 of 337
1. Projects that were in the FY 2021 UTP(regional priorities)
2. Top 100 congested corridors
(IH 35 and Loop 1604)
3. SW Initiative
(Other Top 100 Congested Corridors and IH 10 East)
4. Oher regional priorities
Project Tiering
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 26 of 337
11
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 27 of 337
12
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 28 of 337
Draft Resolution
13
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 29 of 337
Draft Resolution
14
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 30 of 337
–Multi-agency workgroup may meet in midDecember
– TAC action is scheduled for January 8, 2021
– TPB action is scheduled for January 25, 2021
– Transmitted to TxDOT prior to January 31, 2021 deadline
– Transportation Commission adoption is expected in August 2021
Next Steps
15
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 31 of 337
WHEREAS, pursuant to federal law, the Governor of the State of Texas designated the
Alamo Area Metropolitan Planning Organization (AAMPO) as the Metropolitan Planning
Organization for the San Antonio region; and
WHEREAS, AAMPO’s Transportation Policy Board is the entity for cooperative decision-
making regarding regional transportation issues in Bexar, Comal, and Guadalupe
Counties and a portion of Kendall County; and
WHEREAS, the Texas Department of Transportation (TxDOT) is a valuable partner in
planning for and implementing the region’s mobility needs; and
WHEREAS, TxDOT’s Unified Transportation Program (UTP) is a 10-year planning guide
for transportation project development and construction that is updated annually; and
WHEREAS, the 2022 UTP includes projects funded using Category 2 Metro Corridor
Projects, Category 4 Statewide Connectivity Corridor Projects, and Category 12 Strategic
Priority and Clear Lanes Projects; and
WHEREAS, TxDOT’s Transportation Planning and Programming Division has requested
MPOs and TxDOT Districts collaboratively score and rank Category 2, 4 and 12 projects
that are proposed for inclusion in the 2022 UTP; and
WHEREAS, the projects shown in the attached list:
are consistent with previously identified priorities
have been technically scored and ranked
are included in the AAMPO’s conforming Transportation Improvement
Program and / or Metropolitan Transportation Plan; and
have been supported through the AAMPO’s public involvement process
NOW, THEREFORE BE IT RESOLVED that the Alamo Area Metropolitan Planning
Organization’s Transportation Policy Board approves the ranking of projects in the
attached list.
PASSED AND APPROVED this 25th day of January 2021.
Kevin Webb, Chair Alamo Area Metropolitan Planning Organization
A Resolution In Support of the Region’s Scoring and Ranking of Projects for the FY 2022 Unified Transportation Program
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 32 of 337
Transportation Policy Board December 14, 2020
8. Discussion and Appropriate Action on Revisions to the Metropolitan Transportation Plan and the FY 2021-2024 Transportation Improvement Program
Purpose
The purpose of this agenda item is to review amendments to the Metropolitan Transportation Plan (MTP) and the Transportation Improvement Program (TIP).
Issue
Due to financial constraint issues at the state level, the TxDOT Districts, in coordination with the MPOs, have been reprioritizing projects in their TIPs and MTPs. TxDOT generally amends the Statewide Transportation Improvement Program (STIP) on a quarterly basis. To meet our local process for amending the TIP, amendments will be reviewed in December with action scheduled for January 2021. In order to keep the MTP and TIP consistent, amendments to the TIP will also need to be made to the MTP. The draft presentation and the amendments in their formal format are attached for your review.
Action Requested
For information and discussion only. Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 33 of 337
Roadway and Transit Amendments to the Metropolitan Transportation Plan (MTP) and the
Transportation Improvement Program (TIP)
Transportation Policy BoardDecember 14, 2020
In accordance with MPO policy, amendments to the
Long Range Transportation Plan (MTP)and the
Short Range Transportation Plan (TIP) occur in a two step process with
presentation one month and action the following month
2
Amendment Process
• Amendments are being presented in December 2020 with action scheduled for January 2021
• After approval, amendments to the short range plan are then forwarded to TxDOT for inclusion in the Statewide Transportation Improvement program (STIP)
• Amendments to the short range plan also need to be made to the long range plan so they stay consistent per federal requirements
3
Amendment Process
Unified Planning Work Program (UPWP):
MPO staff budget and regional planning studies
over a two year timeframe; FY 2022-2023
UPWP is scheduled for adoption in June 2021
Transportation Improvement Program (TIP):
Funded transportation projects within a four
year timeframe; FY 2021-2024 TIP was
previously adopted in May 2020 and
amended locally in October 2020
Metropolitan Transportation Plan (MTP):
Future goals, strategies and transportation
projects for 25 years; updated MTP list was
adopted in May 2020 and amended locally in
October 2020
Transportation Conformity Document (TCD)
Evaluates future transportation projects to
ensure they cause no further harm to air quality;
approved through a significant interagency
consultation process; previously adopted in May
2020
• TxDOT experienced financial constraint issues at the state level with the FY 2021-2024 TIP
• Only TxDOT projects are impacted with this amendment
• Impacts are primarily to – Category 2: Metro and Urban Area Corridors
– Category 4: Statewide Connectivity Corridors
– Category 12: Commission Strategic and Clear Lanes
• TxDOT Districts and MPOs have been reprioritizing projects to maintain financial constraint
5
Amendment Process
• 41 TxDOT projects are being amended this quarter– 1 project moving within the FY 2021-2024 TIP– 7 projects moving from the TIP to outside of it: FY 2025 (5), FY
2026 (1), FY 2032 (1)– 2 projects moving from FY 2025 to FY 2026– 6 projects moving from FY 2025 to FY 2032– 4 projects moving from FY 2026 to FY 2032– 2 projects moving from FY 2027 to FY 2032– 6 projects moving from FY 2028 to FY 2032– 2 projects moving from FY 2029 to FY 2032– 6 projects moving from FY 2030 to FY 2032– 3 projects moving from FY 2031 to FY 2032– 2 projects updating cost estimates
6
Roadway Amendment Summary
No impact to transportation
conformity
Action is scheduled for January 2021
7
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor
MPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.2
Limits From: US 281
Limits To: Bentwood Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering: $560,000
Contingencies: $980,000
Indirect Costs: $280,000
Preliminary Engineering: $686,000
Other Field $560,000
$25,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$22,000,000
$0
Other $0
Other $0
$17,600,000 $4,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,600,000 $4,400,000 $0 $0 $22,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
0215-01-044
Expand from 2 lanes to 6 lanes with raised median or CLTL
$22,000,000
Revision: 2nd Qtr 21 - revise cost
N/A
N/A
NOX lbs/day
VOC lbs/day
N/A
CMP Score
None
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.1
Limits From: Farhills Dr
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,800,000
Construction Engineering: $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field $1,040,000
$23,026,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$17,800,000
$0
Other $0
Other $0
$14,240,000 $3,560,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,240,000 $3,560,000 $0 $0 $17,800,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
0215-07-027
Expand from 2 lanes to 6 lanes with raised median or CLTL
$17,800,000
Revision: 2nd Qtr 21 - move from FY 2020 to FY 2022 and revise funding distribution
N/A
N/A
NOX lbs/day
VOC lbs/day
N/A
CMP Score
None
1Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 41 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor
MPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
FM 725 C TxDOT 5308.0
Limits From: Zipp Rd
Limits To: County Line Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,600,000
Construction Engineering: $525,760
Contingencies: $210,940
Indirect Costs: $608,440
Preliminary Engineering: $519,400
Other Field $396,440
$12,860,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,600,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STBG
Other
$10,600,000
$0
Other $0
Other $0
$8,480,000 $2,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,480,000 $2,120,000 $0 $0 $10,600,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - move from FY 2023 to FY 2024; 4/20 - move from FY 2022 to FY 2023; 9/19 - ADM clarify From limit; 4/16 - funded through STP-MM project selection process
Revision Date: 2/2021
0215-09-029
Expand from 2 to 4 lanes with median, sidewalks and bike lanes
$10,600,000
Revision: 2nd Qtr 21 - move from FY 2023 to FY 2024
N/A
N/A
NOX lbs/day
VOC lbs/day
N/A
CMP Score
None
2Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 42 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor
MPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 61.2
Limits From: IH 410 S
Limits To: IH 410 N
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $608,000,000
Construction Engineering: $148,000,000
Contingencies: $0
Indirect Costs: $32,000,000
Preliminary Engineering: $148,000,000
Other Field $0
$936,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$608,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - Strat Priority
12 - CL
$369,000,000
$202,300,000
6 - Structures $36,700,000
3 - DB $296,000,000
$295,200,000 $73,800,000 $0 $0
$161,840,000 $40,460,000 $0 $0
$33,030,000 $3,670,000 $0 $0
$236,800,000 $59,200,000 $0 $0
$726,870,000 $177,130,000 $0 $0 $904,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 -remove from TIP (22 to 25), rev cost; 5/20 -21 to 22; 10/19-move 25 to 21 & rev cost; 9/19- ADM clarify descr; 1/19 - rev descr: incl FR lanes; 10/18 - rev desc, cost; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev descr; 4/13 - rev limits and descr
Revision Date: 2/2021
0017-10-168
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at
IH 410 S & IH 410 N
$608,000,000
Revision: 2nd Qtr 21 - remove from TIP (FY 2022 to FY 2025)
N/A
N/A
NOX lbs/day
VOC lbs/day
58
CMP Score
1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 35
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5380.0
Limits From: SH 211
Limits To: 0.8 Miles W of IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $7,500,000
Construction Cost: $110,000,000
Construction Engineering: $7,018,000
Contingencies: $5,500,000
Indirect Costs: $6,314,000
Preliminary Engineering: $5,390,000
Other Field $6,358,000
$148,080,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$110,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$45,000,000
$65,000,000
Other $0
Other $0
$36,000,000 $9,000,000 $0 $0
$52,000,000 $13,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$88,000,000 $22,000,000 $0 $0 $110,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP (FY 2024 to FY 2025); 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
0024-07-059
Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)
$110,000,000
Revision: 2nd Qtr 21 - move from FY 2024 to FY 2025, remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
45
CMP Score
None
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5381.0
Limits From: 0.8 Miles W of IH 410
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $10,000,000
Construction Engineering: $400,000
Contingencies: $700,000
Indirect Costs: $200,000
Preliminary Engineering: $490,000
Other Field $400,000
$13,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$5,000,000
$5,000,000
Other $0
Other $0
$4,000,000 $1,000,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $2,000,000 $0 $0 $10,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP (FY 2024 to FY 2025); 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
0024-08-138
Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes
$10,000,000
Revision: 2nd Qtr 21 - move from FY 2024 to FY 2025, remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
45
CMP Score
None
3Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 43 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor
MPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5376.0
Limits From: at US 281/San Pedro
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $70,000,000
Construction Engineering: $4,466,000
Contingencies: $903,000
Indirect Costs: $4,018,000
Preliminary Engineering: $3,430,000
Other Field $4,046,000
$86,863,000
Type of Work: TSMO: Operational
Total Project Cost:
$70,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
7 - STBG
$24,000,000
$10,000,000
4 - Connectivity $36,000,000
Other $0
$19,200,000 $4,800,000 $0 $0
$8,000,000 $2,000,000 $0 $0
$28,800,000 $7,200,000 $0 $0
$0 $0 $0 $0
$56,000,000 $14,000,000 $0 $0 $70,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP (FY23 to 25); 5/20 - move 22 to 23; 11/19 - ADM clarify description; 10/18 - incr cost; 4/18 - rev proj (STP-MM project selection process); 3/18 - incr cost and rev fund distrib; 4/17 - add project
Revision Date: 2/2021
0521-04-285
Operational improvements to include direct connector improvement from US 281 to IH 410 WB ; ramp revisions, frontage
road and intersection improvements
$70,000,000
Revision: 2nd Qtr 21 - remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
N/A
CMP Score
None
Bexar15 - San Antonio
Description:
SH 151 C TxDOT 5382.0
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering: $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$80,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
4 - Connectivity
Other
$80,000,000
$0
Other $0
Other $0
$72,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$72,000,000 $8,000,000 $0 $0 $80,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP, move from FY 2024 to FY 2025; 5/20 - move from FY 2021 to FY 2022; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - move from 24 to 21, rev TPC; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
$80,000,000
Revision: 2nd Qtr 21 - remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
49
CMP Score
None
4Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 44 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
FY 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2026FY
TxDOT District County CSJ Hwy Phase Project Sponsor
MPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5385.0
Limits From: FM 464
Limits To: SH 123
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000,000
Construction Engineering: $8,000,000
Contingencies: $14,000,000
Indirect Costs: $4,000,000
Preliminary Engineering: $9,800,000
Other Field $8,000,000
$243,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Priority
$50,000,000
$150,000,000
Other $0
Other $0
$45,000,000 $5,000,000 $0 $0
$135,000,000 $15,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$180,000,000 $20,000,000 $0 $0 $200,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP, move from FY 2025 to FY 2026; 5/20 - move from FY 2021 to FY 2022 and rev limits; 1/19 - rev descr to incl FR lanes; 10/18 - move from FY 2025 to FY 2021 and increase cost; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
0535-01-074
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
$200,000,000
Revision: 2nd Qtr 21 - remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
N/A
CMP Score
See also 0535-01-077 and 0535-01-078 as spin offs to original project
Bexar15 - San Antonio
Description:
FM 1516 C TxDOT 5379.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,754,000
Construction Cost: $23,500,000
Construction Engineering: $940,000
Contingencies: $1,645,000
Indirect Costs: $470,000
Preliminary Engineering: $1,151,500
Other Field $940,000
$39,400,500
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$11,750,000
$11,750,000
Other $0
Other $0
$9,400,000 $2,350,000 $0 $0
$0 $0 $0 $11,750,000
$0 $0 $0 $0
$0 $0 $0 $0
$9,400,000 $2,350,000 $0 $11,750,000 $23,500,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP, move to FY 2026;10/18 - revise TPC; 3/18 - revise funding distribution; 4/17 - 2017 UTP revisions
Revision Date: 2/2021
1477-01-043
Expand from 2 to 4 lane divided with bike lanes and sidewalks
$23,500,000
Revision: 2nd Qtr 21 - Remove from TIP
N/A
N/A
NOX lbs/day
VOC lbs/day
41
CMP Score
None
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.2
Limits From: Macdona-Lacoste Rd
Limits To: US 90 W
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,800,000
Construction Cost: $40,000,000
Construction Engineering: $2,552,000
Contingencies: $516,000
Indirect Costs: $2,296,000
Preliminary Engineering: $4,000,000
Other Field $2,312,000
$56,476,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Proj Hist:
2/21 - remove from TIP (FY 2025 to FY 2026); 10/18 - revise cost, TPC and limits; 3/18 - revise funding distribution; 4/17 - revise project; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
2452-01-066
Expand from 2 lanes to 4 lanes divided
$40,000,000
Revision: 2nd Qtr 21 - remove from TIP (FY 2025 to FY 2026)
N/A
N/A
NOX lbs/day
VOC lbs/day
47
CMP Score
None
5Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 45 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2022FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.2
Limits From: US 281
Limits To: Bentwood Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering: $560,000
Contingencies: $980,000
Indirect Costs: $280,000
Preliminary Engineering: $686,000
Other Field: $560,000
$25,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$22,000,000
$0
Other $0
Other $0
$17,600,000 $4,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,600,000 $4,400,000 $0 $0 $22,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and
funding; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
0215-01-044
Expand from 2 lanes to 6 lanes with raised median or CLTL
$22,000,000
Remarks: 2nd Qtr 21 - revise cost
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.1
Limits From: Farhills Dr
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,800,000
Construction Engineering: $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field: $1,040,000
$23,026,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$17,800,000
$0
Other $0
Other $0
$14,240,000 $3,560,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,240,000 $3,560,000 $0 $0 $17,800,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
0215-07-027
Expand from 2 lanes to 6 lanes with raised median or CLTL
$17,800,000
Remarks: 2nd Qtr 21 - revise cost
1Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 46 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2024FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
FM 725 C TxDOT 5308.0
Limits From: Zipp Rd
Limits To: County Line Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,600,000
Construction Engineering: $525,760
Contingencies: $210,940
Indirect Costs: $608,440
Preliminary Engineering: $519,400
Other Field: $396,440
$12,860,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,600,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STBG
Other
$10,600,000
$0
Other $0
Other $0
$8,480,000 $2,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,480,000 $2,120,000 $0 $0 $10,600,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2023 to FY 2024; 4/20 - move from FY 2022 to FY 2023; 9/19 - ADM clarify From limit; 4/16 - funded
through STP-MM project selection process
Revision Date: 2/2021
0215-09-029
Expand from 2 to 4 lanes with median, sidewalks and bike lanes
$10,600,000
Remarks: 2nd Qtr 21 - move from FY 2023 to FY 2024
2Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 47 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2025FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 61.2
Limits From: IH 410 S
Limits To: IH 410 N
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $608,000,000
Construction Engineering: $148,000,000
Contingencies: $0
Indirect Costs: $32,000,000
Preliminary Engineering: $148,000,000
Other Field: $0
$936,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$608,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - Strat Priority
12 - CL
$369,000,000
$202,300,000
6 - Structures $36,700,000
3 - DB $296,000,000
$295,200,000 $73,800,000 $0 $0
$161,840,000 $40,460,000 $0 $0
$33,030,000 $3,670,000 $0 $0
$236,800,000 $59,200,000 $0 $0
$726,870,000 $177,130,000 $0 $0 $904,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 -remove from TIP (22 to 25), rev cost; 5/20 -21 to 22; 10/19-move 25 to 21 & rev cost; 9/19- ADM clarify descr; 1/19 - rev
descr: incl FR lanes; 10/18 - rev desc, cost; 4/18 - move 20 to 25 (out of TIP); 10/13 -
Revision Date: 2/2021
0017-10-168
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410 N
$608,000,000
Remarks: 2nd Qtr 21 - move from FY 2022 to FY 2025, revise cost
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5380.0
Limits From: SH 211
Limits To: 0.8 Miles W of IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $7,500,000
Construction Cost: $110,000,000
Construction Engineering: $7,018,000
Contingencies: $5,500,000
Indirect Costs: $6,314,000
Preliminary Engineering: $5,390,000
Other Field: $6,358,000
$148,080,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$110,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$45,000,000
$65,000,000
Other $0
Other $0
$36,000,000 $9,000,000 $0 $0
$52,000,000 $13,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$88,000,000 $22,000,000 $0 $0 $110,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP (FY 2024 to FY 2025); 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
0024-07-059
Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)
$110,000,000
Remarks: 2nd Qtr 21 - Move from FY 2024 to FY 2025
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5381.0
Limits From: 0.8 Miles W of IH 410
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $10,000,000
Construction Engineering: $400,000
Contingencies: $700,000
Indirect Costs: $200,000
Preliminary Engineering: $490,000
Other Field: $400,000
$13,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$5,000,000
$5,000,000
Other $0
Other $0
$4,000,000 $1,000,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $2,000,000 $0 $0 $10,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP (FY 2024 to FY
2025); 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 -
add project
Revision Date: 2/2021
0024-08-138
Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes
$10,000,000
Remarks: 2nd Qtr 21 - move from FY 2024 to FY 2025
3Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 48 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2025FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5376.0
Limits From: at US 281/San Pedro
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $70,000,000
Construction Engineering: $4,466,000
Contingencies: $903,000
Indirect Costs: $4,018,000
Preliminary Engineering: $3,430,000
Other Field: $4,046,000
$86,863,000
Type of Work: TSMO: Operational
Total Project Cost:
$70,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
7 - STBG
$24,000,000
$10,000,000
4 - Connectivit $36,000,000
Other $0
$19,200,000 $4,800,000 $0 $0
$8,000,000 $2,000,000 $0 $0
$28,800,000 $7,200,000 $0 $0
$0 $0 $0 $0
$56,000,000 $14,000,000 $0 $0 $70,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP (FY23 to 25); 5/20 - move 22 to 23; 11/19 - ADM clarify description; 10/18 - incr cost; 4/18 - rev proj (STP-MM project selection process); 3/18 - incr cost and rev fund distrib; 4/17 -
Revision Date: 2/2021
0521-04-285
Operational improvements to include direct connector improvement from US 281 to IH 410 WB ; ramp revisions, frontage road and intersection improvements
$70,000,000
Remarks: 2nd Qtr 21 - move from FY 2023 to FY 2025
Bexar15 - San Antonio
Description:
SH 151 C TxDOT 5382.0
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering: $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field: $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$80,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
4 - Connectivity
Other
$80,000,000
$0
Other $0
Other $0
$72,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$72,000,000 $8,000,000 $0 $0 $80,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP, move from FY 2024 to FY 2025; 5/20 - move from FY 2021 to FY 2022; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - move from 24 to 21, rev
Revision Date: 2/2021
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
$80,000,000
Remarks: 2nd Qtr 21 - move from FY 2024 to FY 2025
4Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 49 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2026FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5385.0
Limits From: FM 464
Limits To: SH 123
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000,000
Construction Engineering: $8,000,000
Contingencies: $14,000,000
Indirect Costs: $4,000,000
Preliminary Engineering: $9,800,000
Other Field: $8,000,000
$243,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Priority
$50,000,000
$150,000,000
Other $0
Other $0
$45,000,000 $5,000,000 $0 $0
$135,000,000 $15,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$180,000,000 $20,000,000 $0 $0 $200,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP, move from FY 2025 to FY 2026; 5/20 - move from FY 2021 to FY 2022 and rev limits; 1/19 - rev
descr to incl FR lanes; 10/18 - move from FY 2025 to FY 2021 and increase cost;
Revision Date: 2/2021
0535-01-074
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
$200,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2026
Bexar15 - San Antonio
Description:
FM 1516 C TxDOT 5379.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,754,000
Construction Cost: $23,500,000
Construction Engineering: $940,000
Contingencies: $1,645,000
Indirect Costs: $470,000
Preliminary Engineering: $1,151,500
Other Field: $940,000
$39,400,500
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$11,750,000
$11,750,000
Other $0
Other $0
$9,400,000 $2,350,000 $0 $0
$0 $0 $0 $11,750,000
$0 $0 $0 $0
$0 $0 $0 $0
$9,400,000 $2,350,000 $0 $11,750,000 $23,500,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP, move to FY 2026;10/18 - revise TPC; 3/18 - revise funding distribution; 4/17 - 2017 UTP revisions
Revision Date: 2/2021
1477-01-043
Expand from 2 to 4 lane divided with bike lanes and sidewalks
$23,500,000
Remarks: 2nd Qtr 21 - Move from FY 2022 to FY 2026
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.2
Limits From: Macdona-Lacoste Rd
Limits To: US 90 W
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,800,000
Construction Cost: $40,000,000
Construction Engineering: $2,552,000
Contingencies: $516,000
Indirect Costs: $2,296,000
Preliminary Engineering: $4,000,000
Other Field: $2,312,000
$56,476,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - remove from TIP (FY 2025 to FY
2026); 10/18 - revise cost, TPC and limits; 3/18 - revise funding distribution; 4/17 -
revise project; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
2452-01-066
Expand from 2 lanes to 4 lanes divided
$40,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2026
5Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 50 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5561.0
Limits From: at Lp 1604 W
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $310,000,000
Construction Engineering: $13,800,000
Contingencies: $24,000,000
Indirect Costs: $6,900,000
Preliminary Engineering: $31,000,000
Other Field: $13,800,000
$399,500,000
Type of Work: TSMO: Interchange
Total Project Cost:
$310,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$310,000,000
$0
Other $0
Other $0
$248,000,000 $62,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$248,000,000 $62,000,000 $0 $0 $310,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2031 to FY 2032; 5/20 - add project - spin off of 0024-07-059
Revision Date: 2/2021
0024-07-064
Construct direct connectors: 1 lane DC - SB 1604 to WB 90; NB 1604 to EB 90; NB 1604 to WB 90; EB 90 to NB 1604 & EB 90 to SB 1604; 2 lane DC: WB 90 to NB 1604
$310,000,000
Remarks: 2nd Qtr 21 - move from FY 2031 to FY 2032
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5562.0
Limits From: IH 410
Limits To: Lp 13
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,000,000
Construction Engineering: $1,800,000
Contingencies: $3,000,000
Indirect Costs: $1,000,000
Preliminary Engineering: $4,000,000
Other Field: $1,800,000
$51,600,000
Type of Work: TSMO: Operational
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2031 to FY 2032; 5/20 - add project
Revision Date: 2/2021
0024-08-143
Ramp revisions and rehabilitate mainlanes
$40,000,000
Remarks: 2nd Qtr 21 - move from FY 2031 to FY 2032
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 4008.0
Limits From: Santa Clara Road
Limits To: US 90A
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $210,000,000
Construction Engineering: $9,300,000
Contingencies: $16,300,000
Indirect Costs: $4,700,000
Preliminary Engineering: $21,000,000
Other Field: $9,300,000
$270,600,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$210,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$210,000,000
$0
Other $0
Other $0
$168,000,000 $42,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$168,000,000 $42,000,000 $0 $0 $210,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2028 to FY 2032;
5/20 - revise cost, limit and move from FY 28 to FY 25; 10/19 - add project;
companion project to #5395; no impact to conformity
Revision Date: 2/2021
0025-03-101
Expand from 4 lane to 6 lane expressway and from 4 to 4 frontage road lanes
$210,000,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
6Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 51 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5590.0
Limits From: FM 775
Limits To: US 90A
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $84,000,000
Construction Engineering: $3,700,000
Contingencies: $6,500,000
Indirect Costs: $1,900,000
Preliminary Engineering: $8,400,000
Other Field: $3,700,000
$108,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$84,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$84,000,000
$0
Other $0
Other $0
$67,200,000 $16,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$67,200,000 $16,800,000 $0 $0 $84,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2025 to FY 2032; 5/20 - add project
Revision Date: 2/2021
0025-03-102
Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes
$84,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5400.0
Limits From: SH 46
Limits To: 0.25 Mi W of Bexar/Kendall County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $110,000,000
Construction Engineering: $4,900,000
Contingencies: $8,500,000
Indirect Costs: $2,400,000
Preliminary Engineering: $11,000,000
Other Field: $4,900,000
$141,700,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$110,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$110,000,000
$0
Other $0
Other $0
$88,000,000 $22,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$66,400,000 $16,600,000 $0 $0 $110,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move 24 to 32;5/20 - move 28 to 25, rev limit and cost; 1/19 - rev descr to incl FR lanes; 10/18 - move 29 to 28; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion
Revision Date: 2/2021
0072-06-082
Expand from 4 to 8 lanes expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
$110,000,000
Remarks: 2nd Qtr 21 - move from FY 2024 to FY 2032
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5591.0
Limits From: 0.25 M W of Bexar/Kendall County Line
Limits To: Kendall/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $980,000
Construction Engineering: $43,000
Contingencies: $76,000
Indirect Costs: $22,000
Preliminary Engineering: $98,000
Other Field: $43,000
$1,262,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$980,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$980,000
$0
Other $0
Other $0
$784,000 $196,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$784,000 $196,000 $0 $0 $980,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2025 to FY 2032; 5/20 - add project; spin off of 0072-06-082
Revision Date: 2/2021
0072-06-089
Expand from 4 to 8 lane expressway - 2 new general purpose & 2 new HOV lanes; from 4 to 4 frontage road lanes
$980,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
7Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 52 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5401.0
Limits From: Kendall/Bexar County Line
Limits To: FM 3351
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,020,000
Construction Engineering: $5,700,000
Contingencies: $10,000,000
Indirect Costs: $2,900,000
Preliminary Engineering: $12,900,000
Other Field: $5,700,000
$166,220,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$129,020,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$129,020,000
$0
Other $0
Other $0
$103,216,000 $25,804,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$85,600,000 $21,400,000 $0 $0 $129,020,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move 28 to 32; 5/20 - rev cost and move 28 to 25; 1/19 - rev descr to incl FR lanes; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may
Revision Date: 2/2021
0072-07-075
Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
$129,020,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
Comal15 - San Antonio
Description:
SH 46 C TxDOT 5392.0
Limits From: Bentwood Dr
Limits To: FM 3159
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $70,000,000
Construction Engineering: $3,100,000
Contingencies: $5,400,000
Indirect Costs: $1,600,000
Preliminary Engineering: $7,000,000
Other Field: $3,100,000
$90,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$70,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$70,000,000
$0
Other $0
Other $0
$56,000,000 $14,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$56,000,000 $14,000,000 $0 $0 $70,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2028 to FY 2032; 5/20 - revise cost; 10/18 - move FY 37 to FY 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in
Revision Date: 2/2021
0215-01-051
Expand from 2 lanes to 6 lanes with raised median or CLTL
$70,000,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
Comal15 - San Antonio
Description:
SH 46 C TxDOT 5393.0
Limits From: Bulverde Rd
Limits To: Farhills Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $35,000,000
Construction Engineering: $1,500,000
Contingencies: $2,700,000
Indirect Costs: $800,000
Preliminary Engineering: $3,500,000
Other Field: $1,500,000
$45,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$35,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$35,000,000
$0
Other $0
Other $0
$28,000,000 $7,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$28,000,000 $7,000,000 $0 $0 $35,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2028 to FY 2032; 5/20 - revise cost; 10/18 - move FY 37 to
FY 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in
Revision Date: 2/2021
0215-07-049
Expand from 2 lanes to 6 lanes with raised median or CLTL
$35,000,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
8Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 53 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
SH 123 C TxDOT 5398.0
Limits From: Guadalupe/Hays County Line
Limits To: Cordova Ln
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $50,000,000
Construction Engineering: $2,000,000
Contingencies: $3,500,000
Indirect Costs: $1,000,000
Preliminary Engineering: $2,450,000
Other Field: $2,000,000
$60,950,000
Type of Work: TSMO: Operational
Total Project Cost:
$50,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$50,000,000
$0
Other $0
Other $0
$40,000,000 $10,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$40,000,000 $10,000,000 $0 $0 $50,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2029 to FY 2032; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
Revision Date: 2/2021
0366-02-088
Widen roadway to provide operational improvements including shoulders
$50,000,000
Remarks: 2nd Qtr 21 - move from FY 2029 to FY 2032
Guadalupe15 - San Antonio
Description:
SH 123 C TxDOT 5399.0
Limits From: SH 123B in Seguin
Limits To: Wilson/Guadalupe County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $180,000,000
Construction Engineering: $7,200,000
Contingencies: $12,600,000
Indirect Costs: $3,600,000
Preliminary Engineering: $8,820,000
Other Field: $7,200,000
$219,420,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$180,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$180,000,000
$0
Other $0
Other $0
$144,000,000 $36,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$144,000,000 $36,000,000 $0 $0 $180,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2029 to FY 2032; 9/19 - ADM clarify description; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the
Revision Date: 2/2021
0366-03-066
Expand from 2 to 4 lane divided roadway
$180,000,000
Remarks: 2nd Qtr 21 - move from FY 2029 to FY 2032
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5402.0
Limits From: US 90
Limits To: IH 35 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $490,000,000
Construction Engineering: $21,800,000
Contingencies: $38,000,000
Indirect Costs: $10,900,000
Preliminary Engineering: $49,000,000
Other Field: $21,800,000
$631,500,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$490,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$490,000,000
$0
Other $0
Other $0
$392,000,000 $98,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$392,000,000 $98,000,000 $0 $0 $490,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 move 28 to 32;5/20 - revise cost;11/19 - ADM clarify description;1/19 -
rev descr to incl FR lanes; 10/18 - move 37 to 28; /18 - revise funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7;
Revision Date: 2/2021
0521-05-144
Exp fr 6 to 8 lns btwn US 90 & Valley Hi; frm 4 to 6 lns btwn Valley Hi & IH 35 S; frm 4/6 to 4/6 FR ln; construct all DCs at IH 35 S;
$490,000,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
9Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 54 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5384.0
Limits From: at IH 10 E
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $450,000,000
Construction Engineering: $20,000,000
Contingencies: $35,000,000
Indirect Costs: $10,000,000
Preliminary Engineering: $45,000,000
Other Field: $20,000,000
$580,000,000
Type of Work: TSMO: Interchange
Total Project Cost:
$450,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$450,000,000
$0
Other $0
Other $0
$360,000,000 $90,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$360,000,000 $90,000,000 $0 $0 $450,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21- move from FY 2025 to FY 2032; 5/20 - revise cost; 9/19 - ADM clarify description; 1/19 - update cost; 4/18 - reduce cost; 4/17 - add project
Revision Date: 2/2021
0521-06-142
Phase 2 interchange improvements - 1-lane DC: SB 410 to WB 10; SB 410 to EB 10; NB 410 to WB 10; WB 10 to NB 410; EB 10 to NB 410; EB 10 to SB 410;
$450,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5593.0
Limits From: SH 123
Limits To: SH 130
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $205,000,000
Construction Engineering: $9,100,000
Contingencies: $15,900,000
Indirect Costs: $4,600,000
Preliminary Engineering: $20,500,000
Other Field: $9,100,000
$264,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$205,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$205,000,000
$0
Other $0
Other $0
$164,000,000 $41,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$164,000,000 $41,000,000 $0 $0 $205,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2025 to FY 2032; 5/20 - add project; spin off of 0535-01-074
Revision Date: 2/2021
0535-01-078
Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes
$205,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5397.0
Limits From: SH 130
Limits To: SH 80
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $375,000,000
Construction Engineering: $24,000,000
Contingencies: $19,000,000
Indirect Costs: $21,000,000
Preliminary Engineering: $18,000,000
Other Field: $22,000,000
$479,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$375,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$375,000,000
$0
Other $0
Other $0
$300,000,000 $75,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000,000 $75,000,000 $0 $0 $375,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2028 to FY 2032; 1/19 - rev descr to incl FR lanes and
update cost; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add proj to MTP with Prop 1/Prop 7; portion of proj
Revision Date: 2/2021
0535-02-047
Expand from 4 lane to 6 lane expressway
$375,000,000
Remarks: 2nd Qtr 21 - move from FY 2028 to FY 2032
10Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 55 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Guadalupe15 - San Antonio
Description:
FM 1103 C TxDOT 5560.0
Limits From: Rodeo Way
Limits To: FM 78
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,500,000
Construction Engineering: $1,044,000
Contingencies: $1,826,000
Indirect Costs: $522,000
Preliminary Engineering: $2,350,000
Other Field: $1,044,000
$30,286,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,500,000
$0
Other $0
Other $0
$18,800,000 $4,700,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,800,000 $4,700,000 $0 $0 $23,500,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2025 to FY 2032; 5/20 - move from FY 2024 to FY 2025 and revise cost; 10/18 - add project
Revision Date: 2/2021
1268-02-030
Expand from 2 to 4 lanes with median, turn lanes, sidewalk and bike lanes
$23,500,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.1
Limits From: IH 35 S
Limits To: 0.7 Mi North of FM 2536
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $34,000,000
Construction Engineering: $1,786,000
Contingencies: $362,000
Indirect Costs: $1,607,000
Preliminary Engineering: $1,372,000
Other Field: $1,618,000
$40,745,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$34,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$34,000,000
$0
Other $0
Other $0
$27,200,000 $6,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$27,200,000 $6,800,000 $0 $0 $34,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2031 to FY 2032; 5/20 - revise cost; 10/18 - move FY 22 to FY 31 and rev cost; 3/18 - revise funding distribution; 4/17 - add project; added w/ 12/8/14 adoption of the MTP
Revision Date: 2/2021
2020-02-031
Expand from 2 lanes to 4 lanes divided
$34,000,000
Remarks: 2nd Qtr 21 - move from FY 2031 to FY 2032
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5386.0
Limits From: 0.38 Mi North of FM 1303
Limits To: FM 1303
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,800,000
Construction Engineering: $80,000
Contingencies: $140,000
Indirect Costs: $40,000
Preliminary Engineering: $180,000
Other Field: $80,000
$2,320,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$1,800,000
$0
Other $0
Other $0
$1,440,000 $360,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,440,000 $360,000 $0 $0 $1,800,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21- move from FY 26 to FY 32; 7/20 - correct funding distribution; 4/17 - add
project
Revision Date: 2/2021
2255-01-084
Expand from 2 lanes to 4 lanes divided
$1,800,000
Remarks: 2nd Qtr 21 - move from FY 2026 to FY 2032
11Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 56 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5387.0
Limits From: US 87
Limits To: US 181
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,000,000
Construction Engineering: $1,600,000
Contingencies: $2,800,000
Indirect Costs: $800,000
Preliminary Engineering: $1,960,000
Other Field: $1,600,000
$48,760,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2026 to FY 2032; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
2255-02-027
Expand from 2 lanes to 4 lanes divided
$40,000,000
Remarks: 2nd Qtr 21 - move from FY 2026 to FY 2032
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5388.0
Limits From: US 181
Limits To: 0.38 Mi North of FM 1303
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,200,000
Construction Engineering: $928,000
Contingencies: $1,624,000
Indirect Costs: $464,000
Preliminary Engineering: $1,137,000
Other Field: $928,000
$28,281,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,200,000
$0
Other $0
Other $0
$18,560,000 $4,640,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,560,000 $4,640,000 $0 $0 $23,200,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2026 to FY 2032; 9/19 - ADM clarify limits; 4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
2255-02-028
Expand from 2 lanes to 4 lanes divided
$23,200,000
Remarks: 2nd Qtr 21 - move from FY 2026 to FY 2032
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 2020.0
Limits From: US 90
Limits To: West Military Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $118,486,058
Construction Engineering: $7,103,748
Contingencies: $13,998,121
Indirect Costs: $7,627,182
Preliminary Engineering: $7,328,076
Other Field: $0
$154,553,185
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$118,486,058
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$118,486,058
$0
Other $0
Other $0
$94,788,846 $23,697,212 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$94,788,846 $23,697,212 $0 $0 $118,486,058
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from 30 to 32; 9/19 - ADM clarify description; 1/19 - rev descr to incl
FR lanes; 10/18 - revise description and move to TxDOT; 4/14 - revise limits, year, description and funding; 8/13 - revise
Revision Date: 2/2021
2452-01-029
Expand from 4 to 6 lane expressway & from 4 to 4 FR lanes
$118,486,058
Remarks: 2nd Qtr 21 - move from FY 2030 to FY 2032
12Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 57 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 3911.0
Limits From: West Military Dr.
Limits To: Braun Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,128,554
Construction Cost: $16,897,467
Construction Engineering: $802,630
Contingencies: $1,581,603
Indirect Costs: $861,770
Preliminary Engineering: $827,976
Other Field: $0
$55,100,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$16,897,467
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$16,897,467
$0
Other $0
Other $0
$13,517,974 $3,379,493 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$13,517,974 $3,379,493 $0 $0 $16,897,467
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - Move from 30 to 32; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - rev descr & move to TxDOT; 4/14 - rev year, limits, descr and fund; 8/2012 - proj receives portion of $2B;
Revision Date: 2/2021
2452-01-052
Expand from 4 to 6 lane expressway & from 4/6 to 4/6 FR lanes, including 1 lane direct connectors at SH 151 - NB 1604 to EB 151; WB 151 to SB 1604
$16,897,467
Remarks: 2nd Qtr 21 - move from FY 2030 to FY 2032
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 3912.0
Limits From: Braun Road
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,737,251
Construction Cost: $47,417,043
Construction Engineering: $2,252,310
Contingencies: $4,438,235
Indirect Costs: $2,418,269
Preliminary Engineering: $2,323,435
Other Field: $0
$62,586,543
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$47,417,043
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$47,417,043
$0
Other $0
Other $0
$37,933,634 $9,483,409 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$37,933,634 $9,483,409 $0 $0 $47,417,043
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - Move from 30 to 32; rev descr to incl FR lanes; 10/18 - rev descr and move to TxDOT; 4/14 - rev year, descr and funding; 8/2012 - proj receives portion of $2B; 7/2013 - project had $10.8M in
Revision Date: 2/2021
2452-01-053
Expand from 4 to 8 lane expressway and from 6 to 6 FR lanes
$47,417,043
Remarks: 2nd Qtr 21 - move from FY 2030 to FY 2032
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5557.0
Limits From: 0.7 Mi North of FM 2536
Limits To: Macdona-Lacoste Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $15,000,000
Construction Engineering: $7,000,000
Contingencies: $1,200,000
Indirect Costs: $300,000
Preliminary Engineering: $1,500,000
Other Field: $7,000,000
$19,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$15,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$15,000,000
$0
Other $0
Other $0
$12,000,000 $3,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$12,000,000 $3,000,000 $0 $0 $15,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2031 to FY 2032; 5/20 - revise cost; 10/18 - add project
Revision Date: 2/2021
2452-01-070
Expand from 2 lanes to 4 lanes divided
$15,000,000
Remarks: 2nd Qtr 21 - move from FY 2031 to FY 2032
13Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 58 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9107.0
Limits From: FM 78
Limits To: IH 10 East
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,200,000
Construction Cost: $300,000,000
Construction Engineering: $13,300,000
Contingencies: $23,300,000
Indirect Costs: $6,700,000
Preliminary Engineering: $30,000,000
Other Field: $13,300,000
$390,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$300,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$300,000,000
$0
Other $0
Other $0
$240,000,000 $60,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$240,000,000 $60,000,000 $0 $0 $300,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2025 to FY 2032; 4/20 - move from 2024 to 2025; 1/19 - update funding; 4/18 - correct funding distribution; 4/17 - add project; removed from 10/15 Prop 1 list due to financial
Revision Date: 2/2021
2452-03-111
Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes
$300,000,000
Remarks: 2nd Qtr 21 - move from FY 2025 to FY 2032
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5389.0
Limits From: FM 1346 - Houston Street
Limits To: US 87
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,000,000
Construction Engineering: $800,000
Contingencies: $1,400,000
Indirect Costs: $400,000
Preliminary Engineering: $980,000
Other Field: $800,000
$24,380,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2026 to FY 2032; 4/18 - correct funding dictribution; 4/17 - add project
Revision Date: 2/2021
2452-04-015
Expand from 2 lanes to 4 lanes divided
$20,000,000
Remarks: 2nd Qtr 21 - move from FY 2026 to FY 2032
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5558.0
Limits From: SH 46
Limits To: Kendall/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $24,000,000
Construction Engineering: $1,531,000
Contingencies: $310,000
Indirect Costs: $1,378,000
Preliminary Engineering: $1,176,000
Other Field: $1,387,000
$29,782,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$24,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$24,000,000
$0
Other $0
Other $0
$19,200,000 $4,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$19,200,000 $4,800,000 $0 $0 $24,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2030 to FY 2032; 10/18 - add project
Revision Date: 2/2021
3212-04-008
Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks
$24,000,000
Remarks: 2nd Qtr 21 - move from FY 2030 to FY 2032
14Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 59 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
2032FY
TxDOT District County CSJ Hwy Phase Project SponsorMPO Proj ID
No.
Year of
Expenditure
Cost
SECOND QUARTER 2021 AMENDMENTS
City
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5330.1
Limits From: Kenneland
Limits To: Bexar/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering: $200,000
Contingencies: $350,000
Indirect Costs: $100,000
Preliminary Engineering: $245,000
Other Field: $200,000
$6,095,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$5,000,000
$0
Other $0
Other $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,000,000 $1,000,000 $0 $0 $5,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2027 to FY 2032; 5/20 - move from FY 2023 to FY 2027; 4/18 - correct funding distribution; 4/17 - move project from FY 2027 to FY 2023; 4/16 - funded through 17-20 TIP Call for
Revision Date: 2/2021
3212-05-011
Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks
$5,000,000
Remarks: 2nd Qtr 21 - move from FY 2027 to FY 2032
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5559.0
Limits From: Kendall/Comal County Line
Limits To: Keeneland Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,200,000
Construction Engineering: $1,480,000
Contingencies: $300,000
Indirect Costs: $1,332,000
Preliminary Engineering: $1,137,000
Other Field: $1,341,000
$28,790,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,200,000
$0
Other $0
Other $0
$18,560,000 $4,640,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,560,000 $4,640,000 $0 $0 $23,200,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2030 to FY 2032; 10/18 - add project
Revision Date: 2/2021
3212-05-014
Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks
$23,200,000
Remarks: 2nd Qtr 21 - move from FY 2030 to FY 2032
Bexar15 - San Antonio
Description:
FM 3351 C TxDOT 5330.2
Limits From: Comal/Bexar County Line
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $35,000,000
Construction Engineering: $1,400,000
Contingencies: $2,450,000
Indirect Costs: $700,000
Preliminary Engineering: $1,715,000
Other Field: $1,400,000
$42,665,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$35,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$35,000,000
$0
Other $0
Other $0
$28,000,000 $7,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$28,000,000 $7,000,000 $0 $0 $35,000,000
Total
Local ContributionStateFederal Local
Funding Categories
Totals
Project History: 2/21 - move from FY 2027 to FY 2032; 5/20 - move from FY 2023 to FY 2027;
4/18 - correct funding distribution; 4/17 - add project
Revision Date: 2/2021
3212-06-017
Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks
$35,000,000
Remarks: 2nd Qtr 21 - move from FY 2027 to FY 2032
15Phase: C=Construction, E=Engineering, R=ROW
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 60 of 337
Transportation Policy Board December 14, 2020
9. Discussion and Appropriate Action on Documents Related to Transportation Conformity
Purpose
The purpose of this agenda item is to receive a presentation on the updated
Metropolitan Transportation Plan project lists, the revised FY 2021-2024 Transportation Improvement Program and the corresponding Transportation Conformity document.
Issue
a. Metropolitan Transportation Plan (“Mobility 2045”) Project Lists The MPO adopts revisions to the Metropolitan Transportation Plan and / or project lists in a two – step approval process with presentation one month and action the following month. This is the formal “first reading” of the updated Mobility 2045 roadway and transit project lists which are attached. The updated lists include those projects which are being amended in the previous agenda item as well as the projects that were locally approved in October 2020.
Transportation Policy Board adoption is scheduled for Monday, January 25, 2021.
Action Requested
Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 61 of 337
Documents related toTransportation Conformity
Transportation Policy Board December 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 62 of 337
Unified Planning Work Program (UPWP):
MPO staff budget and regional planning studies
over a two year timeframe; FY 2022-2023
UPWP is scheduled for adoption in June 2021
Transportation Improvement Program (TIP):
Funded transportation projects within a four
year timeframe; FY 2021-2024 TIP was
previously adopted in May 2020 and
amended locally in October 2020
Metropolitan Transportation Plan (MTP):
Future goals, strategies and transportation
projects for 25 years; updated MTP list was
adopted in May 2020 and amended locally in
October 2020
Transportation Conformity Document (TCD)
Evaluates future transportation projects to
ensure they cause no further harm to air quality;
approved through a significant interagency
consultation process; previously adopted in
May 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 63 of 337
Bexar County Nonattainment Designation
• Effective September 24, 2018, Bexar County was designated marginal nonattainment (lowest level of air pollution exceedance)
• Transportation conformity is a resulting requirement intended to help the area attain the standard for healthy air
• After an initial determination of transportation conformity in 2019, the MPO must reassess conformity at certain milestones, including major updates of the TIP or MTP
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 64 of 337
Transportation Conformity Process
Metropolitan Transportation Plan:
25 years
Transportation Improvement
Program: 4 Years
Transportation Conformity Document
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 65 of 337
Updated MTP and TIP Project Lists
• Roadway and Transit MTP and TIP Project Lists are included in your package
• Incorporates the roadway and transit amendments that were locally approved in October 2020 (no impact to conformity)
• Incorporates the reprioritization of projects due to financial constraint issues at the state level
• A new FY 2021-2024 TIP will be available by December 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 66 of 337
Bexar County Summer Weekday Emissions Estimates
NOx: Nitrogen OxidesVOCs: Volatile Organic Compounds
Year NOx VOC
2017 36.50 21.70
2025 18.24 15.83
2035 11.25 10.25
2045 11.48 10.15
Source: Texas A&M Transportation Institute analysis using MOVES2014a (January 17, 2020)
Remember: Emissions
modeled for analysis years
must be below 2017 (base year)
emissions
Updated results are expected by December 10, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 67 of 337
Transportation Conformity Schedule
Task Date
Technical Advisory Committee (TAC) Presentation December 4, 2020
Beginning of Public Comment Period December 14, 2020
Transportation Policy Board (TPB) Presentation) December 14, 2020
Transportation Conformity Public Meeting January 5, 2021
TAC Action January 8, 2021
End of Public Comment Period January 12, 2021
TPB Action January 25, 2021
Interagency Consultation Review Begins April 2021
FHWA-FTA Joint Conformity Determination(Approval)
June 2021
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 68 of 337
30-day public comment period:December 14, 2020 – January 12, 2021
Official comments are accepted:
1. Verbally as a Citizen to be Heard during conformity public meeting or written on a comment card
2. Online at www.alamoareampo.org/airquality/conformity3. By email to Allison Blazosky: [email protected]. By mail to the Alamo Area MPO: 825 South Saint Mary’s
Street, San Antonio, TX 78205
Social media is not an official form of comment for this process
Public Comment
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 69 of 337
• MPO is doing our part to attain ozone standard
• Broad community partners continue to address other ozone sources
• EPA will reassess the area’s air quality in 2021 using monitor data from 2018, 2019 and 2020
• Even if Bexar County attains ozone standard in 2021, a “Maintenance” period of 20 years applies with the same transportation conformity requirements for MPOs and partners constructing transportation projects
Future of Nonattainment
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 70 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CR C ARMA 5546.1
Limits From: In Bexar County on Foster Road
Limits To: From IH 10 to FM 1346
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,650,000
Construction Engineering $488,000
Contingencies: $382,000
Indirect Costs: $439,000
Preliminary Engineering: $2,295,000
Other Field $442,000
$11,696,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,650,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$7,650,000
$0
Other $0
Other $0
$0 $0 $0 $7,650,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,650,000 $7,650,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements
Status: Non-RSR
$7,650,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add ARMA project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS R CoSA 5408.3
Limits From: In San Antonio on Bulverde Road
Limits To: from Briar Crest to North of Quiet Meadow Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $200,000
Construction Cost: $9,700,000
Construction Engineering $619,000
Contingencies: $125,000
Indirect Costs: $557,000
Preliminary Engineering: $1,400,000
Other Field $561,000
$13,162,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$200,000
$0
Other $0
Other $0
$0 $0 $0 $200,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $200,000 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 lanes and CTL to 4 lanes and CTL
Status: RSR
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add project (ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5413.0
Limits From: In San Antonio on Commerce Street
Limits To: from St. Mary's Street to Santa Rosa Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,000,000
Construction Engineering $574,000
Contingencies: $450,000
Indirect Costs: $517,000
Preliminary Engineering: $441,000
Other Field $520,000
$11,502,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,000,000
$0
Other $0
Other $0
$0 $0 $0 $9,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,000,000 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Reduce from 4 travel lanes to 3 travel lanes with sidewalks
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
13Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 71 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5417.0
Limits From: In San Antonio on Commerce Street
Limits To: from Frio to Colorado
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $638,000
Contingencies: $500,000
Indirect Costs: $574,000
Preliminary Engineering: $490,000
Other Field $578,000
$12,780,000
Type of Work: TSMO: Operational
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$10,000,000
$0
Other $0
Other $0
$0 $0 $0 $10,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $10,000,000 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Reconstruct roadway, add CTL, bike lanes and sidewalks
Status: RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C,E CoSA 5419.1
Limits From: In San Antonio on Ingram Road
Limits To: from Potranco Road to Ingram Road Dead End
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,600,000
Construction Engineering $102,000
Contingencies: $20,000
Indirect Costs: $92,000
Preliminary Engineering: $160,000
Other Field $92,000
$2,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,760,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$1,760,000
$0
Other $0
Other $0
$0 $0 $0 $1,760,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,760,000 $1,760,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Construct road extension on new alignment (0 to 4 lanes) with bike accommodation and sidewalks
Status: Non-RSR
$1,760,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CR C BC 5547.0
Limits From: In Bexar County on Marshall Road
Limits To: from US 281 to Bulverde Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,707,055
Construction Engineering $222,423
Contingencies: $185,353
Indirect Costs: $148,282
Preliminary Engineering: $607,565
Other Field $0
$4,870,678
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$3,707,055
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$3,707,055
$0
Other $0
Other $0
$0 $0 $0 $3,707,055
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $3,707,055 $3,707,055
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 2 lanes with a continuous center left turn lane and/or concrete median
Status: Non-RSR
$3,707,055
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - correct project name; 10/18 - add
Bexar County project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
14Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 72 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C,E,R CoSA 5420.1
Limits From: In San Antonio on Prue Road
Limits To: from Babcock Road to Laureate Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $1,000,000
Indirect Costs: $1,148,000
Preliminary Engineering: $3,000,000
Other Field $1,156,000
$28,280,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$23,700,000
$0
Other $0
Other $0
$0 $0 $0 $23,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $23,700,000 $23,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with CTL, Bike lanes and sidewalks
Status: Non-RSR
$23,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C,E CoSA 5421.1
Limits From: In San Antonio on West Military Dr & Ingram Road
Limits To: from W. Military Dead End to Potranco Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $638,000
Contingencies: $500,000
Indirect Costs: $574,000
Preliminary Engineering: $1,500,000
Other Field $578,000
$13,790,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$11,500,000
$0
Other $0
Other $0
$0 $0 $0 $11,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $11,500,000 $11,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Construct road extension on new alignment (0 to 4 lanes) with bike accommodation and sidewalks
Status: Non-RSR
$11,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CR C ARMA 5433.0
Limits From: In Bexar County on Evans Road
Limits To: From TPC Parkway/Dusty Canyon to Hanging Oak
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $479,000
Contingencies: $375,000
Indirect Costs: $431,000
Preliminary Engineering: $2,200,000
Other Field $430,000
$11,415,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$7,500,000
$0
Other $0
Other $0
$0 $0 $0 $7,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,500,000 $7,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add ARMA project to TIP/MTP for AQ
purposes
2025,2035,2045TDM Network Years:
15Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 73 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5550.0
Limits From: 1.2 Miles South of FM 306
Limits To: FM 306
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $766,000
Contingencies: $155,000
Indirect Costs: $689,000
Preliminary Engineering: $588,000
Other Field $694,000
$14,892,000
Type of Work: TSMO: Operational
Total Project Cost:
$12,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$12,000,000
$0
Other $0
Other $0
$9,600,000 $2,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,600,000 $2,400,000 $0 $0 $12,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-04-116
Ramp revisions, intersection and frontage road operational improvements
Status: RSR
$12,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-04-112
2025,2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5551.0
Limits From: FM 306
Limits To: Hays/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $63,000,000
Construction Engineering $4,019,000
Contingencies: $813,000
Indirect Costs: $3,616,000
Preliminary Engineering: $3,087,000
Other Field $3,641,000
$78,176,000
Type of Work: TSMO: Operational
Total Project Cost:
$63,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$63,000,000
$0
Other $0
Other $0
$50,400,000 $12,600,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$50,400,000 $12,600,000 $0 $0 $63,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-04-117
Ramp revisions, intersection operational improvements and convert frontage road to one way operation
Status: RSR
$63,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-04-112
2025,2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5548.0
Limits From: FM 2252
Limits To: Schwab Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $25,000,000
Construction Engineering $1,595,000
Contingencies: $322,000
Indirect Costs: $1,435,000
Preliminary Engineering: $1,225,000
Other Field $1,445,000
$31,022,000
Type of Work: TSMO: Operational
Total Project Cost:
$25,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$25,000,000
$0
Other $0
Other $0
$20,000,000 $5,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$20,000,000 $5,000,000 $0 $0 $25,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-05-119
Ramp revisions, intersection and frontage road operational improvements
Status: RSR
$25,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-05-
114
2025,2035,2045TDM Network Years:
16Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 74 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 10 E,R TxDOT 5396.2
Limits From: Graytown Rd
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $18,480,000
Construction Cost: $154,000,000
Construction Engineering $6,840,000
Contingencies: $11,970,000
Indirect Costs: $3,420,000
Preliminary Engineering: $15,400,000
Other Field $6,840,000
$216,950,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$33,880,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$15,400,000
$18,480,000
Other $0
Other $0
$0 $15,400,000 $0 $0
$16,632,000 $1,848,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,632,000 $17,248,000 $0 $0 $33,880,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-215
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$33,880,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
IH 10 E,R TxDOT 5552.2
Limits From: Loop 1604
Limits To: Graytown Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $6,600,000
Construction Cost: $55,000,000
Construction Engineering $3,509,000
Contingencies: $709,000
Indirect Costs: $3,157,000
Preliminary Engineering: $5,500,000
Other Field $3,179,000
$77,654,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$5,500,000
$6,600,000
Other $0
Other $0
$0 $5,500,000 $0 $0
$5,940,000 $660,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,940,000 $6,160,000 $0 $0 $12,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-219
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$12,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5403.0
Limits From: Cascade Caverns/Scenic Loop
Limits To: Kendall/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,000,000
Construction Engineering $750,000
Contingencies: $1,400,000
Indirect Costs: $390,000
Preliminary Engineering: $1,000,000
Other Field $760,000
$24,300,000
Type of Work: TSMO: Operational
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0072-06-074
Reconfigure ramps and widen frontage road (4 lanes) to convert to one way operation
Status: RSR
$20,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2027 to FY 2019;
3/18 - revise funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2025,2035,2045TDM Network Years:
17Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 75 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 410 E,R TxDOT 5372.2
Limits From: Ingram Rd
Limits To: US 90
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,000,000
Construction Cost: $100,000,000
Construction Engineering $6,380,000
Contingencies: $1,290,000
Indirect Costs: $5,740,000
Preliminary Engineering: $10,000,000
Other Field $5,780,000
$141,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$10,000,000
$12,000,000
Other $0
Other $0
$0 $10,000,000 $0 $0
$10,800,000 $1,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$10,800,000 $11,200,000 $0 $0 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0521-04-204
Expand from 8 to 10 lanes from Ingram to 151 & 6 to 8 lanes from 151 to 90 - add 2 new lanes, & from 6 to 6 FR lanes; reconstruct SH 151 interchange -
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: NB 410 to WB 151 & EB 151 to SB 410
Non-Exempt
Proj Hist:
9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5372.0
Limits From: Ingram Rd
Limits To: US 90
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,000,000
Construction Cost: $100,000,000
Construction Engineering $6,380,000
Contingencies: $1,290,000
Indirect Costs: $5,740,000
Preliminary Engineering: $10,000,000
Other Field $5,780,000
$141,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$100,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - CL
Other
$100,000,000
$0
Other $0
Other $0
$80,000,000 $20,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000,000 $20,000,000 $0 $0 $100,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0521-04-204
Expand from 8 to 10 lanes from Ingram to 151 & 6 to 8 lanes from 151 to 90 - add 2 new lanes, & from 6 to 6 FR lanes; reconstruct SH 151 interchange -
Status: RSR
$100,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: NB 410 to WB 151 & EB 151 to SB 410
Non-Exempt
Proj Hist:
9/19 - ADM clarify descr; 1/19 - rev descr to incl FR lanes; 10/18 - rev limits, descr and funding; consolidate from 0521-04-275 and 0521-04-279; 4/18 - move from 21 to FY 19; 3/18 - rev funding distribution; 4/17 - 2017
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1535 E TxDOT 5310.2
Limits From: Shavano Ranch Road
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $372,000
Contingencies: $149,250
Indirect Costs: $430,500
Preliminary Engineering: $750,000
Other Field $280,500
$9,482,250
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$750,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
Other
$750,000
$0
Other $0
Other $0
$0 $750,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $750,000 $0 $0 $750,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0658-01-044
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: RSR
$750,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
34
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
N/ATDM Network Years:
18Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 76 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
NR C AAMPO 5301.0
Limits From: Alamo Area MPO: Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $300,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$300,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$300,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$300,000
$0
Other $0
Other $0
$300,000 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000 $0 $0 $0 $300,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-00-195
Alamo Area Commute Solutions Program
Status: Exempt
$300,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - increase cost (from 0915-12-546 and 0915-00-196) and move to FY 2019; 4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; fixed amount
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5539.3
Limits From: Various locations in Comal and
Limits To: Bexar Counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,617,950
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,617,950
Type of Work: TSMO: ITS
Total Project Cost:
$1,617,950
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$1,617,950
$0
Other $0
Other $0
$1,294,360 $323,590 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,294,360 $323,590 $0 $0 $1,617,950
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-00-211
Install advanced signal controllers, networking equipment and control software for traffic signals
Status: Exempt
$1,617,950
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS E,R,C Port SA 4005.0
Limits From: On Quintana Road from Harmon Avenue
Limits To: McKenna Avenue
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,600,000
Construction Cost: $5,846,800
Construction Engineering $286,500
Contingencies: $267,200
Indirect Costs: $282,400
Preliminary Engineering: $353,200
Other Field $0
$8,636,100
Type of Work: Maint/Rehab
Total Project Cost:
$7,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$7,800,000
$0
Other $0
Other $0
$6,240,000 $670,800 $889,200 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,240,000 $670,800 $889,200 $0 $7,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-520
Rehab and realign roadway, intersection and flood control improvements
Status: Non-RSR
$7,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019;
1/17 - move from FY 2017 to FY 2018; 4/16 - revise match (EDCP project); 1/16 - move from FY 16 to FY 17; 1/14 - included PE and ROW as funded phases; 4/12 -
N/ATDM Network Years:
19Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 77 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
NR C AAMPO 5102.0
Limits From: Alamo Area MPO: In Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-543
Alamo Area Commute Solutions Pgm - FY 2018
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019, change agency and reduce cost; 10/15 - project has $53,400 in TDCs; 4/14 - funded through STP-MM project selection process; fixed amount
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
NR C AACOG 5101.0
Limits From: Alamo Area MPO: In Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-547
Alamo Area Commute Solutions Pgm - FY 2017
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019 and reduce cost; 10/17 - move from 17 to 18; 10/15 - project has $53,400 in TDCs which are not calculated in the funding total; 4/14 - funded through STP-MM project selection
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CR R BxCo 5106.3
Limits From: On Watson Road from FM 2790-Somerset Road
Limits To: 0.62 Mi East of Somerset Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,440,000
Construction Cost: $4,886,116
Construction Engineering $195,445
Contingencies: $342,028
Indirect Costs: $97,722
Preliminary Engineering: $739,184
Other Field $195,445
$7,895,940
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,440,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$1,440,000
$0
Other $0
Other $0
$0 $0 $0 $1,440,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,440,000 $1,440,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-562
Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage
Status: Non-RSR
$1,440,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify limits and description;
10/18 - add phase (ROW)
N/ATDM Network Years:
20Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 78 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C SARA 4977.0
Limits From: in San Antonio, from Lombrano St
Limits To: Laredo St
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $382,800
Contingencies: $77,400
Indirect Costs: $289,800
Preliminary Engineering: $294,000
Other Field $346,800
$7,390,800
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
9 - TA
3 - LC
$3,125,000
$2,875,000
Other $0
Other $0
$2,500,000 $0 $625,000 $0
$0 $0 $0 $2,875,000
$0 $0 $0 $0
$0 $0 $0 $0
$2,500,000 $0 $625,000 $2,875,000 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-12-595
Extend the Alazan Creek section of the Greenway Trail System
Status: Exempt
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019; 6/17 - add TA project
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5426.0
Limits From: In San Antonio
Limits To: at TransGuide Center
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,000,000
Construction Engineering $240,000
Contingencies: $120,000
Indirect Costs: $200,000
Preliminary Engineering: $196,000
Other Field $240,000
$4,996,000
Type of Work: TSMO: Operational
Total Project Cost:
$4,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$4,000,000
$0
Other $0
Other $0
$3,200,000 $800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,200,000 $800,000 $0 $0 $4,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-12-602
Upgrade TransGuide Facility to include new operator workstations, network cabling, video monitoring wall and associated software
Status: Exempt
$4,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
9/19 - ADM clarify description; 10/17 - add project; created from 0915-12-577 ($3M) and 0915-12-580 ($1M)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 3768.3
Limits From: Rapid Transit Corridor Study
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$10,000,000
Type of Work: Transit
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$10,000,000
$0
Other $0
Other $0
$8,000,000 $0 $2,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $0 $2,000,000 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-612
Rapid Transit Corridor Study
Status: Exempt
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - consolidate 0915-00-172, 0915-12-
613, -614, -616 into 0915-12-612 and move to FY 2019; 4/18 - new CSJ (project) created from 0915-00-172
N/ATDM Network Years:
21Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 79 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
CS C New Braunfels 4973.0
Limits From: In New Braunfels on San Antonio St,
Limits To: Walnut, McQueeney, near Seele Elem
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,344,828
Construction Engineering $60,000
Contingencies: $19,500
Indirect Costs: $30,000
Preliminary Engineering: $74,300
Other Field $60,000
$1,588,628
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,344,828
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
9 - TA
Other
$1,344,828
$0
Other $0
Other $0
$1,075,862 $0 $268,966 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,075,862 $0 $268,966 $0 $1,344,828
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-17-066
Construct sidewalks, ramps & other pedestrian related infrastructure
Status: Exempt
$1,344,828
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/17 - add TA project
N/ATDM Network Years:
Comal15 - San Antonio
Description:
VA C New Braunfels 5539.1
Limits From: Various locations in New Braunfels
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$200,000
Type of Work: TSMO: ITS
Total Project Cost:
$200,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$200,000
$0
Other $0
Other $0
$160,000 $0 $40,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$160,000 $0 $40,000 $0 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-17-068
Purchase of control software for traffic signals
Status: Exempt
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Comal15 - San Antonio
Description:
VA C New Braunfels 5539.2
Limits From: Various locations in New Braunfels
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$200,000
Type of Work: TSMO: ITS
Total Project Cost:
$200,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$200,000
$0
Other $0
Other $0
$160,000 $0 $40,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$160,000 $0 $40,000 $0 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-17-069
Install advanced signal controllers, networking equipment and control software for traffic signals
Status: Exempt
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM
Call for Projects
N/ATDM Network Years:
22Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 80 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 5549.2
Limits From: IH 10 E
Limits To: Martinez Creek
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,400,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $258,000
Indirect Costs: $114,800
Preliminary Engineering: $2,000,000
Other Field $1,156,000
$27,204,800
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$2,000,000
$2,400,000
Other $0
Other $0
$0 $2,000,000 $0 $0
$1,920,000 $480,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,920,000 $2,480,000 $0 $0 $4,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
2452-04-016
Expand from 2 lanes to 4 lanes divided
Status: RSR
$4,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5549.0
Limits From: IH 10 E
Limits To: Martinez Creek
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,400,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $258,000
Indirect Costs: $114,800
Preliminary Engineering: $2,000,000
Other Field $1,156,000
$27,204,800
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
2452-04-016
Expand from 2 lanes to 4 lanes divided
Status: RSR
$20,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add project, created from 2452-04-014
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SH 151 E,R TxDOT 5382.2
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$8,000,000
$9,600,000
Other $0
Other $0
$0 $8,000,000 $0 $0
$7,680,000 $1,920,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,680,000 $9,920,000 $0 $0 $17,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
Status: RSR
$17,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
49
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 -
add phases (Engr, ROW)
2025,2035,2045TDM Network Years:
23Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 81 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SH 211 E,R BxCo 3153.2
Limits From: FM 1957 (Potranco Rd), N 2.9 MI
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,780,000
Construction Cost: $7,000,000
Construction Engineering $340,704
Contingencies: $492,128
Indirect Costs: $383,860
Preliminary Engineering: $840,000
Other Field $0
$10,367,681
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,620,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
3 - LC
$840,000
$1,780,000
Other $0
Other $0
$0 $0 $0 $840,000
$0 $0 $0 $1,780,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,620,000 $2,620,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
3544-04-002
Construct two lane rural highway on new location
Status: RSR
$2,620,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
SH 211 E,R BxCo 3154.2
Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N
Limits To: Medina Co. Line, 2.0 Mi S of FM 471
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $2,600,000
Construction Engineering $126,547
Contingencies: $182,790
Indirect Costs: $142,577
Preliminary Engineering: $312,000
Other Field $0
$3,889,710
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,012,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
3 - LC
$312,000
$700,000
Other $0
Other $0
$0 $0 $0 $312,000
$0 $0 $0 $700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,012,000 $1,012,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
3544-05-001
Construct two lane rural highway on new location
Status: RSR
$1,012,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
PA 1502 E,R TxDOT 5315.4
Limits From: Lockhill Selma Road
Limits To: FM 1535-NW Military
Total Project Cost Information (TxDOT %):
ROW Purchase: $250,000
Construction Cost: $9,000,000
Construction Engineering $360,000
Contingencies: $630,000
Indirect Costs: $180,000
Preliminary Engineering: $900,000
Other Field $360,000
$11,680,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$900,000
$250,000
Other $0
Other $0
$0 $900,000 $0 $0
$200,000 $50,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $950,000 $0 $0 $1,150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
7774-01-001
Expand 4 to 6 lanes divided & intersection operational improvements including new turn lanes and improved signal operation at FM 1535
Status: RSR
$1,150,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
11/19 - ADM clarify description; 10/18 - add
phases (Engr, ROW)
N/ATDM Network Years:
24Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 82 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
IH 35 R TxDOT 4013.2
Limits From: Bexar/Guadalupe County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,000,000
Construction Cost: $80,000,000
Construction Engineering $35,000,000
Contingencies: $0
Indirect Costs: $4,800,000
Preliminary Engineering: $35,000,000
Other Field $0
$164,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
S102
Other
$10,000,000
$0
Other $0
Other $0
$8,000,000 $2,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $2,000,000 $0 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0016-06-047
Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes & from 4 to 4
FR lanes
Status: RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/19 - add project (ROW phase)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
Old FM 471 C ARMA 5429.0
Limits From: FM 471 (West)
Limits To: FM 471 (East)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $13,759,473
Construction Engineering $825,568
Contingencies: $687,974
Indirect Costs: $550,379
Preliminary Engineering: $1,573,257
Other Field $0
$17,396,651
Type of Work: TSMO: Operational
Total Project Cost:
$13,759,473
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$13,759,473
$0
Other $0
Other $0
$0 $0 $0 $13,759,473
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $13,759,473 $13,759,473
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Add continuous left turn lane with operational and drainage improvements including curb, sidewalk and bike lanes
Status: Non-RSR
$13,759,473
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add ARMA project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CR C ARMA 5431.0
Limits From: In Bexar County on Talley Road
Limits To: from FM 1957 to Wiseman Blvd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,632,739
Construction Engineering $1,237,964
Contingencies: $1,031,637
Indirect Costs: $825,310
Preliminary Engineering: $1,540,330
Other Field $0
$25,267,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,632,739
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$20,632,739
$0
Other $0
Other $0
$0 $0 $0 $20,632,739
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $20,632,739 $20,632,739
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements including curb and sidewalk
Status: Non-RSR
$20,632,739
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add ARMA project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
25Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 83 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 35 North R TxDOT 3477.2
Limits From: IH 410 N
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,923,000
Construction Cost: $715,000,000
Construction Engineering $50,000,000
Contingencies: $0
Indirect Costs: $42,900,000
Preliminary Engineering: $50,000,000
Other Field $0
$892,823,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$34,923,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
S102
Other
$34,923,000
$0
Other $0
Other $0
$31,430,700 $3,492,300 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$31,430,700 $3,192,300 $0 $0 $34,923,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0016-07-113
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604
Status: RSR
$34,923,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35;2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N
Non-Exempt
Proj Hist:
10/19 - rev cost; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5396.0
Limits From: Graytown Rd
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $18,480,000
Construction Cost: $154,000,000
Construction Engineering $6,840,000
Contingencies: $11,970,000
Indirect Costs: $3,420,000
Preliminary Engineering: $15,400,000
Other Field $6,840,000
$216,950,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$154,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$154,000,000
$0
Other $0
Other $0
$0 $154,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $154,000,000 $0 $0 $154,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0025-02-215
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$154,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: May 2020 revision to FY 2019-2022 TIP
Non-Exempt
Proj Hist:
4/20 - rev cost alloc; 10/19 - move 21 to 20; 1/19 - rev descr to incl FR; 10/18 - rev limits, cost & TPC; 3/18 - move 29 to 21 and rev funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5552.0
Limits From: Loop 1604
Limits To: Graytown Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $6,600,000
Construction Cost: $55,000,000
Construction Engineering $3,509,000
Contingencies: $709,000
Indirect Costs: $3,157,000
Preliminary Engineering: $5,500,000
Other Field $3,179,000
$77,654,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$55,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$55,000,000
$0
Other $0
Other $0
$44,000,000 $11,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$44,000,000 $11,000,000 $0 $0 $55,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-219
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$55,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 -
add project, created from 0025-02-215
2025,2035,2045TDM Network Years:
26Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 84 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
SL 337 C TxDOT 5543.0
Limits From: at River Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,400,000
Construction Engineering $624,000
Contingencies: $728,000
Indirect Costs: $520,000
Preliminary Engineering: $509,600
Other Field $416,000
$13,197,600
Type of Work: TSMO: Operational
Total Project Cost:
$10,400,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$10,400,000
$0
Other $0
Other $0
$8,320,000 $2,080,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,320,000 $2,080,000 $0 $0 $10,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0216-01-057
Construct grade separation
Status: RSR
$10,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Part of the expansion of Loop 337; see #9111.1 and #9111.2 let in 2017
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1535 C TxDOT 5310.0
Limits From: Shavano Ranch Road
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $372,000
Contingencies: $149,250
Indirect Costs: $430,500
Preliminary Engineering: $750,000
Other Field $280,500
$9,482,250
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$7,500,000
$0
Other $0
Other $0
$6,000,000 $1,500,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,000,000 $1,500,000 $0 $0 $7,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0658-01-044
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
34
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 4/18 - move from FY 2021 to FY 2020; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.1
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$2,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$2,500,000
$0
Other $0
Other $0
$2,000,000 $167,500 $332,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,000,000 $167,500 $332,500 $0 $2,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-00-212
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2019
Status: Exempt
$2,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - move from FY21 to 20; 5/20 - move
from FY 20 to 21; 10/19 - move from FY 19 to 20; 10/18 - revise funding distribution; 4/18 - funded via 19-22 STP-MM Project Call
N/ATDM Network Years:
27Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 85 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.2
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$5,500,000
$0
Other $0
Other $0
$4,400,000 $368,500 $731,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,400,000 $368,500 $731,500 $0 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-00-213
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2020
Status: Exempt
$5,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - move from FY21 to 20; 5/20 - move from FY20 to 21; 6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded via 19-22 STP-MM Project Call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5110.0
Limits From: Harry Wurzbach
Limits To: at Austin Highway
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,177,000
Construction Engineering $852,000
Contingencies: $342,000
Indirect Costs: $986,000
Preliminary Engineering: $842,000
Other Field $642,000
$20,841,000
Type of Work: TSMO: Operational
Total Project Cost:
$17,177,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$17,177,000
$0
Other $0
Other $0
$13,741,600 $1,477,222 $1,958,178 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$13,741,600 $1,477,222 $1,958,178 $0 $17,177,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-550
Construct entrance and exit ramps between Harry Wurzbach and Austin Highway
Status: RSR
$17,177,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: An innovative intersection project
Exempt
Proj Hist:
10/19 - 19 to 20; 4/18 - 18 to 19; 14/17 - rev limits & funding; 1/17 - 19 to18 & rev funding distr; 4/16 - comb with new STP-MM proj & rev match (EDCP proj); 10/15 - rev fund; 4/14 - funded through STP-MM project
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C UC 5325.0
Limits From: In Universal City, on E. Aviation
Limits To: Houston Drive to Aztec Way
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,632,561
Construction Engineering $428,175
Contingencies: $171,788
Indirect Costs: $495,509
Preliminary Engineering: $422,995
Other Field $322,858
$10,473,886
Type of Work: TSMO: Operational
Total Project Cost:
$8,632,561
Authorized Funding by Category/Share
UC
Cost of Approved Phases:
7 - STP-MM
3 - LC
$7,444,174
$1,188,387
Other $0
Other $0
$5,955,339 $0 $1,488,835 $0
$0 $0 $0 $1,188,387
$0 $0 $0 $0
$0 $0 $0 $0
$5,955,339 $0 $1,488,835 $1,188,387 $8,632,561
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-578
Widen to provide operational improvements, bike lanes, sidewalks and drainage
Status: Non-RSR
$8,632,561
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020;
1/17 - revise limits and description; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
28Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 86 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS E Converse 5319.2
Limits From: On Rocket/Schaeffer, from E. Norris
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,430,481
Construction Engineering $269,352
Contingencies: $108,067
Indirect Costs: $311,710
Preliminary Engineering: $266,094
Other Field $203,100
$6,588,804
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$266,094
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
3 - LC
Other
$266,094
$0
Other $0
Other $0
$0 $0 $0 $266,094
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $266,094 $266,094
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-582
Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path
Status: Non-RSR
$266,094
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CR C ARMA 5317.0
Limits From: In Bexar County, on Blanco Rd
Limits To: From West Oak Estates to Borgfeld
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,661,000
Construction Engineering $727,000
Contingencies: $292,000
Indirect Costs: $842,000
Preliminary Engineering: $718,400
Other Field $548,000
$17,788,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$14,661,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$14,661,235
$0
Other $0
Other $0
$11,728,988 $0 $2,932,247 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,728,988 $0 $2,932,247 $0 $14,661,235
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-585
Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, curbs and drainage
Status: RSR
$14,661,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
30
Remarks: None
Non-Exempt
Proj Hist:
10/20 - move 2021 to 2020; 5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/17 - rev funding; 1/17 - TIP: add project; MTP: move 23 to FY 19; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
VA C Converse 4972.0
Limits From: In Converse, from Converse Park N
Limits To: to FM 78
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,382,725
Construction Engineering $88,200
Contingencies: $17,800
Indirect Costs: $66,800
Preliminary Engineering: $67,800
Other Field $79,900
$1,703,225
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,382,725
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
9 - TA
3 - LC
$1,365,440
$17,285
Other $0
Other $0
$1,092,352 $0 $273,088 $0
$0 $0 $0 $17,285
$0 $0 $0 $0
$0 $0 $0 $0
$1,092,352 $0 $273,088 $17,285 $1,382,725
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-594
Construct multi use path
Status: Exempt
$1,382,725
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020;
4/18 - move from FY 2018 to FY 2019; 6/17 - add TA project
N/ATDM Network Years:
29Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 87 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5425.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $90,000
Contingencies: $45,000
Indirect Costs: $75,000
Preliminary Engineering: $73,500
Other Field $90,000
$1,873,500
Type of Work: TSMO: ITS
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-601
Intelligent Transportation Systems - Enhancements; Upgrade Traffic Signal Controllers
Status: Exempt
$1,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 1/18 - update project description; 10/17 - add project; created from 0915-12-580
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5428.0
Limits From: In City of San Antonio on Judson Road
Limits To: from Independence to IH 35
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $60,000
Contingencies: $30,000
Indirect Costs: $50,000
Preliminary Engineering: $49,000
Other Field $60,000
$1,249,000
Type of Work: Pedestrian
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-603
Construct sidewalk along west side of Judson Road
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 10/17 - add project; configured from $1M from 0915-12-579
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5580.1
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,334
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,334
Type of Work: Transit
Total Project Cost:
$7,553,334
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,667
$686,667
Other $0
Other $0
$5,493,334 $0 $1,373,333 $0
$0 $0 $0 $686,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,334 $0 $1,373,333 $686,667 $7,553,334
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 8/2019
0915-12-672
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2020
Status: Exempt
$7,553,334
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
30Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 88 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA T VIA 5581.1
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,037,144
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,037,144
Type of Work: Transit
Total Project Cost:
$7,037,144
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,345,477
$691,667
Other $0
Other $0
$5,076,382 $0 $1,269,095 $0
$0 $0 $0 $691,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,076,382 $0 $1,269,095 $691,667 $7,037,144
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 8/2019
0915-12-673
VIA Bus Frequency Program. Purchase 9 CNG buses. Increase service on #7 and #552 routes. FY 2020
Status: Exempt
$7,037,144
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
FM 2252 C TxDOT 5324.0
Limits From: at Evans Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $479,000
Contingencies: $97,000
Indirect Costs: $431,000
Preliminary Engineering: $368,000
Other Field $434,000
$9,309,000
Type of Work: TSMO: Operational
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
2 - Metro Corridor
$4,200,000
$1,812,430
Other $0
Other $0
$3,360,000 $840,000 $0 $0
$2,640,000 $660,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
1433-01-029
Improvements include widening of Cibolo Creek bridge to allow for intersection operational improvements including turn lanes
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/20 - let in 1/20 not 2021; 11/19 - ADM clarify description; 10/18 - revise funding distribution; 4/17 - move from FY 2019 to FY 2021 and revise funding; 1/17 - revise funding distribution; 4/16 - funded through
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 3913.2
Limits From: SH 16
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $185,500,000
Construction Engineering $8,200,000
Contingencies: $14,400,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,500,000
Other Field $8,200,000
$238,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$18,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
Other
$18,500,000
$0
Other $0
Other $0
$14,800,000 $3,700,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,800,000 $3,700,000 $0 $0 $18,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
2452-02-083
Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes
Status: RSR
$18,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Reference #4049 and #5556
Non-Exempt
Proj Hist:
10/19 - revise cost, limits, description and
move from FY 2019 to FY 2020; reference #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
31Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 89 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
PA 1502 C TxDOT 5315.0
Limits From: Lockhill Selma Road
Limits To: FM 1535-NW Military
Total Project Cost Information (TxDOT %):
ROW Purchase: $250,000
Construction Cost: $9,000,000
Construction Engineering $360,000
Contingencies: $630,000
Indirect Costs: $180,000
Preliminary Engineering: $900,000
Other Field $360,000
$11,680,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
2 - Metro Corridor
$8,000,000
$1,000,000
Other $0
Other $0
$6,400,000 $1,600,000 $0 $0
$800,000 $200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,200,000 $1,800,000 $0 $0 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
7774-01-001
Expand from 4 to 6 lanes divided & intersection operational improvements including new turn lanes and improved signal operation at FM 1535
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
11/19 - ADM clarify description; 10/18 - revise description & TPC; 3/18 - revise CSJ from 1502-03-003 and decrease cost; 4/17 - move from FY 18 to FY 20, revise funding and limits; 4/16 - funded through STP-MM
2025,2035,2045TDM Network Years:
32Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 90 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 1518 E TxDOT 5309.3
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$2,194,000
$0
Other $0
Other $0
$0 $2,194,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $2,194,000 $0 $0 $2,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$2,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase; 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM
selected project; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 E TxDOT 5391.3
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$1,900,000
$0
Other $0
Other $0
$0 $1,900,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $1,900,000 $0 $0 $1,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$1,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 4049.2
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $193,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$247,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$18,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$18,800,000
$0
Other $0
Other $0
$15,040,000 $3,760,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,040,000 $3,760,000 $0 $0 $18,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$18,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 9/20 - FR coded as 6 lanes per schematic reflecting merge lanes; 4 lanes is thru-travel lanes; 10/19 - add project
(E); spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/20 - revise TPC; 9/20 - ADM clarify description; 10/19 - add project (E); spin off
of 2452-02-083 (MPO #3913); no impact to conformity
N/ATDM Network Years:
33Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 91 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5423.0
Limits From: In San Antonio on Alamo/Commerce/Losoya Intersection
Limits To: from Commerce to Market
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $128,000
Contingencies: $100,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $116,000
$2,557,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,000,000
$0
Other $0
Other $0
$0 $0 $0 $2,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,000,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Close Alamo Street to vehicle traffic
Status: RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5416.0
Limits From: In San Antonio on South Alamo Street
Limits To: from Market Street to Cesar Chavez Blvd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,000,000
Construction Engineering $574,000
Contingencies: $450,000
Indirect Costs: $517,000
Preliminary Engineering: $441,000
Other Field $520,000
$11,502,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,000,000
$0
Other $0
Other $0
$0 $0 $0 $9,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,000,000 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5415.0
Limits From: In San Antonio on Santa Rosa Street
Limits To: from Cesar Chavez Blvd to Martin Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,500,000
Construction Engineering $542,000
Contingencies: $425,000
Indirect Costs: $488,000
Preliminary Engineering: $416,000
Other Field $491,000
$10,862,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$8,500,000
$0
Other $0
Other $0
$0 $0 $0 $8,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $8,500,000 $8,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$8,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
34Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 92 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5407.0
Limits From: In San Antonio on Fredericksburg Road
Limits To: From N. Flores to Woodlawn
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,300,000
Construction Engineering $338,000
Contingencies: $68,000
Indirect Costs: $304,000
Preliminary Engineering: $260,000
Other Field $306,000
$6,576,000
Type of Work: TSMO: Operational
Total Project Cost:
$5,300,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$5,300,000
$0
Other $0
Other $0
$0 $0 $0 $5,300,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $5,300,000 $5,300,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide sidewalks
Status: RSR
$5,300,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5410.0
Limits From: In San Antonio on Rittiman Road
Limits To: from IH 35 to Castle Cross Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,100,000
Construction Engineering $134,000
Contingencies: $27,000
Indirect Costs: $120,000
Preliminary Engineering: $103,000
Other Field $121,000
$2,605,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,100,000
$0
Other $0
Other $0
$0 $0 $0 $2,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,100,000 $2,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Extend right turn lane from Rittiman to IH 35
Status: Non-RSR
$2,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5408.1
Limits From: In San Antonio on Bulverde Road
Limits To: from Briar Crest to North of Quiet Meadow Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $200,000
Construction Cost: $9,700,000
Construction Engineering $619,000
Contingencies: $125,000
Indirect Costs: $557,000
Preliminary Engineering: $1,400,000
Other Field $561,000
$13,162,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,700,000
$0
Other $0
Other $0
$0 $0 $0 $9,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,700,000 $9,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Expand from 2 lanes and CTL to 4 lanes and CTL
Status: RSR
$9,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
35Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 93 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5414.0
Limits From: In San Antonio on North Main & Soledad
Limits To: from Pecan Street to Navarro Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $300,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,668,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$6,000,000
$0
Other $0
Other $0
$0 $0 $0 $6,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $6,000,000 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 7 to 4 travel lanes with CTL, bike lanes, sidewalks and traffic circle at Navarro
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5409.0
Limits From: In San Antonio on N. New Braunfels
Limits To: from Houston Street to Burleson
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,500,000
Construction Engineering $287,000
Contingencies: $58,000
Indirect Costs: $258,000
Preliminary Engineering: $220,000
Other Field $260,000
$5,583,000
Type of Work: TSMO: Operational
Total Project Cost:
$4,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$4,500,000
$0
Other $0
Other $0
$0 $0 $0 $4,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,500,000 $4,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks
Status: Non-RSR
$4,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5553.0
Limits From: at FM 725
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $78,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,446,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$6,000,000
$0
Other $0
Other $0
$0 $6,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $6,000,000 $0 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-05-120
Intersection operational improvements including turn lanes
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost; 11/19 - ADM clarify
description; 10/18 - add project, created from 0016-05-114
2025,2035,2045TDM Network Years:
36Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 94 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
IH 35 C,E TxDOT 4013.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,000,000
Construction Cost: $132,000,000
Construction Engineering $73,400,000
Contingencies: $0
Indirect Costs: $6,000,000
Preliminary Engineering: $73,400,000
Other Field $0
$284,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$278,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
12 - CL
$51,000,000
$81,000,000
3 - DB $146,800,000
Other $0
$40,800,000 $10,200,000 $0 $0
$64,800,000 $16,200,000 $0 $0
$0 $146,800,000 $0 $0
$0 $0 $0 $0
$105,600,000 $173,200,000 $0 $0 $278,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-06-047
Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes; from 4 to 4 FR lanes
Status: RSR
$278,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost; 10/19 - move 20 to 21, rev cost; 1/19 - rev descr; 10/18 - move 25 to 20; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev descr; 4/13 - add to MTP (Env document)
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 3477.0
Limits From: IH 410 N
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,900,000
Construction Cost: $1,007,000,000
Construction Engineering $168,100,000
Contingencies: $0
Indirect Costs: $42,900,000
Preliminary Engineering: $168,100,000
Other Field $0
$1,421,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,343,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$261,400,000
$100,600,000
3-DB/11 - Distr Discr
$339,200,000
12 - CL $642,000,000
$209,120,000 $52,280,000 $0 $0
$80,480,000 $20,120,000 $0 $0
$2,400,000 $336,800,000 $0 $0
$513,600,000 $128,400,000 $0 $0
$805,600,000 $537,600,000 $0 $0 $1,343,200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-07-113
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604
Status: RSR
$1,343,200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: Category 11 - Distr. Disc. funding equals $3m 80/20 fed/state; 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N
Non-Exempt
Proj Hist:
10/20 - revise cost; 10/19 - move 20 to 21, rev cost; 9/19 - rev descr; 1/19 - rev descr; 10/18 - 25 to 20, rev descr, TPC; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev limits, descr; 04/13 - rev limits
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 368 C CoSA 5313.0
Limits From: Burr Road
Limits To: IH 35
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering $2,600,000
Contingencies: $850,000
Indirect Costs: $1,500,000
Preliminary Engineering: $950,000
Other Field $950,000
$28,850,000
Type of Work: TSMO: Operational
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$9,000,000
$5,000,000
3 - LC $8,000,000
Other $0
$7,200,000 $1,800,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $8,000,000
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $8,000,000 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-08-034
Reduce from 6 to 4 travel lanes; roadway rehabilitation, bicycle and pedestrian facilities
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
10/20 - revise cost; 5/20 - move from FY20
to 21; 10/19 - revise project sponsor; 9/19 - ADM clarify description; 4/17 - revise funding; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
37Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 95 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SS 536 C CoSA 5536.2
Limits From: at San Antonio River
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $120,000
Contingencies: $140,000
Indirect Costs: $100,000
Preliminary Engineering: $98,000
Other Field $80,000
$2,538,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0253-06-037
Construct bicycle and pedestrian bridge
Status: Non-RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5542.0
Limits From: FM 2536 - Pearsall Road
Limits To: Valley Hi Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $19,100,000
Construction Engineering $850,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $850,000
$24,600,000
Type of Work: TSMO: Operational
Total Project Cost:
$19,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$8,100,000
$11,000,000
Other $0
Other $0
$6,480,000 $1,620,000 $0 $0
$8,800,000 $2,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,280,000 $3,820,000 $0 $0 $19,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0521-05-148
Operational improvements, including ramp revisions, intersection improvements, reconstruct frontage roads and mainlane overlay
Status: RSR
$19,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - move from FY20 to FY21, revise cost; 4/19 - increase cost, revise decription; 4/18 - funded via 19-22 STP-MM Project Call
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5371.0
Limits From: at IH 10 E
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000,000
Construction Engineering $4,000,000
Contingencies: $7,000,000
Indirect Costs: $2,000,000
Preliminary Engineering: $4,800,000
Other Field $4,000,000
$121,800,000
Type of Work: TSMO: Interchange
Total Project Cost:
$100,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$50,000,000
$25,000,000
12 - CL $25,000,000
Other $0
$45,000,000 $5,000,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$0 $0 $0 $0
$90,000,000 $10,000,000 $0 $0 $100,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0521-06-138
Construct direct connectors: Phase 1 - Priority Connectors - NB 410 to EB 10; WB 10 to SB 410
Status: RSR
$100,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/20 - rev descr and move FY 21 to FY 25;
9/19 - ADM clarify description; 3/18 - revise funding distribution; 4/17 - add project
2025,2035,2045TDM Network Years:
38Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 96 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 1535 C TxDOT 5323.0
Limits From: Lp 1604
Limits To: Huebner Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,600,000
Construction Engineering $400,000
Contingencies: $750,000
Indirect Costs: $200,000
Preliminary Engineering: $960,000
Other Field $425,000
$12,335,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$6,500,000
$3,100,000
Other $0
Other $0
$5,200,000 $1,300,000 $0 $0
$2,480,000 $620,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,680,000 $1,920,000 $0 $0 $9,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0658-01-045
Construct 2 way left turn lane, bike lanes and sidewalks
Status: RSR
$9,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - revise cost; 4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 471 E, R TxDOT 5377.2
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,620,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$2,100,000
$2,520,000
Other $0
Other $0
$0 $2,100,000 $0 $0
$2,016,000 $504,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,016,000 $2,604,000 $0 $0 $4,620,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$4,620,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.3
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$5,500,000
$0
Other $0
Other $0
$4,400,000 $368,500 $731,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,400,000 $368,500 $731,500 $0 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-214
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2021
Status: Exempt
$5,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - revise cost (+$1M from #5316.3);
10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
39Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 97 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CR C BxCo 3988.0
Limits From: On Bulverde Road from Marshall Road
Limits To: Wilderness Oak
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,097,480
Construction Engineering $401,635
Contingencies: $463,986
Indirect Costs: $554,677
Preliminary Engineering: $396,777
Other Field $0
$9,914,555
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,097,480
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$8,097,480
$0
Other $0
Other $0
$6,477,984 $0 $1,619,496 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,477,984 $0 $1,619,496 $0 $8,097,480
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-509
Reconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements
Status: RSR
$8,097,480
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
33
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 9/19 - ADM clarify descr; 4/19 - 19 to 20 and rev proj sponsor; 4/18 - 18 to 19; 1/17 - 17 to 18; 4/15 - 15 to 16 and update descr; 1/14 - 14 to 15; 4/13 - 13 to 14 and rev funding cats; 4/12 - funded
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C LV 3992.0
Limits From: SH 16 - Bandera Road
Limits To: Crystal Hills Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $933,000
Construction Engineering $59,525
Contingencies: $65,963
Indirect Costs: $63,911
Preliminary Engineering: $45,717
Other Field $0
$1,168,116
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$933,000
Authorized Funding by Category/Share
Leon Valley
Cost of Approved Phases:
7 - STBG
Other
$933,000
$0
Other $0
Other $0
$746,400 $0 $186,600 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$746,400 $0 $186,600 $0 $933,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-514
Construction of a hike and bike trail along Huebner Creek
Status: Exempt
$933,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/18 - move 19 to 20; 4/17 - move 17 to 19; 10/15 - move 15 to 17 and revise limits; 4/14 - rev limits and move 14 to 15; 4/12 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C BxCo 5105.0
Limits From: On Galm Road, from FM 471 (Culebra Road)
Limits To: Government Canyon State Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,323,351
Construction Engineering $363,238
Contingencies: $145,735
Indirect Costs: $353,718
Preliminary Engineering: $1,181,757
Other Field $273,893
$9,641,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,323,351
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
12S - STP-MM Rec
$3,223,351
$4,100,000
Other $0
Other $0
$2,578,681 $0 $644,670 $0
$3,280,000 $0 $820,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,858,681 $0 $1,464,670 $0 $7,323,351
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-544
Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities
Status: Non-RSR
$7,323,351
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
44
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 4/19 - move 19 to FY
20; 10/18 - rev TPC; 4/18 - move 18 to FY 19; 1/16 - rev funding; 4/14 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
40Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 98 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CR C BxCo 5106.0
Limits From: On Watson Road from FM 2790-Somerset Road
Limits To: 0.62 Mi East of Somerset Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,440,000
Construction Cost: $4,886,116
Construction Engineering $195,445
Contingencies: $342,028
Indirect Costs: $97,722
Preliminary Engineering: $739,184
Other Field $195,445
$7,895,940
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,886,116
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$4,886,116
$0
Other $0
Other $0
$3,908,893 $0 $977,223 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,908,893 $0 $977,223 $0 $4,886,116
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-562
Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage
Status: Non-RSR
$4,886,116
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 9/19 - ADM clarify limits and description; 1/19 - move 19 to 20; 10/18 - rev TPC; 4/14 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5305.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $99,000
Contingencies: $40,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $75,000
$2,427,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-579
Construct citywide pedestrian and bicycle improvements
Status: Exempt
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 19 to FY 20; 10/17 - reduce project cost by $1M to fund 0915-12-603; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5306.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $90,000
Contingencies: $45,000
Indirect Costs: $75,000
Preliminary Engineering: $73,500
Other Field $90,000
$1,873,500
Type of Work: TSMO: ITS
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-580
Intelligent Transportation System - Enhancements to include controller hardware and software and CCTV cameras
Status: Exempt
$1,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to FY
20; 9/19 - ADM clarify description; 10/17 - reduce cost from $4M to $1.5M and move 20 to 19; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
41Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 99 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CR C BxCo 5304.0
Limits From: In Bexar County, on Talley Road
Limits To: From Wiseman Blvd to Tamaron Pass
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,917,924
Construction Engineering $1,255,000
Contingencies: $1,464,000
Indirect Costs: $1,046,000
Preliminary Engineering: $1,025,000
Other Field $837,000
$26,544,924
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,917,924
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$19,417,924
$1,500,000
Other $0
Other $0
$15,534,339 $0 $3,883,585 $0
$0 $0 $0 $1,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$15,534,339 $0 $3,883,585 $1,500,000 $20,917,924
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-581
Expand from 2 lane to 4 lane divided roadway with medians, curbs, bicycle facilities, pedestrian improvements, operational improvements and drainage
Status: Non-RSR
$20,917,924
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/18 and 4/16 - funded through STP-MM project selection processes
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C Converse 5319.0
Limits From: On Rocket/Schaeffer, from E. Norris
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,430,481
Construction Engineering $269,352
Contingencies: $108,067
Indirect Costs: $311,710
Preliminary Engineering: $266,094
Other Field $203,100
$6,588,804
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$5,430,481
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
7 - STBG
Other
$5,430,481
$0
Other $0
Other $0
$4,344,385 $0 $1,086,096 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,344,385 $0 $1,086,096 $0 $5,430,481
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-582
Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path
Status: Non-RSR
$5,430,481
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 4974.0
Limits From: In San Antonio, on Zarzamora
Limits To: From Fredericksburg Rd to Loop 13
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $319,000
Contingencies: $64,500
Indirect Costs: $241,500
Preliminary Engineering: $245,000
Other Field $289,000
$6,159,000
Type of Work: Pedestrian
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
9 - TA
3 - LC
$4,500,000
$500,000
Other $0
Other $0
$3,600,000 $0 $900,000 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,600,000 $0 $900,000 $500,000 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-596
Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS
Status: RSR
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
6/17 - add TA project
N/ATDM Network Years:
42Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 100 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5434.0
Limits From: in San Antonio on Presa Street
Limits To: from W. Boyer to SE Military Drive (Lp 13)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $600,000
Contingencies: $300,000
Indirect Costs: $500,000
Preliminary Engineering: $490,000
Other Field $600,000
$12,490,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3 - LC
$9,000,000
$1,000,000
Other $0
Other $0
$7,200,000 $0 $1,800,000 $0
$0 $0 $0 $1,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$7,200,000 $0 $1,800,000 $1,000,000 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-604
Bike and Pedestrian Corridor enhancements to implement Complete Streets
Status: Non-RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 travel lanes throughout the corridor
Exempt
Proj Hist:
9/19 - ADM clarify description; 4/18 - move from FY 2019 to FY 2021; 10/17 - add project per CoSA, funding is from 0025-02-204; 4/16 - revise match (EDCP project); 4/14 - funded through STP-MM project
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5545.1
Limits From: In San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,000,000
Type of Work: Planning
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-609
Multimodal planning study on one arterial to accommodate travel modes including higher capacity transit
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5536.1
Limits From: In San Antonio
Limits To: Along San Pedro Avenue
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $60,000
Contingencies: $70,000
Indirect Costs: $50,000
Preliminary Engineering: $49,000
Other Field $40,000
$1,269,000
Type of Work: Pedestrian
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-610
Construct sidewalks and pedestrian infrastructure
Status: RSR
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
4/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
43Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 101 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5545.2
Limits From: In San Antonio
Limits To: at various locations
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$3,000,000
Type of Work: Planning
Total Project Cost:
$3,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$3,000,000
$0
Other $0
Other $0
$2,400,000 $0 $600,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,400,000 $0 $600,000 $0 $3,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-611
Multimodal planning study on three arterials to accommodate travel modes including higher capacity transit
Status: Exempt
$3,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5570.0
Limits From: Various locations on
Limits To: IH 35 S and IH 37 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,400,000
Construction Engineering $270,000
Contingencies: $540,000
Indirect Costs: $216,000
Preliminary Engineering: $264,000
Other Field $162,000
$6,852,000
Type of Work: TSMO: ITS
Total Project Cost:
$5,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$5,400,000
$0
Other $0
Other $0
$4,860,000 $540,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,860,000 $540,000 $0 $0 $5,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-664
Install ITS equipment on IH 35 South and IH 37 South Corridors
Status: RSR
$5,400,000
NOX lbs/day
91.029
VOC lbs/day
16.777
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5578.0
Limits From: In Bexar County
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $75,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$75,000
Type of Work: TSMO: Training
Total Project Cost:
$75,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$75,000
$0
Other $0
Other $0
$60,000 $15,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$60,000 $15,000 $0 $0 $75,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-665
Traffic Incident Management Training Program
Status: Exempt
$75,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
6/19 - added through CMAQ project call
N/ATDM Network Years:
44Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 102 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5573.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-667
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2020
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5574.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-668
Install ITS equipment on congested corridors in the City of San Antonio - FY 2020
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-669
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2020
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021;
6/19 - added through CMAQ project call
N/ATDM Network Years:
45Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 103 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5576.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-670
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2020
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C UTSA 5577.1
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,041
$16,184
Other $0
Other $0
$90,433 $0 $22,608 $0
$0 $0 $0 $16,184
$0 $0 $0 $0
$0 $0 $0 $0
$90,433 $0 $22,608 $16,184 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-671
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2020
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5574.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-674
Install ITS equipment on congested corridors in the City of San Antonio - FY 2021
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
46Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 104 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5573.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-675
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2021
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-676
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2021
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5576.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-677
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2021
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
47Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 105 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C UTSA 5577.2
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-678
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2021
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5580.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,334
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,334
Type of Work: Transit
Total Project Cost:
$7,553,334
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,667
$686,667
Other $0
Other $0
$5,493,334 $0 $1,373,333 $0
$0 $0 $0 $686,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,334 $0 $1,373,333 $686,667 $7,553,334
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-679
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2021
Status: Exempt
$7,553,334
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5581.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,429
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,429
Type of Work: Transit
Total Project Cost:
$2,181,429
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,762
$691,667
Other $0
Other $0
$1,191,810 $0 $297,952 $0
$0 $0 $0 $691,667
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,810 $0 $297,952 $691,667 $2,181,429
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-680
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2021
Status: Exempt
$2,181,429
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
48Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 106 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
CS C Seguin 5322.0
Limits From: In Seguin, on Rudeloff Rd.
Limits To: From SH 46 to Huber Rd.
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,316,658
Construction Engineering $313,306
Contingencies: $125,701
Indirect Costs: $263,576
Preliminary Engineering: $309,516
Other Field $236,243
$7,565,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$6,316,658
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$6,316,658
$0
Other $0
Other $0
$5,053,326 $0 $1,263,332 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,053,326 $0 $1,263,332 $0 $6,316,658
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-045
Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities
Status: Non-RSR
$6,316,658
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
VA C Seguin 4976.0
Limits From: in Seguin from Vaughan Bridge
Limits To: to Max Starcke Park East
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,801,246
Construction Engineering $178,700
Contingencies: $36,100
Indirect Costs: $135,300
Preliminary Engineering: $137,300
Other Field $162,000
$3,450,646
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,801,246
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
9 - TA
3 - LC
$2,773,234
$28,012
Other $0
Other $0
$2,218,587 $0 $554,647 $0
$0 $0 $0 $28,012
$0 $0 $0 $0
$0 $0 $0 $0
$2,218,587 $0 $554,647 $28,012 $2,801,246
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-046
Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and below grade crossing
Status: Exempt
$2,801,246
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 2019 to FY 2020; 6/17 - add TA project
N/ATDM Network Years:
Guadalupe15 - San Antonio
Description:
CS C Schertz 4975.0
Limits From: in Schertz on Woodland Oaks Dr,
Limits To: Savannah Dr & Live Oak Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,158,266
Construction Engineering $73,900
Contingencies: $15,000
Indirect Costs: $56,000
Preliminary Engineering: $56,800
Other Field $67,000
$1,426,966
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,158,266
Authorized Funding by Category/Share
Schertz
Cost of Approved Phases:
9 - TA
Other
$1,158,266
$0
Other $0
Other $0
$926,613 $0 $231,653 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$926,613 $0 $231,653 $0 $1,158,266
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-050
Construct sidewalks, bike lanes and off-road trail
Status: Non-RSR
$1,158,266
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 4/19 - move 19 to 20;
10/18 - adm rev CSJ from 0915-17-065 to 0915-46-050; 4/18 - move 18 to FY 19; 6/17 - add TA project
N/ATDM Network Years:
49Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 107 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
FM 1103 C TxDOT 4970.0
Limits From: IH 35
Limits To: Guadalupe C/L
Total Project Cost Information (TxDOT %):
ROW Purchase: $870,000
Construction Cost: $2,000,000
Construction Engineering $89,000
Contingencies: $455,000
Indirect Costs: $44,000
Preliminary Engineering: $200,000
Other Field $89,000
$3,747,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$700,000
$800,000
3 - LC $500,000
Other $0
$560,000 $140,000 $0 $0
$640,000 $160,000 $0 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$1,200,000 $300,000 $0 $500,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-01-013
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20; 1/17 - move 18 to 19; 10/15 - add project
2025,2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
FM 1103 C TxDOT 4971.0
Limits From: Comal C/L
Limits To: Rodeo Way
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,285,000
Construction Cost: $37,500,000
Construction Engineering $1,666,000
Contingencies: $2,915,000
Indirect Costs: $833,000
Preliminary Engineering: $3,750,000
Other Field $1,666,000
$51,615,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$37,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$18,111,852
$11,922,500
3 - LC $7,465,648
Other $0
$14,489,482 $3,622,370 $0 $0
$9,538,000 $2,384,500 $0 $0
$0 $0 $0 $7,465,648
$0 $0 $0 $0
$24,027,482 $6,006,870 $0 $7,465,648 $37,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-02-027
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$37,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20 and rev funding; 1/17 - move 18 to19 and rev funding; 10/15 - add project
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 2252 E TxDOT 5329.2
Limits From: Evans Road
Limits To: Comal/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $500,000
Construction Engineering $32,000
Contingencies: $7,000
Indirect Costs: $29,000
Preliminary Engineering: $50,000
Other Field $29,000
$647,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$50,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$50,000
$0
Other $0
Other $0
$0 $50,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $50,000 $0 $0 $50,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-01-028
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$50,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
N/ATDM Network Years:
50Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 108 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 1560 E,R TxDOT 5311.2
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$13,467,333
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
SWROW
$1,210,000
$12,257,333
Other $0
Other $0
$0 $1,210,000 $0 $0
$9,805,866 $2,451,467 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,805,866 $3,661,467 $0 $0 $13,467,333
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$13,467,333
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/18 - add phases E & R
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3913.0
Limits From: SH 16
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $185,500,000
Construction Engineering $8,200,000
Contingencies: $14,400,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,500,000
Other Field $8,200,000
$238,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$185,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$185,500,000
$0
Other $0
Other $0
$148,400,000 $37,100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$148,400,000 $37,100,000 $0 $0 $185,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-083
Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes
Status: RSR
$185,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: Reference #4049 and #5556
Non-Exempt
Proj Hist:
10/19 - move 19 to 21 and rev cost, limits and descr; see #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - 20 to 21, rev descr & fund, move to TxDOT; 4/17 - rev limits, descr, cost (has $398.3M in Cat 2: '17-
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5332.0
Limits From: at FM 2696 - Blanco Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,600,000
Construction Engineering $1,800,000
Contingencies: $3,100,000
Indirect Costs: $900,000
Preliminary Engineering: $4,100,000
Other Field $1,800,000
$52,300,000
Type of Work: TSMO: Operational
Total Project Cost:
$40,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,600,000
$0
Other $0
Other $0
$32,480,000 $8,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,480,000 $8,120,000 $0 $0 $40,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-117
Intersection operational improvements including construction of a diverging diamond interchange (DDI)
Status: RSR
$40,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
11/19 - ADM* clarify description; 10/19 - rev
cost; 10/18 - move 22 to 21; 3/18 - incr cost from $30M; 10/17 - move 20 to 22; 4/17 - TIP: add project; MTP - move 27 to 20; 4/16 - funded in 17-20 TIP Call for Projects
2025,2035,2045TDM Network Years:
51Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 109 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 4049.0
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $193,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$247,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$193,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
7 - STBG
$187,800,000
$6,000,000
Other $0
Other $0
$150,240,000 $37,560,000 $0 $0
$4,800,000 $1,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$155,040,000 $38,760,000 $0 $0 $193,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$193,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: 9/20 - FR coded as 6 lanes per schematic reflecting merge lanes; 4 lanes is thru-travel lanes; 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/20 - increase cost, funds from 0916-12-574 and -575; 9/20 - ADM clarify description; 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
2025,2035,2045TDM Network Years:
Medina15 - San Antonio
Description:
SH 211 C BxCo 3152.0
Limits From: Bexar C/L, 2.0 Mi S of FM 471, N
Limits To: FM 471 (Culebra Rd)
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,100,000
Construction Cost: $4,400,000
Construction Engineering $214,157
Contingencies: $309,338
Indirect Costs: $241,283
Preliminary Engineering: $233,193
Other Field $0
$6,497,971
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,400,000
$0
Other $0
Other $0
$0 $0 $0 $4,400,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,400,000 $4,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-03-002
Construct two lane rural highway on new location
Status: Non-RSR
$4,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3153.0
Limits From: FM 1957 (Potranco Rd), N 2.9 MI
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,780,000
Construction Cost: $7,000,000
Construction Engineering $340,704
Contingencies: $492,128
Indirect Costs: $383,860
Preliminary Engineering: $840,000
Other Field $0
$10,836,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$7,000,000
$0
Other $0
Other $0
$0 $0 $0 $7,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,000,000 $7,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-04-002
Construct two lane rural highway on new location
Status: RSR
$7,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to FY
20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045TDM Network Years:
52Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 110 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3154.0
Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N
Limits To: Medina Co. Line, 2.0 Mi S of FM 471
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $2,600,000
Construction Engineering $126,547
Contingencies: $182,790
Indirect Costs: $142,577
Preliminary Engineering: $137,796
Other Field $0
$3,889,710
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,600,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$2,600,000
$0
Other $0
Other $0
$0 $0 $0 $2,600,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,600,000 $2,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-05-001
Construct two lane rural highway on new location
Status: RSR
$2,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 10/18 - revise TPC; 4/18 - move 18 to 19;10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045TDM Network Years:
Medina15 - San Antonio
Description:
SH 211 C BxCo 3155.0
Limits From: Bexar C/L, 2.9 MI N of FM 1957, N
Limits To: Bexar C/L, 4.5 MI N of FM 1957
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $4,100,000
Construction Engineering $199,555
Contingencies: $288,246
Indirect Costs: $224,832
Preliminary Engineering: $217,293
Other Field $0
$6,029,926
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,100,000
$0
Other $0
Other $0
$0 $0 $0 $4,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,100,000 $4,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-06-001
Construct two lane rural highway on new location
Status: Non-RSR
$4,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to FY 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045TDM Network Years:
53Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 111 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 1518 R TxDOT 5309.2
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$8,194,000
$0
Other $0
Other $0
$6,555,200 $1,638,800 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,555,200 $1,638,800 $0 $0 $8,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$8,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP: 4/18 - move from FY 2021 to FY 2023 and combine with STP-
MM selected project; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 R TxDOT 5391.2
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$11,800,000
$0
Other $0
Other $0
$9,440,000 $2,360,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,440,000 $2,360,000 $0 $0 $11,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$11,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
N/ATDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5395.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 465
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000,000
Construction Engineering $6,700,000
Contingencies: $11,600,000
Indirect Costs: $3,300,000
Preliminary Engineering: $15,000,000
Other Field $6,700,000
$193,300,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$150,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$150,000,000
$0
Other $0
Other $0
$120,000,000 $30,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000,000 $30,000,000 $0 $0 $150,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0025-03-097
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$150,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Move from MTP to TIP; no impact to conformity; see companion project #4008
Exempt
Proj Hist:
5/20 - move 21 to 22; 10/19 - move 28 to 21, rev funding & limits; 1/19 - rev descr to incl
FR lanes & update cost; 10/18 - move 29 to 28; 6/18 - correct fund distrib; 4/17 - add proj to MTP with P1/P7; portion of project
2025,2035,2045TDM Network Years:
54Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 112 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5556.0
Limits From: at Loop 1604 North
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $285,400,000
Construction Engineering $12,400,000
Contingencies: $21,700,000
Indirect Costs: $6,200,000
Preliminary Engineering: $27,900,000
Other Field $12,400,000
$366,000,000
Type of Work: TSMO: Interchange
Total Project Cost:
$285,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$245,400,000
$17,000,000
12 - CL $17,000,000
7 - STBG $6,000,000
$196,320,000 $49,080,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$4,800,000 $1,200,000 $0 $0
$228,320,000 $57,080,000 $0 $0 $285,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0072-08-144
Construct Direct Connectors - 1 lane DC - NB 10 to EB 1604; EB 1604 to NB 10; SB 10 to WB 1604; WB 1604 to SB 10;
Status: RSR
$285,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 lane - NB 10 to WB 1604; EB 1604 to SB 10; SB 10 to EB 1604 & WB 1604 to NB 10
Exempt
Proj Hist:
10/20 - increase cost, funds from 0915-12-575 and -576; 10/19 - move from FY26 to FY22, revise funding and CSJ from 2452-02-127; 9/19 - ADM clarify description; 1/19 - rev cost; 10/18 - add project
2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.2
Limits From: US 281
Limits To: Bentwood Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering $560,000
Contingencies: $980,000
Indirect Costs: $280,000
Preliminary Engineering: $686,000
Other Field $560,000
$25,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$22,000,000
$0
Other $0
Other $0
$17,600,000 $4,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,600,000 $4,400,000 $0 $0 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-01-044
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
2025,2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.1
Limits From: Farhills Dr
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,800,000
Construction Engineering $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field $1,040,000
$23,026,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$17,800,000
$0
Other $0
Other $0
$14,240,000 $3,560,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,240,000 $3,560,000 $0 $0 $17,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-07-027
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$17,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020
to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
2025,2035,2045TDM Network Years:
55Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 113 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SH 16 C TxDOT 5571.0
Limits From: LP 1604
Limits To: 0.3 Mi West of FM 1560/Leslie Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,600,000
Construction Engineering $430,000
Contingencies: $516,000
Indirect Costs: $430,000
Preliminary Engineering: $421,000
Other Field $258,000
$10,655,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,600,000
Authorized Funding by Category/Share
Helotes
Cost of Approved Phases:
5 - CMAQ
Other
$8,600,000
$0
Other $0
Other $0
$6,880,000 $1,720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,880,000 $1,720,000 $0 $0 $8,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0291-10-114
Operational improvements including implementation of median U-turns and R-cut intersections
Status: RSR
$8,600,000
NOX lbs/day
10.097
VOC lbs/day
6.945
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
9/20 - ADM reverse limits; 11/19 - ADM clarify description; 6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
FM 471 C TxDOT 5377.0
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$21,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$10,500,000
$10,500,000
Other $0
Other $0
$8,400,000 $2,100,000 $0 $0
$0 $0 $0 $10,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,400,000 $2,100,000 $0 $10,500,000 $21,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$21,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC
2025,2035,2045TDM Network Years:
Medina15 - San Antonio
Description:
FM 471 C TxDOT 5378.0
Limits From: Medina County Line
Limits To: SH 211
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $375,000
Construction Engineering $15,000
Contingencies: $26,000
Indirect Costs: $8,000
Preliminary Engineering: $18,000
Other Field $15,000
$457,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$375,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$375,000
$0
Other $0
Other $0
$300,000 $75,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000 $75,000 $0 $0 $375,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-02-045
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: Non-RSR
$375,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Exempt
Proj Hist:
3/18 - revise funding distribution
2025,2035,2045TDM Network Years:
56Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 114 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.1
Limits From: Alamo Area MPO: Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-197
Alamo Area Commute Solutions Pgm - FY 2022
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; project has $53,400 in TDCs which are not calculated in the funding total; fixed amount
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5579.0
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$4,950,000
$550,000
Other $0
Other $0
$3,960,000 $990,000 $0 $0
$0 $0 $0 $550,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,960,000 $990,000 $0 $550,000 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-227
Safety service patrol on controlled access highways in Bexar, Comal and Kendall Counties
Status: Exempt
$5,500,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.1
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,073,444
Construction Engineering $240,000
Contingencies: $280,000
Indirect Costs: $227,000
Preliminary Engineering: $196,000
Other Field $150,000
$4,166,444
Type of Work: Pedestrian
Total Project Cost:
$3,073,444
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$1,373,444
$1,700,000
Other $0
Other $0
$1,098,755 $274,689 $0 $0
$0 $0 $0 $1,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$1,098,755 $274,689 $0 $1,700,000 $3,073,444
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-574
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$3,073,444
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost, funding to 2452-02-128,
move from FY23 to FY22; 4/18 - move from FY21 to FY23; 1/17 - revise desc, cost, move $1M to 0915-12-586; 3Q '16 - new project in FY 2017-2020 TIP
N/ATDM Network Years:
57Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 115 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.3
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Pedestrian
Total Project Cost:
$0
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-576
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$0
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - delete project and move funding to 0072-08-144; 10/18 - move from FY 2019 to FY 2022 and reduce cost; 4/18 - move from FY 2022 to FY 2019; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C BxCo 5318.0
Limits From: In Bexar County, on Crestway
Limits To: From Kitty Hawk Rd to FM 1976
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,791,571
Construction Engineering $386,462
Contingencies: $155,052
Indirect Costs: $447,236
Preliminary Engineering: $381,787
Other Field $291,405
$9,453,513
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$7,791,571
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$7,791,571
$0
Other $0
Other $0
$6,233,257 $0 $1,558,314 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,233,257 $0 $1,558,314 $0 $7,791,571
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-584
Reconstruct to provide operational improvements including bike lanes and sidewalks
Status: Non-RSR
$7,791,571
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/19 - revise description; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5572.0
Limits From: Various locations in San Antonio
Limits To: on Hamilton Wolfe and Ewing Halsell
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $180,000
Contingencies: $300,000
Indirect Costs: $240,000
Preliminary Engineering: $294,000
Other Field $180,000
$7,194,000
Type of Work: Bicycle
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$6,000,000
$0
Other $0
Other $0
$4,800,000 $0 $1,200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,800,000 $0 $1,200,000 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-666
Construct cycle track on Hamilton Wolff Rd from Babcock to Ewing Halsell. And on Ewing Halsell from Hamilton Wolff to Sid Katz
Status: Non-RSR
$6,000,000
NOX lbs/day
0.132
VOC lbs/day
0.090
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
58Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 116 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C CoSA 5573.3
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-681
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2022
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-682
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2022
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5576.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-683
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2022
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
59Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 117 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C UTSA 5577.3
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-684
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2022
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5580.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,332
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,332
Type of Work: Transit
Total Project Cost:
$7,553,332
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,666
$686,666
Other $0
Other $0
$5,493,333 $0 $1,373,333 $0
$0 $0 $0 $686,666
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,333 $0 $1,373,333 $686,666 $7,553,332
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-685
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2022
Status: Exempt
$7,553,332
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5581.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,427
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,427
Type of Work: Transit
Total Project Cost:
$2,181,427
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,761
$691,666
Other $0
Other $0
$1,191,809 $0 $297,952 $0
$0 $0 $0 $691,666
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,809 $0 $297,952 $691,666 $2,181,427
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-686
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2022
Status: Exempt
$2,181,427
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/ATDM Network Years:
60Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 118 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 1560 C TxDOT 5311.0
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$10,580,000
$1,520,000
Other $0
Other $0
$8,464,000 $2,116,000 $0 $0
$0 $0 $0 $1,520,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,464,000 $2,116,000 $0 $1,520,000 $12,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$12,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
31
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 4/16 - funded through STP-MM project selection process
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 3786.2
Limits From: US 281
Limits To: Redland Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,600,000
Construction Cost: $58,000,000
Construction Engineering $2,600,000
Contingencies: $4,500,000
Indirect Costs: $1,300,000
Preliminary Engineering: $5,800,000
Other Field $2,600,000
$78,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$5,800,000
$3,600,000
Other $0
Other $0
$4,640,000 $1,160,000 $0 $0
$2,880,000 $720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,520,000 $1,880,000 $0 $0 $9,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-113
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$9,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/19 - move from FY 2021 to FY 2024 and revise funding; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/ATDM Network Years:
61Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 119 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 10 E TxDOT 5401.2
Limits From: Kendall/Bexar County Line
Limits To: FM 3351
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,020,000
Construction Engineering $5,700,000
Contingencies: $10,000,000
Indirect Costs: $2,900,000
Preliminary Engineering: $12,900,000
Other Field $5,700,000
$166,220,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$12,900,000
$0
Other $0
Other $0
$10,320,000 $2,580,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$10,320,000 $2,580,000 $0 $0 $12,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0072-07-075
Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
Status: RSR
$12,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - rev cost and move 28 to 25 & add E phase to TIP ; 1/19 - rev descr to incl FR
lanes; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with P1/P7; portion of project may have
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 3530.2
Limits From: Redland Road
Limits To: IH 35 North
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $230,000,000
Construction Engineering $10,000,000
Contingencies: $17,900,000
Indirect Costs: $5,100,000
Preliminary Engineering: $23,000,000
Other Field $10,200,000
$296,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$23,000,000
$0
Other $0
Other $0
$18,400,000 $4,600,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,400,000 $4,600,000 $0 $0 $23,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-087
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$23,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase to TIP; 9/19 - ADM clarify description; 1/19 - incl FR lanes & update cost; 10/18 - move 27 to 25 & rev descr; 4/17 - move 30 to 27 and rev funding; 4/14 - move18 to 30, rev limits and descr;
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 9107.2
Limits From: FM 78
Limits To: IH 10 East
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,200,000
Construction Cost: $300,000,000
Construction Engineering $13,300,000
Contingencies: $23,300,000
Indirect Costs: $6,700,000
Preliminary Engineering: $30,000,000
Other Field $13,300,000
$390,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$47,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
SWROW
$43,300,000
$4,200,000
Other $0
Other $0
$0 $43,300,000 $0 $0
$3,360,000 $840,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,360,000 $44,140,000 $0 $0 $47,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-111
Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes
Status: RSR
$47,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E,R phases to TIP; 1/19 - update funding; 4/18 - correct funding distribution;
4/17 - add project; removed from 10/15 Prop 1 list due to financial constraint issues
2035,2045TDM Network Years:
62Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 120 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 5554.2
Limits From: Martinez Creek
Limits To: FM 1346 - Houston Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $766,000
Contingencies: $155,000
Indirect Costs: $689,000
Preliminary Engineering: $588,000
Other Field $694,000
$14,892,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$588,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$588,000
$0
Other $0
Other $0
$470,400 $117,600 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$470,400 $117,600 $0 $0 $588,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-04-017
Expand from 2 lanes to 4 lanes divided
Status: RSR
$588,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2023 to FY 2025 & add E phase to TIP; 10/18 - add project, created from 2452-04-016
2025,2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1518 C TxDOT 5309.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$44,780,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
7 - STBG
$8,000,000
$21,780,000
3 - LC (Schertz) $10,000,000
3 - LC (BC) $5,000,000
$6,400,000 $1,600,000 $0 $0
$17,424,000 $4,356,000 $0 $0
$0 $0 $0 $10,000,000
$0 $0 $0 $5,000,000
$23,824,000 $5,956,000 $0 $15,000,000 $44,780,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$44,780,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
41
Remarks: None
Non-Exempt
Proj Hist:
4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.2
Limits From: Alamo Area MPO: in Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-216
Alamo Area Commute Solutions Pgm - FY 2023
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - add project
N/ATDM Network Years:
63Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 121 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.2
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Pedestrian
Total Project Cost:
$0
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-575
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$0
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - delete project and move funding to 0072-08-144; 4/18 - move from FY 2021 to FY 2023; 4/16 - funded through STP-MM project selection process
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5540.0
Limits From: In San Antonio
Limits To: at various locations
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,500,000
Construction Engineering $270,000
Contingencies: $315,000
Indirect Costs: $225,000
Preliminary Engineering: $220,000
Other Field $180,000
$5,710,000
Type of Work: TSMO: ITS
Total Project Cost:
$4,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$4,500,000
$0
Other $0
Other $0
$3,600,000 $0 $900,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,600,000 $0 $900,000 $0 $4,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-615
Implement communication network improvements
Status: Exempt
$4,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
FM 2252 C TxDOT 5329.0
Limits From: Evans Road
Limits To: Comal/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $500,000
Construction Engineering $32,000
Contingencies: $7,000
Indirect Costs: $29,000
Preliminary Engineering: $50,000
Other Field $29,000
$647,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
11 - Distr Discr
Other
$500,000
$0
Other $0
Other $0
$400,000 $100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$400,000 $100,000 $0 $0 $500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-01-028
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
43
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2023;
10/18 - revise funding distribution & TPC; 3/18 - revise funding distribution; 4/17 - move from FY 2027 to FY 2021
2035,2045TDM Network Years:
64Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 122 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
FM 2252 C TxDOT 9115.0
Limits From: Bexar/Comal County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $21,700,000
Construction Engineering $760,000
Contingencies: $1,330,000
Indirect Costs: $380,000
Preliminary Engineering: $931,000
Other Field $760,000
$25,861,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$21,700,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$21,700,000
$0
Other $0
Other $0
$17,360,000 $4,340,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,360,000 $4,340,000 $0 $0 $21,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-02-044
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$21,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2023; 10/18 - revise funding distribution; 3/18 - reverse limits and revise funding distribution; 4/17 - move from FY 2023 to FY 2021; added w/ 12/8/14 adoption of the MTP
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 C TxDOT 5391.0
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$19,750,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$14,750,000
$5,000,000
Other $0
Other $0
$11,800,000 $2,950,000 $0 $0
$0 $0 $0 $5,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$11,800,000 $2,950,000 $0 $5,000,000 $19,750,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$19,750,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
38
Remarks: None
Non-Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045TDM Network Years:
65Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 123 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 368 C TxDOT 5535.0
Limits From: New Braunfels St.
Limits To: Burr Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,000,000
Construction Engineering $840,000
Contingencies: $980,000
Indirect Costs: $700,000
Preliminary Engineering: $686,000
Other Field $560,000
$17,766,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$14,000,000
Authorized Funding by Category/Share
Alamo Heights
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$10,000,000
$4,000,000
Other $0
Other $0
$8,000,000 $2,000,000 $0 $0
$3,200,000 $800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $0 $14,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-08-041
Roadway rehabilitation and reduce travel lanes from 6 to 4 lanes, bicycle and pedestrian facilities
Status: RSR
$14,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
FM 725 C TxDOT 5308.0
Limits From: Zipp Rd
Limits To: County Line Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,600,000
Construction Engineering $525,760
Contingencies: $210,940
Indirect Costs: $608,440
Preliminary Engineering: $519,400
Other Field $396,440
$12,860,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,600,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STBG
Other
$10,600,000
$0
Other $0
Other $0
$8,480,000 $2,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,480,000 $2,120,000 $0 $0 $10,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-09-029
Expand from 2 to 4 lanes with median, sidewalks and bike lanes
Status: RSR
$10,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2023 to FY 2024; 4/20 - move from FY 2022 to FY 2023; 9/19 - ADM clarify From limit; 4/16 - funded through STP-MM project selection process
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.3
Limits From: Alamo Area MPO: in Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-217
Alamo Area Commute Solutions Pgm - FY 2024
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - add project
N/ATDM Network Years:
66Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 124 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CS C CoSA 5538.0
Limits From: In San Antonio, on Zarzamora
Limits To: From US 90 to Jennings
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,000,000
Construction Engineering $1,170,000
Contingencies: $1,365,000
Indirect Costs: $975,000
Preliminary Engineering: $955,000
Other Field $780,000
$28,245,000
Type of Work: TSMO: Operational
Total Project Cost:
$23,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3 - LC
$19,500,000
$3,500,000
Other $0
Other $0
$15,600,000 $0 $3,900,000 $0
$0 $0 $0 $3,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$15,600,000 $0 $3,900,000 $3,500,000 $23,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-617
Construct 4 lane grade separation at UPRR/Frio City Rd
Status: RSR
$23,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 4 lane underlying roadway remains
Exempt
Proj Hist:
11/19 - ADM clarify description; 6/18 - revise funding to include local contribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
2025,2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
CS C Seguin 5533.0
Limits From: In Seguin, on Rudeloff Road
Limits To: From Huber Road to SH 123 (at FM 20)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $720,000
Contingencies: $840,000
Indirect Costs: $600,000
Preliminary Engineering: $588,000
Other Field $480,000
$15,228,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,000,000
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$12,000,000
$0
Other $0
Other $0
$9,600,000 $0 $2,400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,600,000 $0 $2,400,000 $0 $12,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-049
Construct new alignment 4 lane roadway (0 to 4 lanes) with center left turn lane, bicycle and pedestrian facilities
Status: Non-RSR
$12,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2025 to FY 2024; 9/19 - ADM clarify description; 4/18 - funded through the 19-22 STP-MM Call for Projects
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3786.0
Limits From: US 281
Limits To: Redland Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,600,000
Construction Cost: $58,000,000
Construction Engineering $2,600,000
Contingencies: $4,500,000
Indirect Costs: $1,300,000
Preliminary Engineering: $5,800,000
Other Field $2,600,000
$78,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$58,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$58,000,000
$0
Other $0
Other $0
$0 $0 $0 $58,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $58,000,000 $58,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-113
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$58,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
10/19 - move from 21 to 24 and rev
funding/cost; 1/19 - rev descr to incl FR lns; 10/18 - move 20 to 21, rev descr, TPC & funding, move to TxDOT; 4/17 - rev cost; 4/14 - rev limits, year ('15 to '20), descr and
2025,2035,2045TDM Network Years:
67Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 125 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5541.0
Limits From: at Cibolo Creek
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $11,900,000
Construction Engineering $714,000
Contingencies: $833,000
Indirect Costs: $595,000
Preliminary Engineering: $583,000
Other Field $476,000
$15,101,000
Type of Work: Bridge
Total Project Cost:
$11,900,000
Authorized Funding by Category/Share
Fair Oaks Ranch
Cost of Approved Phases:
7 - STBG
Other
$11,900,000
$0
Other $0
Other $0
$9,520,000 $2,380,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,520,000 $2,380,000 $0 $0 $11,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3212-05-013
Reconstruct existing bridge and expand from 2 to 6 lanes
Status: RSR
$11,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Approaches remain 2 lanes
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2025,2035,2045TDM Network Years:
68Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 126 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
FM 306 Extens C TBD 9123.0
Limits From: FM 1101
Limits To: FM 758
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $15,000,000
Construction Engineering $600,000
Contingencies: $1,050,000
Indirect Costs: $300,000
Preliminary Engineering: $735,000
Other Field $600,000
$18,285,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$15,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
LC
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $15,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $15,000,000 $15,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Expand from 2 to 4 lanes with turn lanes at intersections
Status: Non-RSR
$15,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - revise funding source; 9/19 - ADM clarify description; added w/ 12/8/14
adoption of the MTP
2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C,E TxDOT 4014.0
Limits From: Guadalupe/Comal County Line
Limits To: FM 1103
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $175,000,000
Construction Engineering $25,000,000
Contingencies: $13,600,000
Indirect Costs: $3,900,000
Preliminary Engineering: $25,000,000
Other Field $7,800,000
$250,300,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$225,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$225,000,000
$0
Other $0
Other $0
$180,000,000 $45,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$128,000,000 $32,000,000 $0 $0 $225,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-05-111
Expand from 6 ln to 10 ln expy - add 4 new express lanes including 2 HOV-special use lanes & from 4 to 4 FR lanes
Status: RSR
$225,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Design Build project
Exempt
Proj Hist:
5/20 - rev cost; 1/19 - rev descr to incl FR lanes; 10/18 - rev descr and cost; 4/18 - move from FY 2020 to FY 2025 (out of TIP); 10/13 - revise description; 4/13 - add project to MTP (Env document)
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 35 C,E,R TxDOT 5555.0
Limits From: FM 3009
Limits To: Guadalupe Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $22,000,000
Construction Cost: $148,000,000
Construction Engineering $11,000,000
Contingencies: $11,500,000
Indirect Costs: $3,300,000
Preliminary Engineering: $11,000,000
Other Field $6,600,000
$213,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$192,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$192,000,000
$0
Other $0
Other $0
$153,600,000 $38,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$153,600,000 $38,400,000 $0 $0 $192,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-06-115
Expand from 6 ln to 10 lane expy - add 4 new express lanes including 2 HOV-Special Use Lanes & from 4 to
4 FR lanes
Status: RSR
$192,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: Design Build project
Exempt
Proj Hist:
5/20 - revise cost; 1/19 - rev descr to incl FR lanes; 10/18 - add project
2035,2045TDM Network Years:
69Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 127 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 61.2
Limits From: IH 410 S
Limits To: IH 410 N
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $608,000,000
Construction Engineering $148,000,000
Contingencies: $0
Indirect Costs: $32,000,000
Preliminary Engineering: $148,000,000
Other Field $0
$936,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$608,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - Strat Priority
12 - CL
$369,000,000
$202,300,000
6 - Structures $36,700,000
3 - DB $296,000,000
$295,200,000 $73,800,000 $0 $0
$161,840,000 $40,460,000 $0 $0
$33,030,000 $3,670,000 $0 $0
$236,800,000 $59,200,000 $0 $0
$726,870,000 $177,130,000 $0 $0 $904,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0017-10-168
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410 N
Status: RSR
$608,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: 1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 35
Non-Exempt
Proj Hist:
2/21 -remove from TIP (22 to 25), rev cost; 5/20 -21 to 22; 10/19-move 25 to 21 & rev cost; 9/19- ADM clarify descr; 1/19 - rev descr: incl FR lanes; 10/18 - rev desc, cost; 4/18 - move 20 to 25 (out of TIP); 10/13 -
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5380.0
Limits From: SH 211
Limits To: 0.8 Miles W of IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $7,500,000
Construction Cost: $110,000,000
Construction Engineering $7,018,000
Contingencies: $5,500,000
Indirect Costs: $6,314,000
Preliminary Engineering: $5,390,000
Other Field $6,358,000
$148,080,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$110,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$45,000,000
$65,000,000
Other $0
Other $0
$36,000,000 $9,000,000 $0 $0
$52,000,000 $13,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$88,000,000 $22,000,000 $0 $0 $110,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0024-07-059
Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)
Status: RSR
$110,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
45
Remarks: None
Non-Exempt
Proj Hist:
2/21 - remove from TIP (FY 2024 to FY 2025); 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5381.0
Limits From: 0.8 Miles W of IH 410
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $10,000,000
Construction Engineering $400,000
Contingencies: $700,000
Indirect Costs: $200,000
Preliminary Engineering: $490,000
Other Field $400,000
$13,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Pri
$5,000,000
$5,000,000
Other $0
Other $0
$4,000,000 $1,000,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $2,000,000 $0 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0024-08-138
Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
45
Remarks: None
Non-Exempt
Proj Hist:
2/21 - remove from TIP (FY 2024 to FY
2025); 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
70Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 128 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 37 C TxDOT 4969.0
Limits From: LP 13
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,900,000
Construction Engineering $129,000
Contingencies: $225,000
Indirect Costs: $64,000
Preliminary Engineering: $290,000
Other Field $129,000
$3,737,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,900,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - BC Local
1 - Prvnt Maint
$2,175,000
$725,000
Other $0
Other $0
$0 $0 $0 $2,175,000
$652,500 $72,500 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$652,500 $72,500 $0 $2,175,000 $2,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0073-08-183
Construction of a SB 2 lane frontage road from Lp 13 to relocated entrance ramp to SB IH 37 and intersection improvements
Status: RSR
$2,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 25; 10/19 - rev fund distrib; 9/19 - ADM clarify descr (partial); 1/19 - rev descr to incl FR lanes; 10/18 - move 19 to 20 and rev funding; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 10/15 - add
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5376.0
Limits From: at US 281/San Pedro
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $70,000,000
Construction Engineering $4,466,000
Contingencies: $903,000
Indirect Costs: $4,018,000
Preliminary Engineering: $3,430,000
Other Field $4,046,000
$86,863,000
Type of Work: TSMO: Operational
Total Project Cost:
$70,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
7 - STBG
$24,000,000
$10,000,000
4 - Connectivity $36,000,000
Other $0
$19,200,000 $4,800,000 $0 $0
$8,000,000 $2,000,000 $0 $0
$28,800,000 $7,200,000 $0 $0
$0 $0 $0 $0
$56,000,000 $14,000,000 $0 $0 $70,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0521-04-285
Operational improvements to include direct connector improvement from US 281 to IH 410 WB ; ramp revisions, frontage road and intersection improvements
Status: RSR
$70,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - remove from TIP (FY23 to 25); 5/20 - move 22 to 23; 11/19 - ADM clarify description; 10/18 - incr cost; 4/18 - rev proj (STP-MM project selection process); 3/18 - incr cost and rev fund distrib; 4/17 - add
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5592.0
Limits From: US 90A
Limits To: FM 464
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $106,000,000
Construction Engineering $4,700,000
Contingencies: $8,200,000
Indirect Costs: $2,400,000
Preliminary Engineering: $10,600,000
Other Field $4,700,000
$136,600,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$106,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$106,000,000
$0
Other $0
Other $0
$84,800,000 $21,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$84,800,000 $21,200,000 $0 $0 $106,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0535-01-077
Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes
Status: RSR
$106,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Spin off of 0535-01-074
Exempt
Proj Hist:
5/20 - add project; spin off of 0535-01-074
2035,2045TDM Network Years:
71Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 129 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
VA C,E,R AAMPO 3768.2
Limits From: Austin-San Antonio Regional
Limits To: Corridor Project
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$10,000,000
Type of Work: Passenger Rail
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$10,000,000
$0
Other $0
Other $0
$8,000,000 $0 $2,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $0 $2,000,000 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-173
Studies, plans and projects associated with multimodal transportation solutions
Status: Exempt
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - split project into 4 projs, red from $16M to $10M; 1/17 - rev limit,cost,agency, descr, and move 18 to 20; 4/15 - move 17 to 18 and correct limits; 1/13 - move 14 to 16; fixed amount; portion of $20M for Passenger
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.4
Limits From: Alamo Area MPO: in Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-218
Alamo Area Commute Solutions Pgm - FY 2025
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - add project
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5534.0
Limits From: In San Antonio on South New Braunfels
Limits To: From Lyster Road to IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $19,500,000
Construction Engineering $1,170,000
Contingencies: $1,365,000
Indirect Costs: $975,000
Preliminary Engineering: $955,000
Other Field $780,000
$24,745,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$19,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3-LC
$9,500,000
$10,000,000
Other $0
Other $0
$7,600,000 $0 $1,900,000 $0
$0 $0 $0 $10,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$7,600,000 $0 $1,900,000 $10,000,000 $19,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-593
Construct new alignment 4 lane roadway (0 to 4 lanes) with multiuse path and sidewalks
Status: Non-RSR
$19,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
53
Remarks: None
Non-Exempt
Proj Hist:
11/19 - ADM clarify description; 4/18 -
funded through the 19-22 STP-MM Call for Projects
2035,2045TDM Network Years:
72Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 130 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
CR C BC 5532.0
Limits From: In Bexar County, on Blanco Road
Limits To: Borgfeld to Bexar/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $16,791,743
Construction Engineering $1,007,000
Contingencies: $1,175,000
Indirect Costs: $840,000
Preliminary Engineering: $823,000
Other Field $672,000
$21,308,743
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$16,791,743
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$16,791,743
$0
Other $0
Other $0
$13,433,394 $0 $3,358,349 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$13,433,394 $0 $3,358,349 $0 $16,791,743
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-618
Expand from 2 to 4 lane divided roadway with a raised median, bike lanes, sidewalk, curbs and drainage
Status: Non-RSR
$16,791,743
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
18
Remarks: None
Non-Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3530.0
Limits From: Redland Road
Limits To: IH 35 North
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $230,000,000
Construction Engineering $10,000,000
Contingencies: $17,900,000
Indirect Costs: $5,100,000
Preliminary Engineering: $23,000,000
Other Field $10,200,000
$296,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$230,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$230,000,000
$0
Other $0
Other $0
$184,000,000 $46,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$184,000,000 $46,000,000 $0 $0 $230,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-087
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$230,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify description; 1/19 - incl FR lanes & update cost; 10/18 - move 27 to 25 & rev descr; 4/17 - move 30 to 27 and rev funding; 4/14- move18 to 30, rev limits and descr; 8/12 - revise description
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5554.0
Limits From: Martinez Creek
Limits To: FM 1346 - Houston Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $766,000
Contingencies: $155,000
Indirect Costs: $689,000
Preliminary Engineering: $588,000
Other Field $694,000
$14,892,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$12,000,000
$0
Other $0
Other $0
$9,600,000 $2,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,600,000 $2,400,000 $0 $0 $12,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-04-017
Expand from 2 lanes to 4 lanes divided
Status: RSR
$12,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
4/20 - move from FY 2023 to FY 2025;
10/18 - add project, created from 2452-04-016
2025,2035,2045TDM Network Years:
73Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 131 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2025FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SH 151 C TxDOT 5382.0
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$80,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
4 - Connectivity
Other
$80,000,000
$0
Other $0
Other $0
$72,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$72,000,000 $8,000,000 $0 $0 $80,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
Status: RSR
$80,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
49
Remarks: None
Non-Exempt
Proj Hist:
2/21 - remove from TIP, move from FY 2024 to FY 2025; 5/20 - move from FY 2021 to FY 2022; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - move from 24 to 21, rev TPC; 4/18 - correct
2035,2045TDM Network Years:
74Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 132 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2026FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
SH 123 C TxDOT 5337.0
Limits From: Cordova Ln
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $16,200,000
Construction Engineering $648,000
Contingencies: $1,134,000
Indirect Costs: $324,000
Preliminary Engineering: $794,000
Other Field $648,000
$19,748,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$16,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$16,200,000
$0
Other $0
Other $0
$12,960,000 $3,240,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$12,960,000 $3,240,000 $0 $0 $16,200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0366-02-089
Expand from 2 to 4 lanes with center left turn lane
Status: RSR
$16,200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - correct funding distribution; 4/17 - move from FY 2027 to FY 2026; 4/16 -
funded through 17-20 TIP Call for Projects (P1/P7); temporarily placed in FY 2027
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5385.0
Limits From: FM 464
Limits To: SH 123
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000,000
Construction Engineering $8,000,000
Contingencies: $14,000,000
Indirect Costs: $4,000,000
Preliminary Engineering: $9,800,000
Other Field $8,000,000
$243,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Priority
$50,000,000
$150,000,000
Other $0
Other $0
$45,000,000 $5,000,000 $0 $0
$135,000,000 $15,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$180,000,000 $20,000,000 $0 $0 $200,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0535-01-074
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$200,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: See also 0535-01-077 and 0535-01-078 as spin offs to original project
Exempt
Proj Hist:
2/21 - remove from TIP, move from FY 2025 to FY 2026; 5/20 - move from FY 2021 to FY 2022 and rev limits; 1/19 - rev descr to incl FR lanes; 10/18 - move from FY 2025 to FY 2021 and increase cost; 4/18 - correct
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1516 C TxDOT 5379.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,754,000
Construction Cost: $23,500,000
Construction Engineering $940,000
Contingencies: $1,645,000
Indirect Costs: $470,000
Preliminary Engineering: $1,151,500
Other Field $940,000
$39,400,500
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$11,750,000
$11,750,000
Other $0
Other $0
$9,400,000 $2,350,000 $0 $0
$0 $0 $0 $11,750,000
$0 $0 $0 $0
$0 $0 $0 $0
$9,400,000 $2,350,000 $0 $11,750,000 $23,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
1477-01-043
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$23,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
41
Remarks: None
Non-Exempt
Proj Hist:
2/21 - remove from TIP, move to FY 2026;10/18 - revise TPC; 3/18 - revise
funding distribution; 4/17 - 2017 UTP revisions
2035,2045TDM Network Years:
75Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 133 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2026FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.2
Limits From: Macdona-Lacoste Rd
Limits To: US 90 W
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,800,000
Construction Cost: $40,000,000
Construction Engineering $2,552,000
Contingencies: $516,000
Indirect Costs: $2,296,000
Preliminary Engineering: $4,000,000
Other Field $2,312,000
$56,476,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-01-066
Expand from 2 lanes to 4 lanes divided
Status: RSR
$40,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
2/21 - remove from TIP (FY 2025 to FY 2026); 10/18 - revise cost, TPC and limits; 3/18 - revise funding distribution; 4/17 - revise project; added w/ 12/8/14 adoption of the MTP
2035,2045TDM Network Years:
76Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 134 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2031FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
Transit Station C VIA 9129.0
Limits From: -
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $200,000
Contingencies: $350,000
Indirect Costs: $100,000
Preliminary Engineering: $245,000
Other Field $200,000
$6,095,000
Type of Work: Transit
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STBG
Other
$5,000,000
$0
Other $0
Other $0
$4,000,000 $0 $1,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,000,000 $0 $1,000,000 $0 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Construct transit station in New Braunfels, Texas
Status: Exempt
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
added w/ 12/8/14 adoption of the MTP
N/ATDM Network Years:
77Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 135 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Kendall15 - San Antonio
Description:
Transit Station C VIA 9117.0
Limits From: -
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $200,000
Contingencies: $350,000
Indirect Costs: $100,000
Preliminary Engineering: $245,000
Other Field $200,000
$6,095,000
Type of Work: Transit
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
Boerne
Cost of Approved Phases:
7 - STBG
Other
$5,000,000
$0
Other $0
Other $0
$4,000,000 $0 $1,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,000,000 $0 $1,000,000 $0 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Construct transit station in Boerne, Texas
Status: Exempt
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
added w/ 12/8/14 adoption of the MTP
N/ATDM Network Years:
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5561.0
Limits From: at Lp 1604 W
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $310,000,000
Construction Engineering $13,800,000
Contingencies: $24,000,000
Indirect Costs: $6,900,000
Preliminary Engineering: $31,000,000
Other Field $13,800,000
$399,500,000
Type of Work: TSMO: Interchange
Total Project Cost:
$310,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$310,000,000
$0
Other $0
Other $0
$248,000,000 $62,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$248,000,000 $62,000,000 $0 $0 $310,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0024-07-064
Construct direct connectors: 1 lane DC - SB 1604 to WB 90; NB 1604 to EB 90; NB 1604 to WB 90; EB 90 to NB 1604 & EB 90 to SB 1604; 2 lane DC: WB 90 to NB 1604 & WB 90 to SB 1604
Status: RSR
$310,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2031 to FY 2032; 5/20 - add project - spin off of 0024-07-059
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5562.0
Limits From: IH 410
Limits To: Lp 13
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,000,000
Construction Engineering $1,800,000
Contingencies: $3,000,000
Indirect Costs: $1,000,000
Preliminary Engineering: $4,000,000
Other Field $1,800,000
$51,600,000
Type of Work: TSMO: Operational
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0024-08-143
Ramp revisions and rehabilitate mainlanes
Status: RSR
$40,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2031 to FY 2032; 5/20 - add project
N/ATDM Network Years:
78Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 136 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 4008.0
Limits From: Santa Clara Road
Limits To: US 90A
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $210,000,000
Construction Engineering $9,300,000
Contingencies: $16,300,000
Indirect Costs: $4,700,000
Preliminary Engineering: $21,000,000
Other Field $9,300,000
$270,600,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$210,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$210,000,000
$0
Other $0
Other $0
$168,000,000 $42,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$168,000,000 $42,000,000 $0 $0 $210,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0025-03-101
Expand from 4 lane to 6 lane expressway and from 4 to 4 frontage road lanes
Status: RSR
$210,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2028 to FY 2032; 5/20 - revise cost, limit and move from FY 28 to FY 25; 10/19 - add project; companion project to #5395; no impact to conformity
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5590.0
Limits From: FM 775
Limits To: US 90A
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $84,000,000
Construction Engineering $3,700,000
Contingencies: $6,500,000
Indirect Costs: $1,900,000
Preliminary Engineering: $8,400,000
Other Field $3,700,000
$108,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$84,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$84,000,000
$0
Other $0
Other $0
$67,200,000 $16,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$67,200,000 $16,800,000 $0 $0 $84,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0025-03-102
Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes
Status: RSR
$84,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Overlap with 0025-03-101
Exempt
Proj Hist:
2/21 - move from FY 2025 to FY 2032; 5/20 - add project
2035,2045TDM Network Years:
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5400.0
Limits From: SH 46
Limits To: 0.25 Mi W of Bexar/Kendall County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $110,000,000
Construction Engineering $4,900,000
Contingencies: $8,500,000
Indirect Costs: $2,400,000
Preliminary Engineering: $11,000,000
Other Field $4,900,000
$141,700,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$110,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$110,000,000
$0
Other $0
Other $0
$88,000,000 $22,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$66,400,000 $16,600,000 $0 $0 $110,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0072-06-082
Expand from 4 to 8 lanes expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
Status: RSR
$110,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move 24 to 32;5/20 - move 28 to 25,
rev limit and cost; 1/19 - rev descr to incl FR lanes; 10/18 - move 29 to 28; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project
2035,2045TDM Network Years:
79Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 137 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5591.0
Limits From: 0.25 M W of Bexar/Kendall County Line
Limits To: Kendall/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $980,000
Construction Engineering $43,000
Contingencies: $76,000
Indirect Costs: $22,000
Preliminary Engineering: $98,000
Other Field $43,000
$1,262,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$980,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$980,000
$0
Other $0
Other $0
$784,000 $196,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$784,000 $196,000 $0 $0 $980,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0072-06-089
Expand from 4 to 8 lane expressway - 2 new general purpose & 2 new HOV lanes; from 4 to 4 frontage road lanes
Status: RSR
$980,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Spin off of 0072-06-082
Exempt
Proj Hist:
2/21 - move from FY 2025 to FY 2032; 5/20 - add project; spin off of 0072-06-082
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5401.0
Limits From: Kendall/Bexar County Line
Limits To: FM 3351
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,020,000
Construction Engineering $5,700,000
Contingencies: $10,000,000
Indirect Costs: $2,900,000
Preliminary Engineering: $12,900,000
Other Field $5,700,000
$166,220,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$129,020,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$129,020,000
$0
Other $0
Other $0
$103,216,000 $25,804,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$85,600,000 $21,400,000 $0 $0 $129,020,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0072-07-075
Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
Status: RSR
$129,020,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move 28 to 32; 5/20 - rev cost and move 28 to 25; 1/19 - rev descr to incl FR lanes; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may
2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
SH 46 C TxDOT 5392.0
Limits From: Bentwood Dr
Limits To: FM 3159
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $70,000,000
Construction Engineering $3,100,000
Contingencies: $5,400,000
Indirect Costs: $1,600,000
Preliminary Engineering: $7,000,000
Other Field $3,100,000
$90,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$70,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$70,000,000
$0
Other $0
Other $0
$56,000,000 $14,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$56,000,000 $14,000,000 $0 $0 $70,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-01-051
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$70,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2028 to FY 2032;
5/20 - revise cost; 10/18 - move FY 37 to FY 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045TDM Network Years:
80Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 138 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
SH 46 C TxDOT 5393.0
Limits From: Bulverde Rd
Limits To: Farhills Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $35,000,000
Construction Engineering $1,500,000
Contingencies: $2,700,000
Indirect Costs: $800,000
Preliminary Engineering: $3,500,000
Other Field $1,500,000
$45,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$35,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$35,000,000
$0
Other $0
Other $0
$28,000,000 $7,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$28,000,000 $7,000,000 $0 $0 $35,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-07-049
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$35,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2028 to FY 2032; 5/20 - revise cost; 10/18 - move FY 37 to FY 28; 6/18 - correct funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
SH 123 C TxDOT 5398.0
Limits From: Guadalupe/Hays County Line
Limits To: Cordova Ln
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $50,000,000
Construction Engineering $2,000,000
Contingencies: $3,500,000
Indirect Costs: $1,000,000
Preliminary Engineering: $2,450,000
Other Field $2,000,000
$60,950,000
Type of Work: TSMO: Operational
Total Project Cost:
$50,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$50,000,000
$0
Other $0
Other $0
$40,000,000 $10,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$40,000,000 $10,000,000 $0 $0 $50,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0366-02-088
Widen roadway to provide operational improvements including shoulders
Status: RSR
$50,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2029 to FY 2032; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
SH 123 C TxDOT 5399.0
Limits From: SH 123B in Seguin
Limits To: Wilson/Guadalupe County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $180,000,000
Construction Engineering $7,200,000
Contingencies: $12,600,000
Indirect Costs: $3,600,000
Preliminary Engineering: $8,820,000
Other Field $7,200,000
$219,420,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$180,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$180,000,000
$0
Other $0
Other $0
$144,000,000 $36,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$144,000,000 $36,000,000 $0 $0 $180,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0366-03-066
Expand from 2 to 4 lane divided roadway
Status: RSR
$180,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2029 to FY 2032;
9/19 - ADM clarify description; 6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045TDM Network Years:
81Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 139 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5402.0
Limits From: US 90
Limits To: IH 35 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $490,000,000
Construction Engineering $21,800,000
Contingencies: $38,000,000
Indirect Costs: $10,900,000
Preliminary Engineering: $49,000,000
Other Field $21,800,000
$631,500,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$490,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$490,000,000
$0
Other $0
Other $0
$392,000,000 $98,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$392,000,000 $98,000,000 $0 $0 $490,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0521-05-144
Exp fr 6 to 8 lns btwn US 90 & Valley Hi; frm 4 to 6 lns btwn Valley Hi & IH 35 S; frm 4/6 to 4/6 FR ln; construct all DCs at IH 35 S;
Status: RSR
$490,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
41
Remarks: all DCs are 1 lane; cloverleaf remains for FR connectivity
Non-Exempt
Proj Hist:
2/21 move 28 to 32;5/20 - revise cost;11/19 - ADM clarify description;1/19 - rev descr to incl FR lanes; 10/18 - move 37 to 28; /18 - revise funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5384.0
Limits From: at IH 10 E
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $450,000,000
Construction Engineering $20,000,000
Contingencies: $35,000,000
Indirect Costs: $10,000,000
Preliminary Engineering: $45,000,000
Other Field $20,000,000
$580,000,000
Type of Work: TSMO: Interchange
Total Project Cost:
$450,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$450,000,000
$0
Other $0
Other $0
$360,000,000 $90,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$360,000,000 $90,000,000 $0 $0 $450,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0521-06-142
Phase 2 interchange improvements - 1-lane DC: SB 410 to WB 10; SB 410 to EB 10; NB 410 to WB 10; WB 10 to NB 410; EB 10 to NB 410; EB 10 to SB 410;
Status: RSR
$450,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 lane DC: WB 10 to SB 410 & NB 410 to EB 10
Exempt
Proj Hist:
2/21- move from FY 2025 to FY 2032; 5/20 - revise cost; 9/19 - ADM clarify description; 1/19 - update cost; 4/18 - reduce cost; 4/17 - add project
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5593.0
Limits From: SH 123
Limits To: SH 130
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $205,000,000
Construction Engineering $9,100,000
Contingencies: $15,900,000
Indirect Costs: $4,600,000
Preliminary Engineering: $20,500,000
Other Field $9,100,000
$264,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$205,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$205,000,000
$0
Other $0
Other $0
$164,000,000 $41,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$164,000,000 $41,000,000 $0 $0 $205,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0535-01-078
Expand from 4 to 6 lane expressway and from 4 to 4 frontage road lanes
Status: RSR
$205,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Spin off of 0535-01-074
Exempt
Proj Hist:
2/21 - move from FY 2025 to FY 2032;
5/20 - add project; spin off of 0535-01-074
2035,2045TDM Network Years:
82Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 140 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5397.0
Limits From: SH 130
Limits To: SH 80
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $375,000,000
Construction Engineering $24,000,000
Contingencies: $19,000,000
Indirect Costs: $21,000,000
Preliminary Engineering: $18,000,000
Other Field $22,000,000
$479,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$375,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$375,000,000
$0
Other $0
Other $0
$300,000,000 $75,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000,000 $75,000,000 $0 $0 $375,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0535-02-047
Expand from 4 lane to 6 lane expressway
Status: RSR
$375,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2028 to FY 2032; 1/19 - rev descr to incl FR lanes and update cost; 10/18 - move 29 to 28; 6/18 - correct funding distrib; 4/17 - add proj to MTP with Prop 1/Prop 7; portion of proj may have
2035,2045TDM Network Years:
Guadalupe15 - San Antonio
Description:
FM 1103 C TxDOT 5560.0
Limits From: Rodeo Way
Limits To: FM 78
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,500,000
Construction Engineering $1,044,000
Contingencies: $1,826,000
Indirect Costs: $522,000
Preliminary Engineering: $2,350,000
Other Field $1,044,000
$30,286,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,500,000
$0
Other $0
Other $0
$18,800,000 $4,700,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,800,000 $4,700,000 $0 $0 $23,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
1268-02-030
Expand from 2 to 4 lanes with median, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$23,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2025 to FY 2032; 5/20 - move from FY 2024 to FY 2025 and revise cost; 10/18 - add project
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.1
Limits From: IH 35 S
Limits To: 0.7 Mi North of FM 2536
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $34,000,000
Construction Engineering $1,786,000
Contingencies: $362,000
Indirect Costs: $1,607,000
Preliminary Engineering: $1,372,000
Other Field $1,618,000
$40,745,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$34,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$34,000,000
$0
Other $0
Other $0
$27,200,000 $6,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$27,200,000 $6,800,000 $0 $0 $34,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2020-02-031
Expand from 2 lanes to 4 lanes divided
Status: RSR
$34,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2031 to FY 2032;
5/20 - revise cost; 10/18 - move FY 22 to FY 31 and rev cost; 3/18 - revise funding distribution; 4/17 - add project; added w/ 12/8/14 adoption of the MTP
2035,2045TDM Network Years:
83Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 141 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5386.0
Limits From: 0.38 Mi North of FM 1303
Limits To: FM 1303
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,800,000
Construction Engineering $80,000
Contingencies: $140,000
Indirect Costs: $40,000
Preliminary Engineering: $180,000
Other Field $80,000
$2,320,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$1,800,000
$0
Other $0
Other $0
$1,440,000 $360,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,440,000 $360,000 $0 $0 $1,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2255-01-084
Expand from 2 lanes to 4 lanes divided
Status: RSR
$1,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21- move from FY 26 to FY 32; 7/20 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5387.0
Limits From: US 87
Limits To: US 181
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,000,000
Construction Engineering $1,600,000
Contingencies: $2,800,000
Indirect Costs: $800,000
Preliminary Engineering: $1,960,000
Other Field $1,600,000
$48,760,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2255-02-027
Expand from 2 lanes to 4 lanes divided
Status: RSR
$40,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2026 to FY 2032; 4/18 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5388.0
Limits From: US 181
Limits To: 0.38 Mi North of FM 1303
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,200,000
Construction Engineering $928,000
Contingencies: $1,624,000
Indirect Costs: $464,000
Preliminary Engineering: $1,137,000
Other Field $928,000
$28,281,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,200,000
$0
Other $0
Other $0
$18,560,000 $4,640,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,560,000 $4,640,000 $0 $0 $23,200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2255-02-028
Expand from 2 lanes to 4 lanes divided
Status: RSR
$23,200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2026 to FY 2032;
9/19 - ADM clarify limits; 4/18 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
84Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 142 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 2020.0
Limits From: US 90
Limits To: West Military Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $118,486,058
Construction Engineering $7,103,748
Contingencies: $13,998,121
Indirect Costs: $7,627,182
Preliminary Engineering: $7,328,076
Other Field $0
$154,553,185
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$118,486,058
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$118,486,058
$0
Other $0
Other $0
$94,788,846 $23,697,212 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$94,788,846 $23,697,212 $0 $0 $118,486,058
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-01-029
Expand from 4 to 6 lane expressway & from 4 to 4 FR lanes
Status: RSR
$118,486,058
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from 30 to 32; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - revise description and move to TxDOT; 4/14 - revise limits, year, description and funding; 8/13 - revise
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 3911.0
Limits From: West Military Dr.
Limits To: Braun Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,128,554
Construction Cost: $16,897,467
Construction Engineering $802,630
Contingencies: $1,581,603
Indirect Costs: $861,770
Preliminary Engineering: $827,976
Other Field $0
$55,100,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$16,897,467
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$16,897,467
$0
Other $0
Other $0
$13,517,974 $3,379,493 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$13,517,974 $3,379,493 $0 $0 $16,897,467
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-01-052
Expand from 4 to 6 lane expressway & from 4/6 to 4/6 FR lanes, including 1 lane direct connectors at SH 151 - NB 1604 to EB 151; WB 151 to SB 1604
Status: RSR
$16,897,467
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - Move from 30 to 32; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - rev descr & move to TxDOT; 4/14 - rev year, limits, descr and fund; 8/2012 - proj receives portion of $2B;
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
Loop 1604 C TxDOT 3912.0
Limits From: Braun Road
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,737,251
Construction Cost: $47,417,043
Construction Engineering $2,252,310
Contingencies: $4,438,235
Indirect Costs: $2,418,269
Preliminary Engineering: $2,323,435
Other Field $0
$62,586,543
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$47,417,043
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$47,417,043
$0
Other $0
Other $0
$37,933,634 $9,483,409 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$37,933,634 $9,483,409 $0 $0 $47,417,043
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-01-053
Expand from 4 to 8 lane expressway and from 6 to 6 FR lanes
Status: RSR
$47,417,043
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - Move from 30 to 32; rev descr to incl
FR lanes; 10/18 - rev descr and move to TxDOT; 4/14 - rev year, descr and funding; 8/2012 - proj receives portion of $2B; 7/2013 - project had $10.8M in Category 2
2035,2045TDM Network Years:
85Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 143 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5557.0
Limits From: 0.7 Mi North of FM 2536
Limits To: Macdona-Lacoste Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $15,000,000
Construction Engineering $7,000,000
Contingencies: $1,200,000
Indirect Costs: $300,000
Preliminary Engineering: $1,500,000
Other Field $7,000,000
$19,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$15,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$15,000,000
$0
Other $0
Other $0
$12,000,000 $3,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$12,000,000 $3,000,000 $0 $0 $15,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-01-070
Expand from 2 lanes to 4 lanes divided
Status: RSR
$15,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2031 to FY 2032; 5/20 - revise cost; 10/18 - add project
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9107.0
Limits From: FM 78
Limits To: IH 10 East
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,200,000
Construction Cost: $300,000,000
Construction Engineering $13,300,000
Contingencies: $23,300,000
Indirect Costs: $6,700,000
Preliminary Engineering: $30,000,000
Other Field $13,300,000
$390,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$300,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$300,000,000
$0
Other $0
Other $0
$240,000,000 $60,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$240,000,000 $60,000,000 $0 $0 $300,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-03-111
Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes
Status: RSR
$300,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
35
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2025 to FY 2032; 4/20 - move from 2024 to 2025; 1/19 - update funding; 4/18 - correct funding distribution; 4/17 - add project; removed from 10/15 Prop 1 list due to financial
2035,2045TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5389.0
Limits From: FM 1346 - Houston Street
Limits To: US 87
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,000,000
Construction Engineering $800,000
Contingencies: $1,400,000
Indirect Costs: $400,000
Preliminary Engineering: $980,000
Other Field $800,000
$24,380,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
2452-04-015
Expand from 2 lanes to 4 lanes divided
Status: RSR
$20,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2026 to FY 2032;
4/18 - correct funding dictribution; 4/17 - add project
2035,2045TDM Network Years:
86Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 144 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5558.0
Limits From: SH 46
Limits To: Kendall/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $24,000,000
Construction Engineering $1,531,000
Contingencies: $310,000
Indirect Costs: $1,378,000
Preliminary Engineering: $1,176,000
Other Field $1,387,000
$29,782,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$24,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$24,000,000
$0
Other $0
Other $0
$19,200,000 $4,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$19,200,000 $4,800,000 $0 $0 $24,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
3212-04-008
Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks
Status: RSR
$24,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2030 to FY 2032; 10/18 - add project
2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5330.1
Limits From: Kenneland
Limits To: Bexar/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $200,000
Contingencies: $350,000
Indirect Costs: $100,000
Preliminary Engineering: $245,000
Other Field $200,000
$6,095,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$5,000,000
$0
Other $0
Other $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,000,000 $1,000,000 $0 $0 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
3212-05-011
Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks
Status: RSR
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2027 to FY 2032; 5/20 - move from FY 2023 to FY 2027; 4/18 - correct funding distribution; 4/17 - move project from FY 2027 to FY 2023; 4/16 - funded through 17-20 TIP Call for
2035,2045TDM Network Years:
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5559.0
Limits From: Kendall/Comal County Line
Limits To: Keeneland Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,200,000
Construction Engineering $1,480,000
Contingencies: $300,000
Indirect Costs: $1,332,000
Preliminary Engineering: $1,137,000
Other Field $1,341,000
$28,790,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$23,200,000
$0
Other $0
Other $0
$18,560,000 $4,640,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,560,000 $4,640,000 $0 $0 $23,200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
3212-05-014
Expand from 2 to 6 lanes with center turn lane, bike lanes and sidewalks
Status: RSR
$23,200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2030 to FY 2032;
10/18 - add project
2035,2045TDM Network Years:
87Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 145 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2032FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
FM 3351 C TxDOT 5330.2
Limits From: Comal/Bexar County Line
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $35,000,000
Construction Engineering $1,400,000
Contingencies: $2,450,000
Indirect Costs: $700,000
Preliminary Engineering: $1,715,000
Other Field $1,400,000
$42,665,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$35,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$35,000,000
$0
Other $0
Other $0
$28,000,000 $7,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$28,000,000 $7,000,000 $0 $0 $35,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
3212-06-017
Expand from 2 to 4 lanes with turn lanes, bike lanes & sidewalks
Status: RSR
$35,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
21
Remarks: None
Non-Exempt
Proj Hist:
2/21 - move from FY 2027 to FY 2032; 5/20 - move from FY 2023 to FY 2027; 4/18 - correct funding distribution; 4/17 - add project
2035,2045TDM Network Years:
88Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 146 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2034FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
Transit Station C VIA 9132.0
Limits From: -
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $200,000
Contingencies: $350,000
Indirect Costs: $100,000
Preliminary Engineering: $245,000
Other Field $200,000
$6,095,000
Type of Work: Transit
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$5,000,000
$0
Other $0
Other $0
$4,000,000 $0 $1,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,000,000 $0 $1,000,000 $0 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Construct transit station in Seguin, Texas
Status: Exempt
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
added w/ 12/8/14 adoption of the MTP
N/ATDM Network Years:
89Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 147 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2035FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Comal15 - San Antonio
Description:
FM 306 C TxDOT 9122.0
Limits From: River Chase Way
Limits To: FM 2673
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $26,000,000
Construction Engineering $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field $1,040,000
$31,694,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$26,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$26,000,000
$0
Other $0
Other $0
$20,800,000 $5,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$20,800,000 $5,200,000 $0 $0 $26,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Expand from 2 to 4 lanes with turn lanes at intersections
Status: RSR
$26,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
9/19 - ADM clarify description; added w/ 12/8/14 adoption of the MTP
2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5375.0
Limits From: Guadalupe River
Limits To: Hays/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $60,000,000
Construction Engineering $3,000,000
Contingencies: $5,250,000
Indirect Costs: $1,500,000
Preliminary Engineering: $3,675,000
Other Field $3,000,000
$76,425,000
Type of Work: TSMO: Operational
Total Project Cost:
$60,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$60,000,000
$0
Other $0
Other $0
$48,000,000 $12,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$48,000,000 $12,000,000 $0 $0 $60,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-04-112
Operational improvements including ramp revisions and intersection improvements - convert frontage roads to one way
Status: RSR
$60,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2021 to FY 2035; 3/18 - rev funding distrib; 1/18 - move from FY 22 to FY 21 and incr cost from $50M to $75M in Cat 4; 4/17 - add project
2045TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5383.0
Limits From: Guadalupe River
Limits To: FM 1103
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $89,000,000
Construction Engineering $2,000,000
Contingencies: $3,500,000
Indirect Costs: $1,000,000
Preliminary Engineering: $2,450,000
Other Field $2,000,000
$99,950,000
Type of Work: TSMO: Operational
Total Project Cost:
$89,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$89,000,000
$0
Other $0
Other $0
$71,200,000 $17,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$71,200,000 $17,800,000 $0 $0 $89,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-05-114
Operational improvements including ramp revisions & intersection improvements
Status: RSR
$89,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2025 to FY 2035; 4/17 - add project
2045TDM Network Years:
90Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 148 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2035FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
US 90 C TxDOT 5338.0
Limits From: at Zarzamora
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $16,000,000
Construction Engineering $640,000
Contingencies: $1,120,000
Indirect Costs: $320,000
Preliminary Engineering: $784,000
Other Field $640,000
$19,504,000
Type of Work: TSMO: Operational
Total Project Cost:
$16,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$16,000,000
$0
Other $0
Other $0
$12,800,000 $3,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$12,800,000 $3,200,000 $0 $0 $16,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0024-08-139
Construct westbound entrance ramp
Status: RSR
$16,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2028 to FY 2035; 6/18 - move from FY 2026 to FY 2028 and correct funding distribution; 4/17 - move from FY 2027 to FY 2026; 4/16 - funded through 17-20 TIP Call for Projects (P1/P7);
2045TDM Network Years:
91Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 149 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2037FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Guadalupe15 - San Antonio
Description:
FM 725 C TxDOT 5390.0
Limits From: Zipp Rd
Limits To: FM 78
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $26,900,000
Construction Engineering $1,076,000
Contingencies: $1,883,000
Indirect Costs: $538,000
Preliminary Engineering: $1,318,000
Other Field $1,076,000
$32,791,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$26,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
Prop 1/Prop 7
Other
$26,900,000
$0
Other $0
Other $0
$21,520,000 $5,380,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$21,520,000 $5,380,000 $0 $0 $26,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0215-09-033
Expand from 2 lanes to 4 lane divided and intersection improvements
Status: RSR
$26,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/18 - correct funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of
project may have already been in the MTP
2045TDM Network Years:
92Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 150 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2040FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
IH 35 North C TxDOT 3514.0
Limits From: US 281/IH 37, East
Limits To: IH 410 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $225,000,000
Construction Engineering $10,000,000
Contingencies: $17,500,000
Indirect Costs: $5,000,000
Preliminary Engineering: $22,500,000
Other Field $10,000,000
$290,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$225,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$225,000,000
$0
Other $0
Other $0
$180,000,000 $45,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$180,000,000 $45,000,000 $0 $0 $225,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 9/2020
0017-10-180
Expand from 6 lane to 10 lane expressway - add 4 new express lanes including 2 HOV - special use lanes;
from 4 to 4 FR lanes
Status: RSR
$225,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: None
Non-Exempt
Proj Hist:
9/20 - ADM clarify description; 5/20 - revise descr; 1/19 - rev descr to incl FR lanes;
10/18 - revise description; 10/13 - revise description
2045TDM Network Years:
93Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 151 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2044FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
SH 16 C TxDOT 9112.2
Limits From: Guilbeau Rd
Limits To: Loop 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $35,000,000
Construction Engineering $1,400,000
Contingencies: $2,450,000
Indirect Costs: $700,000
Preliminary Engineering: $1,715,000
Other Field $1,400,000
$42,665,000
Type of Work: TSMO: Operational
Total Project Cost:
$35,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
Prop 1/Prop 7
Other
$35,000,000
$0
Other $0
Other $0
$28,000,000 $7,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$28,000,000 $7,000,000 $0 $0 $35,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0291-10-099
Operational improvements
Status: RSR
$35,000,000
NOX lbs/day
N/
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Feasibility study is underway; partnership between TxDOT, CoSA and Leon Valley
Exempt
Proj Hist:
9/19 - ADM clarify let date; 10/18 - move from FY 2023 to FY 2025; 4/18 - correct
funding distribution; 4/17 - revise description and funding; added w/ 12/8/14 adoption of the MTP
past 2045TDM Network Years:
Bexar15 - San Antonio
Description:
SH 16 C TxDOT 9112.1
Limits From: IH 410
Limits To: Guilbeau Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $65,000,000
Construction Engineering $2,600,000
Contingencies: $4,550,000
Indirect Costs: $1,300,000
Preliminary Engineering: $3,185,000
Other Field $2,600,000
$79,235,000
Type of Work: TSMO: Operational
Total Project Cost:
$65,000,000
Authorized Funding by Category/Share
Leon Valley
Cost of Approved Phases:
Prop 1/Prop 7
Other
$65,000,000
$0
Other $0
Other $0
$52,000,000 $13,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$52,000,000 $13,000,000 $0 $0 $65,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0291-10-100
Operational improvements
Status: RSR
$65,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Feasibility study is underway; partnership between TxDOT, CoSA and Leon Valley
Exempt
Proj Hist:
9/19 - ADM clarify let date; 10/18 - move from FY 2023 to FY 2025; 4/18 - correct funding dostribution; 4/17 - revise description and funding; added w/ 12/8/14 adoption of the MTP
past 2045TDM Network Years:
94Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 152 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
GroupedFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Various15 - San Antonio
Description:
Various C TxDOT 6910.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-916
Bicycle and Pedestrian
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6911.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Other
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-917
Safety Rest Areas and Truck Weigh Stations
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6912.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Transit
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-918
Transit Improvements
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
95Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 153 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
GroupedFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Various15 - San Antonio
Description:
Various PE TxDOT 6906.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Proj Development
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-950
Preliminary Engineering
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various R TxDOT 6907.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Proj Development
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-951
Right of Way Acquisition
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6902.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Maint/Rehab
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-952
Preventive Maintenance and Rehabilitation
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
96Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 154 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
GroupedFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Various15 - San Antonio
Description:
Various C TxDOT 6902.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Bridge
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-953
Bridge Replacement and Rehabilitation
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6904.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: RR Grade Sep
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-954
Railroad Grade Separations
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6905.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Landscaping
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-956
Landscaping
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
97Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 155 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
GroupedFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Various15 - San Antonio
Description:
Various C TxDOT 6908.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Maint/Rehab
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-957
Preventive Maintenance and Rehabilitation
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6909.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Maint/Rehab
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5000-00-958
Preventive Maintenance and Rehabilitation
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
Various15 - San Antonio
Description:
Various C TxDOT 6901.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: TSMO: ITS
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5800-00-915
Intelligent Transportation Systems Deployment
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
98Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 156 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
GroupedFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Various15 - San Antonio
Description:
Various C TxDOT 6900.0
Limits From: Grouped Project
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Safety
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
Other
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
5800-00-950
Safety
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
99Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 157 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
Lump SumFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
MPO15 - San Antonio
Description:
Various C TxDOT 4988.0
Limits From: Transportation Alternatives
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Transportation Alternatives
Total Project Cost:
$65,061,049
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
9 - TA
Other
$65,061,049
$0
Other $0
Other $0
$52,048,840 $0 $13,012,209 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$52,048,840 $0 $13,012,209 $0 $65,061,049
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Transportation Alternatives
Status: Exempt
$65,061,049
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the MPO through a project call
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various C TxDOT 4980.0
Limits From: Metro Corridor
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Maint/Rehab
Total Project Cost:
$0
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,346,952,040 $0 $0 $0 $1,346,952,040
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Preventive Maintenance and Rehabilitation
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various C TxDOT 4984.0
Limits From: Varies
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Varies
Total Project Cost:
$0
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
11 - Distr DiscretionaryOther
$138,775,000
$0
Other $0
Other $0
$111,020,000 $27,755,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$111,020,000 $27,755,000 $0 $0 $138,775,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
District Discretionary
Status: Varies
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
100Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 158 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
Lump SumFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
Bexar15 - San Antonio
Description:
Lump Sum C MPO 7001.0
Limits From: Congestion Mitigation Air Quality (CMAQ)
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Lump Sum
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
5 - CMAQ
Other
$549,575,000
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0
$549,575,000 $0 $0 $0 $549,575,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Congestion Mitigation Air Quality (CMAQ)
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various C TxDOT 4982.0
Limits From: Safety
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Safety
Total Project Cost:
$0
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
8 - Safety
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Safety
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various Locati MPO
Limits From:
Limits To:
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: TSMO: Rideshare
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
7 - STBG
MPO
$8,000,000
$2,000,000
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $0 $2,000,000 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Lump Sum: Alamo Area Commute Solutions Program
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Exempt
Proj Hist:
N/ATDM Network Years:
101Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 159 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
Lump SumFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
MPO15 - San Antonio
Description:
Various C TxDOT 4983.0
Limits From: Varies
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Varies
Total Project Cost:
$0
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
10 - Misc
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Miscellaneous
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various C TxDOT 4981.0
Limits From: Structures Repl and Rehab
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Structures Repl and Rehab
Total Project Cost:
$0
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
6 - Struct Rehab
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Structures Repl and Rehab
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Various C MPO 4985.0
Limits From: Surface Transportation Block Grant
Limits To: Metro Mobility Funding
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Varies
Total Project Cost:
Authorized Funding by Category/Share
Varies
Cost of Approved Phases:
7 - STBG
Other
$747,562,873
$0
Other $0
Other $0
$598,050,298 $0############ $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$598,050,298 $0############ $0 $747,562,873
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Surface Transporation Block Grant
Status: Varies
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the MPO through a
project call
N/ATDM Network Years:
102Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 160 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
Lump SumFY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
METROPOLITAN TRANSPORTATION PLAN "Mobility 2045"
City
Updated:
December 3, 2020
MPO15 - San Antonio
Description:
Lump Sum C MPO 7003.0
Limits From: Commission Strategic Priority
Limits To:
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Commission Strat
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
12 - Strategic PriorityOther
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Commission Strategic Priority
Status: Varies
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
MPO15 - San Antonio
Description:
Lump Sum C TxDOT 7005.0
Limits From: Preventative Maintenance
Limits To:
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
Type of Work: Preventative Maintenance
Total Project Cost:
$0
Authorized Funding by Category/Share
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
Other
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0000-00-000
Preventative Maintenance
Status: Exempt
$0
NOX lbs/day
VOC lbs/day
CMP Score
Remarks: None
Proj Hist:
Projects are selected by the State
N/ATDM Network Years:
103Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 161 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10301
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $33,495,000
State Funds from TxDOT: $0
Other Funds: $8,373,750
Total Project Cost: $41,868,750
Project Description: Fiscal Year Cost: $41,868,750
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10302
Transit: JARC Expenses
VIA Job Access Reverse Commute Services
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,155,000
State Funds from TxDOT: $0
Other Funds: $1,155,000
Total Project Cost: $2,310,000
Project Description: Fiscal Year Cost: $2,310,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303
Transit: AACOG Operating Projects
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303.1
Transit: AACOG Operating Projects
Public Transportation for the
City of New Braunfels, Texas
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $493,500
State Funds from TxDOT: $0
Other Funds: $493,500
Total Project Cost: $987,000
Project Description: Fiscal Year Cost: $987,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
111 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 162 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303.2
Transit: AACOG Operating Projects
Public Transportation for the
City of Schertz, Texas
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $42,666
State Funds from TxDOT: $0
Other Funds: $42,666
Total Project Cost: $85,332
Project Description: Fiscal Year Cost: $85,332
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303.3
Transit: AACOG Operating Projects
Public Transportation for the
City of Cibolo, Texas
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $16,045
State Funds from TxDOT: $0
Other Funds: $16,045
Total Project Cost: $32,090
Project Description: Fiscal Year Cost: $32,090
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303.4
Transit: AACOG Operating Projects
Public Transportation for the
City of McQueeney, Texas
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $8,023
State Funds from TxDOT: $0
Other Funds: $8,023
Total Project Cost: $16,046
Project Description: Fiscal Year Cost: $16,046
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10303.5
Transit: AACOG Operating Projects
Public Transportation for the
City of Marion, Texas
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $10,031
State Funds from TxDOT: $0
Other Funds: $10,031
Total Project Cost: $20,062
Project Description: Fiscal Year Cost: $20,062
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
211 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 163 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10304
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category FTA - Section 5310
Federal (FTA) Funds: $1,680,000
State Funds from TxDOT: $0
Other Funds: $420,000
Total Project Cost: $2,100,000
Project Description: Fiscal Year Cost: $2,100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10305
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category FTA - Section 5310
Federal (FTA) Funds: $168,000
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $168,000
Project Description: Fiscal Year Cost: $168,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10306
Transit: Paratransit Facility
FY 2018 5339b
Paratransit Facility
Federal Funding Category FTA - Section 5339
Federal (FTA) Funds: $6,000,000
State Funds from TxDOT: $12,160,034
Other Funds: $89,966
Total Project Cost: $18,250,000
Project Description: Fiscal Year Cost: $18,250,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10307
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $377,000
Total Project Cost: $377,000
Project Description: Fiscal Year Cost: $377,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
311 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 164 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10308
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category FTA - Section 5339
Federal (FTA) Funds: $2,074,000
State Funds from TxDOT: $2,780,268
Other Funds: $1,983,685
Total Project Cost: $6,837,953
Project Description: Fiscal Year Cost: $6,837,953
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10309
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $910,000
Total Project Cost: $910,000
Project Description: Fiscal Year Cost: $910,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10310
Transit: Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $24,000,000
Total Project Cost: $24,000,000
Project Description: Fiscal Year Cost: $24,000,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10311
Transit: Administrative Facilities
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $800,000
Total Project Cost: $800,000
Project Description: Fiscal Year Cost: $800,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
411 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 165 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10312
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $882,000
Total Project Cost: $882,000
Project Description: Fiscal Year Cost: $882,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10313
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,246,110
Total Project Cost: $1,246,110
Project Description: Fiscal Year Cost: $1,246,110
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10314
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $2,610,000
Total Project Cost: $2,610,000
Project Description: Fiscal Year Cost: $2,610,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10315
Transit: Joint Development
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $500,000
Total Project Cost: $500,000
Project Description: Fiscal Year Cost: $500,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
511 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 166 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10316
Transit: Revenue Vehicles
FY 2018 / FY 2019 / FY 2020 5339a
Purchase 139 Paratransit Vehicles
Federal Funding Category FTA - Section 5339
Federal (FTA) Funds: $12,363,531
State Funds from TxDOT: $0
Other Funds: $5,946,429
Total Project Cost: $18,309,960
Project Description: Fiscal Year Cost: $18,309,960
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: Note: CMAQ flexed in 2020
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.1
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-67
Purchase 14 CNG Buses
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $5,493,334
State Funds from TxDOT: $0
Other Funds: $2,060,000
Total Project Cost: $7,553,334
Project Description: Fiscal Year Cost: $7,553,334
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.2
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-67
Purchase 14 CNG Buses
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $5,493,334
State Funds from TxDOT: $0
Other Funds: $2,060,000
Total Project Cost: $7,553,334
Project Description: Fiscal Year Cost: $7,553,334
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: Note: CMAQ flexed in 2020
Project Phase: C,O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.1
Transit: Revenue Vehicles and Service
Bus Frequency Program CSJ 0915-12-673
Purchase 9 CNG buses and increase service on #7 and #552 routes
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $5,076,382
State Funds from TxDOT: $0
Other Funds: $1,960,762
Total Project Cost: $7,037,144
Project Description: Fiscal Year Cost: $7,037,144
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
611 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 167 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.2
Transit: Service
Bus Frequency Program CSJ 0915-12-680
Increase service on #7 and #552 routes
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,191,810
State Funds from TxDOT: $0
Other Funds: $989,619
Total Project Cost: $2,181,429
Project Description: Fiscal Year Cost: $2,181,429
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10401
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $34,545,420
State Funds from TxDOT: $0
Other Funds: $8,636,355
Total Project Cost: $43,181,775
Project Description: Fiscal Year Cost: $43,181,775
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10403
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10405
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $1,592,778
State Funds from TxDOT: $0
Other Funds: $398,195
Total Project Cost: $1,990,973
Project Description: Fiscal Year Cost: $1,990,973
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
711 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 168 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10406
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $176,975
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $176,975
Project Description: Fiscal Year Cost: $176,975
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10407
Transit: Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $7,672,871
State Funds from TxDOT: $0
Other Funds: $16,967,129
Total Project Cost: $24,640,000
Project Description: Fiscal Year Cost: $24,640,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10408
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $872,500
Total Project Cost: $872,500
Project Description: Fiscal Year Cost: $872,500
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10409
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $54,000
State Funds from TxDOT: $10,076,092
Other Funds: $375,500
Total Project Cost: $10,505,592
Project Description: Fiscal Year Cost: $10,505,592
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
811 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 169 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10410
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $7,723,853
State Funds from TxDOT: $16,557,153
Other Funds: $6,292,563
Total Project Cost: $30,573,569
Project Description: Fiscal Year Cost: $30,573,569
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10411
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10412
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $150,000
Total Project Cost: $150,000
Project Description: Fiscal Year Cost: $150,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10413
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $4,105,000
Total Project Cost: $4,105,000
Project Description: Fiscal Year Cost: $4,105,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
911 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 170 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10414
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $6,089,626
Total Project Cost: $6,089,626
Project Description: Fiscal Year Cost: $6,089,626
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10415
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10416
Transit: Administrative Facilities
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $90,000
Total Project Cost: $90,000
Project Description: Fiscal Year Cost: $90,000
General Project Information Funding Information (YOE)
Date TDC Awarded:
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10417
Transit: Misc. (Facilities, Equipment, Other)
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $300,000
Total Project Cost: $300,000
Project Description: Fiscal Year Cost: $300,000
General Project Information Funding Information (YOE)
Date TDC Awarded:
Apportionment Year: 2021
1011 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 171 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.3
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-68
Purchase 14 CNG Buses
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $5,493,333
State Funds from TxDOT: $0
Other Funds: $2,059,999
Total Project Cost: $7,553,332
Project Description: Fiscal Year Cost: $7,553,332
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.3
Transit: Service
Bus Frequency Program CSJ 0915-12-686
Increase service on #7 and #552 routes
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,191,809
State Funds from TxDOT: $0
Other Funds: $989,618
Total Project Cost: $2,181,427
Project Description: Fiscal Year Cost: $2,181,427
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10501
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $36,301,207
State Funds from TxDOT: $0
Other Funds: $9,075,302
Total Project Cost: $45,376,509
Project Description: Fiscal Year Cost: $45,376,509
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10503
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
1111 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 172 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10504
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $1,672,417
State Funds from TxDOT: $0
Other Funds: $418,104
Total Project Cost: $2,090,521
Project Description: Fiscal Year Cost: $2,090,521
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10505
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $185,824
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $185,824
Project Description: Fiscal Year Cost: $185,824
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10506
Transit: Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $8,362,878
State Funds from TxDOT: $0
Other Funds: $14,765,185
Total Project Cost: $23,128,063
Project Description: Fiscal Year Cost: $23,128,063
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10507
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5307,5339
Federal (FTA) Funds: $7,981,301
State Funds from TxDOT: $10,004,417
Other Funds: $764,253
Total Project Cost: $18,749,971
Project Description: Fiscal Year Cost: $18,749,971
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
1211 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 173 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10508
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $280,000
Total Project Cost: $280,000
Project Description: Fiscal Year Cost: $280,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10509
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10510
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $40,000
State Funds from TxDOT: $0
Other Funds: $1,060,000
Total Project Cost: $1,100,000
Project Description: Fiscal Year Cost: $1,100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10511
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,235,000
Total Project Cost: $1,235,000
Project Description: Fiscal Year Cost: $1,235,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
1311 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 174 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10512
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $2,050,000
Total Project Cost: $2,050,000
Project Description: Fiscal Year Cost: $2,050,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10513
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $256,282
Total Project Cost: $256,282
Project Description: Fiscal Year Cost: $256,282
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10514
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10601
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $38,144,783
State Funds from TxDOT: $0
Other Funds: $9,536,196
Total Project Cost: $47,680,979
Project Description: Fiscal Year Cost: $47,680,979
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
1411 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 175 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10603
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10604
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $1,756,038
State Funds from TxDOT: $0
Other Funds: $439,010
Total Project Cost: $2,195,048
Project Description: Fiscal Year Cost: $2,195,048
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10605
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $195,115
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $195,115
Project Description: Fiscal Year Cost: $195,115
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10606
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $483,167
Total Project Cost: $483,167
Project Description: Fiscal Year Cost: $483,167
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
1511 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 176 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10607
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $896,274
State Funds from TxDOT: $345,711
Other Funds: $1,501,250
Total Project Cost: $2,743,235
Project Description: Fiscal Year Cost: $2,743,235
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10608
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $2,084,000
State Funds from TxDOT: $0
Other Funds: $521,000
Total Project Cost: $2,605,000
Project Description: Fiscal Year Cost: $2,605,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10609
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $53,093,000
Total Project Cost: $53,093,000
Project Description: Fiscal Year Cost: $53,093,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10610
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $150,000
Total Project Cost: $150,000
Project Description: Fiscal Year Cost: $150,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
1611 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 177 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10611
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $1,788,000
State Funds from TxDOT: $0
Other Funds: $447,000
Total Project Cost: $2,235,000
Project Description: Fiscal Year Cost: $2,235,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10612
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,005,000
Total Project Cost: $1,005,000
Project Description: Fiscal Year Cost: $1,005,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10613
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $4,805,000
Total Project Cost: $4,805,000
Project Description: Fiscal Year Cost: $4,805,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10701
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $40,080,538
State Funds from TxDOT: $0
Other Funds: $10,020,134
Total Project Cost: $50,100,672
Project Description: Fiscal Year Cost: $50,100,672
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
1711 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 178 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10703
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10704
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $1,843,640
State Funds from TxDOT: $0
Other Funds: $460,960
Total Project Cost: $2,304,800
Project Description: Fiscal Year Cost: $2,304,800
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10705
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category FTA - 5310
Federal (FTA) Funds: $204,871
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $204,871
Project Description: Fiscal Year Cost: $204,871
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10706
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $711,041
Total Project Cost: $711,041
Project Description: Fiscal Year Cost: $711,041
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
1811 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 179 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10707
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $26,989
State Funds from TxDOT: $0
Other Funds: $460,346
Total Project Cost: $487,335
Project Description: Fiscal Year Cost: $487,335
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10708
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $80,000
State Funds from TxDOT: $0
Other Funds: $20,000
Total Project Cost: $100,000
Project Description: Fiscal Year Cost: $100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10709
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $56,457,000
Total Project Cost: $56,457,000
Project Description: Fiscal Year Cost: $56,457,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10710
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $182,000
Total Project Cost: $182,000
Project Description: Fiscal Year Cost: $182,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
1911 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 180 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10711
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $48,000
State Funds from TxDOT: $0
Other Funds: $12,000
Total Project Cost: $60,000
Project Description: Fiscal Year Cost: $60,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10712
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category FTA - 5339
Federal (FTA) Funds: $3,200,000
State Funds from TxDOT: $0
Other Funds: $1,745,000
Total Project Cost: $4,945,000
Project Description: Fiscal Year Cost: $4,945,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10713
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $34,270,000
Total Project Cost: $34,270,000
Project Description: Fiscal Year Cost: $34,270,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9060
Transit: Vehicle Acquisition
Years 2021-2025 *
Lump Sum Amount: Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $37,680,000
State Funds from TxDOT: $0
Other Funds: $9,420,000
Total Project Cost: $47,100,000
Project Description: Fiscal Year Cost: $47,100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
2011 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 181 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9160
Transit: Vehicle Acquisition
Years 2021-2025 *
Lump Sum Amount: Non-Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,056,000
State Funds from TxDOT: $0
Other Funds: $264,000
Total Project Cost: $1,320,000
Project Description: Fiscal Year Cost: $1,320,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9260
Transit: Facility Rehabilitation & Equipment
Years 2021-2025 *
Lump Sum Amount: Buildings & Equipment
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $146,616,000
State Funds from TxDOT: $0
Other Funds: $36,654,000
Total Project Cost: $183,270,000
Project Description: Fiscal Year Cost: $183,270,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9270
Transit: Facility Rehabilitation & Equipment
Years 2026-2030 *
Lump Sum Amount: Buildings & Equipment
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $54,576,000
State Funds from TxDOT: $0
Other Funds: $13,644,000
Total Project Cost: $68,220,000
Project Description: Fiscal Year Cost: $68,220,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9300
Transit: Operating Expenses
Years 2021-2025 *
Lump Sum Amount: Line Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,001,150,000
Total Project Cost: $1,001,150,000
Project Description: Fiscal Year Cost: $1,001,150,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
2111 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 182 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9400
Transit: Operating Expenses
Years 2021-2025 *
Lump Sum Amount: VIAtrans Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $258,870,000
Total Project Cost: $258,870,000
Project Description: Fiscal Year Cost: $258,870,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9500
Transit: Operating Expenses
Years 2021-2025 *
Lump Sum Amount: Other Services
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $45,120,000
Total Project Cost: $45,120,000
Project Description: Fiscal Year Cost: $45,120,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2025
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9070
Transit: Vehicle Acquisition
Years 2026-2030 *
Lump Sum Amount: Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $45,912,000
State Funds from TxDOT: $0
Other Funds: $11,478,000
Total Project Cost: $57,390,000
Project Description: Fiscal Year Cost: $57,390,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2030
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9170
Transit: Vehicle Acquisition
Years 2026-2030 *
Lump Sum Amount: Non-Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,088,000
State Funds from TxDOT: $0
Other Funds: $272,000
Total Project Cost: $1,360,000
Project Description: Fiscal Year Cost: $1,360,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2030
2211 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 183 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9300
Transit: Operating Expenses
Years 2026-2030 *
Lump Sum Amount: Line Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,135,480,000
Total Project Cost: $1,135,480,000
Project Description: Fiscal Year Cost: $1,135,480,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2030
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9400
Transit: Operating Expenses
Years 2026-2030 *
Lump Sum Amount: VIAtrans Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $293,190,000
Total Project Cost: $293,190,000
Project Description: Fiscal Year Cost: $293,190,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2030
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9500
Transit: Operating Expenses
Years 2026-2030 *
Lump Sum Amount: Other Services
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $67,020,000
Total Project Cost: $67,020,000
Project Description: Fiscal Year Cost: $67,020,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2030
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9080
Transit: Vehicle Acquisition
Years 2031-2035 *
Lump Sum Amount: Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $213,200,000
State Funds from TxDOT: $0
Other Funds: $53,300,000
Total Project Cost: $266,500,000
Project Description: Fiscal Year Cost: $266,500,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
2311 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 184 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9180
Transit: Vehicle Acquisition
Years 2031-2035 *
Lump Sum Amount: Non-Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,192,000
State Funds from TxDOT: $0
Other Funds: $298,000
Total Project Cost: $1,490,000
Project Description: Fiscal Year Cost: $1,490,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9280
Transit: Facility Rehabilitation & Equipment
Years 2031-2035 *
Lump Sum Amount: Buildings & Equipment
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $60,264,000
State Funds from TxDOT: $0
Other Funds: $15,066,000
Total Project Cost: $75,330,000
Project Description: Fiscal Year Cost: $75,330,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9300
Transit: Operating Expenses
Years 2031-2035 *
Lump Sum Amount: Line Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,284,670,000
Total Project Cost: $1,284,670,000
Project Description: Fiscal Year Cost: $1,284,670,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9400
Transit: Operating Expenses
Years 2031-2035 *
Lump Sum Amount: VIAtrans Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $331,730,000
Total Project Cost: $331,730,000
Project Description: Fiscal Year Cost: $331,730,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
2411 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 185 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9500
Transit: Operating Expenses
Years 2031-2035 *
Lump Sum Amount: Other Services
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $69,470,000
Total Project Cost: $69,470,000
Project Description: Fiscal Year Cost: $69,470,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2035
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9090
Transit: Vehicle Acquisition
Years 2036-2040 *
Lump Sum Amount: Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $42,160,000
State Funds from TxDOT: $0
Other Funds: $10,540,000
Total Project Cost: $52,700,000
Project Description: Fiscal Year Cost: $52,700,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9190
Transit: Vehicle Acquisition
Years 2036-2040 *
Lump Sum Amount: Non-Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,320,000
State Funds from TxDOT: $0
Other Funds: $330,000
Total Project Cost: $1,650,000
Project Description: Fiscal Year Cost: $1,650,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9290
Transit: Facility Rehabilitation & Equipment
Years 2036-2040 *
Lump Sum Amount: Buildings & Equipment
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $66,528,000
State Funds from TxDOT: $0
Other Funds: $16,632,000
Total Project Cost: $83,160,000
Project Description: Fiscal Year Cost: $83,160,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
2511 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 186 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9310
Transit: Operating Expenses
Years 2036-2040 *
Lump Sum Amount: Line Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,453,490,000
Total Project Cost: $1,453,490,000
Project Description: Fiscal Year Cost: $1,453,490,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9410
Transit: Operating Expenses
Years 2036-2040 *
Lump Sum Amount: VIAtrans Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $375,320,000
Total Project Cost: $375,320,000
Project Description: Fiscal Year Cost: $375,320,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9510
Transit: Operating Expenses
Years 2036-2040 *
Lump Sum Amount: Other Services
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $78,600,000
Total Project Cost: $78,600,000
Project Description: Fiscal Year Cost: $78,600,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2040
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9095
Transit: Vehicle Acquisition
Years 2041-2045 *
Lump Sum Amount: Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $74,440,000
State Funds from TxDOT: $0
Other Funds: $18,610,000
Total Project Cost: $93,050,000
Project Description: Fiscal Year Cost: $93,050,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
2611 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 187 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9195
Transit: Vehicle Acquisition
Years 2041-2045 *
Lump Sum Amount: Non-Revenue Vehicles
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $1,456,000
State Funds from TxDOT: $0
Other Funds: $364,000
Total Project Cost: $1,820,000
Project Description: Fiscal Year Cost: $1,820,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9295
Transit: Facility Rehabilitation & Equipment
Years 2041-2045 *
Lump Sum Amount: Buildings & Equipment
Federal Funding Category FTA - Section 5307
Federal (FTA) Funds: $73,448,000
State Funds from TxDOT: $0
Other Funds: $18,362,000
Total Project Cost: $91,810,000
Project Description: Fiscal Year Cost: $91,810,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9320
Transit: Operating Expenses
Years 2041-2045 *
Lump Sum Amount: Line Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,644,490,000
Total Project Cost: $1,644,490,000
Project Description: Fiscal Year Cost: $1,644,490,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9420
Transit: Operating Expenses
Years 2041-2045 *
Lump Sum Amount: VIAtrans Service
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $424,650,000
Total Project Cost: $424,650,000
Project Description: Fiscal Year Cost: $424,650,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
2711 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 188 of 337
Alamo Area Metropolitan Planning Organization
San Antonio TxDOT District YOE=Year of Expenditure
Metropolitan Transportation Plan: Transit Projects
Transit Project Listing
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: N/A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 9520
Transit: Operating Expenses
Years 2041-2045 *
Lump Sum Amount: Other Services
Federal Funding Category Local
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $88,950,000
Total Project Cost: $88,950,000
Project Description: Fiscal Year Cost: $88,950,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2045
2811 -Project detail is listed separately.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 189 of 337
Transportation Policy Board December 14, 2020
b. FY 2021-2024 Transportation Improvement Program
The MPO adopts a new Transportation Improvement Program (TIP) in a two – step approval process with presentation one month and action the following month. This is the formal “first reading” of the FY 2021-2024 Transportation Improvement Program of which the roadway and transit project lists are attached. A draft TIP document is expected to be completed soon.
Transportation Policy Board adoption is scheduled for Monday, January 25, 2021
Action Requested
Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 190 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 4049.2
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $193,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$247,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$18,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$18,800,000
$0
Other $0
Other $0
$15,040,000 $3,760,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,040,000 $3,760,000 $0 $0 $18,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$18,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 9/20 - FR coded as 6 lanes per schematic reflecting merge lanes; 4 lanes is thru-travel lanes; 10/19 - add project
(E); spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/20 - revise TPC; 9/20 - ADM clarify description; 10/19 - add project (E); spin off
of 2452-02-083 (MPO #3913); no impact to conformity
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 E TxDOT 5391.3
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$1,900,000
$0
Other $0
Other $0
$0 $1,900,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $1,900,000 $0 $0 $1,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$1,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1518 E TxDOT 5309.3
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$2,194,000
$0
Other $0
Other $0
$0 $2,194,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $2,194,000 $0 $0 $2,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$2,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase; 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM
selected project; 4/16 - funded through STP-
MM project selection process
N/A TDM Network Years:
13Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 191 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CS C CoSA 5408.1
Limits From: In San Antonio on Bulverde Road
Limits To: from Briar Crest to North of Quiet Meadow Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $200,000
Construction Cost: $9,700,000
Construction Engineering $619,000
Contingencies: $125,000
Indirect Costs: $557,000
Preliminary Engineering: $1,400,000
Other Field $561,000
$13,162,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,700,000
$0
Other $0
Other $0
$0 $0 $0 $9,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,700,000 $9,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Expand from 2 lanes and CTL to 4 lanes and CTL
Status: RSR
$9,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5416.0
Limits From: In San Antonio on South Alamo Street
Limits To: from Market Street to Cesar Chavez Blvd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,000,000
Construction Engineering $574,000
Contingencies: $450,000
Indirect Costs: $517,000
Preliminary Engineering: $441,000
Other Field $520,000
$11,502,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,000,000
$0
Other $0
Other $0
$0 $0 $0 $9,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,000,000 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5415.0
Limits From: In San Antonio on Santa Rosa Street
Limits To: from Cesar Chavez Blvd to Martin Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,500,000
Construction Engineering $542,000
Contingencies: $425,000
Indirect Costs: $488,000
Preliminary Engineering: $416,000
Other Field $491,000
$10,862,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$8,500,000
$0
Other $0
Other $0
$0 $0 $0 $8,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $8,500,000 $8,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$8,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
14Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 192 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CS C CoSA 5410.0
Limits From: In San Antonio on Rittiman Road
Limits To: from IH 35 to Castle Cross Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,100,000
Construction Engineering $134,000
Contingencies: $27,000
Indirect Costs: $120,000
Preliminary Engineering: $103,000
Other Field $121,000
$2,605,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,100,000
$0
Other $0
Other $0
$0 $0 $0 $2,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,100,000 $2,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Extend right turn lane from Rittiman to IH 35
Status: Non-RSR
$2,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5414.0
Limits From: In San Antonio on North Main & Soledad
Limits To: from Pecan Street to Navarro Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $300,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,668,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$6,000,000
$0
Other $0
Other $0
$0 $0 $0 $6,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $6,000,000 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 7 to 4 travel lanes with CTL, bike lanes, sidewalks and traffic circle at Navarro
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5423.0
Limits From: In San Antonio on Alamo/Commerce/Losoya Intersection
Limits To: from Commerce to Market
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $128,000
Contingencies: $100,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $116,000
$2,557,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,000,000
$0
Other $0
Other $0
$0 $0 $0 $2,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,000,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Close Alamo Street to vehicle traffic
Status: RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
15Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 193 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CS C CoSA 5407.0
Limits From: In San Antonio on Fredericksburg Road
Limits To: From N. Flores to Woodlawn
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,300,000
Construction Engineering $338,000
Contingencies: $68,000
Indirect Costs: $304,000
Preliminary Engineering: $260,000
Other Field $306,000
$6,576,000
Type of Work: TSMO: Operational
Total Project Cost:
$5,300,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$5,300,000
$0
Other $0
Other $0
$0 $0 $0 $5,300,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $5,300,000 $5,300,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide sidewalks
Status: RSR
$5,300,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5409.0
Limits From: In San Antonio on N. New Braunfels
Limits To: from Houston Street to Burleson
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,500,000
Construction Engineering $287,000
Contingencies: $58,000
Indirect Costs: $258,000
Preliminary Engineering: $220,000
Other Field $260,000
$5,583,000
Type of Work: TSMO: Operational
Total Project Cost:
$4,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$4,500,000
$0
Other $0
Other $0
$0 $0 $0 $4,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,500,000 $4,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks
Status: Non-RSR
$4,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
2025,2035,2045 TDM Network Years:
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5553.0
Limits From: at FM 725
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $78,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,446,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$6,000,000
$0
Other $0
Other $0
$0 $6,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $6,000,000 $0 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-05-120
Intersection operational improvements including turn lanes
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost; 11/19 - ADM clarify description; 10/18 - add project, created from 0016-05-114
2025,2035,2045 TDM Network Years:
16Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 194 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Guadalupe15 - San Antonio
Description:
IH 35 C,E TxDOT 4013.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,000,000
Construction Cost: $132,000,000
Construction Engineering $73,400,000
Contingencies: $0
Indirect Costs: $6,000,000
Preliminary Engineering: $73,400,000
Other Field $0
$284,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$278,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
12 - CL
$51,000,000
$81,000,000
3 - DB $146,800,000
Other $0
$40,800,000 $10,200,000 $0 $0
$64,800,000 $16,200,000 $0 $0
$0 $146,800,000 $0 $0
$0 $0 $0 $0
$105,600,000 $173,200,000 $0 $0 $278,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-06-047
Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes; from 4 to 4 FR lanes
Status: RSR
$278,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost; 10/19 - move 20 to 21, rev cost; 1/19 - rev descr; 10/18 - move 25 to 20; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev descr; 4/13 - add to MTP (Env document)
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 3477.0
Limits From: IH 410 N
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,900,000
Construction Cost: $1,007,000,000
Construction Engineering $168,100,000
Contingencies: $0
Indirect Costs: $42,900,000
Preliminary Engineering: $168,100,000
Other Field $0
$1,421,000,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,343,200,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$261,400,000
$100,600,000
3-DB/11 - Distr Discr
$339,200,000
12 - CL $642,000,000
$209,120,000 $52,280,000 $0 $0
$80,480,000 $20,120,000 $0 $0
$2,400,000 $336,800,000 $0 $0
$513,600,000 $128,400,000 $0 $0
$805,600,000 $537,600,000 $0 $0 $1,343,200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-07-113
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604
Status: RSR
$1,343,200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: Category 11 - Distr. Disc. funding equals $3m 80/20 fed/state; 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N
Non-Exempt
Proj Hist:
10/20 - revise cost; 10/19 - move 20 to 21, rev cost; 9/19 - rev descr; 1/19 - rev descr; 10/18 - 25 to 20, rev descr, TPC; 4/18 - move 20 to 25 (out of TIP); 10/13 - rev limits, descr; 04/13 - rev limits
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SL 368 C CoSA 5313.0
Limits From: Burr Road
Limits To: IH 35
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering $2,600,000
Contingencies: $850,000
Indirect Costs: $1,500,000
Preliminary Engineering: $950,000
Other Field $950,000
$28,850,000
Type of Work: TSMO: Operational
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$9,000,000
$5,000,000
3 - LC $8,000,000
Other $0
$7,200,000 $1,800,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $8,000,000
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $8,000,000 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0016-08-034
Reduce from 6 to 4 travel lanes; roadway rehabilitation, bicycle and pedestrian facilities
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
10/20 - revise cost; 5/20 - move from FY20 to 21; 10/19 - revise project sponsor; 9/19 - ADM clarify description; 4/17 - revise funding; 4/16 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
17Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 195 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SS 536 C CoSA 5536.2
Limits From: at San Antonio River
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $120,000
Contingencies: $140,000
Indirect Costs: $100,000
Preliminary Engineering: $98,000
Other Field $80,000
$2,538,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0253-06-037
Construct bicycle and pedestrian bridge
Status: Non-RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5542.0
Limits From: FM 2536 - Pearsall Road
Limits To: Valley Hi Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $19,100,000
Construction Engineering $850,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $850,000
$24,600,000
Type of Work: TSMO: Operational
Total Project Cost:
$19,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$8,100,000
$11,000,000
Other $0
Other $0
$6,480,000 $1,620,000 $0 $0
$8,800,000 $2,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,280,000 $3,820,000 $0 $0 $19,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0521-05-148
Operational improvements, including ramp revisions, intersection improvements, reconstruct frontage roads and mainlane overlay
Status: RSR
$19,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - move from FY20 to FY21, revise cost; 4/19 - increase cost, revise decription; 4/18 - funded via 19-22 STP-MM Project Call
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5371.0
Limits From: at IH 10 E
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000,000
Construction Engineering $4,000,000
Contingencies: $7,000,000
Indirect Costs: $2,000,000
Preliminary Engineering: $4,800,000
Other Field $4,000,000
$121,800,000
Type of Work: TSMO: Interchange
Total Project Cost:
$100,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$50,000,000
$25,000,000
12 - CL $25,000,000
Other $0
$45,000,000 $5,000,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$0 $0 $0 $0
$90,000,000 $10,000,000 $0 $0 $100,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0521-06-138
Construct direct connectors: Phase 1 - Priority Connectors - NB 410 to EB 10; WB 10 to SB 410
Status: RSR
$100,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/20 - rev descr and move FY 21 to FY 25; 9/19 - ADM clarify description; 3/18 - revise funding distribution; 4/17 - add project
2025,2035,2045 TDM Network Years:
18Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 196 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
FM 1535 C TxDOT 5323.0
Limits From: Lp 1604
Limits To: Huebner Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,600,000
Construction Engineering $400,000
Contingencies: $750,000
Indirect Costs: $200,000
Preliminary Engineering: $960,000
Other Field $425,000
$12,335,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$6,500,000
$3,100,000
Other $0
Other $0
$5,200,000 $1,300,000 $0 $0
$2,480,000 $620,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,680,000 $1,920,000 $0 $0 $9,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0658-01-045
Construct 2 way left turn lane, bike lanes and sidewalks
Status: RSR
$9,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - revise cost; 4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
FM 471 E, R TxDOT 5377.2
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,620,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$2,100,000
$2,520,000
Other $0
Other $0
$0 $2,100,000 $0 $0
$2,016,000 $504,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,016,000 $2,604,000 $0 $0 $4,620,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$4,620,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.3
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$5,500,000
$0
Other $0
Other $0
$4,400,000 $368,500 $731,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,400,000 $368,500 $731,500 $0 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-214
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2021
Status: Exempt
$5,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
19Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 197 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CR C BxCo 3988.0
Limits From: On Bulverde Road from Marshall Road
Limits To: Wilderness Oak
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,097,480
Construction Engineering $401,635
Contingencies: $463,986
Indirect Costs: $554,677
Preliminary Engineering: $396,777
Other Field $0
$9,914,555
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,097,480
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$8,097,480
$0
Other $0
Other $0
$6,477,984 $0 $1,619,496 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,477,984 $0 $1,619,496 $0 $8,097,480
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-509
Reconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements
Status: RSR
$8,097,480
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
33
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 9/19 - ADM clarify descr; 4/19 - 19 to 20 and rev proj sponsor; 4/18 - 18 to 19; 1/17 - 17 to 18; 4/15 - 15 to 16 and update descr; 1/14 - 14 to 15; 4/13 - 13 to 14 and rev funding cats; 4/12 - funded
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C LV 3992.0
Limits From: SH 16 - Bandera Road
Limits To: Crystal Hills Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $933,000
Construction Engineering $59,525
Contingencies: $65,963
Indirect Costs: $63,911
Preliminary Engineering: $45,717
Other Field $0
$1,168,116
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$933,000
Authorized Funding by Category/Share
Leon Valley
Cost of Approved Phases:
7 - STBG
Other
$933,000
$0
Other $0
Other $0
$746,400 $0 $186,600 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$746,400 $0 $186,600 $0 $933,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-514
Construction of a hike and bike trail along Huebner Creek
Status: Exempt
$933,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/18 - move 19 to 20; 4/17 - move 17 to 19; 10/15 - move 15 to 17 and revise limits; 4/14 - rev limits and move 14 to 15; 4/12 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
CS C BxCo 5105.0
Limits From: On Galm Road, from FM 471 (Culebra Road)
Limits To: Government Canyon State Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,323,351
Construction Engineering $363,238
Contingencies: $145,735
Indirect Costs: $353,718
Preliminary Engineering: $1,181,757
Other Field $273,893
$9,641,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,323,351
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
12S - STP-MM Rec
$3,223,351
$4,100,000
Other $0
Other $0
$2,578,681 $0 $644,670 $0
$3,280,000 $0 $820,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,858,681 $0 $1,464,670 $0 $7,323,351
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-544
Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities
Status: Non-RSR
$7,323,351
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
44
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 4/19 - move 19 to FY 20; 10/18 - rev TPC; 4/18 - move 18 to FY 19; 1/16 - rev funding; 4/14 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
20Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 198 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CR C BxCo 5106.0
Limits From: On Watson Road from FM 2790-Somerset Road
Limits To: 0.62 Mi East of Somerset Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,440,000
Construction Cost: $4,886,116
Construction Engineering $195,445
Contingencies: $342,028
Indirect Costs: $97,722
Preliminary Engineering: $739,184
Other Field $195,445
$7,895,940
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,886,116
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$4,886,116
$0
Other $0
Other $0
$3,908,893 $0 $977,223 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,908,893 $0 $977,223 $0 $4,886,116
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-562
Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage
Status: Non-RSR
$4,886,116
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 9/19 - ADM clarify limits and description; 1/19 - move 19 to 20; 10/18 - rev TPC; 4/14 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5305.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $99,000
Contingencies: $40,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $75,000
$2,427,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-579
Construct citywide pedestrian and bicycle improvements
Status: Exempt
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 19 to FY 20; 10/17 - reduce project cost by $1M to fund 0915-12-603; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5306.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $90,000
Contingencies: $45,000
Indirect Costs: $75,000
Preliminary Engineering: $73,500
Other Field $90,000
$1,873,500
Type of Work: TSMO: ITS
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-580
Intelligent Transportation System - Enhancements to include controller hardware and software and CCTV cameras
Status: Exempt
$1,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to FY 20; 9/19 - ADM clarify description; 10/17 - reduce cost from $4M to $1.5M and move 20 to 19; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
21Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 199 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CR C BxCo 5304.0
Limits From: In Bexar County, on Talley Road
Limits To: From Wiseman Blvd to Tamaron Pass
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,917,924
Construction Engineering $1,255,000
Contingencies: $1,464,000
Indirect Costs: $1,046,000
Preliminary Engineering: $1,025,000
Other Field $837,000
$26,544,924
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,917,924
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$19,417,924
$1,500,000
Other $0
Other $0
$15,534,339 $0 $3,883,585 $0
$0 $0 $0 $1,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$15,534,339 $0 $3,883,585 $1,500,000 $20,917,924
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-581
Expand from 2 lane to 4 lane divided roadway with medians, curbs, bicycle facilities, pedestrian improvements, operational improvements and drainage
Status: Non-RSR
$20,917,924
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/18 and 4/16 - funded through STP-MM project selection processes
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C Converse 5319.0
Limits From: On Rocket/Schaeffer, from E. Norris
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,430,481
Construction Engineering $269,352
Contingencies: $108,067
Indirect Costs: $311,710
Preliminary Engineering: $266,094
Other Field $203,100
$6,588,804
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$5,430,481
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
7 - STBG
Other
$5,430,481
$0
Other $0
Other $0
$4,344,385 $0 $1,086,096 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,344,385 $0 $1,086,096 $0 $5,430,481
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-582
Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path
Status: Non-RSR
$5,430,481
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 4974.0
Limits From: In San Antonio, on Zarzamora
Limits To: From Fredericksburg Rd to Loop 13
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $319,000
Contingencies: $64,500
Indirect Costs: $241,500
Preliminary Engineering: $245,000
Other Field $289,000
$6,159,000
Type of Work: Pedestrian
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
9 - TA
3 - LC
$4,500,000
$500,000
Other $0
Other $0
$3,600,000 $0 $900,000 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,600,000 $0 $900,000 $500,000 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-596
Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS
Status: RSR
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/17 - add TA project
N/A TDM Network Years:
22Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 200 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CS C CoSA 5434.0
Limits From: in San Antonio on Presa Street
Limits To: from W. Boyer to SE Military Drive (Lp 13)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $600,000
Contingencies: $300,000
Indirect Costs: $500,000
Preliminary Engineering: $490,000
Other Field $600,000
$12,490,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3 - LC
$9,000,000
$1,000,000
Other $0
Other $0
$7,200,000 $0 $1,800,000 $0
$0 $0 $0 $1,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$7,200,000 $0 $1,800,000 $1,000,000 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-604
Bike and Pedestrian Corridor enhancements to implement Complete Streets
Status: Non-RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 travel lanes throughout the corridor
Exempt
Proj Hist:
9/19 - ADM clarify description; 4/18 - move from FY 2019 to FY 2021; 10/17 - add project per CoSA, funding is from 0025-02-204; 4/16 - revise match (EDCP project); 4/14 - funded through STP-MM project
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5545.1
Limits From: In San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,000,000
Type of Work: Planning
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-609
Multimodal planning study on one arterial to accommodate travel modes including higher capacity transit
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
CS C CoSA 5536.1
Limits From: In San Antonio
Limits To: Along San Pedro Avenue
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $60,000
Contingencies: $70,000
Indirect Costs: $50,000
Preliminary Engineering: $49,000
Other Field $40,000
$1,269,000
Type of Work: Pedestrian
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-610
Construct sidewalks and pedestrian infrastructure
Status: RSR
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
23Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 201 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C CoSA 5545.2
Limits From: In San Antonio
Limits To: at various locations
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$3,000,000
Type of Work: Planning
Total Project Cost:
$3,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$3,000,000
$0
Other $0
Other $0
$2,400,000 $0 $600,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,400,000 $0 $600,000 $0 $3,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-611
Multimodal planning study on three arterials to accommodate travel modes including higher capacity transit
Status: Exempt
$3,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5570.0
Limits From: Various locations on
Limits To: IH 35 S and IH 37 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,400,000
Construction Engineering $270,000
Contingencies: $540,000
Indirect Costs: $216,000
Preliminary Engineering: $264,000
Other Field $162,000
$6,852,000
Type of Work: TSMO: ITS
Total Project Cost:
$5,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$5,400,000
$0
Other $0
Other $0
$4,860,000 $540,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,860,000 $540,000 $0 $0 $5,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-664
Install ITS equipment on IH 35 South and IH 37 South Corridors
Status: RSR
$5,400,000
NOX lbs/day
91.029
VOC lbs/day
16.777
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5578.0
Limits From: In Bexar County
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $75,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$75,000
Type of Work: TSMO: Training
Total Project Cost:
$75,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$75,000
$0
Other $0
Other $0
$60,000 $15,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$60,000 $15,000 $0 $0 $75,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-665
Traffic Incident Management Training Program
Status: Exempt
$75,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
24Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 202 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C CoSA 5573.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-667
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2020
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5574.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-668
Install ITS equipment on congested corridors in the City of San Antonio - FY 2020
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-669
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2020
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
25Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 203 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C CoSA 5576.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-670
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2020
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C UTSA 5577.1
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,041
$16,184
Other $0
Other $0
$90,433 $0 $22,608 $0
$0 $0 $0 $16,184
$0 $0 $0 $0
$0 $0 $0 $0
$90,433 $0 $22,608 $16,184 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-671
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2020
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5574.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-674
Install ITS equipment on congested corridors in the City of San Antonio - FY 2021
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
26Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 204 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C CoSA 5573.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-675
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2021
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-676
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2021
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5576.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-677
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2021
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
27Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 205 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C UTSA 5577.2
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-678
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2021
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5580.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,334
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,334
Type of Work: Transit
Total Project Cost:
$7,553,334
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,667
$686,667
Other $0
Other $0
$5,493,334 $0 $1,373,333 $0
$0 $0 $0 $686,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,334 $0 $1,373,333 $686,667 $7,553,334
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-679
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2021
Status: Exempt
$7,553,334
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5581.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,429
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,429
Type of Work: Transit
Total Project Cost:
$2,181,429
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,762
$691,667
Other $0
Other $0
$1,191,810 $0 $297,952 $0
$0 $0 $0 $691,667
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,810 $0 $297,952 $691,667 $2,181,429
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-680
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2021
Status: Exempt
$2,181,429
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
28Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 206 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Guadalupe15 - San Antonio
Description:
CS C Seguin 5322.0
Limits From: In Seguin, on Rudeloff Rd.
Limits To: From SH 46 to Huber Rd.
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,316,658
Construction Engineering $313,306
Contingencies: $125,701
Indirect Costs: $263,576
Preliminary Engineering: $309,516
Other Field $236,243
$7,565,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$6,316,658
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$6,316,658
$0
Other $0
Other $0
$5,053,326 $0 $1,263,332 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,053,326 $0 $1,263,332 $0 $6,316,658
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-045
Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities
Status: Non-RSR
$6,316,658
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/16 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
Guadalupe15 - San Antonio
Description:
VA C Seguin 4976.0
Limits From: in Seguin from Vaughan Bridge
Limits To: to Max Starcke Park East
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,801,246
Construction Engineering $178,700
Contingencies: $36,100
Indirect Costs: $135,300
Preliminary Engineering: $137,300
Other Field $162,000
$3,450,646
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,801,246
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
9 - TA
3 - LC
$2,773,234
$28,012
Other $0
Other $0
$2,218,587 $0 $554,647 $0
$0 $0 $0 $28,012
$0 $0 $0 $0
$0 $0 $0 $0
$2,218,587 $0 $554,647 $28,012 $2,801,246
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-046
Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and below grade crossing
Status: Exempt
$2,801,246
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 2019 to FY 2020; 6/17 - add TA project
N/A TDM Network Years:
Guadalupe15 - San Antonio
Description:
CS C Schertz 4975.0
Limits From: in Schertz on Woodland Oaks Dr,
Limits To: Savannah Dr & Live Oak Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,158,266
Construction Engineering $73,900
Contingencies: $15,000
Indirect Costs: $56,000
Preliminary Engineering: $56,800
Other Field $67,000
$1,426,966
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,158,266
Authorized Funding by Category/Share
Schertz
Cost of Approved Phases:
9 - TA
Other
$1,158,266
$0
Other $0
Other $0
$926,613 $0 $231,653 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$926,613 $0 $231,653 $0 $1,158,266
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-050
Construct sidewalks, bike lanes and off-road trail
Status: Non-RSR
$1,158,266
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 4/19 - move 19 to 20; 10/18 - adm rev CSJ from 0915-17-065 to 0915-46-050; 4/18 - move 18 to FY 19; 6/17 - add TA project
N/A TDM Network Years:
29Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 207 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Comal15 - San Antonio
Description:
FM 1103 C TxDOT 4970.0
Limits From: IH 35
Limits To: Guadalupe C/L
Total Project Cost Information (TxDOT %):
ROW Purchase: $870,000
Construction Cost: $2,000,000
Construction Engineering $89,000
Contingencies: $455,000
Indirect Costs: $44,000
Preliminary Engineering: $200,000
Other Field $89,000
$3,747,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$700,000
$800,000
3 - LC $500,000
Other $0
$560,000 $140,000 $0 $0
$640,000 $160,000 $0 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$1,200,000 $300,000 $0 $500,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-01-013
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20; 1/17 - move 18 to 19; 10/15 - add project
2025,2035,2045 TDM Network Years:
Guadalupe15 - San Antonio
Description:
FM 1103 C TxDOT 4971.0
Limits From: Comal C/L
Limits To: Rodeo Way
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,285,000
Construction Cost: $37,500,000
Construction Engineering $1,666,000
Contingencies: $2,915,000
Indirect Costs: $833,000
Preliminary Engineering: $3,750,000
Other Field $1,666,000
$51,615,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$37,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$18,111,852
$11,922,500
3 - LC $7,465,648
Other $0
$14,489,482 $3,622,370 $0 $0
$9,538,000 $2,384,500 $0 $0
$0 $0 $0 $7,465,648
$0 $0 $0 $0
$24,027,482 $6,006,870 $0 $7,465,648 $37,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-02-027
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$37,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move 19 to 20 and rev funding; 1/17 - move 18 to19 and rev funding; 10/15 - add project
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
FM 2252 E TxDOT 5329.2
Limits From: Evans Road
Limits To: Comal/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $500,000
Construction Engineering $32,000
Contingencies: $7,000
Indirect Costs: $29,000
Preliminary Engineering: $50,000
Other Field $29,000
$647,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$50,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$50,000
$0
Other $0
Other $0
$0 $50,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $50,000 $0 $0 $50,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-01-028
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$50,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
N/A TDM Network Years:
30Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 208 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
FM 1560 E,R TxDOT 5311.2
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$13,467,333
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
SWROW
$1,210,000
$12,257,333
Other $0
Other $0
$0 $1,210,000 $0 $0
$9,805,866 $2,451,467 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,805,866 $3,661,467 $0 $0 $13,467,333
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$13,467,333
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/18 - add phases E & R
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3913.0
Limits From: SH 16
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $185,500,000
Construction Engineering $8,200,000
Contingencies: $14,400,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,500,000
Other Field $8,200,000
$238,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$185,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$185,500,000
$0
Other $0
Other $0
$148,400,000 $37,100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$148,400,000 $37,100,000 $0 $0 $185,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-083
Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes
Status: RSR
$185,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: Reference #4049 and #5556
Non-Exempt
Proj Hist:
10/19 - move 19 to 21 and rev cost, limits and descr; see #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - 20 to 21, rev descr & fund, move to TxDOT; 4/17 - rev limits, descr, cost (has $398.3M in Cat 2: '17-
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5332.0
Limits From: at FM 2696 - Blanco Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,600,000
Construction Engineering $1,800,000
Contingencies: $3,100,000
Indirect Costs: $900,000
Preliminary Engineering: $4,100,000
Other Field $1,800,000
$52,300,000
Type of Work: TSMO: Operational
Total Project Cost:
$40,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,600,000
$0
Other $0
Other $0
$32,480,000 $8,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,480,000 $8,120,000 $0 $0 $40,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-117
Intersection operational improvements including construction of a diverging diamond interchange (DDI)
Status: RSR
$40,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
11/19 - ADM* clarify description; 10/19 - rev cost; 10/18 - move 22 to 21; 3/18 - incr cost from $30M; 10/17 - move 20 to 22; 4/17 - TIP: add project; MTP - move 27 to 20; 4/16 - funded in 17-20 TIP Call for Projects
2025,2035,2045 TDM Network Years:
31Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 209 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 4049.0
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $193,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$247,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$193,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
7 - STBG
$187,800,000
$6,000,000
Other $0
Other $0
$150,240,000 $37,560,000 $0 $0
$4,800,000 $1,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$155,040,000 $38,760,000 $0 $0 $193,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$193,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: 9/20 - FR coded as 6 lanes per schematic reflecting merge lanes; 4 lanes is thru-travel lanes; 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/20 - increase cost, funds from 0916-12-574 and -575; 9/20 - ADM clarify description; 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
2025,2035,2045 TDM Network Years:
Medina15 - San Antonio
Description:
SH 211 C BxCo 3152.0
Limits From: Bexar C/L, 2.0 Mi S of FM 471, N
Limits To: FM 471 (Culebra Rd)
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,100,000
Construction Cost: $4,400,000
Construction Engineering $214,157
Contingencies: $309,338
Indirect Costs: $241,283
Preliminary Engineering: $233,193
Other Field $0
$6,497,971
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,400,000
$0
Other $0
Other $0
$0 $0 $0 $4,400,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,400,000 $4,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-03-002
Construct two lane rural highway on new location
Status: Non-RSR
$4,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3153.0
Limits From: FM 1957 (Potranco Rd), N 2.9 MI
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,780,000
Construction Cost: $7,000,000
Construction Engineering $340,704
Contingencies: $492,128
Indirect Costs: $383,860
Preliminary Engineering: $840,000
Other Field $0
$10,836,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$7,000,000
$0
Other $0
Other $0
$0 $0 $0 $7,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,000,000 $7,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-04-002
Construct two lane rural highway on new location
Status: RSR
$7,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to FY 20; 4/18 - move 18 to 19; 10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045 TDM Network Years:
32Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 210 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3154.0
Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N
Limits To: Medina Co. Line, 2.0 Mi S of FM 471
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $2,600,000
Construction Engineering $126,547
Contingencies: $182,790
Indirect Costs: $142,577
Preliminary Engineering: $137,796
Other Field $0
$3,889,710
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,600,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$2,600,000
$0
Other $0
Other $0
$0 $0 $0 $2,600,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,600,000 $2,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-05-001
Construct two lane rural highway on new location
Status: RSR
$2,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 10/18 - revise TPC; 4/18 - move 18 to 19;10/17 - move 17 to 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045 TDM Network Years:
Medina15 - San Antonio
Description:
SH 211 C BxCo 3155.0
Limits From: Bexar C/L, 2.9 MI N of FM 1957, N
Limits To: Bexar C/L, 4.5 MI N of FM 1957
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $4,100,000
Construction Engineering $199,555
Contingencies: $288,246
Indirect Costs: $224,832
Preliminary Engineering: $217,293
Other Field $0
$6,029,926
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,100,000
$0
Other $0
Other $0
$0 $0 $0 $4,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,100,000 $4,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-06-001
Construct two lane rural highway on new location
Status: Non-RSR
$4,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move 20 to 21; 10/19 - move 19 to 20; 4/18 - move 18 to 19; 10/17 - move 17 to FY 18; 4/15 - move 15 to 16; Pass through financing project to be reimbursed from Cat 12
2025,2035,2045 TDM Network Years:
33Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 211 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
FM 1518 R TxDOT 5309.2
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$8,194,000
$0
Other $0
Other $0
$6,555,200 $1,638,800 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,555,200 $1,638,800 $0 $0 $8,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$8,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP: 4/18 - move from FY 2021 to FY 2023 and combine with STP-
MM selected project; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 R TxDOT 5391.2
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$11,800,000
$0
Other $0
Other $0
$9,440,000 $2,360,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,440,000 $2,360,000 $0 $0 $11,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$11,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
N/A TDM Network Years:
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5395.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 465
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000,000
Construction Engineering $6,700,000
Contingencies: $11,600,000
Indirect Costs: $3,300,000
Preliminary Engineering: $15,000,000
Other Field $6,700,000
$193,300,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$150,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$150,000,000
$0
Other $0
Other $0
$120,000,000 $30,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000,000 $30,000,000 $0 $0 $150,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0025-03-097
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$150,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Move from MTP to TIP; no impact to conformity; see companion project #4008
Exempt
Proj Hist:
5/20 - move 21 to 22; 10/19 - move 28 to 21, rev funding & limits; 1/19 - rev descr to incl
FR lanes & update cost; 10/18 - move 29 to
28; 6/18 - correct fund distrib; 4/17 - add proj to MTP with P1/P7; portion of project
2025,2035,2045 TDM Network Years:
34Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 212 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5556.0
Limits From: at Loop 1604 North
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $285,400,000
Construction Engineering $12,400,000
Contingencies: $21,700,000
Indirect Costs: $6,200,000
Preliminary Engineering: $27,900,000
Other Field $12,400,000
$366,000,000
Type of Work: TSMO: Interchange
Total Project Cost:
$285,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$245,400,000
$17,000,000
12 - CL $17,000,000
7 - STBG $6,000,000
$196,320,000 $49,080,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$4,800,000 $1,200,000 $0 $0
$228,320,000 $57,080,000 $0 $0 $285,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0072-08-144
Construct Direct Connectors - 1 lane DC - NB 10 to EB 1604; EB 1604 to NB 10; SB 10 to WB 1604; WB 1604 to SB 10;
Status: RSR
$285,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 lane - NB 10 to WB 1604; EB 1604 to SB 10; SB 10 to EB 1604 & WB 1604 to NB 10
Exempt
Proj Hist:
10/20 - increase cost, funds from 0915-12-575 and -576; 10/19 - move from FY26 to FY22, revise funding and CSJ from 2452-02-127; 9/19 - ADM clarify description; 1/19 - rev cost; 10/18 - add project
2035,2045 TDM Network Years:
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.2
Limits From: US 281
Limits To: Bentwood Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $22,000,000
Construction Engineering $560,000
Contingencies: $980,000
Indirect Costs: $280,000
Preliminary Engineering: $686,000
Other Field $560,000
$25,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$22,000,000
$0
Other $0
Other $0
$17,600,000 $4,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,600,000 $4,400,000 $0 $0 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-01-044
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
2025,2035,2045 TDM Network Years:
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.1
Limits From: Farhills Dr
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,800,000
Construction Engineering $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field $1,040,000
$23,026,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$17,800,000
$0
Other $0
Other $0
$14,240,000 $3,560,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,240,000 $3,560,000 $0 $0 $17,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-07-027
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$17,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - revise cost; 3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
2025,2035,2045 TDM Network Years:
35Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 213 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SH 16 C TxDOT 5571.0
Limits From: LP 1604
Limits To: 0.3 Mi West of FM 1560/Leslie Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,600,000
Construction Engineering $430,000
Contingencies: $516,000
Indirect Costs: $430,000
Preliminary Engineering: $421,000
Other Field $258,000
$10,655,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,600,000
Authorized Funding by Category/Share
Helotes
Cost of Approved Phases:
5 - CMAQ
Other
$8,600,000
$0
Other $0
Other $0
$6,880,000 $1,720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,880,000 $1,720,000 $0 $0 $8,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0291-10-114
Operational improvements including implementation of median U-turns and R-cut intersections
Status: RSR
$8,600,000
NOX lbs/day
10.097
VOC lbs/day
6.945
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
9/20 - ADM reverse limits; 11/19 - ADM clarify description; 6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
FM 471 C TxDOT 5377.0
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$21,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$10,500,000
$10,500,000
Other $0
Other $0
$8,400,000 $2,100,000 $0 $0
$0 $0 $0 $10,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,400,000 $2,100,000 $0 $10,500,000 $21,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$21,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC
2025,2035,2045 TDM Network Years:
Medina15 - San Antonio
Description:
FM 471 C TxDOT 5378.0
Limits From: Medina County Line
Limits To: SH 211
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $375,000
Construction Engineering $15,000
Contingencies: $26,000
Indirect Costs: $8,000
Preliminary Engineering: $18,000
Other Field $15,000
$457,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$375,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$375,000
$0
Other $0
Other $0
$300,000 $75,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000 $75,000 $0 $0 $375,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-02-045
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: Non-RSR
$375,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Exempt
Proj Hist:
3/18 - revise funding distribution
2025,2035,2045 TDM Network Years:
36Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 214 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.1
Limits From: Alamo Area MPO: Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-197
Alamo Area Commute Solutions Pgm - FY 2022
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; project has $53,400 in TDCs which are not calculated in the funding total; fixed amount
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5579.0
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Patrol
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$4,950,000
$550,000
Other $0
Other $0
$3,960,000 $990,000 $0 $0
$0 $0 $0 $550,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,960,000 $990,000 $0 $550,000 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-227
Safety service patrol on controlled access highways in Bexar, Comal and Kendall Counties
Status: Exempt
$5,500,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.1
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,073,444
Construction Engineering $240,000
Contingencies: $280,000
Indirect Costs: $227,000
Preliminary Engineering: $196,000
Other Field $150,000
$4,166,444
Type of Work: Pedestrian
Total Project Cost:
$3,073,444
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$1,373,444
$1,700,000
Other $0
Other $0
$1,098,755 $274,689 $0 $0
$0 $0 $0 $1,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$1,098,755 $274,689 $0 $1,700,000 $3,073,444
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-574
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$3,073,444
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - revise cost, funding to 2452-02-128, move from FY23 to FY22; 4/18 - move from FY21 to FY23; 1/17 - revise desc, cost, move $1M to 0915-12-586; 3Q '16 - new project in FY 2017-2020 TIP
N/A TDM Network Years:
37Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 215 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.3
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Pedestrian
Total Project Cost:
$0
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-576
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$0
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - delete project and move funding to 0072-08-144; 10/18 - move from FY 2019 to FY 2022 and reduce cost; 4/18 - move from FY 2022 to FY 2019; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
CS C BxCo 5318.0
Limits From: In Bexar County, on Crestway
Limits To: From Kitty Hawk Rd to FM 1976
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,791,571
Construction Engineering $386,462
Contingencies: $155,052
Indirect Costs: $447,236
Preliminary Engineering: $381,787
Other Field $291,405
$9,453,513
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$7,791,571
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$7,791,571
$0
Other $0
Other $0
$6,233,257 $0 $1,558,314 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,233,257 $0 $1,558,314 $0 $7,791,571
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-584
Reconstruct to provide operational improvements including bike lanes and sidewalks
Status: Non-RSR
$7,791,571
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/19 - revise description; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5572.0
Limits From: Various locations in San Antonio
Limits To: on Hamilton Wolfe and Ewing Halsell
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $180,000
Contingencies: $300,000
Indirect Costs: $240,000
Preliminary Engineering: $294,000
Other Field $180,000
$7,194,000
Type of Work: Bicycle
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$6,000,000
$0
Other $0
Other $0
$4,800,000 $0 $1,200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,800,000 $0 $1,200,000 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-666
Construct cycle track on Hamilton Wolff Rd from Babcock to Ewing Halsell. And on Ewing Halsell from Hamilton Wolff to Sid Katz
Status: Non-RSR
$6,000,000
NOX lbs/day
0.132
VOC lbs/day
0.090
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
38Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 216 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C CoSA 5573.3
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-681
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2022
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5575.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-682
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2022
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5576.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-683
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2022
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
39Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 217 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C UTSA 5577.3
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-684
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2022
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5580.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,332
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,332
Type of Work: Transit
Total Project Cost:
$7,553,332
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,666
$686,666
Other $0
Other $0
$5,493,333 $0 $1,373,333 $0
$0 $0 $0 $686,666
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,333 $0 $1,373,333 $686,666 $7,553,332
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-685
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2022
Status: Exempt
$7,553,332
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA T VIA 5581.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,427
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,427
Type of Work: Transit
Total Project Cost:
$2,181,427
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,761
$691,666
Other $0
Other $0
$1,191,809 $0 $297,952 $0
$0 $0 $0 $691,666
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,809 $0 $297,952 $691,666 $2,181,427
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-686
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2022
Status: Exempt
$2,181,427
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
N/A TDM Network Years:
40Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 218 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
FM 1560 C TxDOT 5311.0
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$10,580,000
$1,520,000
Other $0
Other $0
$8,464,000 $2,116,000 $0 $0
$0 $0 $0 $1,520,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,464,000 $2,116,000 $0 $1,520,000 $12,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$12,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
31
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 4/16 - funded through STP-MM project selection process
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 3786.2
Limits From: US 281
Limits To: Redland Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,600,000
Construction Cost: $58,000,000
Construction Engineering $2,600,000
Contingencies: $4,500,000
Indirect Costs: $1,300,000
Preliminary Engineering: $5,800,000
Other Field $2,600,000
$78,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$5,800,000
$3,600,000
Other $0
Other $0
$4,640,000 $1,160,000 $0 $0
$2,880,000 $720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,520,000 $1,880,000 $0 $0 $9,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-113
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$9,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/19 - move from FY 2021 to FY 2024 and revise funding; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
N/A TDM Network Years:
41Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 219 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 5554.2
Limits From: Martinez Creek
Limits To: FM 1346 - Houston Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $766,000
Contingencies: $155,000
Indirect Costs: $689,000
Preliminary Engineering: $588,000
Other Field $694,000
$14,892,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$588,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$588,000
$0
Other $0
Other $0
$470,400 $117,600 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$470,400 $117,600 $0 $0 $588,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-04-017
Expand from 2 lanes to 4 lanes divided
Status: RSR
$588,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2023 to FY 2025 & add E phase to TIP; 10/18 - add project, created
from 2452-04-016
2025,2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 3530.2
Limits From: Redland Road
Limits To: IH 35 North
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $230,000,000
Construction Engineering $10,000,000
Contingencies: $17,900,000
Indirect Costs: $5,100,000
Preliminary Engineering: $23,000,000
Other Field $10,200,000
$296,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$23,000,000
$0
Other $0
Other $0
$18,400,000 $4,600,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$18,400,000 $4,600,000 $0 $0 $23,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-087
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$23,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase to TIP; 9/19 - ADM clarify description; 1/19 - incl FR lanes & update cost; 10/18 - move 27 to 25 & rev descr; 4/17 - move 30 to 27 and rev funding; 4/14 - move18 to 30, rev limits and descr;
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
IH 10 E TxDOT 5401.2
Limits From: Kendall/Bexar County Line
Limits To: FM 3351
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,020,000
Construction Engineering $5,700,000
Contingencies: $10,000,000
Indirect Costs: $2,900,000
Preliminary Engineering: $12,900,000
Other Field $5,700,000
$166,220,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$12,900,000
$0
Other $0
Other $0
$10,320,000 $2,580,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$10,320,000 $2,580,000 $0 $0 $12,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0072-07-075
Expand from 4 to 8 lane expressway - 2 new general purpose, 2 new HOV lanes & from 4 to 4 FR lanes
Status: RSR
$12,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - rev cost and move 28 to 25 & add E phase to TIP ; 1/19 - rev descr to incl FR
lanes; 10/18 - move 29 to 28; 6/18 - correct
funding distrib; 4/17 - add project to MTP with P1/P7; portion of project may have
2035,2045 TDM Network Years:
42Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 220 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 9107.2
Limits From: FM 78
Limits To: IH 10 East
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,200,000
Construction Cost: $300,000,000
Construction Engineering $13,300,000
Contingencies: $23,300,000
Indirect Costs: $6,700,000
Preliminary Engineering: $30,000,000
Other Field $13,300,000
$390,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$47,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
SWROW
$43,300,000
$4,200,000
Other $0
Other $0
$0 $43,300,000 $0 $0
$3,360,000 $840,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,360,000 $44,140,000 $0 $0 $47,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-111
Expand from 4 lane divided to 4 lane expressway and from 0 to 4 FR lanes
Status: RSR
$47,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E,R phases to TIP; 1/19 - update funding; 4/18 - correct funding distribution; 4/17 - add project; removed from 10/15 Prop 1 list due to financial constraint issues
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1518 C TxDOT 5309.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$44,780,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
7 - STBG
$8,000,000
$21,780,000
3 - LC (Schertz) $10,000,000
3 - LC (BC) $5,000,000
$6,400,000 $1,600,000 $0 $0
$17,424,000 $4,356,000 $0 $0
$0 $0 $0 $10,000,000
$0 $0 $0 $5,000,000
$23,824,000 $5,956,000 $0 $15,000,000 $44,780,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$44,780,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
41
Remarks: None
Non-Exempt
Proj Hist:
4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.2
Limits From: Alamo Area MPO: in Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-216
Alamo Area Commute Solutions Pgm - FY 2023
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - add project
N/A TDM Network Years:
43Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 221 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.2
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $0
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$0
Type of Work: Pedestrian
Total Project Cost:
$0
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$0
$0
Other $0
Other $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2020
0915-12-575
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$0
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/20 - delete project and move funding to 0072-08-144; 4/18 - move from FY 2021 to FY 2023; 4/16 - funded through STP-MM project selection process
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
VA C CoSA 5540.0
Limits From: In San Antonio
Limits To: at various locations
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,500,000
Construction Engineering $270,000
Contingencies: $315,000
Indirect Costs: $225,000
Preliminary Engineering: $220,000
Other Field $180,000
$5,710,000
Type of Work: TSMO: ITS
Total Project Cost:
$4,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$4,500,000
$0
Other $0
Other $0
$3,600,000 $0 $900,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,600,000 $0 $900,000 $0 $4,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-615
Implement communication network improvements
Status: Exempt
$4,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
N/A TDM Network Years:
Bexar15 - San Antonio
Description:
FM 2252 C TxDOT 5329.0
Limits From: Evans Road
Limits To: Comal/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $500,000
Construction Engineering $32,000
Contingencies: $7,000
Indirect Costs: $29,000
Preliminary Engineering: $50,000
Other Field $29,000
$647,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
11 - Distr Discr
Other
$500,000
$0
Other $0
Other $0
$400,000 $100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$400,000 $100,000 $0 $0 $500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-01-028
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
43
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2023; 10/18 - revise funding distribution & TPC; 3/18 - revise funding distribution; 4/17 - move from FY 2027 to FY 2021
2035,2045 TDM Network Years:
44Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 222 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2023FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Comal15 - San Antonio
Description:
FM 2252 C TxDOT 9115.0
Limits From: Bexar/Comal County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $21,700,000
Construction Engineering $760,000
Contingencies: $1,330,000
Indirect Costs: $380,000
Preliminary Engineering: $931,000
Other Field $760,000
$25,861,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$21,700,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$21,700,000
$0
Other $0
Other $0
$17,360,000 $4,340,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$17,360,000 $4,340,000 $0 $0 $21,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-02-044
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$21,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2023; 10/18 - revise funding distribution; 3/18 - reverse limits and revise funding distribution; 4/17 - move from FY 2023 to FY 2021; added w/ 12/8/14 adoption of the MTP
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
FM 1560 C TxDOT 5391.0
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$19,750,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$14,750,000
$5,000,000
Other $0
Other $0
$11,800,000 $2,950,000 $0 $0
$0 $0 $0 $5,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$11,800,000 $2,950,000 $0 $5,000,000 $19,750,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$19,750,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
38
Remarks: None
Non-Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
2035,2045 TDM Network Years:
45Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 223 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
SL 368 C TxDOT 5535.0
Limits From: New Braunfels St.
Limits To: Burr Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,000,000
Construction Engineering $840,000
Contingencies: $980,000
Indirect Costs: $700,000
Preliminary Engineering: $686,000
Other Field $560,000
$17,766,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$14,000,000
Authorized Funding by Category/Share
Alamo Heights
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$10,000,000
$4,000,000
Other $0
Other $0
$8,000,000 $2,000,000 $0 $0
$3,200,000 $800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $0 $14,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-08-041
Roadway rehabilitation and reduce travel lanes from 6 to 4 lanes, bicycle and pedestrian facilities
Status: RSR
$14,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2035,2045 TDM Network Years:
Guadalupe15 - San Antonio
Description:
FM 725 C TxDOT 5308.0
Limits From: Zipp Rd
Limits To: County Line Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,600,000
Construction Engineering $525,760
Contingencies: $210,940
Indirect Costs: $608,440
Preliminary Engineering: $519,400
Other Field $396,440
$12,860,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,600,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STBG
Other
$10,600,000
$0
Other $0
Other $0
$8,480,000 $2,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,480,000 $2,120,000 $0 $0 $10,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2021
0215-09-029
Expand from 2 to 4 lanes with median, sidewalks and bike lanes
Status: RSR
$10,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
2/21 - move from FY 2023 to FY 2024; 4/20 - move from FY 2022 to FY 2023; 9/19 - ADM clarify From limit; 4/16 - funded through STP-MM project selection process
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.3
Limits From: Alamo Area MPO: in Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-217
Alamo Area Commute Solutions Pgm - FY 2024
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - add project
N/A TDM Network Years:
46Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 224 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Bexar15 - San Antonio
Description:
CS C CoSA 5538.0
Limits From: In San Antonio, on Zarzamora
Limits To: From US 90 to Jennings
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $23,000,000
Construction Engineering $1,170,000
Contingencies: $1,365,000
Indirect Costs: $975,000
Preliminary Engineering: $955,000
Other Field $780,000
$28,245,000
Type of Work: TSMO: Operational
Total Project Cost:
$23,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3 - LC
$19,500,000
$3,500,000
Other $0
Other $0
$15,600,000 $0 $3,900,000 $0
$0 $0 $0 $3,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$15,600,000 $0 $3,900,000 $3,500,000 $23,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-617
Construct 4 lane grade separation at UPRR/Frio City Rd
Status: RSR
$23,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 4 lane underlying roadway remains
Exempt
Proj Hist:
11/19 - ADM clarify description; 6/18 - revise funding to include local contribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
2025,2035,2045 TDM Network Years:
Guadalupe15 - San Antonio
Description:
CS C Seguin 5533.0
Limits From: In Seguin, on Rudeloff Road
Limits To: From Huber Road to SH 123 (at FM 20)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $720,000
Contingencies: $840,000
Indirect Costs: $600,000
Preliminary Engineering: $588,000
Other Field $480,000
$15,228,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,000,000
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$12,000,000
$0
Other $0
Other $0
$9,600,000 $0 $2,400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,600,000 $0 $2,400,000 $0 $12,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-049
Construct new alignment 4 lane roadway (0 to 4 lanes) with center left turn lane, bicycle and pedestrian facilities
Status: Non-RSR
$12,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2025 to FY 2024; 9/19 - ADM clarify description; 4/18 - funded through the 19-22 STP-MM Call for Projects
2035,2045 TDM Network Years:
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3786.0
Limits From: US 281
Limits To: Redland Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,600,000
Construction Cost: $58,000,000
Construction Engineering $2,600,000
Contingencies: $4,500,000
Indirect Costs: $1,300,000
Preliminary Engineering: $5,800,000
Other Field $2,600,000
$78,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$58,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$58,000,000
$0
Other $0
Other $0
$0 $0 $0 $58,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $58,000,000 $58,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-113
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$58,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
10/19 - move from 21 to 24 and rev funding/cost; 1/19 - rev descr to incl FR lns; 10/18 - move 20 to 21, rev descr, TPC & funding, move to TxDOT; 4/17 - rev cost; 4/14 - rev limits, year ('15 to '20), descr and
2025,2035,2045 TDM Network Years:
47Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 225 of 337
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2024FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of
Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
Updated:
December 3, 2020 TIP PROJECTS FY 2021-2024
Comal15 - San Antonio
Description:
FM 3351 C TxDOT 5541.0
Limits From: at Cibolo Creek
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $11,900,000
Construction Engineering $714,000
Contingencies: $833,000
Indirect Costs: $595,000
Preliminary Engineering: $583,000
Other Field $476,000
$15,101,000
Type of Work: Bridge
Total Project Cost:
$11,900,000
Authorized Funding by Category/Share
Fair Oaks Ranch
Cost of Approved Phases:
7 - STBG
Other
$11,900,000
$0
Other $0
Other $0
$9,520,000 $2,380,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,520,000 $2,380,000 $0 $0 $11,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3212-05-013
Reconstruct existing bridge and expand from 2 to 6 lanes
Status: RSR
$11,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Approaches remain 2 lanes
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
2025,2035,2045 TDM Network Years:
48Phase: C=Construction, E=Engineering, R=ROW, T=Transfer Emissions reductions are provided for CMAQ projects only.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 226 of 337
Transit Project Listing2021
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10401
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $34,545,420
State Funds from TxDOT: $0
Other Funds: $8,636,355
Total Project Cost: $43,181,775
Project Description: Fiscal Year Cost: $43,181,775
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10403
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10409
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $54,000
State Funds from TxDOT: $10,076,092
Other Funds: $375,500
Total Project Cost: $10,505,592
Project Description: Fiscal Year Cost: $10,505,592
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10405
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $1,592,778
State Funds from TxDOT: $0
Other Funds: $398,195
Total Project Cost: $1,990,973
Project Description: Fiscal Year Cost: $1,990,973
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
61Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 227 of 337
Transit Project Listing2021
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10406
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $176,975
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $176,975
Project Description: Fiscal Year Cost: $176,975
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10407
Transit: Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $7,672,871
State Funds from TxDOT: $0
Other Funds: $16,967,129
Total Project Cost: $24,640,000
Project Description: Fiscal Year Cost: $24,640,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10410
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $7,723,853
State Funds from TxDOT: $16,557,153
Other Funds: $6,292,563
Total Project Cost: $30,573,569
Project Description: Fiscal Year Cost: $30,573,569
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10412
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $150,000
Total Project Cost: $150,000
Project Description: Fiscal Year Cost: $150,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
62Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 228 of 337
Transit Project Listing2021
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10413
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $4,105,000
Total Project Cost: $4,105,000
Project Description: Fiscal Year Cost: $4,105,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10408
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $872,500
Total Project Cost: $872,500
Project Description: Fiscal Year Cost: $872,500
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10411
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10414
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $6,089,626
Total Project Cost: $6,089,626
Project Description: Fiscal Year Cost: $6,089,626
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
63Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 229 of 337
Transit Project Listing2021
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10415
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10416
Transit: Administrative Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $90,000
Total Project Cost: $90,000
Project Description: Fiscal Year Cost: $90,000
General Project Information Funding Information (YOE)
Date TDC Awarded:
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10417
Transit: Misc. (Facilities, Equipment, Other)
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $300,000
Total Project Cost: $300,000
Project Description: Fiscal Year Cost: $300,000
General Project Information Funding Information (YOE)
Date TDC Awarded:
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: Note: CMAQ flexed in 2020
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.1
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-67
Purchase 14 CNG Buses
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $5,493,334
State Funds from TxDOT: $0
Other Funds: $2,060,000
Total Project Cost: $7,553,334
Project Description: Fiscal Year Cost: $7,553,334
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
64Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 230 of 337
Transit Project Listing2021
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.2
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-67
Purchase 14 CNG Buses
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $5,493,334
State Funds from TxDOT: $0
Other Funds: $2,060,000
Total Project Cost: $7,553,334
Project Description: Fiscal Year Cost: $7,553,334
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: Note: CMAQ flexed in 2020
Project Phase: C,O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.1
Transit: Revenue Vehicles and Service
Bus Frequency Program CSJ 0915-12-673
Purchase 9 CNG buses and increase service on #7 and #552 routes
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $5,076,382
State Funds from TxDOT: $0
Other Funds: $1,960,762
Total Project Cost: $7,037,144
Project Description: Fiscal Year Cost: $7,037,144
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2020
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.2
Transit: Service
Bus Frequency Program CSJ 0915-12-680
Increase service on #7 and #552 routes
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $1,191,810
State Funds from TxDOT: $0
Other Funds: $989,619
Total Project Cost: $2,181,429
Project Description: Fiscal Year Cost: $2,181,429
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2021
65Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 231 of 337
Transit Project Listing2022
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10501
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $36,301,207
State Funds from TxDOT: $0
Other Funds: $9,075,302
Total Project Cost: $45,376,509
Project Description: Fiscal Year Cost: $45,376,509
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10503
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10507
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5307,5339
Federal (FTA) Funds: $7,981,301
State Funds from TxDOT: $10,004,417
Other Funds: $764,253
Total Project Cost: $18,749,971
Project Description: Fiscal Year Cost: $18,749,971
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10504
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $1,672,417
State Funds from TxDOT: $0
Other Funds: $418,104
Total Project Cost: $2,090,521
Project Description: Fiscal Year Cost: $2,090,521
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
66Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 232 of 337
Transit Project Listing2022
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10505
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $185,824
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $185,824
Project Description: Fiscal Year Cost: $185,824
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10506
Transit: Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $8,362,878
State Funds from TxDOT: $0
Other Funds: $14,765,185
Total Project Cost: $23,128,063
Project Description: Fiscal Year Cost: $23,128,063
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10510
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $40,000
State Funds from TxDOT: $0
Other Funds: $1,060,000
Total Project Cost: $1,100,000
Project Description: Fiscal Year Cost: $1,100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10508
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $280,000
Total Project Cost: $280,000
Project Description: Fiscal Year Cost: $280,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
67Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 233 of 337
Transit Project Listing2022
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10509
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10511
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,235,000
Total Project Cost: $1,235,000
Project Description: Fiscal Year Cost: $1,235,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10512
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $2,050,000
Total Project Cost: $2,050,000
Project Description: Fiscal Year Cost: $2,050,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10513
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $256,282
Total Project Cost: $256,282
Project Description: Fiscal Year Cost: $256,282
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
68Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 234 of 337
Transit Project Listing2022
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10514
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $0
Project Description: Fiscal Year Cost: $0
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5580.3
Transit: Revenue Vehicles
Fleet Replacement Program CSJ 0915-12-68
Purchase 14 CNG Buses
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $5,493,333
State Funds from TxDOT: $0
Other Funds: $2,059,999
Total Project Cost: $7,553,332
Project Description: Fiscal Year Cost: $7,553,332
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 5581.3
Transit: Service
Bus Frequency Program CSJ 0915-12-686
Increase service on #7 and #552 routes
Federal Funding Category: FTA - Section 5307
Federal (FTA) Funds: $1,191,809
State Funds from TxDOT: $0
Other Funds: $989,618
Total Project Cost: $2,181,427
Project Description: Fiscal Year Cost: $2,181,427
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2022
69Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 235 of 337
Transit Project Listing2023
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10601
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $38,144,783
State Funds from TxDOT: $0
Other Funds: $9,536,196
Total Project Cost: $47,680,979
Project Description: Fiscal Year Cost: $47,680,979
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10603
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10604
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $1,756,038
State Funds from TxDOT: $0
Other Funds: $439,010
Total Project Cost: $2,195,048
Project Description: Fiscal Year Cost: $2,195,048
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10605
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $195,115
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $195,115
Project Description: Fiscal Year Cost: $195,115
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
70Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 236 of 337
Transit Project Listing2023
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10607
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $896,274
State Funds from TxDOT: $345,711
Other Funds: $1,501,250
Total Project Cost: $2,743,235
Project Description: Fiscal Year Cost: $2,743,235
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10608
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $2,084,000
State Funds from TxDOT: $0
Other Funds: $521,000
Total Project Cost: $2,605,000
Project Description: Fiscal Year Cost: $2,605,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10611
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $1,788,000
State Funds from TxDOT: $0
Other Funds: $447,000
Total Project Cost: $2,235,000
Project Description: Fiscal Year Cost: $2,235,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10606
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $483,167
Total Project Cost: $483,167
Project Description: Fiscal Year Cost: $483,167
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
71Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 237 of 337
Transit Project Listing2023
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10609
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $53,093,000
Total Project Cost: $53,093,000
Project Description: Fiscal Year Cost: $53,093,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10610
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $150,000
Total Project Cost: $150,000
Project Description: Fiscal Year Cost: $150,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10612
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $1,005,000
Total Project Cost: $1,005,000
Project Description: Fiscal Year Cost: $1,005,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10613
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $4,805,000
Total Project Cost: $4,805,000
Project Description: Fiscal Year Cost: $4,805,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2023
72Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 238 of 337
Transit Project Listing2024
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10701
Transit: Operating Expenses
Capital Cost of Contracting, ADA, Preventive Maintenance
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $40,080,538
State Funds from TxDOT: $0
Other Funds: $10,020,134
Total Project Cost: $50,100,672
Project Description: Fiscal Year Cost: $50,100,672
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10703
Transit: JARC Operating Projects
Pass Through to AACOG
Transportation Services for New Braunfels, Cibolo, McQueeney, Marion, Schertz, etc
Federal Funding Category: FTA - 5307
Federal (FTA) Funds: $570,315
State Funds from TxDOT: $0
Other Funds: $570,315
Total Project Cost: $1,140,630
Project Description: Fiscal Year Cost: $1,140,630
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: O
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10704
Transit: Mobility of Seniors and Persons
with Disabilities
Other Programs Pass through to Subrecipients
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $1,843,640
State Funds from TxDOT: $0
Other Funds: $460,960
Total Project Cost: $2,304,800
Project Description: Fiscal Year Cost: $2,304,800
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: A
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10705
Transit: Mobility of Seniors and Persons
with Disabilities
Program Administration
Federal Funding Category: FTA - 5310
Federal (FTA) Funds: $204,871
State Funds from TxDOT: $0
Other Funds: $0
Total Project Cost: $204,871
Project Description: Fiscal Year Cost: $204,871
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
73Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 239 of 337
Transit Project Listing2024
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10707
Transit: Passenger Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $26,989
State Funds from TxDOT: $0
Other Funds: $460,346
Total Project Cost: $487,335
Project Description: Fiscal Year Cost: $487,335
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10708
Transit: Operational Facilities
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $80,000
State Funds from TxDOT: $0
Other Funds: $20,000
Total Project Cost: $100,000
Project Description: Fiscal Year Cost: $100,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10711
Transit: Replacement Components for
Revenue Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $48,000
State Funds from TxDOT: $0
Other Funds: $12,000
Total Project Cost: $60,000
Project Description: Fiscal Year Cost: $60,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10712
Transit: Computer Hardware/Software
See Appendix for Project Detail
Federal Funding Category: FTA - 5339
Federal (FTA) Funds: $3,200,000
State Funds from TxDOT: $0
Other Funds: $1,745,000
Total Project Cost: $4,945,000
Project Description: Fiscal Year Cost: $4,945,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
74Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 240 of 337
Transit Project Listing2024
Alamo Area MPO Transportation Improvement Program
San Antonio TxDOT District YOE=Year of Expenditure
FY
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10706
Transit: Service Vehicles
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $711,041
Total Project Cost: $711,041
Project Description: Fiscal Year Cost: $711,041
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10709
Transit: Advanced Rapid Transit Project
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $56,457,000
Total Project Cost: $56,457,000
Project Description: Fiscal Year Cost: $56,457,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10710
Transit: Maintenance Tools and Equipment
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $182,000
Total Project Cost: $182,000
Project Description: Fiscal Year Cost: $182,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
Project Sponsor: VIA Metropolitan Transit
Section 5309 ID #: N/A
Project Phase: C
TDC Awarded: $0
TDC Requested: $0
MPO Project Number: 10713
Transit: Bus Operations and
Maintenance Facility
See Appendix for Project Detail
Federal Funding Category: FTA - None
Federal (FTA) Funds: $0
State Funds from TxDOT: $0
Other Funds: $34,270,000
Total Project Cost: $34,270,000
Project Description: Fiscal Year Cost: $34,270,000
General Project Information Funding Information (YOE)
Date TDC Awarded: N/A
Apportionment Year: 2024
75Projects are sorted by Federal Funding Category and MPO Project Number.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 241 of 337
Transportation Policy Board December 14, 2020
c. 2020 Transportation Conformity Document
On July 17, 2018, the U.S. Environmental Protection Agency (EPA) officially designated Bexar County as nonattainment for the 2015 ozone standard.
The draft Transportation Conformity Document is attached. More information will be available soon at http://www.alamoareampo.org/airquality/conformity/
The 30 day online public comment period will run from Monday, December 14, 2020 through Tuesday, January 12, 2021. The online public meeting is scheduled for 5:00-6:00 p.m. on Tuesday, January 5th. Transportation Policy Board action is scheduled for Monday, January 25, 2021.
Action Requested
Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 242 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
1
2021 Transportation Conformity
2045 Metropolitan Transportation Plan and 2021-2024 Transportation Improvement Program
for the Alamo Area
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 243 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
2
What is the Alamo Area MPO?
The Alamo Area Metropolitan Planning Organization (MPO) is the designated MPO for
the greater San Antonio area. The MPO develops transportation plans and programs to
address the needs of Bexar, Comal, Guadalupe and a portion of Kendall Counties, a
region that is home to more than 2.2 million people.
List of Transportation Policy Board and Technical Advisory Committee
Members
http://www.alamoareampo.org/Committees/TPB/docs/TPB_Members.pdf http://www.alamoareampo.org/Committees/TAC/docs/TAC_Members.pdf
Electronic Submittal
Conformity analysis documentation typically requires a significant amount of information
to be submitted through an interagency consultation process. All items of this analysis
are provided in electronic format. The electronic structure is organized consistent to this
document’s Table of Contents by chapter, section and appendix for efficient reviewing.
Acknowledgements
Prepared in cooperation with the Texas Department of Transportation and the U.S.
Department of Transportation, Federal Highway Administration and Federal Transit
Administration.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 244 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
3
Abstract
TITLE: Transportation Conformity
DATE: January 2021
AUTHORS: Allison Blazosky Transportation Planning Program Manager
Zachary Graham Senior Transportation Modeler
SUBJECT: Transportation Conformity Determination for the Alamo Area
Nonattainment Area including Mobility 2045: The Metropolitan
Transportation Plan for the Alamo Area (Mobility 2045) and the 2021-
2024 Transportation Improvement Program for the Alamo Area (2021-
2024 TIP)
SOURCE Alamo Area Metropolitan Planning Organization OF COPIES: 825 S St. Mary’s Street
San Antonio, TX 78205
NUMBER 58 OF PAGES:
ABSTRACT: This report documents the conformity determination of the Bexar
County nonattainment area. As required under Section 176(c)(4) of the
Clean Air Act Amendments of 1990, Metropolitan Planning
Organizations and the U.S. Department of Transportation are to make
conformity determinations on transportation plans and transportation
improvement programs before they are adopted, approved or accepted
in air quality nonattainment areas. This report documents the conformity
determination of Mobility 2045 and 2021‐2024 TIP by demonstrating
both meet the conformity‐related requirements of the Clean Air Act
Amendments of 1990 (United States Code, Title 42 Section 7506),
State Implementation Plan, and the final conformity rule (Title 40 Code
of Federal Regulations, Parts 51 and 93).
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 245 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
4
This page intentionally left blank
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 246 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
5
Table of Contents
What is the Alamo Area MPO? ..................................................................................... 2
List of Transportation Policy Board and Technical Advisory Committee Members ....... 2
Electronic Submittal ...................................................................................................... 2
Acknowledgements ....................................................................................................... 2
Abstract ........................................................................................................................ 3
List of Exhibits .............................................................................................................. 7
Glossary of Abbreviations ............................................................................................. 9
Chapter 1: Executive Summary ...................................................................................... 10
1.1 Conformity Overview ............................................................................................ 10
1.2 Nonattainment Area .............................................................................................. 10
1.3 Analysis ................................................................................................................ 11
1.4 Summary .............................................................................................................. 12
Chapter 2: Air Quality ..................................................................................................... 13
2.1 Air Pollution........................................................................................................... 13
2.1.1 Ground Level Ozone ...................................................................................... 13
2.2 Background on the Bexar County Ozone Nonattainment Area ............................. 13
2.2.1 Current Ozone Standard ................................................................................ 13
Chapter 3: Conformity .................................................................................................... 15
3.1 What is Transportation Conformity ....................................................................... 15
3.2 Purpose ............................................................................................................... 16
3.3 Conformity Criteria ................................................................................................ 16
3.4 Checklist ............................................................................................................... 16
3.5 Emissions Analysis ............................................................................................... 20
3.5.1 Regional Inventory ......................................................................................... 20
3.5.2 Emissions Tests ............................................................................................. 20
3.5.3 Analysis Years ............................................................................................... 20
3.5.4 Analysis Results ............................................................................................. 21
Chapter 4: Mobility 2045 and 2021-2024 TIP ................................................................. 23
4.1 Overview .............................................................................................................. 23
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 247 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
6
4.2 Submittal Frequency ............................................................................................ 23
4.3 Regionally Significant Travel Projects/Programs ................................................. 24
4.4 Non-Federal Projects/Programs .......................................................................... 25
4.5 Exempt Projects/Programs .................................................................................. 26
4.6 Constraints ........................................................................................................... 26
4.6.1 Long-Range Financial Constraint (Plan) ....................................................... 26
4.6.2 Short-Range Financial Constraint (TIP) ......................................................... 27
Chapter 5: Estimation of Vehicle Activity ....................................................................... 28
5.1 Travel Demand Model Overview (Regional SAMM4.1 TDM) ................................ 28
5.2 Multimodal Transportation Analysis Process ........................................................ 30
5.2.3 Roadway & Transit Assignment Model .......................................................... 32
5.3 Speed Estimation Procedure ................................................................................ 32
5.4 Local Speed VMT ................................................................................................. 33
5.5 Model VMT Adjustments ....................................................................................... 33
5.5.1 2017 Historical Year HPMS Consistency and Summer Weekday Adjustments
................................................................................................................................ 34
5.5.3 Summer Weekday Hourly VMT Distribution ................................................... 35
5.5.4 Directional Factors ......................................................................................... 36
5.5.5 Hourly Congested Speeds ............................................................................. 36
5.6 Transit System ...................................................................................................... 36
5.6.1 Transit VMT .................................................................................................... 36
5.7 Roadway Travel & VMT by Time of Day ............................................................... 37
5.7.1 Average Loaded Speeds ................................................................................ 37
5.7.2 Centerline and Lane Miles.............................................................................. 37
Chapter 6: Estimation of Off-Network Activity ................................................................ 38
6.1 Estimation of Vehicle Population .......................................................................... 38
6.1.1 Vehicle Population Estimates for 2017, 2025, 2035 and 2045 ....................... 38
6.2 Estimation of Source Hours Parked ...................................................................... 39
6.3 Estimation of Starts ............................................................................................... 40
6.4 Estimation of Source Hours Idling and Auxiliary Power Unit Hours ...................... 40
Chapter 7: Emission Factors / MOVES Model ............................................................... 42
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 248 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
7
7.1 Overview ............................................................................................................... 42
7.2 Emissions Factor Estimation Model ...................................................................... 42
7.2.1 Vehicle Registration Distribution .................................................................... 49
7.3 Adjustments to Emission Factors .......................................................................... 50
7.3.1 Low Emissions Diesel NOx Adjustment ......................................................... 50
7.3.2 Vehicle Miles of Travel Mix ............................................................................. 50
7.4 Modeled Emission Estimation ............................................................................... 51
Chapter 8: Mobile Source Emission Reduction Strategies (MoSERS) ........................... 52
8.1 Overview ............................................................................................................... 52
8.2 Congestion Mitigation and Air Quality Improvement Program .............................. 52
Chapter 9: Determination of Regional Emissions ........................................................... 53
9.1 Procedure ............................................................................................................. 53
9.2 Modeled Emissions ............................................................................................... 53
9.3 Adjustments to Emission Factors .......................................................................... 53
9.4 Mobile Source Emission Reduction Strategies ..................................................... 53
9.5 Final Emission Analysis Results ........................................................................... 53
Chapter 10: Interagency Consultation ............................................................................ 54
10.1 Process Description ........................................................................................... 54
Chapter 11: Public Participation ..................................................................................... 55
11.1 Process Description ............................................................................................ 55
List of Appendices .......................................................................................................... 59
List of Exhibits
Exhibit 1.2-1 Alamo Area Metropolitan Planning Area and Nonattainment Area.………11
Exhibit 1.3-1 Emission Results for the Bexar County Nonattainment Area………….….11
Exhibit 2.2.1-1 Alamo Area Design Value in Parts Per Billion………………..…………..14
Exhibit 3.4-1 Information Required for Transportation Conformity Review……………...16
Exhibit 3.5.2-1 Baseline Emissions for the Bexar County Nonattainment Area………………………………………………………………………………………..……20
Exhibit 3.5.3-1 Required Analysis Years……………………………………………………21
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 249 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
8
Exhibit 3.5.4-1 2020 Transportation Conformity for the Bexar County Nonattainment Area Emissions of Nitrogen Oxides……………………………………………………….……….22
Exhibit 3.5.4-2 2020 Transportation Conformity for the Bexar County Nonattainment Area Emissions of Volatile Organic Compounds………………………………………..……….21
Exhibit 4.3-1 Regionally Significant Roads in Bexar County…………………………......25
Exhibit 5.1-1 TDM Daily Time Periods………………………………………………………28
Exhibit 5.1-2 Facility Type Codes……………………………………………………………29
Exhibit 5.1-3 Area Types…………………………………………………………………......30
Exhibit 5.2.1-1 Trip Purposes……………………………………………………………...…31
Exhibit 5.2.3-1 Mode Choices Modeled…………………………………………………..…32
Exhibit 5.5.2-1 HPMS Factor…………………………………………………………………34
Exhibit 5.5.2-2 Summer Weekday Factors for Analysis Years 2017, 2025, 2035 and 2045……………………………………………………………………………………..………34
Exhibit 5.5.3-1 Summer Weekday Hourly VMT Distributions…………………………..…35
Exhibit 6.1-1 TxDMV Vehicle Registration Aggregations and Associated Vehicle Types for Estimating Vehicle Populations…………………………………………39
Exhibit 6.4-1 Hotelling Activity Distributions by Model Year………………………………41
Exhibit 7.2-1 MOVES2014a External Conditions…………………………………………..43
Exhibit 7.2-2 MOVES2014a Input…. Parameters and Source……………………………44
Exhibit 7.2-3 MOVES2014a Hourly Meteorological Data for Bexar County..……………47
Exhibit 7.2-4 MOVES2014a Fuel Supply……………………………………………………48
Exhibit 7.2-5 MOVES2014a Fuel Formulation Inputs for Bexar County..……………..…49
Exhibit 7.2.1-1 TxDMV Vehicle Registration Aggregations and Associated Vehicle Types for Estimating Vehicle Populations…………………………………………48
Exhibit 7.3.2-1 Vehicle Types Delineated in Local VMT Mix…………………………...…51
Exhibit 9.2-1 Emission Results for the Bexar County Nonattainment Area…………..…53
Exhibit 10.1-1 Interagency Consultation Meeting Participation………………………..…54
Exhibit 11.1-1: Public Involvement for Transportation Conformity…………………….…57
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 250 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
9
Glossary of Abbreviations AT Area Type ANSWT Average Non-Summer Weekday
Travel CAA Clean Air Act CAAA Clean Air Act Amendments of
1990 CBD Central Business District CFR Code of Federal Regulations CMAQ Congestion Mitigation and Air
Quality Improvement Program CMP Congestion Management
Process EAC Early Action Compact EPA Environmental Protection Agency FAST Act Fixing America’s Surface
Transportation Act FHWA Federal Highway Administration FTA Federal Transit Administration FY Fiscal Year GVWR Gross Vehicle Weight Rating HBW Home-based Work HNW Home-based Non-work HOV High Occupancy Vehicle HPMS Highway Performance Monitoring
System IAC Interagency Consultation I/M Inspection and Maintenance ITS Intelligent Transportation System MAP-21 Moving Ahead for Progress in the
21st Century Mobility 2045 Mobility 2045: The Metropolitan
Transportation Plan for the Alamo Area
MoSERS Mobile Source Emissions Reduction Strategies
MOVES Motor Vehicle Emissions Simulator
MPA Metropolitan Planning Area MPO Metropolitan Planning
Organization MTP Metropolitan Transportation Plan MVEB Motor Vehicle Emissions
Budgets
NAAQS National Ambient Air Quality Standards
NHB Non-home based NOx Nitrogen Oxides ppb Parts per Billion PM Particulate Matter RFP Reasonable Further Progress SAFETEA-LU Safe, Accountable, Flexible,
Efficient Transportation Equity Act: A Legacy for Users
SHI Source Hours Idling SHP Source Hours Parked SHO Source Hours Operating SIP State Implementation Plan SUT Source Use Type TAC Technical Advisory Committee TAZ Traffic Analysis Zone TCM Transportation Control Measure TCEQ Texas Commission on
Environmental Quality TERM Transportation Emission
Reduction Measure TIP Transportation Improvement
Program TPB Transportation Policy Board tpd Tons per Day TTI Texas A&M Transportation
Institute TxDMV Texas Department of Motor
Vehicles TxDOT Texas Department of
Transportation TWG Technical Working Group for
Mobile Source Emissions USC United States Code USDOT United States Department of
Transportation WOE Weight of Evidence VHT Vehicle Hours of Travel VIA VIA Metropolitan Transit VMT Vehicle Miles of Travel VOC Volatile Organic Compounds
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 251 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
10
Chapter 1: Executive Summary
1.1 Conformity Overview
Section 176(c)(4) of the Clean Air Act Amendments (CAAA) of 1990 requires
Metropolitan Planning Organizations (MPOs) for areas designated as nonattainment for
the pollutant ozone to conduct an air quality conformity analysis to ensure metropolitan
transportation plans (MTP) and transportation improvement programs (TIP) are
consistent with the region’s air quality goals. The conformity analysis estimates two
precursors to ozone – nitrogen oxides (NOx) and volatile organic compounds (VOC) –
that result from the area’s multi-modal transportation system. The analysis must
demonstrate that expected future year emission totals of on-road mobile sources in the
Bexar County nonattainment area are under emission totals of a known baseline year.
1.2 Nonattainment Area
Bexar County is classified as marginal nonattainment under the 2015 8-hour ozone
National Ambient Air Quality Standards (NAAQS), shown in Exhibit 1.2-1. The Alamo
Area Metropolitan Planning Organization is responsible for conducting the air quality
conformity analysis to address the 2015 ozone NAAQS.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 252 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
11
Exhibit 1.2-1 Alamo Area Metropolitan Planning Area and Nonattainment Area
1.3 Analysis
This emissions analysis is being conducted to ensure that the MPO’s Metropolitan
Transportation Plan, known as Mobility 2045, and the 2021-2024 TIP meet the
conformity‐related requirements of the CAAA, State Implementation Plan (SIP), and the
final conformity rule (40 CFR Parts 51 and 93). The analysis years for this conformity
are: 2017 (baseline year), 2025, 2035, and 2045 (MTP horizon year). To meet regional
air quality conformity requirements, emissions in all future analysis years must be lower
than the emissions of the baseline year. PENDING: The NOX and VOC vehicle emission
results shown in Exhibit 1.3-1 demonstrates the requirement is met.
Exhibit 1.3-1 Emission Results for the Bexar County Nonattainment Area
Analysis Year NOx (tons/day) VOC (tons/day)
2017 (Baseline) pending pending
2025 pending pending
2035 pending pending
2045 pending pending
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 253 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
12
1.4 Summary
Results of the transportation conformity determination demonstrate Mobility 2045 and
the 2021-2024 TIP for the MPO meet all transportation air quality conformity
requirements of the Clean Air Act Amendments and the final conformity rule (40 CFR
Parts 51 and 93). More information on what conformity is and the regulations that apply
to it can be found at:
https://www.fhwa.dot.gov/environment/air_quality/conformity/index.cfm. This conformity
determination involved a pre-analysis consensus plan agreed upon by the Interagency
Consultation (IAC) partner agencies (Chapter 10) and a public comment period
(Chapter 11).
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 254 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
13
Chapter 2: Air Quality
2.1 Air Pollution
Based on the 1970 Clean Air Act and subsequent Amendments (CAAA), the U.S.
Environmental Protection Agency (EPA) sets national standards, known as National
Ambient Air Quality Standards (NAAQS), for six criteria pollutants: ozone, particulate
matter, carbon monoxide, sulfur dioxide, nitrogen dioxide and lead. In the Alamo Area,
the primary pollutant issue is ozone. Up-to-date regional information is available on the
Alamo Area Metropolitan Planning Organization (MPO) website at
www.alamoareampo.org/airquality.
2.1.1 Ground Level Ozone
Ground level or “bad” ozone is not emitted directly into the air. It is created when
nitrogen oxides (NOx) and volatile organic compounds (VOC) chemically react in the
presence of sunlight. The Texas Commission on Environmental Quality (TCEQ), in
concert with the MPO, is responsible for the part of the State Implementation Plan (SIP)
that describes the amount of NOx and VOC emitted by on-road vehicles.
Ground level ozone is known to trigger a variety of health problems. It is particularly
harmful for children, older adults and people of all ages who have lung diseases such
as asthma.
2.2 Background on the Bexar County Ozone Nonattainment Area
The EPA regulates ground level ozone based on the three-year average of the fourth-
highest eight-hour average ozone concentration at regulatory monitoring sites within the
region. This is referred to as the area’s design value. The Alamo Area has three
regulatory monitoring sites called Continuous Air Monitoring Stations (CAMS).
On April 15, 2004, the EPA designated Bexar, Comal and Guadalupe Counties in
violation, or "nonattainment", of the eight-hour ozone standard. That standard was set at
80 parts per billion (ppb).
The area entered into an Early Action Compact (EAC) with the EPA that deferred
nonattainment status for three years. As part of the EAC, the EPA would designate the
area in attainment for ozone if the area’s air quality could comply with the 80 ppb ozone
NAAQS during the 2005-2007 monitoring period. The area succeeded in the EAC, and,
in 2008, the EPA proposed and ultimately designated the Alamo Area in attainment.
In late 2008, the EPA set a new ozone standard of 75 parts per billion (ppb). The Alamo
Area violated this standard by 2012. With a new ozone NAAQS due in 2015, though,
the EPA refrained from designating areas newly in violation of the outgoing standard.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 255 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
14
2.2.1 Current Ozone Standard
While ozone levels in the Alamo Area have declined since 2012, the levels did not meet
the most recent ozone NAAQS set in 2015 of 70 ppb. In 2018, the EPA designated
Bexar County as marginal nonattainment, effective September 24, 2018. Under this
marginal classification, Bexar County has until September 24, 2021 to attain the 2015
ozone NAAQS.
Exhibit 2.2.1-1 summarizes the area’s declining design value compared against the
1997, 2008 and 2015 eight-hour ozone NAAQS.
Exhibit 2.2.1-1 Alamo Area Design Value in Parts Per Billion
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 256 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
15
Chapter 3: Conformity
3.1 What is Transportation Conformity
Transportation conformity ensures federal funding and approval go to transportation
activities consistent with air quality goals. Before the metropolitan transportation plan
(MTP) and transportation improvement program (TIP) can be adopted, approved, or
accepted in nonattainment areas, Metropolitan Planning Organizations (MPOs) and the
U.S. Department of Transportation must make transportation conformity determinations
on these documents. As described in Section 176(c)(1) of the Clean Air Act
Amendments (CAAA) of 1990, transportation conformity is granted when the following
conditions are met:
(A) conformity to an implementation plan’s purpose of eliminating or reducing the
severity and number of violations of the national ambient air quality standards and
achieving expeditious attainment of such standards; and
(B) that such activities will not –
(i) cause or contribute to any new violation of any standards in any area;
(ii) increase the frequency or severity of any existing violation of any standard in
any area; or
(iii) delay timely attainment of any standard or any required interim emission
reductions or other milestones in any area.
Because ozone budgets are not yet established for Bexar County, an interim emissions
test is the key analytic component of the transportation conformity process. It is
conducted to demonstrate that expected future year emission totals of on-road mobile
sources in the Bexar County nonattainment area are under emission totals of a known
baseline year. When this can be demonstrated through an emission model,
transportation activities are determined to be consistent with air quality goals identified
in the State Implementation Plan (SIP).
The determination of the analysis is a two-step process in metropolitan areas. The first
step is for the MPO to make the initial transportation conformity determination at the
local level. For the Alamo Area, the Transportation Policy Board (TPB) of the Alamo
Area MPO (MPO) makes this determination. The second step is for the Federal
Highway Administration (FHWA) and the Federal Transit Administration (FTA) to make
a joint transportation conformity determination at the federal level. Upon federal
approval, a four-year window begins during which projects, programs and policies
identified in the MTP and TIP may move toward implementation.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 257 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
16
3.2 Purpose
This transportation conformity was prompted by the adoption of a new TIP (2021-2024
TIP) and modification of the current MTP (Mobility 2045) for plan and TIP consistency.
3.3 Conformity Criteria
As stipulated by the Clean Air Act Amendments of 1990, transportation conformity
involves the following requirements:
• Use of the latest planning assumptions (40 CFR Part 93.110);
• Analysis based on the latest emission estimation model available (40 CFR Part
93.111);
• Interagency consultation and a public involvement process conducted during the
analysis (40 CFR Part 93.112);
• Timely implementation of Transportation Control Measures (TCMs) (40 CFR Part
93.113);
• An MTP and TIP that are consistent with the Motor Vehicle Emissions Budget
(MVEB) established in the applicable SIP (if there is an adequate or approved
SIP budget) (40 CFR Part 93.118); and
• Inclusion of all regionally significant projects expected in the nonattainment and
maintenance area in the MTP and TIP (40 CFR Part 93.114 & 115).
3.4 Checklist
In an effort to improve the efficiency of the conformity determination review process for
Texas, a checklist was developed as a guideline for preparing and reviewing
transportation conformity documents. Exhibit 3.4-1 is the checklist detailing information
relevant to this transportation conformity document.
Exhibit 3.4-1 Information Required for Transportation Conformity Review
Item Regulation Reference
Format Report
Location
Documents
Mobility 2045: The Metropolitan Transportation Plan (MTP)
40 CFR Part 93 Subpart A
Independent Self-Supporting Document (Electronic File)
Appendix 12.2
2021-2024 Transportation Improvement Program (TIP)
40 CFR Part 93 Subpart A
Independent Self-Supporting Document (Electronic File)
Appendix 12.3
Conformity document for the MTP and TIP
40 CFR Part 93 Subpart A
Independent Self-Supporting Document (Electronic File)
This document serves as the conformity document
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 258 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
17
Item Regulation Reference
Format Report
Location
Emission Model
Guidance Supporting MOVES Input Development (SIP Consistency, EPA's Information Sheets, etc.)
Discussion Contained in Conformity Document. EPA information in Appendix
Chapter 7 Appendix 12.10
Description of Version of MOVES Model Being Used
40 CFR Part 93.111
Discussion Contained in Conformity Document
Chapter 7
MOVES Input and Output Files Electronic (XML files and MYSQL Databases)
Appendix 12.11
MOVES Emission Factors Electronic (MYSQL Databases and text file format)
Appendix 12.12
MOVES External Reference Files (Estimated Hourly Emissions and Activity)
Electronic (Text file format)
Appendix 12.13
Mobile Source Emissions Reduction Strategies (MoSERS)
MoSERS Methodology and Calculation Descriptions
Electronic File Chapter 8
MoSERS Project Listing Electronic File N/A
Travel Demand Model
Highway Performance Monitoring System Adjustment(s), Factors, Approach
40 CFR Part 93.122(b)(3)
Discussion Contained in Conformity Document
Chapter 5
Description of Travel Demand Model Validation, Including Validation Year
40 CFR Part 93.106(a)(1)(ii)
Discussion Contained in Conformity Document
Chapter 5 Appendix 12.4
Vehicle Miles of Travel (VMT) (August Midweek 24-hour by Roadway Type)
Discussion Contained in Conformity Document
Appendix 12.5
Average Loaded Speeds (August Midweek 24-hour by Roadway Type)
Discussion Contained in Conformity Document
Appendix 12.5
Centerline Mile Summaries for Each Analysis Year
Discussion Contained in
Appendix 12.5
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 259 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
18
Item Regulation Reference
Format Report
Location
Conformity Document
Definition of Regionally Significant Roadway System
Discussion Contained in Conformity Document
Appendix 12.6
Network Link Listing for Each Analysis Year
Discussion Contained in Conformity Document (Electronic File) (Electronic Files should include TransCAD Files, SHAPE Files, and Spreadsheet Files)
Chapter 5 Appendix 12.7 Appendix 12.8
Files Containing Hourly Distribution By County, Roadway Type, and Vehicle Type for:
• Vehicle Miles of Travel
• Vehicle Hours
• Average Operational Speed
• Vehicle Population
• NOX Emissions
• VOC Emissions
Electronic Files in Tab Delimited Summary Tables
Appendix 12.14
SIP Requirements
TCMs in SIP Including Emission Reductions, Methodologies, Implementation Dates, etc.
N/A N/A
Timely Implementation of TCMs (progress)
40 CFR Part
93.113 N/A N/A
Project Listings
Congestion Mitigation and Air Quality Projects Containing: Emission Benefits, Methodologies, and Implementation Dates
N/A N/A
Roadway System (Capacity Staging)
Electronic File Appendix 12.7
List of Non-Federal Projects In response to March 2, 1999, court ruling
Identified in TIP: Independent Self- Supporting Document (Electronic File)
Appendix 12.3
List of Exempt Projects 40 CFR Part 93.105(c)
Identified in TIP: Appendix 12.3
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 260 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
19
Item Regulation Reference
Format Report
Location
40 CFR Part
93.126
40 CFR Part
93.1271
40 CFR Part
93.128
Independent Self-Supporting Document (Electronic File)
Evidence of Fiscal Constraint 40 CFR Part
93.108
Identified in TIP: Independent Self- Supporting Document (Electronic File)
Appendix 12.3
Evidence of MTP Specifically Describing the Transportation System Envisioned for Each Analysis Year
40 CFR Part
93.106(a)
Included in MTP: Independent Self- Supporting Document (Electronic File)
Appendix 12.2
Public, State and Federal Involvement
Conformity Pre-Analysis Consensus Plan
Electronic File Appendix 12.15
Documentation of pre-interagency consultation dialogue (conference calls, etc.)
40 CFR Part
93.105(b)
Discussion Contained In Conformity Document
Chapter 10 Appendix 12.15
Questions and comments raised through interagency consultation process and responses
40 CFR Part
93.105(b)(2) Electronic File Appendix 12.15
Evidence of Public Participation and Response to Comments
40 CFR Part
93.105(7)(e)
Discussion Contained In Conformity Document. Response to comments (Electronic File)
Chapter 11 Appendix 12.16
General
Glossary of Abbreviations
Discussion contained in Conformity Document
This conformity document, pg. 8
Endorsements and/or Resolutions Electronic File Appendix 12.1
1 Projects listed in 40 CFR 93.127 are exempt from regional emissions analysis, but not localized emissions (hot-spot) analysis
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 261 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
20
3.5 Emissions Analysis
A regional emissions analysis is a required component of the transportation conformity
process. It is conducted to demonstrate that regional emissions from on-road mobile
sources do not exceed the established area’s MVEB, cause or contribute to violations of
the NAAQS and to ensure transportation activities are consistent with air quality goals
identified in the SIP.
3.5.1 Regional Inventory
This conformity analysis of the Bexar County nonattainment area accounts for
emissions resulting from the nonattainment area’s MTP (Mobility 2045) including all
regionally significant projects located within the Bexar County nonattainment area
boundary.
3.5.2 Emissions Tests
This conformity determination uses the no-greater-than-baseline year emissions test (40
CFR Part 93.119(b)(2)(ii)). The baseline year test is one of two interim emissions tests
available to nonattainment areas classified as “marginal” and with no prior ozone
NAAQS budgets.
In this test, the transportation emissions reflecting the proposed MTP or TIP in the
analysis year (the “build” or “action scenario”) must not be greater than the level of
motor vehicle emissions in the baseline year. All conformity determinations using the
baseline year test as an interim emissions test must use 2017 as the baseline year (40
CFR Part 93.119(e)(4)). Exhibit 3.5.2-1 outlines the baseline NOx and VOC levels for
the Bexar County nonattainment area.
Exhibit 3.5.2-1 Baseline Emissions for the Bexar County Nonattainment Area
Nonattainment Area NOx (tons/day) VOC (tons/day)
2017 Baseline pending pending
3.5.3 Analysis Years
The required analysis years when using an interim emissions test, based on 40 CFR
Part 93.119(g)(1), are:
• A year no more than five years beyond the year in which the conformity
determination is being made;
• The last year of the timeframe of the conformity determination, and
• Intermediate years as necessary, such that analysis years are not more than ten
years apart
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 262 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
21
Exhibit 3.5.3-1 Required Analysis Years
Year Requirement (40 CFR Part 93.119(g))
2017 Transportation conformity baseline year
2025 A year within five years of the year the conformity determination is being made (2021)
2035 Intermediate year
2045 Last year of the transportation plan
3.5.4 Analysis Results
This emissions analysis for determining transportation conformity was performed under
the 40 CFR Part 93.119. PENDING: The vehicle emission results shown in Exhibits
3.5.4-1 and 3.5.4-2 demonstrate that the Bexar County nonattainment area meets the
conformity requirements for a newly designated nonattainment area.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 263 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
22
UPDATE Exhibit 3.5.4-1 2020 Transportation Conformity for the Bexar County Nonattainment Area Emissions of Nitrogen Oxides
UPDATE Exhibit 3.5.4-2 2020 Transportation Conformity for the Bexar County Nonattainment Area Emissions of Volatile Organic Compounds
18.24
11.25 11.48
0
5
10
15
20
25
30
35
40
2025 2035 2045
Emis
sio
ns
(to
ns/
day
)
Analysis Years
NOx Baseline (2017)
15.83
10.25 10.15
0
5
10
15
20
25
30
35
40
2025 2035 2045
Emis
sio
ns
(to
ns/
day
)
Analysis Years
VOC Baseline (2017)
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 264 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
23
Chapter 4: Mobility 2045 and 2021-2024 TIP
4.1 Overview
The Alamo Area MPO’s Metropolitan Transportation Plan (MTP), Mobility 2045, reflects
the transportation needs of the three and one-half county metropolitan planning area. It
is a long-range plan that identifies mobility and access goals for our region, strategies to
meet these goals and priority actions to be implemented by 2045. The geographic area
covered by this plan includes Bexar County, Comal County, Guadalupe County and a
portion of Kendall County (Exhibit 1.2-1). The MPO ensures the transportation planning
in the Alamo Area is in accordance with Section 112 of the Federal Highway Act of
1973. The Transportation Policy Board (TPB) is the policy body for the MPO and
oversees the regional transportation planning process. It continues to be the forum for
continuous, comprehensive and cooperative decisions on transportation planning in the
region.
4.2 Submittal Frequency
Bexar County was designated a marginal nonattainment area under the 2015 ozone
NAAQS, effective September 24, 2018. The designation triggered the region’s first
determination of transportation conformity, due from the MPO and U.S. Department of
Transportation (DOT) by September 24, 2019.
The MPO and DOT must determine the conformity of an MTP and TIP in nonattainment
areas no less frequently than every four years (40 CFR Part 93.104). Every
determination must include a new regional emissions analysis.
Each new MTP or revision to an MTP must be found to conform before the
transportation plan is approved by the MPO or accepted by the DOT. A determination of
transportation conformity is based on the MTP and revision taken as a whole. Only
revisions that simply add or delete exempt project types listed in 40 CFR Part 93.126 or
127 are exempt from this requirement.
A new or revised TIP must also conform before the TIP is approved by the MPO or
accepted by the DOT. A TIP amendment requires a new conformity determination for
the entire TIP before the amendment is approved. The only allowable exceptions are
again those found at 40 CFR Part 93.126 or 127.
Transportation conformity determinations can also be triggered by publication of State
Implementation Plans (SIPs) establishing or revising Motor Vehicle Emissions Budgets
(MVEB).
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 265 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
24
4.3 Regionally Significant Travel Projects/Programs
Projects determined to be regionally significant, except as specifically exempted under
40 CFR Part 93.126 and 40 CFR Part 93.127, must come from a conforming MTP and
TIP or be individually found to conform prior to the issuance of federal approvals and
other actions. The MPO has developed the following definition to classify projects as
regionally significant for transportation conformity purposes:
• Those facilities federally functionally classified as interstate freeways, other
freeways or expressways
• Those facilities federally functionally classified as principal arterials
• Roadways and intermodal connectors included in the federally adopted National
Highway System
• Roads designated as SH or US routes
• Community connections that provide direct, continuously signed connections
between nearby or adjacent census defined urbanized areas, urban clusters and
population centers with more than 5,000 people
• Roadways between activity centers that serve as primary regional connectors to
an otherwise unserved regional activity center
• Extensions of Regionally Significant Roadways to connect non-connecting
termini
• Fixed guideway transit facilities that offer an alternative to regional highway travel
• Tollways as documented in the Metropolitan Transportation Plan
• Grade-separated interchange projects on Regionally Significant Roadways
where no access existed previously
Exhibit 4.3-1 illustrates the roadway system within Bexar County that meets the definition
of regionally significant. These roads are subject to transportation and project-level
conformity determinations. All regionally significant roads in the MPO study area,
including those outside the Bexar County nonattainment area, can be viewed online at:
http://www.alamoareampo.org/imap/ (check “on” the layer titled “Regionally Significant
Roads”). Appendix 12.6 describes the local process undergone to identify a regionally
significant roadway system.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 266 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
25
Exhibit 4.3-1 Regionally Significant Roads in Bexar County
4.4 Non-Federal Projects/Programs
The MTP must include the design concept and descriptions for all existing and proposed
regionally significant transportation projects, regardless of funding source (23 CFR Part
450.324(f)(9)). Further, it must also identify all necessary financial resources from public
and private sources that are reasonably expected to be available to carry out the plan.
Such regionally significant projects are included within the plan’s conformity
determination.
Non-federal projects funded by sources such as local governments and local
transportation authorities, such as signal improvements, intersection improvements and
local roadway widening, may be of insufficient scale or scope to require inclusion within a
transportation conformity regional emissions analysis. These “non-regionally significant”
projects that do not require any federal project approval actions (i.e. environmental
clearance or permit approvals) are not individually listed within the MTP or TIP.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 267 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
26
4.5 Exempt Projects/Programs
A number of project types are exempt from the requirement of a transportation
conformity determination. Revisions to a conforming MTP or TIP that simply add or
delete such projects do not trigger a new conformity determination.
Some of the exempt projects listed under 40 CFR Part 93.126 include:
• continuation of ridesharing and vanpooling promotion activities at current levels,
• bicycle and pedestrian facilities,
• railroad/highway crossing,
• pavement resurfacing and/or rehabilitation,
• adding medians,
• widening narrow pavements or reconstructing bridges (no additional travel
lanes), and
• purchasing new transit vehicles to replace existing vehicles or for minor fleet
expansion.
40 CFR Part 93.127 identifies a number of project types exempt from a regional
emissions analysis but that may require project-level conformity in areas that are
nonattainment for carbon monoxide or particulate matter. This does not pertain to the
Bexar County nonattainment area.
Additionally, 40 CFR Part 93.128 exempts traffic signal synchronization projects but
requires that those which are regionally significant be included in subsequent regional
emissions analyses.
4.6 Constraints
One of the key requirements of the MTP and TIP is financial constraint, which is
intended to ensure that the total estimated cost of projects included in the MTP does not
exceed reasonably available estimated revenues. A conformity determination on
financially constrained plans ensures that conformity findings are based on realistic
plans and programs and that Transportation Control Measures (TCMs) and other
projects that may be beneficial to air quality are funded.
4.6.1 Long-Range Financial Constraint (Plan)
The MTP’s financial element must identify all sources of funds reasonably expected to
be available and any innovative financial strategies that may be necessary to implement
the MTP. The financial element of the MTP is documented in Mobility 2045: The
Metropolitan Transportation Plan for the Alamo Area MPO, which is included as
Appendix 12.2.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 268 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
27
4.6.2 Short-Range Financial Constraint (TIP)
Financial constraint is also required for a conforming TIP, with funds programmed being
equal to the total funds available. The TIP comprises the first four years of transportation
activities in the MTP, and the requirement of financial constraint ensures that those
activities committed to be funded in that timeframe have the financial resources
available for implementation. The 2021-2024 TIP is included as Appendix 12.3.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 269 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
28
Chapter 5: Estimation of Vehicle Activity
5.1 Travel Demand Model Overview (Regional SAMM4.1 TDM)
The MPO’s travel demand model (TDM), called San Antonio Multi-Modal Model
(SAMM4.1), was validated in 2015 and serves as the source for forecasting vehicle
miles of travel (VMT) and other travel characteristics for the MPO’s five-county model
region (Bexar, Comal, Guadalupe, Kendall and Wilson Counties). Although the model is
run for the entire 5-county region, subareas such as the MPO region, individual counties
or specific travel corridors can easily be “clipped out” for further processing. This
method is used to further process the modeling characteristics for the Bexar County
nonattainment area.
The network-based TDM is executed in the TransCAD environment, which is a
Geographic Information System-based commercial travel demand software package for
transportation planning. The MPO is responsible for the development and application of
the Regional TDM.
SAMM4.1 generates travel for 4 daily time periods outlined in Exhibit 5.1-1.
Exhibit 5.1-1 TDM Daily Time Periods
Time Period Description
A.M. Peak 6:00AM - 9:00AM
Midday 9:00AM - 3:00PM
P.M. Peak 3:00PM - 7:00PM
Overnight 7:00PM – 6:00AM
The methodology for developing and validating a regional travel demand model involves
a number of distinct steps:
• Develop base year (2015) demographic database
• Develop base year (2015) roadway network database
• Develop Tripcal5 Trip Generation model
• Develop Destination Choice Trip Distribution model
• Develop the Mode Choice model
• Develop vehicle and transit assignment models
• Cycle through the TDM process until the 2015 model is validated as compared to observed 2015 traffic counts and transit riders
The most recent model calibration and validation was performed for base year 2015.
The existing 2010 base year model was re-calibrated/validated on the basis of 2015
regional traffic counts and 2015 transit ridership. This effort also included a re-forecast
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 270 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
29
of county-wide demographic data, which was allocated to individual Traffic Analysis
Zones (TAZ) by a demographic allocation model as used for 2010. The 2015 county-
wide population estimates from the State Data Center were used as the control totals
for each of the five counties within the modeling region. TAZ population, households,
income and employment were interpolated for all analysis years, 2017 (baseline year),
2025, 2035 and 2045.
Network Development was performed to create representations of the five-county
highway and transit systems. For the roadway network, both physical and operational
characteristics are coded for each link. These include Functional Class, Facility Type,
Area Type, Lanes, Direction (1-way/2-way), Access (divided/undivided), Average Daily
Speed, Congested (loaded) Speed, Capacity and Count/Forecast traffic volumes. As
part of the network requirements for transportation conformity, several other link
attributes were added including Annotations (Letting Years), Descriptions (for Projects)
and Project IDs. An additional Edits field indicates the origination year of each network
link. This, along with the letting year is used to determine the “open and operational”
year so the project can be placed into the correct analysis year network.
For the transit network, Routes, Headways, Stops, Access (walk or park) and Fares are
coded. The transit network also contains (auto-generated) dedicated walk links from
Centroids to Stops.
The Facility Type Codes outlined in Exhibit 5.1-2 are used for the 2015 and all forecast
roadway networks.
Exhibit 5.1-2 Facility Type Codes
Facility Type Code
1. Radial IH FWY 10. Loop EXPY 19. Collector-Und
2. Radial HOV/Mgd FWY 11. Principal Art-Div 20. Frontage Rd
3. Loop IH FWY 12. Principal Art-CLT 21. Freeway Ramp
4. Loop HOV/Mgd FWY 13. Principal Art-Und 22. Direct Ramp
5. Radial Other FWY 14. Minor Art-Div 23. HOV/Mgd Ramp
6. Radial Other HOV/Mgd 15. Minor Art-CLT 24. Transit Link
7. Loop Other FWY 16. Minor Art-Und 99. Transit Walk
8. Loop Other HOV/Mgd 17. Collector-Div
9. Radial EXPY 18. Collector-CLT
In addition to facility type, each network link is associated with an area type (AT). ATs
are defined by TAZ density and used to set roadway speeds and capacities. Changes in
densities and area types over time enable the model networks to properly represent
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 271 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
30
roadway and transit performance within various types of urban settings. Generally, as
urban density increases, roadway speeds decline and capacities increase. Exhibit 5.1-3
outlines the five area types, from highest to lowest density.
Exhibit 5.1-3 Area Types
Area Type
Central Business District
(CBD)
CBD Fringe (Urban Dense)
Urban Residential
Suburban Residential
Rural
A brief description of the 2015 Travel Demand Model steps is provided in section 5.2.
Appendix 12.4 provides a more complete description of the TDM model development
and calibration/validation.
5.2 Multimodal Transportation Analysis Process
The forecasting techniques used by the MPO are based on a four-step process
designed to model observed travel behavior and predict the level of travel demand by
region (5-county), MPO study area, County (Bexar nonattainment area), sub-area or
specific travel corridors. The four model steps are: Trip Generation, Trip Distribution,
Mode Choice, and Roadway/Transit Assignment. A detailed explanation is included in
Appendix 12.4.
5.2.1 Trip Generation Model
The basic geographic unit for the travel demand modes is the traffic analysis zone
(TAZ). The Trip Generation model (TRIPCAL5) estimates trip productions and trip
attractions by trip purpose for each internal TAZ. There are 1,317 TAZs in the five-
county region modeled by the MPO. The various trip purposes used in the MPO model
are outlined in Exhibit 5.2.1-1.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 272 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
31
Exhibit 5.2.1-1 Trip Purposes
Trip Purpose
Home-based Work
Home-based non-work Retail
Home-based non-work Other
Home-based non-work Education (Grades 1-12)
Home-based non-work Education (College, Trade)
Non-work Airport
Non home-based
Non home-based (Visitor/Commuter)
Commercial Truck & Taxi
External-local Commercial Truck
External-local Non-commercial
External Through
TRIPCAL5, the Trip Generation model, estimates zonal trip productions by purpose
from zonal households, persons per household, income and household workers. The
model next estimates zonal trip attractions from zonal employment and zonal Area
Types. The model also ensures that total trip productions equal total trip attractions for
each trip purpose, so that every completed trip will have two trip ends.
Within the Trip Generation model, the concept of market segmentation is first applied,
segmenting (or disaggregating) person trip ends into various trip types, income and auto
sufficiency groups based upon the zonal characteristics from which they originate.
These market segments are carried forward into the Trip Distribution and Mode Choice
models to improve the estimation of trip destinations (Destination Choice Model) and
the estimation of selected travel modes.
5.2.2 Trip Distribution Model
The Trip Distribution Model (Destination Choice) determines the interaction between
each zone within the MPO study area. Trips are allocated to competing destinations
based on observed trip length frequencies and the attractiveness (number of trip
attractions) of each TAZ. Using the trip purpose and “market segmentation” by trip
purpose and income to inform the destination choice model of the relative
characteristics of the traveler, the model estimates appropriate destination choices for
the attraction end of the trip. This step produces completed trip interchanges with
reasonable overall trip length and travel time characteristics. Again, the market
segmentation is carried forward in the form of TAZ to TAZ trip matrices segmented by
trip purpose and traveler characteristics. Reasonableness checks are performed after
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 273 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
32
this step to ensure that modeled trip orientation matches (sector-to-sector) observed
travel flows.
5.2.3 Mode Choice Model
The Mode Choice (Nested Logit) model then determines the mode of travel selected by
travelers. These decisions are based upon characteristics of (1) the trip maker (income
and auto sufficiency); (2) the trip (purpose, length and orientation); and (3) the
availability and utility of the competing transportation modes. The mode choice model
produces travel for each of the four time periods for the modes listed in Exhibit 5.2.3-1.
Exhibit 5.2.3-1 Mode Choices Modeled
Mode Choice
Drive Alone
Shared Ride 2
Shared Ride 3+
Bus Local/Express (walk access)
Bus Local/Express (drive access)
Bicycle
Walk
5.2.3 Roadway & Transit Assignment Model
Finally, the Traffic Assignment model (TransCAD User Equilibrium) loads the travel
demand (trips) to the roadway network, calculates delay for congested links and re-
assigns as necessary to achieve network equilibrium. For future year networks
(containing managed lanes), additional steps are necessary to properly assign travel to
the managed facilities.
Two products of the Traffic Assignment Model are the regional traffic loads and transit
demand. Analyses of vehicle flow and current or future congestion are often used to
examine a variety of alternatives for future transportation systems.
The Transit Assignment model (TransCAD) simply assigns the transit riders to the
appropriate routes, according to access/egress (stops) and the need for possible
transfers between or among modes.
5.3 Speed Estimation Procedure
As part of the TDM calibration process, network (input) speeds are estimated for each
roadway facility type and further stratified by area type. The input speeds represent
average daily travel speeds, which produce average travel times for weekday travel.
Speeds on facilities that are access controlled (freeways/expressways) are the faster
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 274 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
33
speeds and decline for facilities that are affected by traffic controls at intersections.
Speeds also decline as area types become denser, which is indicative of typical urban,
suburban and rural activities affecting travel behavior.
In addition to input speeds, the SAMM4 modeling process contains a speed feedback
loop. This process degrades the network input speeds through a traditional Bureau of
Public Roads (BPR) curve, which is calibrated for the San Antonio region. Thus, speeds
are degraded as volume-to-capacity ratios (on a link-by-link basis) increase. The
degraded speeds are recycled through model steps 2-4 (distribution, mode choice and
assignment) and adjusted through five iterations to achieve a reasonable set of
consistent speeds as used by each model step. The final set of (loaded) link speeds
produced by the model consists of directional speeds for all facility types, area types
and for the four (weekday) daily time periods.
Transit or bus speeds are also estimated by the modeling process. As most of the
transit routes operate on roadways, the transit speeds begin with the roadway speeds
and are adjusted (within the speed feedback loop). The transit route speeds are also
further degraded based upon transit wait and dwell times calculated by transit routes.
For those transit routes operating in their own dedicated or restricted transit lanes, the
roadway input speeds are not affected by congestion.
5.4 Local Speed VMT
Local streets are not included in the regular roadway network coding, except for those
used by transit (transit links). Local street speeds as well as local street VMT are
estimated outside the modeling process so that total VMT can be reconciled with HPMS
VMT.
5.5 Model VMT Adjustments
Federal regulations require Highway Performance Monitoring System (HPMS) VMT to
be the primary measure of VMT within a nonattainment area. AAMPO provided TDM
data sets, including trip matrices and four-time-period, directional, average non-summer
weekday traffic (ANSWT) assignments, to the Texas A&M Transportation Institute (TTI)
for emissions analysis. TTI post-processed the data sets to determine average summer
weekday, county-coded, hourly, directional network link VMT and volumes consistent
with HPMS VMT, and added intrazonal link VMT estimates. The TDM network ANSWT
VMT plus intrazonal ANSWT VMT is referred to as “total model VMT”. The methodology
followed is consistent with the procedures TTI uses to develop model adjustment factors
for the other urban areas within Texas.
The summer weekday and hourly distribution factors were developed using the latest
available 10-year aggregate Texas Department of Transportation (TxDOT) San Antonio
District Automatic Traffic Recorder (ATR) traffic count data (2010-2019).
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 275 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
34
5.5.1 2017 Historical Year HPMS Consistency and Summer Weekday Adjustments
HPMS consistency: The 2017 historical year total model VMT was adjusted to summer
weekday VMT using county-level VMT control totals. The VMT control total is county
total, annual average daily traffic (AADT) HPMS VMT (from TxDOT’s 2017 Roadway
Inventory Annual Report), adjusted to the summer weekday form using the seasonal
adjustment. County control total VMT divided by county total model VMT produces the
adjustment applied by county to total model VMT at the link level.
Seasonal adjustment: The seasonal (summer) weekday factor for converting county
AADT HPMS VMT to county, summer weekday VMT control totals was calculated as
the ratio average summer weekday-to-AADT ATR counts.
5.5.2 2025, 2035 and 2045 Forecast Years HPMS Consistency and Summer
Weekday Adjustments
HPMS consistency: TTI applied an HPMS adjustment factor to total model link-level
VMT for each analysis year. The validation year HPMS adjustment factor was
calculated as 2015 HPMS VMT divided by 2015 validation year total model VMT. HPMS
VMT was first adjusted to ANSWT from the ANSWT/AADT ATR count ratio, based on
aggregate 2015 ATR data from the five TDM counties.
Seasonal adjustment: A county-level seasonal (summer) weekday factor was produced
and used with the 2025, 2035 and 2045 analysis years. This factor was calculated as
the ratio of the summer weekday-to-ANSWT counts.
Exhibits 5.5.2-1 and 5.5.2-2 outline the validation year HPMS factor and analysis year
seasonal (summer) weekday factor.
UPDATE Exhibit 5.5.2-1 HPMS Factor
2015 HPMS AADT VMT
AADT-to-ANSWT Factor
HPMS-Based ANSWT VMT
2015 TDM VMT1 HPMS Factor
53,827,397.00 1.02751 56,134,977.51 60,007,443.61 0.935466904
1 AAMPO-provided TDM data (December 17, 2019) processed by TTI (unchanged from previous AAMPO-provided TDM data [December 14, 2018] for prior January 2019 TTI emissions analysis).
UPDATE Exhibit 5.5.2-2 Summer Weekday (SWKD) Factors for Analysis Years 2017, 2025, 2035 and 2045
Year Seasonal Factor Type Factor
2017 (Baseline) AADT-to-SWKD 1.07579
2025 and later ANSWT-to-SWKD 1.02696
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 276 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
35
5.5.3 Summer Weekday Hourly VMT Distribution
County level, summer weekday, hourly travel factors were developed and used to
allocate the 24-hour link VMT/volume estimates to each hour of the day. A single set
was used for all analysis years. In order to maintain VMT proportions within each of the
four time periods, the hourly fractions were normalized within each time period. Exhibit
5.5.3-1 outlines the summer weekday hourly VMT distributions.
UPDATE Exhibit 5.5.3-1 Summer Weekday Hourly VMT Distributions
Period Hour 24-Hour-Period Four-Period1
AM Peak 3-Hrs.
6-7 a.m. 0.050238 0.283697
7-8 a.m. 0.068068 0.384385
8-9 a.m. 0.058777 0.331918
Mid-Day 6-Hrs.
9-10 a.m. 0.049564 0.154387
10-11 a.m. 0.048790 0.151976
11 a.m-12 p.m.
0.051999 0.161971
12-1 p.m. 0.054649 0.170226
1-2 p.m. 0.056347 0.175515
2-3 p.m. 0.059689 0.185925
PM Peak 4-Hrs.
3-4 p.m. 0.068092 0.238077
4-5 p.m. 0.076470 0.267370
5-6 p.m. 0.079294 0.277237
6-7 p.m. 0.062154 0.217316
Overnight 11-Hrs.
7-8 p.m. 0.045035 0.208620
8-9 p.m. 0.036392 0.168582
9-10 p.m. 0.032068 0.148552
10-11 p.m. 0.025152 0.116514
11 p.m.-12 a.m.
0.017459 0.080877
12-1 a.m. 0.009966 0.046166
1-2 a.m. 0.006758 0.031306
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 277 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
36
Period Hour 24-Hour-Period Four-Period1
2-3 a.m. 0.005895 0.027308
3-4 a.m. 0.006003 0.027808
4-5 a.m. 0.009358 0.043350
5-6 a.m. 0.021785 0.100917
1 To maintain VMT proportions within the four periods,
the hourly fractions were normalized within each period.
5.5.4 Directional Factors
Directional split factors were applied to total link volumes by functional class and area
type. The directional factors were created by aggregating TDM link-level volumes by
direction for each functional class/area type. Link-level AB directional volumes were
divided by total volumes for each functional class/area type to estimate the direction
split. This process was used for each TDM analysis year and time period.
5.5.5 Hourly Congested Speeds
TTI estimated directional, hourly operational link speeds using the TTI speed model,
which estimates delay on each link as function of volume-to-capacity and applies it to
the link’s estimated free-flow speed. TTI estimated the local streets category link
average operational speeds, represented by the centroid connector links, as centroid
connector TDM input speeds and, represented as added intrazonal links, as the zone’s
average centroid connector input speed.
5.6 Transit System
VIA Metropolitan Transit (VIA) is the only fixed route transit provider within Bexar
County, serving an area over 1,220 square miles that includes unincorporated parts of
Bexar County as well as Alamo Heights, Balcones Heights, Castle Hills, China Grove,
Cibolo (Bexar County portion only), Converse, Elmendorf, Kirby, Leon Valley, Olmos
Park, San Antonio, Shavano Park, Sandy Oaks, St. Hedwig and Terrell Hills.
Assumptions regarding the level of transit service for this transportation conformity
determination are consistent with VIA’s Vision 2040 long-range comprehensive
transportation plan.
5.6.1 Transit VMT
The mode choice model forecasts the number and the routing of the transit person trips.
(Person Trip Summaries by Mode for all analysis years are outlined in Appendix 12.9.)
Transit trips are assigned to the individual transit routes, based upon trip origins and
destinations. Buses, which are typically viewed as large commercial vehicles, are
accounted for in the traffic assignment model, so transit VMT would be included. The
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 278 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
37
travel demand model does not explicitly estimate VMT made by transit vehicles, but
emissions made by transit bus are captured in the vehicle fleet assumptions in the
emission model. Usually, however, improved transit service (current or projected) would
result in higher transit usage, which would reduce auto driver trips, VMT and emissions.
5.7 Roadway Travel & VMT by Time of Day
VMT estimates are provided by functional class and area type. VMT estimates for each
analysis year are listed in Appendix 12.5.
5.7.1 Average Loaded Speeds
Average Loaded Speeds are provided by functional class and area type. Final loaded
speeds for each analysis year are listed in Appendix 12.5.
5.7.2 Centerline and Lane Miles
Centerline miles and lane miles are provided by functional class and area type for each
analysis year are listed in Appendix 12.5.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 279 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
38
Chapter 6: Estimation of Off-Network Activity
To estimate the off-network (or parked vehicle) emissions, county-level, hourly
estimates of the source-hours-parked (SHP) and starts activity were required for each
vehicle type. Source hours extended idling (SHI) and auxiliary power unit (APU) hours
estimates were needed for combination long-haul trucks. For estimation of the SHP and
vehicle starts, vehicle population estimates were also needed. Appendix 12.13 contains
the vehicle population and hourly SHP, starts, SHI and APU hours.
6.1 Estimation of Vehicle Population
Vehicle population estimates are needed to estimate the SHP and starts off-network
activity. The vehicle population estimates were based on TxDMV registration data
(latest available [2018 end-of-year]), vehicle population factors derived from the VMT
mix and county-level VMT-based growth estimates for future years where actual
registration data were not yet available.
6.1.1 Vehicle Population Estimates for 2017, 2025, 2035 and 2045
Since registration data were not available for future year analyses, the most recent
TxDMV registration data sets (2018 end-of-year) were used. This data included vehicle
population aggregated by vehicle registration category (Exhibit 6.1-1). Since the TxDMV
registration data does not include each MOVES source use type and fuel type (SUT/FT)
combination, vehicle population factors are developed using the 24-hour VMT mix for
the analysis year. These factors are applied to vehicle registrations aggregated by
category to split each category into each SUT/FT combination included in the analysis.
This resulted in the base (2018) vehicle population estimates.
For each analysis year, VMT-based growth estimates were then calculated by dividing
county, analysis year, summer weekday VMT by county, 2018 summer weekday VMT.
These growth estimates were applied to the base vehicle population estimates to scale
from the 2018 base to each analysis year estimate.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 280 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
39
Exhibit 6.1-1 TxDMV Vehicle Registration Aggregations and Associated Vehicle Types for Estimating Vehicle Populations
Vehicle Registration1 Aggregation
Associated Vehicle Type2
Motorcycles MC_G
Passenger Cars (PC) PC_G; PC_D
Trucks ≤ 8,500 gross vehicle weight rating (GVWR) (pounds)
PT_G; PT_D; LCT_G; LCT_D
Trucks > 8,500 and ≤ 19,500 GVWR
RT_G; RT_D SUShT_G; SUShT_D
MH_G; MH_D IBus_D
TBus_G; TBus_D SBus_G; SBus_D
Trucks >19,500 GVWR CShT_G; CShT_D
NA2 SULhT_G; SULhT_D
CLhT_G; CLhT_D
1To estimate vehicle populations, mid-year TxDMV county registrations data extracts were used, consisting of: 1) light-duty cars, trucks, and motorcycles; 2) heavy-duty diesel trucks; and 3) heavy-duty gasoline trucks. 2 Vehicle population factors are the 24-hour weekday VMT mix fraction for each vehicle type in a category divided by the sum of the VMT mix fractions for all vehicle types in a category, except long-haul trucks. The four long-haul vehicle type populations are estimated using a long-haul-to-short-haul VMT mix ratio applied to the short-haul SUT population estimate.
6.2 Estimation of Source Hours Parked
The first activity measure needed to estimate the off-network emissions are county-level
estimates of SHP by hour and vehicle type for each activity scenario. The SHP was
estimated as a function of total hours (hours a vehicle exists) minus its hours of
operation on roads (source hours operating, or SHO, which is the same as VHT).
The vehicle type SHP estimates were calculated for each hour of the day based on the
link VMT and speeds, the VMT mix used in the link-based emissions analysis and the
vehicle population estimates.
The VMT mix was applied to the link VMT to produce VMT estimates by vehicle type.
Link VMT was divided by the link speed to produce SHO estimates. SHO was
aggregated across links, then subtracted from source hours (equal to vehicle population
as source hours equal number of hours in the period multiplied by the vehicle
population, and each period is one hour) resulting in SHP estimates by vehicle type.
This was performed for each analysis year, county and hour of day.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 281 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
40
6.3 Estimation of Starts
The second activity measure needed to estimate the off-network emissions are county-
level estimates of starts by hour and vehicle type for each activity scenario. Engine
starts were based on the MOVES national default starts per vehicle per hour by vehicle
type and the local vehicle type vehicle population estimates.
MOVES default weekday starts per vehicle were calculated using MOVES national
scale inventory mode national default run activity output, as vehicle starts (for the
MOVES weekday day type) divided by vehicle population. This was performed by hour
and SUT/fuel type.
The local vehicle starts activity estimates were calculated as the product of national
default starts/vehicle and the local vehicle type population estimates. The weekday
vehicle starts estimates for each vehicle type were calculated by county, analysis year
and hour of day.
6.4 Estimation of Source Hours Idling and Auxiliary Power Unit Hours
The remaining activity measures needed to estimate the off-network are emissions-
producing hotelling activities. During hotelling, the truck’s main engine is assumed to be
in idling mode or its diesel auxiliary power unit is in use, or it is using electric power or
no power. For each activity scenario, hotelling hours were first estimated followed by the
hours attributed to the two emissions-producing hotelling components, SHI and diesel
APU hours.
County, analysis year, summer weekday hotelling hours were first estimated using 24-
hour weekday hotelling hour estimates for a 2017 baseline year (new estimates from
recent TCEQ extended idling study); baseline and analysis year scenario VMT, speeds,
and VMT mix; and analysis year scenario SHP estimation data.2
The 2017 baseline year county hotelling hours estimates for a 24-hour weekday from
the TCEQ study were scaled to each analysis scenario using the ratio of analysis
scenario-to-baseline combination long-haul truck 24-hour VMT (as truck VMT increases,
so does the hotelling activity).
The 24-hour hotelling estimates were then distributed to each hour of day using the
hotelling hours hourly distribution calculated for the analysis scenario as the inverse of
the hourly distribution of VHT (or SHO, from the SHP calculation process) for
combination long-haul trucks. Within each hour, SHP and hotelling hours were
compared, and if hotelling hours exceeded SHP, hotelling hours were set equal to SHP.
2 Baseline estimates of hotelling hours are 2017 winter weekday estimates, developed by TTI as part of the truck extended idling study that produced county 24-hour hotelling estimate totals for all Texas counties, sponsored by TCEQ starting in 2017.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 282 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
41
SHI and APU hours components of hotelling hours were then estimated for each hour
using the hourly hotelling hours estimates, combination long-haul truck travel fractions
(calculated from local age distributions and MOVES default relative mileage
accumulation rates) and hotelling activity distributions for each model year (Exhibit 6.4-
1)3.
The SHI and APU hours activity distribution fractions were each first multiplied by the
travel distribution (model year operating mode activity fraction multiplied by the
associated model year travel fraction).
The product of the SHI fractions and travel fractions were then summed to produce the
total SHI fraction, and the same process was performed for APU hours to produce total
APU hours fraction. (The sum of the SHI and APU hours fractions subtracted from 1.0
results in the fraction of hotelling hours with electric power or no power in use.)
The total SHI and APU hours fractions were then each multiplied by the hotelling hours
for each hour of the day to produce the SHI and APU hours estimates for each hour.
This was performed for each analysis scenario (analysis year summer weekday).
Exhibit 6.4-1 Hotelling Activity Distributions by Model Year
First Model Year
Last Model Year
Operating Mode Fraction by ID and Name
200 201 203 204
ExtendIdling Diesel Aux Battery AC APU Off
1960 2009 0.8 0 0 0.2
2010 2020 0.73 0.07 0 0.2
2021 2023 0.48 0.24 0.08 0.2
2024 2026 0.4 0.32 0.08 0.2
2027 2050 0.36 0.32 0.12 0.2
3 Population and Activity of On-road Vehicles in MOVES201X (page 87 of unpublished report), https://cfpub.epa.gov/si/si_public_record_report.cfm?dirEntryId=328870
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 283 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
42
Chapter 7: Emission Factors / MOVES Model
7.1 Overview This chapter discusses development of the regional motor vehicle emissions analysis
for the Bexar County nonattainment area, including all key assumptions used in the
process. A regional emissions analysis must be conducted for multiple analysis years to
satisfy the requirements of 40 CFR Part 93.109 of the conformity rule for ozone
nonattainment areas. The following sections discuss the analysis years and a
description of the modeling processes used to conduct the analysis.
7.2 Emissions Factor Estimation Model The United States Environmental Protection Agency (EPA) has developed the MOtor
Vehicle Emission Simulator (MOVES) model to estimate emissions for mobile sources
covering a broad range of pollutants. The latest model is MOVES2014. Subsequent
enhancements have been made to the model. This emission analysis uses the August
2018 MOVES2014b release.
As outlined in the Pre-Analysis Consensus Plan included in Appendix 12.15, the
Interagency Consultation (IAC) partners approved the use of MOVES2014b to develop
2017 (baseline year), 2025, 2035 and 2045 vehicle emission factors. Emission factors
are one component in determining volatile organic compound (VOC) and nitrogen oxide
(NOX) emissions from the region’s on-road vehicles. MOVES2014b input factors are
outlined below in Exhibits 7.2-1 – 7.2-5.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 284 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
43
Exhibit 7.2-1 MOVES2014b External Conditions
Command and Function
Input Parameter Values
Description
MOVES Model Version Identifies the model version to be utilized for the analysis
MOVES2014b
MOVES2014a was released November 2015, then updated December 2015, November 2016 and December 2017 and August 2018. Texas A&M Transportation Institute (TTI) is using the latest and final MOVES2014 version, MOVES2014b.
Calendar Year Identifies calendar year for which emissions factors are to be calculated (Required to run model)
2017, 2025, 2035 and 2045
2017 baseline year and plan forecast years
Evaluation Month Provides option of calculating emissions factors for each month of the calendar year
7 (July) Month of July is used to represent the summer season.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 285 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
44
Exhibit 7.2-2 MOVES2014b Input Parameters and Source
Input Parameter Name
Description Source
Source Type Population
Input the number of vehicles in the geographic modeling domain for each source use type (SUT). (MOVES sourcetypeyear table.)
MOVES defaults for rates runs. TTI estimates local gasoline- and diesel-powered source type populations by analysis year for use external to MOVES in the estimation of county-level vehicle starts and source-hours-parked activity (needed in the external emissions calculations), per TTI’s rates-per-activity, TDM-based method. Populations by SUT and fuel type are a function of Texas Department of Motor Vehicles (TxDMV) vehicle registration data (2018 is latest available) and VMT mix and, in the case of future years, population scaling factors.
Source Type Age Distribution
Input that provides the distribution of vehicle counts by age for each calendar year and MOVES source type. TxDMV registration data is used to estimate the age distributions of vehicle types up to 31 years. The distribution of age fractions should sum up to 1.0 for all vehicle types for each analysis year. (MOVES sourcetypeagedistribution table.)
TTI develops age distributions using TxDMV analysis year-specific mid-year vehicle registration data aggregated at the county-level for all vehicle classes except short-haul source types, which use the regional aggregation (five TDM counties), and the long-haul source types, which use the statewide level. All source type age distributions are estimated using the TxDMV data except for refuse trucks, motor homes and buses, which use MOVES defaults for the year of the local data. Latest available 2018 EOY registration data (for age distributions) will be used for the 2017 baseline and all future years.
Vehicle Type VMT
Input county-specific VMT distributed to 5 HPMS vehicle types (by MOVES “HPMSVtypeID”). (MOVES hpmsvtypeyear table.)
MOVES defaults for rates runs. Local activity estimates are applied in the link-based emissions calculations external to MOVES.
Average Speed Distribution
Input average speed fractions into 16 speed bins by SUT, road type,
MOVES defaults for rates runs.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 286 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
45
Input Parameter Name
Description Source
hour and day-type. The sum of each speed distribution over the 16 speed bins by SUT, road type, hour and day-type is 1.0. (MOVES avgspeeddistribution table.)
Local activity estimates are applied in the link-based emissions calculations external to MOVES.
Road Type Distribution (VMT Fractions)
Input county specific VMT by road type. VMT fractions are distributed between the road types and must sum to 1.0 for each SUT. (MOVES roadtypedistribution table.)
MOVES defaults for rates runs. Local activity estimates are applied in the link-based emissions calculations external to MOVES.
Ramp Fraction
Input county specific fraction of ramp driving time on rural and urban restricted roadway types. (MOVES roadtype table.)
Ramp fractions are set to zero. The restricted access roadway type emission rates output will be 100% restricted access roadway type, exclusive of ramps, which are processed separately. TTI’s external link-level emissions calculation procedure applies MOVES un-restricted access roadway type emission rates to individual network links coded as ramps. (Separate ramp roadway type emission rates output is not available from MOVES.)
Meteorology
County specific data on temperature and humidity. (MOVES zonemonthhour table.)
Average June through August, hourly temperature and hourly relative humidity inputs for each county (produced by TCEQ for inventory development using 2017 weather station data) for all analysis years. See Exhibit 7.2-3.
I/M Coverage
Input Inspection and Maintenance (I/M) program coverage record for each combination of pollutants, process, county, fuel type, regulatory class and model year are specified using this input. (MOVES imcoverage table.)
No I/M program to be modeled since none is required in the San Antonio region.
Fuel Supply
Input to assign existing fuels to counties, months and years and to assign the associated market share for each fuel type.
For each analysis year and season, the fuel supply will consist of one conventional gasoline formulation
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 287 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
46
Input Parameter Name
Description Source
(MOVES fuelsupply table.)
and one conventional diesel formulation. See Exhibit 7.2-4.
Fuel Formulation
Input county specific fuel properties in the MOVES database. (MOVES fuelformulation table.)
Local fuel formulations based on TCEQ 2017 summer fuel survey data for 2017, and latest local survey data (TCEQ 2020 summer fuel survey), with some adjustments to particular future year values made for consistency with future year “expected” values (regulatory standards). See Exhibit 7.2-5.
Fuel Engine Fraction / Diesel Fraction
Input fuel engine fractions (i.e. Gasoline vs. Diesel Engines types in the vehicle population) for all vehicle types. (MOVES avft table.)
Locality-specific and MOVES default. TTI develops the evaluation year-specific local gasoline/diesel fractions for the MOVES single unit and combination truck SUTs using the TxDMV registration data for each analysis year, aggregated to the statewide level. MOVES defaults are used for the other SUTs, except alternative fuel fractions are dropped and the default gasoline/diesel fractions are renormalized.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 288 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
47
Exhibit 7.2-3 MOVES2014b Hourly Meteorological Data for Bexar County
Hour Temperature (degrees F.)1
Relative Humidity (%)1
12:00 a.m. 78.99 77.90
1:00 a.m. 77.82 81.39
2:00 a.m. 76.91 84.04
3:00 a.m. 76.21 85.87
4:00 a.m. 75.69 87.13
5:00 a.m. 75.26 88.00
6:00 a.m. 74.88 88.78
7:00 a.m. 75.43 87.31
8:00 a.m. 77.66 81.44
9:00 a.m. 80.33 72.68
10:00 a.m. 82.98 64.24
11:00 a.m. 85.47 57.70
12:00 p.m. 87.72 52.12
1:00 p.m. 89.53 48.18
2:00 p.m. 91.03 44.94
3:00 p.m. 92.13 43.00
4:00 p.m. 92.60 42.18
5:00 p.m. 92.48 42.81
6:00 p.m. 91.50 44.95
7:00 p.m. 89.54 50.16
8:00 p.m. 86.61 56.89
9:00 p.m. 84.11 62.97
10:00 p.m. 82.12 68.75
11:00 p.m. 80.42 73.82
Period Barometric Pressure (Inches of Mercury)
24-hr 29.049
Average hourly data (24-hr for pressure) from weather stations within Bexar County June through August 2017 (provided by TCEQ).
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 289 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
48
Exhibit 7.2-4 MOVES2014b Fuel Supply
Exhibit 7.2-5 MOVES2014a Fuel Formulation Inputs for Bexar County
Fuel Type Units Summer 2017 Summer Future Years
Gas E Diesel Gas E Diesel
Fuel Formulation ID - 17702 30637 19702 30011
Fuel Subtype ID - 12 20 12 20
RVP psi 7.54 0 7.80 0
Sulfur Level ppm 21.28 6.37 10.00 11.00
ETOH Volume vol. % 9.66 0 9.56 0
MTBE Volume vol. % 0 0 0 0
ETBE Volume vol. % 0 0 0 0
TAME Volume vol. % 0 0 0 0
Aromatic Content vol. % 25.35 0 22.22 0
Olefin Content vol. % 8.33 0 8.69 0
Benzene Content vol. % 0.76 0 0.61 0
e200 vap. % 49.45 0 49.64 0
e300 vap. % 82.68 0 84.60 0
Vol to Wt Percent Oxy2 - 0.3653 0 0.3653 0
BioDieselEster Volume2 vol.% \N \N \N \N
Cetane Index2 - \N \N \N \N
PAH Content vol.% \N \N \N \N
T50 °F 203.73 0 202.53 0
4 Market Share CV – the coefficient of the market share (“\N” is “null” or not used).
Fuel Formulation ID Market Share Market Share CV4
17702, 19702 1.0 \N
30637, 30011 1.0 \N
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 290 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
49
T90 °F 327.68 0 319.75 0
TTI produced the gasoline formulations based on information in TCEQ’s summer 2017 and summer 2020 statewide fuel (gasoline and diesel) surveys. The gasoline formulations are by Texas fuel regions; diesel is statewide. Gas E is the east Texas formulation based on samples from “state 7.8 RVP limit” counties. Summer 2017 gasoline formulations are actuals using the 2017 survey data. Future Years formulations are summer 2020 actuals (latest local survey-based estimates), except with RVP, sulfur level, and benzene content set equal to the MOVES defaults (i.e., expected future year values consistent with the pertinent regulatory standards). Bexar County falls under Gas E. Diesel sulfur for 2017 is the statewide actual average based on TCEQ’s summer 2017 fuel survey data; and for Future Years diesel sulfur is set to the expected level (i.e., within the ultra low sulfur diesel average annual standard and consistent with the maximum observed values from the last four TCEQ statewide surveys). “\N” is “null” value, or not used.
7.2.1 Vehicle Registration Distribution The vehicle population estimates were based on TxDMV registration data (latest
available [2018 end-of-year]), vehicle population factors derived from the VMT mix and
county-level VMT-based growth estimates. Exhibit 7.2.1-1 displays the vehicle types
associated with aggregated TxDMV registration data. Vehicle population factors
developed using the analysis year 24-hour VMT mix were applied to vehicle
registrations aggregated by category to split each category into each SUT/fuel type
combination included in the analysis, creating the base (2018) vehicle population
estimates. For each analysis year, VMT-based growth estimates were calculated by
dividing county, analysis year, summer weekday VMT by county, 2018 summer
weekday VMT. These growth estimates were applied to the base vehicle population
estimates to scale from the 2018 base to each analysis year estimates.
Exhibit 7.2.1-1 TxDMV Vehicle Registration Aggregations and Associated Vehicle Types for Estimating Vehicle Populations
Vehicle Registration1 Aggregation
Associated Vehicle Type2
Motorcycles MC_G
Passenger Cars (PC) PC_G; PC_D
Trucks ≤ 8,500 gross vehicle weight rating (GVWR) (pounds)
PT_G; PT_D; LCT_G; LCT_D
Trucks > 8,500 and ≤ 19,500 GVWR
RT_G; RT_D SUShT_G; SUShT_D
MH_G; MH_D IBus_D
TBus_G; TBus_D SBus_G; SBus_D
Trucks >19,500 GVWR CShT_G; CShT_D
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 291 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
50
NA2 SULhT_G; SULhT_D
CLhT_G; CLhT_D
1To estimate vehicle populations, mid-year TxDMV county registrations data extracts were used, consisting of: 1) light-duty cars, trucks, and motorcycles; 2) heavy-duty diesel trucks; and 3) heavy-duty gasoline trucks. 2 Vehicle population factors are the 24-hour weekday VMT mix fraction for each vehicle type in a category divided by the sum of the VMT mix fractions for all vehicle types in a category, except long-haul trucks. The four long-haul vehicle type populations are estimated using a long-haul-to-short-haul VMT mix ratio applied to the short-haul SUT population estimate.
7.3 Adjustments to Emission Factors
7.3.1 Low Emissions Diesel NOx Adjustment The nitrogen oxides (NOx) emission factors calculated by MOVES need to be adjusted
due to the use of TxLED, which produces lower NOx emissions than the national low
emission diesel fuel. The RatesAdj utility was used along with TxLED NOx adjustment
factors, produced by TTI using TCEQ procedures, to generate emission rates that
account for the effects of TxLED on diesel vehicle NOx emissions. These factors are
listed in Table 14 of the MOVES Analysis Notes in Appendix 12.10.
7.3.2 Vehicle Miles of Travel Mix The VMT mix designates the vehicle categories included in the analysis and specifies
the fraction of on-road fleet VMT attributable to each vehicle type. VMT mixes were
estimated using TTI’s VMT mix method.5 The method sets Texas vehicle registration
category aggregations for MOVES SUT categories for developing the VMT mixes, as
well as for developing other fleet parameters needed elsewhere in the process (i.e. SUT
age distributions, vehicle population estimates).
The VMT mixes are produced in five-year increments and applied to analysis years as
follows: 2015 VMT mix – 2013 through 2017 analysis years; 2020 VMT mix – 2018
through 2022 analysis years; 2025 VMT mix 2023 through 2027 analysis years, and so
on. No seasonal adjustments are made for VMT mix. Average weekday vehicle type
VMT mixes by MOVES road type and by four time-of-day periods (AM Peak, Mid-Day,
PM Peak, Overnight) were estimated for the TxDOT San Antonio District for use with
Bexar County in this analysis.
TTI used the latest available multi-year TxDOT San Antonio District vehicle
classification counts (2005-2014) and associated TxDMV year-end registration data
5 Developing MOVES Source Use Types and VMT Mix for Conformity Analysis (TxDOT Air Quality / Conformity IAC-A - TTI Task
409252-0643: Maintain, Update and Enhance Traffic Activity Estimation and Forecasting Methods), Texas Department of Transportation, Austin, TX, August 2016.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 292 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
51
(2018) and TxDOT/TxDMV registration data, along with MOVES default data, as
needed (i.e., appropriate for each analysis year).
Exhibit 7.3.2-1 lists the vehicle types delineated in the local VMT mix.
Exhibit 7.3.2-1 Vehicle Types Delineated in Local VMT Mix
Source Use Type Gasoline Diesel
Motorcycle MC_G -
Passenger Car PC_G PC_D
Passenger Truck PT_G PT_D
Light Commercial Truck LCT_G LCT_D
Intercity Bus - IBus_D
Transit Bus - TBus_D
School Bus SBus_G SBus_D
Refuse Truck RT_G RT_D
Single Unit Short-Haul Truck SUShT_G SUShT_D
Single Unit Long-Haul Truck SULhT_G SULhT_D
Motor Home MH_G MH_D
Combination Short-Haul Truck CShT_G CShT_D
Combination Long-Haul Truck - CLhT_D
7.4 Modeled Emission Estimation Modeled emission estimates are calculated using “TTI emission inventory estimation
utilities using moves: MOVES2014bUtils”, developed by TTI for MOVES. This utility
combines vehicle activity and emissions factors to create emission estimates at the link
level.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 293 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
52
Chapter 8: Mobile Source Emission Reduction Strategies (MoSERS)
8.1 Overview
Mobile Source Emission Reduction Strategies (MoSERS) are a collection of
transportation projects or related activities with identifiable emission reduction benefits.
To meet requirements of the State Implementation Plan (SIP), nonattainment areas may
make specific commitments in their SIP to implement MoSERS, called Transportation
Control Measures (TCMs). Nonattainment areas may elect to complement TCMs with
programs that reduce on-road mobile source emissions through voluntary changes in
transportation choices and activities called Weight of Evidence (WOE). Finally, a
nonattainment area may include Transportation Emission Reduction Measures
(TERMs) in transportation conformity analysis that are outside of commitments in their
SIP.
Bexar County does not have an ozone NAAQS budget in the existing SIP. Instead, the
interim emissions test described in Chapter 3.1 demonstrated that on-road sources in
Bexar County do not exceed known emissions in the baseline year (2017) or expected
emissions in future analysis years (2025, 2035 or 2045). Thus, no TCMs, WOE or
TERMS were incorporated into this transportation conformity analysis.
8.2 Congestion Mitigation and Air Quality Improvement Program
The Congestion Mitigation and Air Quality Improvement (CMAQ) Program is a
categorical funding program created with ISTEA and continued under TEA-21,
SAFETEA-LU, MAP-21 and the FAST Act. This program directs funding to projects that
contribute to meeting the National Ambient Air Quality Standards (NAAQS). CMAQ
funds generally may not be used for projects that result in the construction of new
capacity available to single-occupant vehicles. On April 20, 2019, the MPO
Transportation Policy Board approved CMAQ funding for 12 programs and projects
through FY 2022 of the FY 2021-2024 TIP and Mobility 2045. More information on the
local allocation of CMAQ funding can be found at
http://alamoareampo.org/AirQuality/funding.html.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 294 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
53
Chapter 9: Determination of Regional Emissions
9.1 Procedure
In order to report final emission analysis results, it is necessary to account for modeled
link level emission inventories, emission factor adjustments and Mobile Source
Emission Reduction Strategies (MoSERS) emission benefits.
9.2 Modeled Emissions Emissions for analysis years 2017 (baseline year), 2025, 2035, and 2045 are listed in
Exhibit 9.2-1. These consist of link level roadway-based modeled emissions for Bexar
County. The emissions were calculated by the Texas A&M Transportation Institute (TTI)
using the Environmental Protection Agency’s MOVES2014b model.
UPDATE Exhibit 9.2-1 Emission Results for the Bexar County Nonattainment Area
Analysis Year NOx (tons/day) VOC (tons/day)
2017 (Baseline) pending pending
2025 pending pending
2035 pending pending
2045 pending pending
9.3 Adjustments to Emission Factors Post-processing adjustments are applied using the emission factor post-process utility
developed by TTI. These adjustments are applied to establish final emission factors
used in emission calculation procedures to establish the model results shown in Exhibit
9.2-1. This process is described in detail in Chapter 7.
9.4 Mobile Source Emission Reduction Strategies Mobile Source Emission Reduction Strategies (MoSERS) are a collection of
transportation projects that have been identified and quantified for having emission
reduction benefits. No MoSERS were incorporated into this transportation conformity
analysis.
9.5 Final Emission Analysis Results Since this conformity does not use credits from Mobile Source Emission Reduction
Strategies, such as voluntary mobile emission reduction programs or TCMs, the final
emission results are the same as the modeled emissions. Table 9.2-1 shows the final
emission results for this conformity.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 295 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
54
Chapter 10: Interagency Consultation
10.1 Process Description
Interagency review and comment on the conformity finding was conducted in
accordance with 40 CFR Part 93.112. Local, state, and federal transportation and air
quality agencies affected by this conformity analysis were consulted on the scope,
methodologies and products of the conformity finding. A group of Interagency
Consultation (IAC) partners included representatives of each of the following agencies:
• Alamo Area Metropolitan Planning Organization (MPO)
• Texas Department of Transportation (TxDOT)
• Texas Commission on Environmental Quality (TCEQ)
• Texas A&M Transportation Institute (TTI)
• Federal Highway Administration (FHWA)
• Federal Transit Administration (FTA)6
• U.S. Environmental Protection Agency (EPA)
The purpose of this group is to ensure that the modeling methodology utilized in this
conformity analysis is consistent with the on-road modeling utilized in the State
Implementation Plan and that the most recent planning assumptions were used. The
IAC partners were consulted regularly during the conformity process, and Exhibit 10.1-1
summarizes the meetings that occurred before local determination of this conformity
document by the MPO Transportation Policy Board. All IAC partner meeting agendas
and a comprehensive summary of decisions are included in Appendix 12.15.
Exhibit 10.1-1 Interagency Consultation Meeting Participation
Date MPO TxDOT TCEQ FHWA EPA Subject
October 30, 2019
Y Y Y Y Y FY 2021-2024 TIP Pre-Analysis Consensus Plan (PACP) Review
February 3, 2020
Y Y Y Y Y Emissions Analysis Review Link Listing
November 17, 2020
Y Y Y Y N
Closure of FY 2020 Conformity and Initiation of FY 2021 Regional Transportation Conformity; Project Changes Related to FY2021-2024 TIP Fiscal Constraint; New PACP Parameters
6 Note: FHWA acts as executive agent for the FTA
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 296 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
55
Chapter 11: Public Participation
11.1 Process Description
Public participation is a cornerstone for all processes undertaken by the Alamo Area
Metropolitan Planning Organization (MPO). The MPO Public Participation Policy (Policy
2), last amended on August 26, 2019, establishes the methods and structure to be
followed when engaging and informing the community of activities of the MPO. In
addition, the MPO has adopted a policy regarding Limited English Proficiency (LEP)
access, which was last modified in March 2015. The Alamo Area Metropolitan Planning
Organization followed its adopted Public Participation and Limited English Proficiency
Plans for the development and adoption of the FY 2021-2024 Transportation
Improvement Program, MTP project list and the 2020 Transportation Conformity
Document.
All meetings of the MPO Transportation Policy Board and Technical Advisory
Committee are subject to the Texas Open Meetings Act and are open to the public.
Meeting notices are sent to the Texas Secretary of State, published in the Texas
Register, and posted at the Bexar, Comal, Guadalupe and Kendall County Courthouses
and at the MPO offices in accordance with the Texas Open Meetings Act. All MPO
meetings are accessible to persons with disabilities.
During Fall 2019, the MPO sought feedback on the projects covered by the draft FY
2021-2024 Transportation Improvement Program during a series of four public meetings
held throughout the MPO study area and in an online format. During those meetings,
the MPO also discussed the region’s air quality status and the impact to planning
processes of the nonattainment designation.
All meetings began at 6:00 p.m., were similar in content and format, and were
livestreamed via Facebook. Generally, each meeting consisted of an overview
presentation and an audience participation exercise to gather input on current projects
and propose projects for future funding. The public meeting dates, time and locations
are provided below:
• Kendall County: Wednesday, September 25, 2019 at Kronkosky Place located at 17 Old San Antonio Road, Boerne, TX 78006
• Bexar County: Thursday, September 26, 2019 at VIA Metropolitan Transit, located at 1021 San Pedro, San Antonio, TX 78212.
• Guadalupe County: Wednesday, October 2, 2019 at the Seguin Public Library located at 313 W. Nolte Street, Seguin, TX 78155
• Comal County: Thursday, October 3, 2019 at the New Braunfels Civic Center, 375 S. Castell Avenue, New Braunfels, TX 78130
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 297 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
56
To advertise the public meetings, newspaper ads were run in the San Antonio Express-
News, New Braunfels Herald, Seguin Gazette and Boerne Star. The public meetings
were also advertised in a press release, through the MPO’s bi-weekly e-newsletter
(FastTrack) and posted on Facebook, Twitter and Instagram. The MPO’s partner
agencies assisted with outreach for the meetings and in securing presentations for MPO
staff at community organizations.
For individuals not able to attend a public meeting in person, the MPO provided a virtual
meeting process online at www.alamoareampo.org/yourmove that duplicated the in-
person public meeting content and format. The online public input ran from Monday,
September 23 through Thursday, October 3, 2019.
Other public input methods during the TIP development process included comment
cards at public meetings, the participation exercise, and e-mails, letters and speaking
opportunities at TAC and TPB meetings. The comment cards allowed for input on the
transit and roadway project lists as well as the effectiveness of the public involvement
process itself. All materials online and at the in-person public meetings were provided
in Spanish.
Continued public involvement for the FY 2021-2024 TIP, MTP project list and the
corresponding Transportation Conformity Determination ran from Friday, February 14,
2020 through Sunday, March 15, 2020. Documentation for this determination of
transportation conformity was posted on the MPO’s website at
www.alamoareampo.org/airquality/conformity on February 13, 2020. The 30-day public
comment period was addressed in all MPO FastTrack emails sent biweekly from
January 14 through March 10, 2020; at the Transportation Policy Board meeting on
January 27, 2020; and in the Texas Register on February 21, 2020. It was also
advertised in the San Antonio Express-News on February 23, 2020 and with a press
release to the media on February 25, 2020.
A public meeting was held on Thursday, February 27, 2020 at the VIA Metro Center
(1021 San Pedro Avenue) in San Antonio to gather comments in person. Other public
input opportunities occurred at each open meeting the MPO held during this time period
(Pedestrian Mobility Advisory Committee meeting on Wednesday, February 19, 2020;
Technical Advisory Committee meeting on Friday, March 6, 2020). Comments were
also accepted through the link above as well as by email to
[email protected] or by mail to 825 S St. Mary’s Street, San Antonio, TX
78205.
The MPO’s Transportation Policy Board made a local determination of transportation
conformity on May 18, 2020. Exhibit 11.1-1 outlines the outreach undertaken for
transportation conformity leading up to the local action by the Board. Copies of all public
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 298 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
57
comments received as part of the transportation conformity process and analysis can be
found in Appendix 12.16. Of the 11 public comments received, seven were related to
the MTP and TIP. Four others were related to transportation conformity, public
participation or an unrelated topic.
In Fall 2020, financial constraint issues at the state level led TxDOT Districts, in
coordination with the MPOs, to reprioritize projects in their TIPs and MTPs. Revisions to
AAMPO’s 2021-2024 TIP necessitated a new analysis of regional motor vehicle
emissions. On November 20, 2020, the MPO officially ceased the FY 2020 Regional
Conformity Determination process and subsequently initiated a FY 2021 Regional
Conformity Determination.
The MPO conducted public involvement in FY 2021 from Monday, December 14, 2020
through Tuesday, January 12, 2021. The public was encouraged to review and
comment on the revised FY 2021-2024 TIP, MTP project list and the corresponding
Transportation Conformity Determination. Documentation for this determination of
transportation conformity was posted on the MPO’s website at
www.alamoareampo.org/airquality/conformity on December 11, 2020. The 30-day public
comment period was addressed in all MPO FastTrack emails sent biweekly from
December 7, 2020 through January 18, 2021, and in the Texas Register on December
11, 2020. It was also advertised in the San Antonio Express-News on December 13,
2020 and with a press release to the media on December ??, 2020.
The MPO held a virtual public meeting, consistent with local public health
recommendations and the MPO’s Public Participation Plan, on Tuesday, January 5,
2021. Other public input opportunities occurred at each open meeting the MPO held
during this time period (Transportation Policy Board meeting on Monday, December 14,
2020; Technical Advisory Committee meeting on Friday, January 8, 2021). Comments
were also accepted through the link above as well as by email to
[email protected] or by mail to 825 S St. Mary’s Street, San Antonio, TX
78205.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 299 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
58
Exhibit 11.1-1: Public Involvement for Transportation Conformity
Activity 2019 2020 2021
August Sept Oct Jan Feb March April May Dec Jan
Transportation Policy Board
P #8 - - - P #8 A #5 P #? A #?
Technical Advisory Committee
P #6 P #6 - - P #7 A #5 P #8 A #?
Announcement of Public Comment Period
X
X
X
Inclusion in FastTrack and MPO Social Media Outlets
X X X X
X
Distribution of Press Release X X
X
FY 2021-2024 TIP, MTP and Conformity Public Meetings
Sept 25 & 26, 2019
Oct 2 & 3, 2019
Feb 27, 2020
Jan 5, 2021
Other Posted MPO Public Meetings
Sept 23,
2019 Oct 4, 2019
Feb 19,
2020 March 6,
2020
Dec 14,
2020 Jan 8, 2021
Key
P – Presentation Item
A – Action Item
# – Agenda Item Number
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 300 of 337
Alamo Area Metropolitan Planning Organization - 2020 Transportation Conformity
59
List of Appendices
12.1 - Resolution
12.2 - Mobility 2045
12.3 - 2021-2024 Transportation Improvement Program
12.4 - Travel Model Validation
12.5 - VMT, Loaded Speed, and Centerline Mile Summaries
12.6 - Definition of Regionally Significant Roadway System
12.7 - Roadway System (Capacity Staging) and Network Link Listing
12.8 - Roadway Network
12.9 - Mode Choice Model Summaries
12.10 - MOVES Information and Analysis Notes
12.11 - MOVES Input and Output Files (.zip)
12.12 - MOVES Emission Factors (.zip)
12.13 - Estimated Hourly Emissions and Activity (.zip)
12.14 - VMT, Speed, and Emissions Summaries (.zip)
12.15 - Interagency Consultation Process
12.16 - Public Involvement Process
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 301 of 337
WHEREAS, pursuant to federal law, the Governor of the State of Texas designated the Alamo Area Metropolitan Planning Organization (MPO) as the Metropolitan Planning Organization for the San Antonio region; and WHEREAS, the MPO’s Transportation Policy Board is the entity for cooperative decision-making regarding regional transportation issues in Bexar, Comal, and Guadalupe Counties and a portion of Kendall County; and WHEREAS, the Fixing America’s Surface Transportation (FAST) Act assigns the MPO the responsibility for developing and maintaining the Metropolitan Transportation Plan (MTP) and Transportation Improvement Program (TIP) and their periodic updates; and WHEREAS, the MTP (Mobility 2045) and the FY 2021-2024 TIP were developed or updated using the most recent federal guidance and applicable regulations; and WHEREAS, the MPO is responsible for carrying out the transportation conformity process, in consultation with the State and local air quality planning agencies, State and local transportation agencies, the Environmental Protection Agency (EPA), and the U.S. Department of Transportation (USDOT); and WHEARAS, the EPA has designated Bexar County as marginal nonattainment under the 2015 8-hour ozone National Ambient Air Quality Standard (NAAQS) effective September 24, 2018; and WHEREAS, the updated Mobility 2045, the FY 2021-2024 TIP and Transportation Conformity document have been developed in compliance with the MPO’s adopted Public Participation Plan; and WHEREAS, the updated Mobility 2045, the FY 2021-2024 TIP and the Transportation Conformity document were recommended for adoption to the Transportation Policy Board by the Technical Advisory Committee. NOW, THEREFORE, BE IT RESOLVED that the Transportation Policy Board adopts the updated Mobility 2045 and the FY 2021-2024 Transportation Improvement Program. BE IT FURTHER RESOLVED that the Transportation Policy Board approves the results of the Transportation Conformity document, which demonstrates that implementation of Mobility 2045 and the FY 2021-2024 TIP will not cause any new violations of the 2015 8-hour ozone NAAQS, increase the frequency or severity of violations of the standard or delay timely attainment of the standard. PASSED AND APPROVED this 25th day of January 2021. Kevin Webb, Chair Alamo Area Metropolitan Planning Organization
A Resolution Adopting Updated Mobility 2045, the FY 2021-2024 Transportation Improvement
Program, and the Transportation Conformity Determination for the
Bexar County Nonattainment Area
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 302 of 337
Transportation Policy Board December 14, 2020
10. Discussion and Appropriate Action on Performance Measures and Target Setting
Purpose
The purpose of this agenda item is to receive presentations on regional targets associated with safety (PM1), bridge/pavement condition (PM2), and roadway system performance (PM3).
Issue
The U.S. Department of Transportation (USDOT) has implemented several roadway-related performance requirements created under MAP-21 and the FAST Act. In the coming months, the Transportation Policy Board is required to again set regional targets for three of these performance areas: a. PM1: Safety b. PM2: Bridge / Pavement Condition c. PM3: Roadway System Performance. By reporting targets in the Metropolitan Transportation Plan and Transportation Improvement Program, performance measures can inform planning and funding decisions in the pursuit of regional and national goals. Statewide targets have been set by the Texas Department of Transportation. This item is being presented in December and action is requested will be requested at your January 2021 meeting. The presentations are attached for your review.
Action Requested
Action is scheduled for January 2021.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 303 of 337
Safety Performance Measures:2021 Target SettingTransportation Policy Board | December 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 304 of 337
Outline
• Target-Setting Process• Trend Data• Proposed 2021 Targets• Action is scheduled for January 2021
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 305 of 337
Target Setting Process
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 306 of 337
Federal Performance Measure Target Dates
FHWA
Safety (PM1)Infrastructure
(PM2)
System Performance
(PM3)
January 2021 January 2021
5 measures 6 measures 6 measures
January 2021
Annually by DOTs
and MPOs
Every two years by DOTs and
MPOs
Every two years by DOTs and
MPOs
Targets are reviewed:
By July 20, 2020 by transit agencies |
Within 180 days of receiving targets from
transit agency. Then, during
update of TIPs/MTPs
FTA
Transit Assets Transit Safety
January 2018
4 measures
Annuallyby transit
providers | During update of TIPs/MTPs
by MPOs
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 307 of 337
Five federal safety performance measures
1. Number of Fatalities
2. Rate of Fatalities
3. Number of Serious Injuries
4. Rate of Serious Injuries
5. Number of Non-motorized Fatalities and Serious Injuries
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 308 of 337
Trends in Texas and the AAMPO region
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 309 of 337
Road to Zero Goal Development
In May of 2019, the Texas Transportation Commission (TTC) adopted Minute Order 115481, directing TxDOT to work toward the goal of reducing the number of deaths on Texas roadways by half by the year 2035 and to zero by the year 2050.
The calculations for the fatality goal was developed by using the following formula:
FY2019 CRIS Fatalities = year the Road to Zero direction was adopted
2050 – current year
FY2019 CRIS Fatalities
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 310 of 337
Historical 2020 Target Development
TxDOT calculated a linear trend based on five years of regional crash data and projected it to 2022, the year of their Strategic Highway Safety Plan. AAMPO mirrored the statewide methodology.
Texas
AAMPO
5-Year Trend- - - - - - - -
Number of Fatalities in Texas and Alamo Area MPO
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 311 of 337
3,384
3,056 (*as of 11/5/2020)
4,068
Number of Fatalities (2010-2020)
2020 Statewide Target
2020 Statewide Actual*
2021 Statewide Target
3,023 3,054
3,408 3,389 3,536 3,582
3,797 3,732 3,642 3,622
176 183
215 234
224 234
279
203 218 224
-
50
100
150
200
250
300
350
400
450
500
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
2010 2012 2014 2016 2018 2020 2022
AAMPO
Texas
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 312 of 337
Reduce expected rise by 1.6% to ≤ 3,384 fatalities
On target(*as of 11/5/2020)
Reduce expected rise by 1.2% to ≤ 4,068 fatalities
Number of Fatalities (2010-2020)
2020 Statewide Target
2020 Statewide Actual*
2021 Statewide Target
3,023 3,054
3,408 3,389
3,536 3,582
3,797 3,732 3,642
3,622
3,056
176 183
215 234 224 234
279
203 218 224
181
-
50
100
150
200
250
300
350
400
450
500
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
2010 2015 2020 2025 2030 2035
AAMPO
Texas
Reduce fatalities by half
(approximately 1,869)
2035 Statewide Goal
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 313 of 337
Rate of Fatalities (2010-2020)
1.29 1.29
1.43 1.39
1.45 1.39
1.40 1.37
1.31 1.24
1.02
1.04 1.07
1.24
1.33 1.25
1.27
1.48
1.04 1.09 1.09
0.82
-
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
2010 2012 2014 2016 2018 2020 2022
On target(*as of 11/5/2020)
Reduce expected rise by 1.2% to ≤ 1.48 fatalities
per 100 MVMT
2020 Statewide Target 2020 Statewide Actual* 2021 Statewide Target
Texas
AAMPO
Reduce expected rise by 1.6% to ≤ 1.25 fatalities
per 100 MVMT
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 314 of 337
Number of Serious Injuries (2010-2020)
15,233 14,761
16,170 16,785 17,134 17,110
17,602 17,546
14,892 15,846
11,854 1,136
1,021
1,342 1,370
1,244
1,365 1,446
1,407
1,006 1,052
689
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
2010 2012 2014 2016 2018 2020 2022
Texas
AAMPO
On Target*(as of 11/5/2020)
Reduce expected rise by 1.2% to ≤ 18,602 serious
injuries
2020 Statewide Target 2020 Statewide Actual* 2021 Statewide Target
Reduce expected rise by 1.6% to ≤ 18,835 serious
injuries
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 315 of 337
Rate of Serious Injuries (2010-2020)
6.50
6.22
6.80 6.86 7.056.63 6.49 6.39
5.37 5.44
3.94
6.725.95
7.71 7.77
6.967.42
7.657.24
5.045.14
3.11
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
2010 2012 2014 2016 2018 2020 2022
AAMPO
Texas
On Target*(as of 11/5/2020)
Decrease rate of serious injuries to ≤ 6.56 SIs per
100 MVMT
2020 Statewide Target 2020 Statewide Actual* 2021 Statewide Target
Decrease rate of serious injuries to ≤ 6.51 SIs per
100 MVMT
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 316 of 337
Number of Non-Motorized Fatalities &Serious Injuries (2010-2020)
1,541 1,624 1,802 1,865 1,902
2,048
2,310 2,148 2,104
2,308
1,750
161138
186213
188214
272
230209 215
136
0
50
100
150
200
250
300
350
400
450
500
-
500
1,000
1,500
2,000
2,500
3,000
3,500
2010 2012 2014 2016 2018 2020 2022
AAMPO
Texas
On Target*(as of 11/5/2020)
Reduce expected rise by 1.2% to ≤ 2,477
non-motorized fatalitiesand serious injuries
2020 Statewide Target 2020 Statewide Actual* 2021 Statewide Target
Reduce expected rise by 1.6% to ≤ 2,560
non-motorized fatalitiesand serious injuries
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 317 of 337
• BMAC and PMAC took action in November 2020 • Recommended supporting 2021 statewide targets and 2050 zero
deaths goal• TAC and TPB are scheduled to take action at their January 2021 meetings• Targets will be revisited annually
Staff proposes supporting statewide 2021 safety targets and 2050 zero deaths goal
Performance Measure State Target for 2021 AAMPO 2021 Estimate
Number of Fatalities 3,384 302
Rate of Fatalities 1.25 1.55
Number of Serious Injuries 18,835 1,482
Rate of Serious Injuries 6.51 7.10
Number of
Non-Motorized Fatalities
& Serious Injuries2,560 317
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 318 of 337
Data Sources
• Fatalities: 2010-2016 Fatality Analysis Reporting System (FARS); 2017 Annual Report File (ARF); 2018-2020 Crash Record Information System (CRIS)
• Serious Injuries: 2010-2020 CRIS
• VMT: TxDOT and AAMPO Travel Demand Model
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 319 of 337
Performance Measures:Pavement/Bridge (PM2) &System Performance (PM3)Transportation Policy Board | December 14, 2020
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 320 of 337
Federal Performance Measure Target Dates
FHWA
Safety (PM1)Infrastructure
(PM2)
System Performance
(PM3)
January 2021 January 2021
5 measures 6 measures 6 measures
January 2021
Annually by DOTs
and MPOs
Every two years by DOTs and
MPOs
Every two years by DOTs and
MPOs
Targets are reviewed:
By July 20, 2020 by transit agencies |
Within 180 days of receiving targets from
transit agency. Then, during
update of TIPs/MTPs
FTA
Transit Assets Transit Safety
January 2018
4 measures
Annuallyby transit
providers | During update of TIPs/MTPs
by MPOs
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 321 of 337
Setting Texas’ System Performance targets
• The measures are difficult to use and explain but the process is designed to incite measurement
• The penalty for States not meeting targets is to document the actions it will take to achieve the target(s) in its next Biennial Performance Report
• As in Safety target-setting, MPOs can agree to support the statewide targets (and to plan and program projects so that they contribute toward their accomplishment) or choose to develop targets specific to their region
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 322 of 337
Pavement and Bridge Condition2020 Mid-Performance Period
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 323 of 337
Pavement and Bridge Condition Targets
• TPB resolved supporting TxDOT’s statewide 2022 targets for NHS pavement and bridge condition
• Starting in May 2019, AAMPO began to describe in our TIP how it is anticipated to impact targets
• Collaborate with TxDOT on On-System roads in “poor” condition
• Collaborate with local governments on NHS Off-System roads in “poor” condition
• TxDOT adjusted 2022 targets in their Mid Performance Period Progress Report (attached)
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 324 of 337
Total NHS Network
(2019)
2018 “Good” Baseline
2020 Mid-Period “Good”
Revised 2022“Good”Target
TxDOT (Statewide) Pavement Condition (lane-miles)
Interstate NHS 17.1% 66.8% 66.6% 66.5%
Non-Interstate NHS
82.9% 54.4% 55.2% 52.3%
AAMPO Pavement Condition (lane-miles)
Interstate NHS 28.4% 68.0% 80.0%
Non-IH NHS(on-system*)
52.3% 51.2% 42.8%
Non-IH NHS(off-system)
19.3% 3.3% 5.2%
Pavement in “Good” Condition
*refers to the TxDOT system
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 325 of 337
Total NHS Network
(2019)
2018“Poor”
Baseline
2020 Mid-Period “Poor”
Revised 2022“Poor”Target
TxDOT (Statewide) Pavement Condition (lane-miles)
Interstate NHS 17.1% 0.3% 0.1% 0.2%
Non-Interstate NHS
82.9% 13.8% 13.5% 14.2%
AAMPO Pavement Condition (lane-miles)
Interstate NHS 35.9% 0.0% 2.1%
Non-IH NHS(on-system*)
51.3% 8.8% 13.7%
Non-IH NHS(off-system)
12.8% 56.0% 66.2%
Pavement in “Poor” Condition
*refers to the TxDOT system
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 326 of 337
2018 Baseline
2020Measures
2022Target
TxDOT (Statewide) NHS Bridge Condition
% Good 50.63% 50.7% 50.42%
% Poor 0.88% 1.3% 1.5%*
AAMPO Bridge Condition
% Good 46.1% 45.1%
% Poor 0.0% 0.0%
NHS Bridge Condition
*revised from 0.8%
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 327 of 337
System Performance2020 Mid-Performance Period
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 328 of 337
Interstate Reliability
80.170.0
65.0
35
45
55
65
75
85
95
2014 2015 2016 2017 2018 2019 2020 2021 2022
Re
liab
le T
rave
l Tim
e (
%)
Historic Travel Time Estimated Future TTI Suggested Baseline and Targets
Be
tter
Wo
rse
2014 2015 2016 2017 2018 2019 2020 2022
Statewide Baseline and Targets
79.5% 81.2% 70.0%
TTI Suggested Baseline and Targets (AAMPO)
80.1% 70.0% 65.0%
Historic Travel Time Reliability (AAMPO)
79.9% 82.0% 78.2% 80.1% 75.2% 74.7% 94.9%YTD
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 329 of 337
Non-Interstate NHS Reliability
74.1
50.045.0
35
40
45
50
55
60
65
70
75
80
85
2017 2018 2019 2020 2021 2022
Re
liab
le T
rave
l Tim
e (
%)
Estimated Future TTI Suggested Baseline and Targets Actual Data
Be
tter
Wo
rse
2017 2018 2019 2020 2022
Statewide Baseline and Targets
80.2% 83.0% 70.0%*
TTI Suggested Baseline and Targets (AAMPO)
74.1% 50.0% 45.0%
Historic Travel Time Reliability (AAMPO)
74.4% 72.8% 73.6 84.2%YTD
*4-year target changed from 55.4%
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 330 of 337
Non-Interstate NHS Reliability
74.1
50.045.0
35
40
45
50
55
60
65
70
75
80
85
2017 2018 2019 2020 2021 2022
Re
liab
le T
rave
l Tim
e (
%)
Estimated Future TTI Suggested Baseline and Targets Actual Data
Be
tter
Wo
rse
2017 2018 2019 2020 2022
Statewide Baseline and Targets
80.2% 83.0% 70.0%*
TTI Suggested Baseline and Targets (AAMPO)
74.1% 50.0% 45.0%
Historic Travel Time Reliability (AAMPO)
74.4% 72.8% 73.6 84.2%YTD
*4-year target changed from 55.4%
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 331 of 337
Truck Travel Time Reliability
1.662.00
2.20
0.0
0.5
1.0
1.5
2.0
2.5
3.0
2014 2015 2016 2017 2018 2019 2020 2021 2022
Re
liab
ility
Ind
ex
Historic Truck Travel Time Reliability Estimated FutureTTI Suggested Baseline and Targets
Wo
rseB
ette
r
2014 2015 2016 2017 2018 2019 2020 2021 2022
Statewide Baseline and Targets
1.5 1.44 1.76
TTI Suggested Baseline and Targets (AAMPO)
1.66 2.00 2.20
Historic Travel Time Reliability (AAMPO)
1.76 1.77 1.75 1.62 1.64 1.65 1.70 1.42YTD
An index score ≥2 means that travel time can vary more than 100% in a given time period
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 332 of 337
Reliability Targets
• AAMPO staff original recommended regional 2022 targets for:
• Interstate reliability (65%) – meeting target
• Non-Interstate NHS reliability (45%) – meeting target
• Truck travel time reliability (1.84) – meeting target
• Beginning in May 2019, AAMPO began describing in our TIP how it is anticipated to impact targets
• Plan and program projects that contribute toward the accomplishment of targets
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 333 of 337
“CMAQ” Measures (beginning in 2021)
4. Annual Hours of Peak Hour Excess Delay per capita
5. Percent non-SOV Travel
6. Total Emissions Reduction
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 334 of 337
Next Steps
• MPO has the option to adopt its own performance targets or to support state targets
• Previous TPB action has supported statewide performance targets
Original 4-year performance measures are on target
• Significant improvement of measures due to COVID-19
• Target Setting Deadline for MPO: March 30, 2021
• TPB action is scheduled for January 25, 2021
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 335 of 337
Transportation Policy Board December 14, 2020
11. Monthly Status Reports Purpose
The purpose of this agenda item is to provide information on several important issues.
Issue Reports will be presented as follows:
a. Alamo Regional Mobility Authority/Bexar County (Green)
b. Air Quality Issues (Rath)
c. City of San Antonio (Hosseini)
d. San Antonio Mobility Coalition (Boyer)
e. Texas Department of Transportation (Jorge)
f. VIA Metropolitan Transit (Arndt)
g. Others Action Requested For information, discussion and action as necessary.
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 336 of 337
Transportation Policy Board December 14, 2020
12. Executive Session - Pursuant to Chapter 551, Subchapter D, Texas
Government Code
At any time during the meeting of the MPO Transportation Policy Board, the Board reserves the right to adjourn into executive Session at any time to discuss any of the matters listed on the posted agenda, as authorized by Texas Government Code Section 551.071 (consultation with attorney), Section 551.072 (deliberations about real property), Section 551.074 (personnel matters), and Section 551.086 (economic development).
Adjourn
December 14, 2020 AAMPO Transportation Policy Board Meeting Package: Page 337 of 337