41
Intermodal Connectivity through Hub & Spoke Update July 2017 member of

member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Embed Size (px)

Citation preview

Page 1: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Intermodal Connectivity through Hub & Spoke

Update July 2017

member of

Page 2: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

1

2

5

3 4

21

78

1011

12

1314

16

17

18

18

20

22

24 23

25

9

15

42East SPOKE

Cikarang Dry Port(Customs Clearance &

Port Clearance)

HUB Tj. Priok Sea Port

(Port Handling)

West SPOKE(proposed)

Cikarang Dry Port work as spoke and hubwith Tanjung Priok Seaport

Page 3: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

62%

JABABEKA

MM 2100

EJIP LIPPO

HYUNDAI SURYA CIPTA

KIKCKIM

KBI

KIIC

GIIC

Connecting industries in the hinterland to the seaport

Port Code: IDJBK

Page 4: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

All formalities are

completed at Cikarang Dry Port

Page 5: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Only vessel berthing and port handling need to be done at the seaport

Page 6: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

27 shipping lines

Page 7: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Tanjung Priok(IDJKT)

CDP(IDJBK)

Import Process

By Consignee / Forwarder

Flow Chart

Shipper / Consignee

CDP/IDJBK asPlace of DeliveryOn Multimodal B/L By Carrier

Export Process

By Carrier By Shipper / Forwarder

CDP/IDJBK asPlace of ReceiptOn Multimodal B/L

BondedLogisticsCenter

SeaportAbroad

Cikarang Dry Port as place of receipt or delivery

Page 8: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Under Multimodal Transport Bill of Lading

Page 9: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Bonded transfer with electronic seal

Page 10: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

For monitoring & security measure

Page 11: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

11

Mobile X-Ray

Physical Inspection

Reefer

Container Yard

New WarehouseBonded Logistics Center

Empty Depot

Office: CDP, Quarantine, & Banking

CFSGate

New Customs Office

3rd party DC

3rd party DC

200 ha of

integrated port & logistics facilities

Page 12: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Container Yard’s capacity

400,000 TEUs per annum

Page 13: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

128 reefer plugs available

Page 14: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Physical Inspection Facilities

Page 15: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Mobile X Ray for container scanning

Page 16: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Empty Container Depot

Page 17: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Special containers handling

Page 18: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Container Freight Station for Less than Container Load consolidation

Consolidators:

Page 19: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Online Tracking

Page 20: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Domestic Rail Freight and Multimodal Service

Tanjung Priok Cikarang Dry Port Surabaya Eastern IndonesiaDestinations

Western IndonesiaDestinations

60 trips a monthCDP - SUB

Seaport – Dry PortConnectivity

DomesticOcean Freight

DomesticOcean Freight

Page 21: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Bonded Logistics Center

Page 21

Page 22: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Seaport – Dry Port Railway Connectivity

22

Emplacement at the seaport

Page 23: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

23

Highway & Railway Access

Legends:

Highway

Railway

Connecting roadfrom Highway

New Exit KM 29

Exit KM 31Cikarang Barat

Exit KM 34Cibatu

Jababeka

EJIP

Delta Silicon

Hyundai

Lippo Cikarang

Page 24: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

New Highway Exit KM 29 (Coming Soon)24

Cikarang Utama Toll Gate

New Toll Gate KM 29

Flyover to Jakarta

Highway Exit KM 29

Page 25: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Smart Port SolutionInterconnecting every parties' systems, streamlining the business process, electronic data exchange for paperless system

Page 26: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Connecting Dry Ports: CDP – Lat Krabang

Page 26

Benefits

• Expand and Explore the marketConnecting strategic industrial zones and getting closer to the markets

• One Stop Service SolutionPort, Customs, and Quarantine are located and integrated in the same area

• Better Visibility and CertaintyPredicted lead time and cost using Multimodal Transport Bill of Lading

• Faster Transit Time6 days total lead time Lat Krabang – Cikarang including 3 days sailing time

In Cooperation With

• Service First• Customer’s Satisfaction is Our Priority• Fastest Transit Time in The Market

6 days

Page 27: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Terminal Tariff Comparison (in rupiah)

• Valid from 1 Jul to 31 Dec 2017• Terminal/port charges are settled in Cikarang Dry Port

Tanjung Priok Sea Port

20 ft 40ft

Handling

- Lift On / Lift Off 187,500 281,300

Storage

- Basic Tariff 27,200 54,400

Import

- Day 1 Free Free

- Day 2 81,600 163,200

- Day 3 163,200 326,400

- Day 4 and forth 244,800 489,600

Free Time Storage Import 1 day from ATA Priok

Free Time Storage Export 5 days counted 1 – basic tariff

Penalty

- After SPPB (Customs) 200%

-After SP2 (Port) 300%

Physical Check (Behandle) 1,015,000 1,390,000

Cikarang Dry Port

20 ft 40ft

Handling

- Lift On / Lift Off 187,500 281,300

Storage

- Basic Tariff 25,840 51,680

Import

- Day 1 - 5 Free Free

- Day 6 - 10 51,680 103,360

- Day 11 and forth 77,520 155,040

Seaport Storage Cost Recovery 163,200 326,400

Free Time Storage Import 5 days from ATA CDP

Free Time Storage Export 7 days from ETD Vessel

Penalty

- After SPPB (customs) Free

- After SP2 (Port) Free

Physical Check (Behandle) 1,015,000 1,390,000

Page 28: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

28

• Streamlined Process• One stop service• Reduce shipment time & cost• Better supply chain planning

• Expanding seaports reach to hinterland

• Developing new economic & production centers in hinterland

• Increasing sea port handling capacity

• Reduce dwelling time, congestion, & fuel consumption

• Lower road & highway maintenance cost

• Reduce berthing queue• Increased truck

utilization

Cargo Owner

Government&

Nation

Liner & 3PL

Benefits of Hub & Spoke

Page 29: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Bonded Logistics Centerin Cikarang Dry Port

Page 30: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Definition

Page 30

Bonded logistics center is similar to free trade zone concept where international traders could pile their stock at a designated warehouse or area in Indonesia.

With fiscal facilitation import taxes or duty on the stockpile would be deferred, until the stock is bought by a buyer and leaves the warehouse. In several countries it’s known as non resident inventory.

Page 31: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Legal Frameworks

Page 31

2nd Economic Policy PackageSeptember 2015

Gov’t RegulationNr. 85/2015

November 2015MoF RegulationNr. 272/PMK.04/2015December 2015

11 PLB inaugurated by President(including CDP’s)March 2016

General of Customs& Excise Regulation

January 2016

Page 32: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Goods Ownership in PLB

Page 32

Goods are entitled to PLB Operator

Supplier-owned goods are consigned to PLB (consignment). Transaction has not yet occurred upon entering PLB

Goods have been entitled to importer in domestic, and importer stored it temporarily in PLB. Transaction has occurred.

PLB

PLB owned1

Supplier owned2

Importer owned3

Page 33: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Existing Cotton Supply Chain

STORAGEPORT

Farmer Grading Warehouse

DistributionCenter

Origin Country

RegionalDistribution Center

DistributionCenter

Buyer

Middle Country Destination Country

Page 34: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

New Scheme Cotton Supply Chain

Farmer Grading Warehouse

DistributionCenter

Origin Country

RegionalDistribution Center

DistributionCenter

Buyer

Middle Country Destination Country

STORAGE

PORT

DOMESTIC

Page 35: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Location at Cikarang Dry Port

Page 35

New Warehouse

Bonded Logistics Center

Page 36: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Bonded Logistics Center: Cotton

Page 36

Page 37: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Page 37

New Warehouse

Page 38: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Page 38

• Saving warehouse cost• Saving transportation cost• Closer to buyer

• Increasing logistics efficiency• Increasing local industry

competitiveness• Becoming logistics hub of SE Asia

• Certainty in supply• Faster lead time• Reducing inventory and

working capital

Shipper

Government&

Nation

Buyer

Benefits Bonded Logistics Center

Page 39: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

PT. Cikarang Inland Port

Cikarang Dry Port

@CikarangDryPort

[email protected]

+6221 2908 2908

Jl. Dry Port Raya, Kota Jababeka, Cikarang, Bekasi 17530, West Java, Indonesia

www.cikarangdryport.com

Thank You

Page 40: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Stakeholders and Customers

TerminalOperator

(5)

LandTransporter

(2)PT Mustika Alam Lestari

Logistics Service

Provider(40+)

Page 40

Terminal 3

Page 41: member of Intermodal Connectivity through Hub & Spoke · Cikarang Barat Exit KM 34 Cibatu Jababeka EJIP Delta Silicon Hyundai Lippo Cikarang. New Highway Exit KM 29 (Coming Soon)

Stakeholders and Customers

Shipper Consignee

(400+)

Page 41