MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

Embed Size (px)

Citation preview

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    1/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    Operations Management

    MELJUNELJUN

    MELJUN CORTES,BSCS,ACS

    Department of ICT

    Faculty of Information

    Technology

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    2/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    H

    APTER

    7

    Design ofWork Systems

    MELJUNELJUN

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    3/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    Job design involves specifying the contentand methods of job

    What will be done

    Who will do the job How the job will bob will be done

    Where the job will be done

    Ergonomics

    Job DesignJob Design

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    4/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    Design of Work SystemsDesign of Work Systems

    Specialization Behavioral Approaches to Job Design

    Teams

    Methods Analysis

    Motions Study

    Working conditions

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    5/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    Job Design SuccessJob Design Success

    Successful Job Design must be: Carried out by experienced personnel with

    the necessary training and background

    Consistent with the goals of theorganization

    In written form

    Understood and agreed to by both

    management and employees

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    6/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,

    MBA,MPA,BSCS,ACS

    Specialization in Business: AdvantagesSpecialization in Business: Advantages

    ForManagement:

    1. Simplifies training

    2. High productivity

    3. Low wage costs

    ForLabor:

    1. Low education and

    skill requirements2.Minimum

    responsibilities

    3.Little mental effortneeded

    Table 7.1

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    7/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    DisadvantagesDisadvantages

    ForManagement:

    1. Difficult to motivate

    quality2. Worker dissatisfaction,

    possibly resulting in

    absenteeism, high

    turnover, disruptivetactics, poor attention

    to quality

    ForLabor:

    1. Monotonous work

    2. Limited opportunitiesfor advancement

    3. Little control over work

    4. Little opportunity for

    self-fulfillment

    Table 7.1

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    8/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Behavioral Approaches to Job DesignBehavioral Approaches to Job Design

    Job Enlargement Giving a worker a larger portion of the total

    task by horizontal loading

    Job Rotation Workers periodically exchange jobs

    Job Enrichment

    Increasing responsibility for planning andcoordination tasks, by vertical loading

    ME JUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    9/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Motivation and TrustMotivation and Trust

    Motivation Influences quality and productivity

    Contributes to work environment

    Trust Influences productivity and employee-

    management relations

    CO S SCS CSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    10/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    TeamsTeams

    Benefits of teams Higher quality

    Higher productivity

    Greater worker satisfaction Self-directed teams

    Groups of empowered to make certain

    changes in their work process

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    11/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Methods AnalysisMethods Analysis

    Methods analysis Analyzing how a job gets done

    Begins with overall analysis

    Moves to specific details

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    12/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Methods AnalysisMethods Analysis

    Changes in tools and equipment

    Changes in product design

    or new products

    Changes in materials or procedures

    Other factors (e.g. accidents, quality

    problems)

    The need for methods analysis can comefrom a number of different sources:

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    13/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Methods Analysis ProcedureMethods Analysis Procedure

    1. Identify the operation to be studied2. Get employee input

    3. Study and document current method

    4. Analyze the job

    5. Propose new methods

    6. Install new methods

    7. Follow-up to ensure improvements

    have been achieved

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    14/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Analyzing the JobAnalyzing the Job

    Flow process chart Chart used to examine the overall sequence

    of an operation by focusing on movements

    of the operator or flow of materials Worker-machine chart

    Chart used to determine portions of a work

    cycle during which an operator andequipment are busy or idle

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    15/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    FLOW PROCESS CHART

    Job Requisition of petty cash

    Details of Method

    ANALYSTD. Kolb PAGE1 of 2

    Operatio

    n

    M

    ovem

    ent

    In

    spec

    tion

    Dela

    y

    Sto

    rag

    e

    Requisition made by department head

    Put in pick-up basket

    To accounting departmentAccount and signature verified

    Amount approved by treasurer

    Amount counted by cashier

    Amount recorded by bookkeeper

    Petty cash sealed in envelopePetty cash carried to department

    Petty cash checked against requisition

    Receipt signed

    Petty cash stored in safety box

    Figure 7-2

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    16/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Motion StudyMotion Study

    Motion study is the systematicstudy of the human motions used

    to perform an operation.

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    17/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Motion Study TechniquesMotion Study Techniques

    Motion study principles - guidelines fordesigning motion-efficient work procedures

    Analysis of therbligs - basic elemental

    motions into which a job can be brokendown

    Micromotion study - use of motion pictures

    and slow motion to study motions thatotherwise would be too rapid to analyze

    Charts

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    18/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    1. Eliminate unnecessary motions2. Combine activities

    3. Reduce fatigue

    4. Improve the arrangement of the workplace

    5. Improve the design of tools and equipment

    Developing Work MethodsDeveloping Work Methods

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    19/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Working ConditionsWorking Conditions

    T e m p e r a t u r e &H u m i d i t y V e n t i l a t i

    I l l u m i n a t i o n C o l o r

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    20/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Working Conditions (contd)Working Conditions (contd)

    Noise & Vibration

    Causes of AccidentsSafety

    Work Breaks

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    21/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Work MeasurementWork Measurement

    Standard time Stopwatch time study

    Historical times Predetermined data

    Work Sampling

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    22/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    CompensationCompensation

    Time-based system Compensation based on time an employee

    has worked during a pay period

    Output-based (incentive) system Compensation based on the amount of output

    an employee produces during a pay period

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    23/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    Form of Incentive PlanForm of Incentive Plan

    Accurate Easy to apply

    Consistent

    Easy to understand

    Fair

    MELJUN CORTES MBA MPA BSCS ACSMELJUN CORTES

    MBA MPA BSCS ACS

  • 8/9/2019 MELJUN CORTES - Operations Management 7th Lecture (JOB DESIGN)

    24/24

    MELJUN CORTES,MBA,MPA,BSCS,ACSMELJUN CORTES,MBA,MPA,BSCS,ACS

    CompensationCompensation

    Individual Incentive Plans Group Incentive Plans

    Knowledge-Based Pay System Management Compensation