62
Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department with Howard/Stein-Hudson Crosby | Schlessinger | Smallridge Toole Design Group GLC Development Resources

Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Embed Size (px)

Citation preview

Page 1: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Melnea Cass Boulevard

Design Objectives Meeting

March 15, 2012

presented byBoston Transportation

Departmentwith

Howard/Stein-HudsonCrosby | Schlessinger | Smallridge

Toole Design GroupGLC Development Resources

Page 2: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Part 1 – Presentation6:00 – 6:30 PM

Introduction/Process

What we have learned:• Community Vision• Design Directions

Complete Streets Principles

Corridor-wide Framework• Melnea Cass Boulevard

by Area

Part 1 – Presentation6:00 – 6:30 PM

Introduction/Process

What we have learned:• Community Vision• Design Directions

Complete Streets Principles

Corridor-wide Framework• Melnea Cass Boulevard

by Area

Part 2 – Framing Design Concepts6:30 – 7:15 PM• Breakout Groups

Part 2 – Framing Design Concepts6:30 – 7:15 PM• Breakout Groups

Part 3 – Breakout Group Reports/ Q & A – 7:15 – 8:00 PM• Group representatives give summaries of

breakout group discussion• Questions and answers

Part 3 – Breakout Group Reports/ Q & A – 7:15 – 8:00 PM• Group representatives give summaries of

breakout group discussion• Questions and answers

Agenda

Page 3: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Project Area

Page 4: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Project Timeline

Initial Public Meeting – 10/11/2011• Introducing the project

Community Visioning Meeting – 12/14/2011• Envisioning success

Design Objectives Meeting – Tonight• Turning the vision into concepts

Sharing Initial Concepts – Spring 2012 Gaining consensus on Preferred Option –

Summer 2012

Page 5: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

What We Heard From You - Vision

Safe, clean and beautiful Well-maintained – snow and

litter consistently removed All parcels owned and cared for Safe for cyclists and pedestrians Providing safe, effective transit

service Moving calmed vehicular traffic

effectively Fully integrated with its

surrounding neighborhood A catalyst for neighborhood

economic development

Page 6: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

What We Heard From You – Design Direction

Keep mature trees as part of new landscaping

Soften the Boulevard – reduce “highway feel”• Calm traffic – enhance pedestrian/cyclist safety• Connect to walking/cycling infrastructure beyond the corridor

Fully integrate the Boulevard with cross streets and the neighborhood• Provide a gateway to Dudley Square• Design buildings for active street life• Safe and family-friendly

Page 7: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

What We Learned – Economic Development

Community Vision

Tighten connections to jobs:• Longwood Medical Area• Boston University

Medical Center• Southeast Expressway

Strengthen and grow retail center:• Improve connections between

Dudley Square and South End• Increase shopper population

Community Vision

Tighten connections to jobs:• Longwood Medical Area• Boston University

Medical Center• Southeast Expressway

Strengthen and grow retail center:• Improve connections between

Dudley Square and South End• Increase shopper population

Development Tools

Improve transit

Keep, but calm, high traffic volumes

Improve pedestrian environment

Create attractive, high-quality environment

Develop retail and commercial:• At major intersections• Visual connections between

Dudley Square and South End• Draw people across the

Boulevard• Create a sense of place

Development Tools

Improve transit

Keep, but calm, high traffic volumes

Improve pedestrian environment

Create attractive, high-quality environment

Develop retail and commercial:• At major intersections• Visual connections between

Dudley Square and South End• Draw people across the

Boulevard• Create a sense of place

Page 8: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Complete Streets are designed and operated to enable safe access for all users.

Pedestrians, bicyclists, motorists and transit riders of all ages and abilities must be able to safely and comfortably move along and across a complete street.

Complete Streets Principles

Page 9: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

• Create vibrant public spaces• Respect and foster a

“sense of place”• Create opportunities for

healthy living and physical activity

• Support economic development

• Design for sustainability• “Smart” in the use of

technology

Complete Streets Principles

Page 10: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Pedestrian• Safety

• Accessible sidewalks• Appropriate degree of separation

from roadways• Lower motor vehicle speeds• Well-lit facilities• Pedestrian-friendly intersections

Shorter crossings Minimal delay Less exposure to conflicts Frequent accessible

crossings• Comfort and Convenience

• Street trees• Comfortable and inviting spaces

with amenities• Connections to other modes

Complete Streets Principles

Page 11: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

[Insert Assessment Map Here]

Pedestrian Connectivity

Page 12: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

[Insert Assessment Map Here]

Pedestrian Connectivity

Page 13: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Bicycle• Safety

• Dedicated space • Degree of separation between modes• Lower motor vehicle speeds• Less exposure to conflicts• Well-lit facilities• Bicycle-friendly intersections

Minimum green intervals Bicycle detection Bicycle priority (i.e. signals, bicycle

boxes, etc.)• Comfort and Convenience

• Consistent facility types• Connections to other modes• Access to shot term and long term parking • Wayfinding signage

Complete Streets Principles

Page 14: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

[Insert Assessment Map Here]

Bicycle Connectivity

Page 15: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Motor Vehicles• Safety

• Designs that reduce conflicts and the severity of crashes

• Intuitive and clear geometry• Appropriate degree of separation

between modes• Safe options for turning movements• Well-lit facilities • Efficient intersection designs

Minimal delay Coordinated signal timing

• Comfort and Convenience• Well-maintained roadways• Clear guidance and Wayfinding • Access to parking

Complete Streets Principles

Page 16: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Transit• Safety

• Safe and accessible transit stops• Appropriate sidewalk widths• Less conflicts with other modes• Well-lit facilities• Transit-friendly intersections

Minimal delay in service Accessible crossings Transit prioritization Responsive signal design

• Comfort and Convenience• Comfortable and inviting transit

stops with amenities• Well-maintained transit stops and

roadways• Connections to other modes• Real-time route information

Complete Streets Principles

Page 17: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

[Insert Assessment Map Here]

MBTA Route 1

Page 18: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

MBTA Route 8

Page 19: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

MBTA Route 19

Page 20: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

MBTA Route 47

Page 21: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

MBTA Route CT3

Page 22: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

MBTA Routes and Stops

Page 23: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

The Urban Ring

Page 24: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Frequent Service

Widely-spaced Stops

High-capacity Vehicles

Real-time Information

Traffic Signal Control

Dedicated Lanes

BRT (Bus Rapid Transit)

Page 25: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Safe Pedestrian Access

Easy Loading/Unloading

Comfort and Security

BRT Stations

Page 26: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Curbside Bus Lanes Buses mix with traffic

Parking conflicts

Right turn conflicts

Slower travel times and less reliability

BRT Configurations

Page 27: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Center Bus Lanes Buses don’t mix with traffic

No parking conflicts and turning conflicts managed through signal design

Faster travel times and increased reliability

BRT Configurations

Page 28: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Center BusLanes

• Urban Ring Phase 2 Locally Preferred Alternative• Reviewed by the Roxbury community including

RSMPOC• Typically most efficient design for BRT• Passengers exit onto median island station• Better access for new development

and curbside parking

BRT Alternatives

TRAVEL LANES

STATION

STATION

TRAVEL LANES

TRAVEL LANES

Page 29: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Center BusLanes

CurbsideBus Lanes

Bus Lanes One Side

• Bus stops next to curb for passenger loading/unloading

• Parking conflicts• Intersection conflicts

• Passengers exit bus onto island and curb stations

• Parking access issues• Intersection challenges

TRAVEL LANES

STATION

STATION

TRAVEL LANES

TRAVEL LANES

TRAVEL LANES

STATION

STATION

STATION

STATION

TRAVEL LANES

TRAVEL LANES

BRT Alternatives

TRAVEL LANES

• Urban Ring Phase 2 Locally Preferred Alternative• Reviewed by the Roxbury community including

RSMPOC• Typically most efficient design for BRT• Passengers exit onto median island station• Better access for new development

and curbside parking

Page 30: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Complete Streets Components

Exclusive Transit Lanes

Page 31: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Complete Streets Components

Travel/Parking Lanes

Travel/ Parking Lanes

Exclusive Transit Lanes

Page 32: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Complete Streets Components

BikesTravel Parking Lanes

Travel Parking Lanes

Exclusive Transit Lanes

Page 33: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Complete Streets Components

BikesTravel Parking Lanes

Travel Parking Lanes

Exclusive Transit Lanes

PedestrianPedestrian

Page 34: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Community Input

Vision of Success for Melnea Cass Boulevard:• Fully integrated with its surrounding neighborhood• Safe, clean and beautiful• Well-maintained – snow and litter consistently removed• All parcels owned and cared for• Safe for cyclists and pedestrians• Providing safe, effective transit service• Moving calmed vehicular traffic effectively• A catalyst for neighborhood economic development

Page 35: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Urban Design Framework

Page 36: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Community Goals

Melnea Cass should be fully integrated with its surrounding neighborhood, providing access to local side streets and a gateway to Dudley Square

• Importance of connecting streets

Page 37: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Urban Design Framework - Shawmut

Page 38: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Tremont Street Columbus Avenue

Page 39: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Shawmut Avenue Kerr Way

Page 40: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Urban Design Framework - Washington

Page 41: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

“… Dudley Square is turning out to be more than just a new place… it’s a perspective shift. Known as the heart of Roxbury, it is where the neighborhood’s major institutions and businesses are clustered in some of the city’s most beautiful historic buildings. It is also the busiest bus station in the public transit system. In this ‘grand central’ of communities, you can imagine that one encounters an incredible variety of people.”

Historic Boston, Inc. Newsletter

Page 42: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Parcel 10

Parcel 9

Page 43: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Washington Street

Page 44: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Urban Design Framework – Harrison

Page 45: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Harrison AvenueOrchard Gardens

Page 46: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Opportunities

Page 47: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 1 – Columbus Ave to Shawmut Ave

NORTH SIDE Residential neighborhood

set back behind park land Separated ped/bike

SOUTH SIDE Residential neighborhood

set back behind park land Separated ped/bike

OPPORTUNITIES Intersection of Melnea Cass

and Tremont Open space

Page 48: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Existing

Area 1 – Columbus Ave to Shawmut Ave

Page 49: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Center Bus Lanes

Area 1 – Columbus Ave to Shawmut Ave

Existing

Page 50: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation DepartmentSide Bus LanesSide Bus Lanes

Center Bus Lanes

Area 1 – Columbus Ave to Shawmut Ave

Existing

Page 51: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 2 – Shawmut Ave to Harrison Ave

NORTH SIDE Future building edge /

destination Ped/bike use?

SOUTH SIDE Future building edge /

destination Sidewalk

OPPORTUNITIES New development to front

Melnea Cass and Washington Street

Gateway connections to Dudley Square

Innovative transportation solutions

Page 52: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 2 – Shawmut Ave to Harrison Ave

Existing

Page 53: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 2 – Shawmut Ave to Harrison Ave

Existing

Center Bus Lanes

Page 54: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 2 – Shawmut Ave to Harrison Ave

Existing

Side Bus Lanes

Center Bus Lanes

Page 55: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 3 – Harrison Ave to Albany StreetNORTH SIDE Building set back behind

landscaped zone Strong double row of trees at

road edge Separated ped/bike use

SOUTH SIDE Fenced parking / open areas -

future development sites Single tree edge Sidewalk

OPPORTUNITIES Strengthen pedestrian

connections across Melnea Cass

Keep separated ped/bikeon north side

Page 56: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 4 – Albany St to Massachusetts AveNORTH SIDE Building set back behind

landscaped zone Single tree edge Separated ped/bike use

SOUTH SIDE Fenced parking -

area / yards Single tree edge Sidewalk

OPPORTUNITIES Strengthen gateway at

Mass Ave South bay Harbor Trail as

designed on north side Improved median treatment

Page 57: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 4 – Albany St to Massachusetts Ave

Existing

Page 58: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Area 4 – Albany St to Massachusetts Ave

Existing

Concept

Page 59: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Opportunities Summary

Connections to SW Corridor Trail

CommercialGateway

Improved Linear Park conditions

Dudley Squareconnections

Improved Harbor TrailConnection and Gateway

at Intersection

MedianImprovements

StrengthenPedestrian Connections

StrengthenPedestrian

Connections

Improved Gateway Intersection

Page 60: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Breakout Sessions

Thinking about Design Concepts

Develop evaluation criteria based on community input

Review and discuss BRT options

Page 61: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Breakout Sessions – 30 min.

Break into small groups (number on handout) Discussion in small groups

• Each group should nominate a speaker to present a summary of its discussion

• Moderator will board comments/questions

Page 62: Melnea Cass Boulevard - Boston.gov Meeting...Boston Transportation Department Melnea Cass Boulevard Design Objectives Meeting March 15, 2012 presented by Boston Transportation Department

Boston Transportation Department

Next Steps

Review feedback from tonight’s meeting

Continue to develop and refine design alternatives based on project goals and community feedback

Hold the next community meeting in late April/early May