Mehemed Delibasic, P.Eng Project Manager Transportation Planning and Traffic Engineering AECOM CANADA Ltd. Currently, Mehemed is employed with AECOM Canada Ltd as a Project Manager (Transportation Planning and Traffic Engineering). .Mehemed is a Professional Engineer with over 11 years of comprehensive experience in transportation/traffic engineering and transportation planning in the public and private sectors. He has worked on projects encompassing a broad range of transportation fields, including Municipal and Provincial Class Environmental Assessments (EA), design projects for the Ministry of Transportation Ontario (MTO), travel demand forecasting/modelling, sustainable transportation, traffic calming and neighbourhood traffic management, traffic and parking impact studies, traffic signal warrant and analysis, and design of traffic control devices.
Mehemed’s technical expertise includes transportation systems planning, network assessment, transportation
demand/network modeling and assessment, route selection analysis, functional and preliminary design, traffic
engineering, data collection and processing, traffic management/ operational analysis, traffic impact analysis,
intersection operations evaluation, and traffic safety/collision analysis. He has hands-on experience using recent
methods and technology involved in Transportation Planning, Traffic Engineering, and related disciplines.
Mehemed has an extensive knowledge of and experience in traffic planning studies, traffic control devices, human
factors, traffic related legislation, illumination, capacity analysis, traffic signal design, signal phasing/timing, traffic
control and construction staging, and mitigation of traffic management issues.
Mehemed has demonstrated project management and leadership skills in Transportation Engineering and Planning projects and has a thorough understanding of the various disciplines, processes, and public consultations that are involved in such projects.
Currently, Mehemed is a member of the ITE Toronto Section Executive as a Communication Coordinator.
Mehemed Delibasic P. EngMehemed Delibasic P. EngProject ManagerProject Manager
T t ti Pl i d T ffi Transportation Planning and Traffic E i iEngineering
AECOM CANADA LTD
What we do:What we do:T t ti M t Pl St diTransportation Master Plan StudiesEnvironmental Assessment StudiesTraffic Impact and Parking Studiesp gTransit StudiesTransit StudiesTraffic Safety StudiesTraffic Safety Studies
City developing a new OP and City developing a new OP and Consolidated Growth Management PlanCity OP must conform with: City OP must conform with: Places to Grow Plan; and Regional OP and Growth StrategyVaughan needs to accommodate Vaughan needs to accommodate additional growthKey issues for Vaughan are: Where and How to Grow?Where and How to Grow?Significant consequences for Significant consequences for Vaughan’s transportation systemIntegration/co-ordination with York Region TMP and MetrolinxYork Region TMP and Metrolinx
Transportation input to City’s Growth Transportation input to City s Growth Management PlanT t ti Vi i & ti li iTransportation Vision & supportive policiesCity-Wide transportation network plan to City Wide transportation network plan to support the Growth Management PlanT t ti l d li i f 3 Transportation plans and policies for 3 focused areas and for new secondary plansImplementation strategy, including staging plans for 2011 and 2021 and an immediate plans for 2011 and 2021, and an immediate action planTransportation monitoring and plan review process including City modelprocess including City modelActive Transportation initiatives co-
di t d ith Cit d R i l Bi l ordinated with City and Regional Bicycle Master Plan
AECOM Study ApproachAECOM Study Approach• Documentation of Existing Transportation
Conditions including 3 Focus Areas • Notice of CommencementConditions, including 3 Focus Areas• 4 Discussion Papers• Documentation of Existing Policies, Road
• Project Website• Transportation Bulletin
Stakeholder Workshop on Strategic PHASE 1g
System Classification & Design Standards• Policy Paper - Key Issues and Strategic Options• Methodology for Evaluation of Alternatives
• Stakeholder Workshop on Strategic Directions
• Initial Newsletter• Methodology for Evaluation of Alternatives• Calibrated Transportation Model • Policy paper - Transportation Vision Guiding
• Public Consultation Centre #1
Policy paper - Transportation Vision, Guiding Principles, Indicators and Targets
• Transportation Assessment of Alternative • Stakeholder Workshop on Vision and
Policy Framework• Update Website
PHASE 22031 Growth Scenarios
• Alternative 2031 Transportation Networks• Preferred 2031 Transportation Network
• Update Website• Stakeholder Workshop on Alternative
Transportation PlansPreferred 2031 Transportation Network• Preferred 2031 Networks for 3 Focused
AreasP f d 2031 N t k d P li i f N
• Newsletter #2• Public Consultation Centre #2
• Preferred 2031 Network and Policies for New Secondary Plan Areas
• Preferred Transportation Policies/Programsp g• Recommended City-Wide Networks for 2031,
2021, 2011 • Newsletter #3PHASE 3
• Supportive Policies and Programs• Networks and Policies for 3 Focused Areas and
New Secondary Plans
• Newsletter #3• Update Website• Notice of CompletionNew Secondary Plans
• Implementation and Staging Plan• Immediate Action Plan• Monitoring and Review Process
Unprecedented growth over the p gpast 20 yearsT t ti diti d Transportation conditions and travel demand
Deficiencies in existing road networkCapacity deficiencies in key Capacity deficiencies in key corridorsTransit modal splits generally low low Truck percentages generally p g g yhighVehicle occupancies remain lowlow
Alternative Strategic DirectionsAlternative Strategic DirectionsOption 1: Continued Auto Dominance (Status Quo)Option 1: Continued Auto Dominance (Status Quo)
Increases in travel demand would be accommodated primarily by new and widened roadways (with significantly increased capital funding needs)Portion of Travel by Transit would decrease furtherTransit capital improvements would be limited to those currently fully committed
• Spadina Subway Extension• Spadina Subway Extension• Hwy 7 Bus Rapid Transit (BRT)
Transportation Demand Management (TDM) continues at modest levelsp g ( )
Option 2: Strong Transit and Alternative Modes Thrust Option 2: Strong Transit and Alternative Modes Thrust Major shift in capital expenditures from road to transit Road expansion more focused on improving transit servicesRoad expansion more focused on improving transit servicesCity would take an active role in facilitating transit improvements through:
• Providing new mid-block collectors for bus routes• Promoting higher density mixed-use centres and nodes• Expanding pedestrian and cycling networks including connections to transit
Restricting new office development to locations well served by transit • Restricting new office development to locations well served by transit • TDM programs upgraded focusing on transit, cycling and walking
Option 3: Aggressive Transportation Demand Management (TDM)S k t i i i “d d” id f t l th h t di i ti ( ll th l i ti Seeks to minimize “demand” side of travel through auto disincentives (as well as the usual incentives for telecommuting, 4 day work weeks, variable work hours, carpooling, and greater use of transit, cycling and walking)y g g)
Auto disincentives include:t f f t ll• greater use of freeway tolls;
• congestion pricing in urban centres;• significantly reduced parking supply requirements; andsignificantly reduced parking supply requirements; and• City-wide parking charges
Travel Demand Modeling ProcessTravel Demand Modeling ProcessWhy is Travel Demand Modeling needed? Why is Travel Demand Modeling needed?
It provides a platform to forecast travel on a network basis and to identify future transportation problemsIt facilitates systematic analysis and evaluation of transportation y y pnetwork improvement alternatives, thus, guiding transportation infrastructure decisions infrastructure decisions
Existing Population andEmployment
Household Survey for Travel Characteristics and Patterns
Road and Transit NetworksAnd Planned Improvements and ProjectionsCharacteristics and Patterns And Planned Improvements
Develop Model Components and Calibrate to Reflect Existing ConditionsExisting Conditions
1. How often people travel – Trip Generation2. Where people travel to and from – Trip Distribution3. Which mode of transportation used – Mode Choice4 Wh t t d T ffi d T it A i t 4. What routes are used – Traffic and Transit Assignment
Apply Model for Future Horizon Years
• Analyses of transportation performance measures such as peak period speeds, travel times and emissions
• Assessment of performance of road and transit networks• Recommendations to improve the Transportation System• Recommendations to improve the Transportation System
Existing and Future Travel PatternsExisting and Future Travel PatternsAuto continues as the dominant travel mode for Vaughan residentsmode for Vaughan residentsRelatively low use of transit, despite many improvementsimprovements Toronto continues to be a major travel destination for Vaughan residentsAuto occupancy remains lowAuto occupancy remains low
Vaughan AM Peak Period Trip Growth betweenVaughan AM Peak Period Trip Growth between 2006 and 2031 by Travel Mode
Transportation Tomorrow Survey, 2006 p y,
74%
77%
15%15% 8% 11%
Transportation Tomorrow Survey, 2006
High Transit use and modal share focused on TorontoHowever, major investments in rapid transit on the horizonWhile not responsible for delivering transit, City can support/facilitate transit, City can support/facilitate transit use:
Provide mid-block collectors for bus Provide mid block collectors for bus routesPromote mixed-use centers in transit Promote mixed use centers in transit accessible locationsIncrease densities along transit Increase densities along transit corridorsExpand pedestrian networks for Expand pedestrian networks for improved transit accessEncourage travel demand Encourage travel demand management initiativesReduce parking supply Reduce parking supply standards/charge for parking
Seeks to reduce and/or manage “demand” side of travel“demand” side of travelTDM is a series of specialized TDM is a series of specialized policies, targeted programs, & innovative mobility services and products to:and products to:
Reduce overall travel (e.g. ( gtelecommuting)Shift t l d f Shift travel modes away from auto useauto useIncrease auto occupancy p y(e.g. through car pooling)
TDM l i t t l i TDM plays an important role in the providing sustainable the providing sustainable transportation
Current safety policies are more reactive reactive Need a more proactive analytical
h approach Safety consideration in planning, Safety consideration in planning, design and operationS f t I t St d ld b Safety Impact Study could be considered early stages of the y gplanning process
The City’s traffic measures are The City’s traffic measures are consistent with those in other j i di ti f C djurisdictions of Canada
Introduce ranking system to Introduce ranking system to prioritize calming plansC id l i i th Consider calming measures in the review of new developmentsp
Spadina subway extension now p yappears a realityWith i d t it With improved transit, opportunities for further ppintensificationWith strong residential market, opportunities for better opportunities for better jobs/labour force balanceRoad network implementation issuesissues
N th M l C it B id ClNorth Maple Community Bridge Class Environmental Assessment, City of Vaughan
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Study AreaStudy Area
The Study Area is bound by:Teston Road to the North;Teston Road to the North;Jane Street to the East;;Major Mackenzie to the S thSouth;Weston Road to the West;Weston Road to the West;Highway 400 bisecting the g y goverall Study Area.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Environmental Assessment BackgroundEnvironmental Assessment Background
I O t i th E i t l A t A t th i tIn Ontario, the Environmental Assessment Act governs the requirements of the Environmental Assessment (EA) process.o t e o e ta ssess e t ( ) p ocessThe purpose of the EA Act is to promote good environmental planning through the:
Protection;Protection;Conservation; and,; ,Wise Management of Ontario’s environment.
The intent is to predict the environmental effects of proposed undertakings before they are carried outundertakings before they are carried out.The EA process ensures that environmental problems or opportunities associated with the project are considered along with alternatives, and their effects are investigated and mitigated through the planning processtheir effects are investigated and mitigated through the planning process, before implementation (i.e. construction) takes place.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Environmental Assessment BackgroundEnvironmental Assessment Background
Th EA l i t t bThe EA process serves several important purposes by:
Allowing for consultation from a variety of sources including 3 levels of g y ggovernment, stakeholders and the public;Id tif i t ti l i d h t iti t th i t i l t tiIdentifying potential issues and how to mitigate them prior to implementation (i.e. construction);( );Promoting good environmental planning practices; Improving community acceptance; and,Allowing for transparency in the decision making processAllowing for transparency in the decision-making process.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
MUNICIPAL CLASS EA PROCESSMUNICIPAL CLASS EA PROCESS
MUNICIPAL CLASS EA PLANNING AND DESIGN PROCESSMUNICIPAL CLASS EA PLANNING AND DESIGN PROCESSNOTE: This flow chart is to be read in conjunction with Part A of the Municipal Class EA
MUNICIPAL CLASS EA PLANNING AND DESIGN PROCESSMUNICIPAL CLASS EA PLANNING AND DESIGN PROCESSNOTE: This flow chart is to be read in conjunction with Part A of the Municipal Class EA
PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5PROBLEM OROPPORTUNITY
ENVIRONMENTALSTUDY REPORT
ALTERNATIVE DESIGNCONCEPTS FOR
PREFERRED SOLUTION
ALTERNATIVESOLUTIONS IMPLEMENTATION
PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5PROBLEM OROPPORTUNITY
ENVIRONMENTALSTUDY REPORT
ALTERNATIVE DESIGNCONCEPTS FOR
PREFERRED SOLUTION
ALTERNATIVESOLUTIONS IMPLEMENTATION
APPROVED-MAY PROCEED
OPPORTUNITY STUDY REPORTPREFERRED SOLUTION
PROBLEM OROPPORTUNITYIDENTIFY PROBLEM
OR OPPORTUNITY
1 IDENTIFY ALTERNATIVE SOLUTIONS TO PROBLEM
OR OPPORTUNITY
1 IDENTIFY ALTERNATIVE DESIGN CONCEPTS FOR PREFERRED SOLUTION
1 COMPLETE ENVIRONMENTAL
STUDY REPORT (ESR)
1 COMPLETE CONTRACT DRAWINGS AND
TENDER DOCUMENTS
1
APPROVED-MAY PROCEED
OPPORTUNITY STUDY REPORTPREFERRED SOLUTION
PROBLEM OROPPORTUNITYIDENTIFY PROBLEM
OR OPPORTUNITY
1IDENTIFY PROBLEM OR OPPORTUNITY
1 IDENTIFY ALTERNATIVE SOLUTIONS TO PROBLEM
OR OPPORTUNITY
1 IDENTIFY ALTERNATIVE SOLUTIONS TO PROBLEM
OR OPPORTUNITY
1 IDENTIFY ALTERNATIVE DESIGN CONCEPTS FOR PREFERRED SOLUTION
1 IDENTIFY ALTERNATIVE DESIGN CONCEPTS FOR PREFERRED SOLUTION
1 COMPLETE ENVIRONMENTAL
STUDY REPORT (ESR)
1 COMPLETE ENVIRONMENTAL
STUDY REPORT (ESR)
1 COMPLETE CONTRACT DRAWINGS AND
TENDER DOCUMENTS
1 COMPLETE CONTRACT DRAWINGS AND
TENDER DOCUMENTS
1
DISCRETIONARY PUBLIC CONSULTATION TO REVIEW PROBLEM OR OPPORTUNITY
SELECT SCHEDULE
(APPENDIX 1)SCHEDULE A
2 DETAIL INVENTORY OF NATURAL, SOCIAL AND
ECONOMIC ENVIRONMENT
2
PROCEED TO2
ENVIRONMENTALSTUDY REPORT (ESR)
PLACED ON PUBLIC RECORD
2DISCRETIONARY PUBLIC CONSULTATION TO REVIEW PROBLEM OR OPPORTUNITY
SELECT SCHEDULE
(APPENDIX 1)SCHEDULE A
2 DETAIL INVENTORY OF NATURAL, SOCIAL AND
ECONOMIC ENVIRONMENT
2 DETAIL INVENTORY OF NATURAL, SOCIAL AND
ECONOMIC ENVIRONMENT
2
PROCEED TO2 PROCEED TO2
ENVIRONMENTALSTUDY REPORT (ESR)
PLACED ON PUBLIC RECORD
2 ENVIRONMENTALSTUDY REPORT (ESR)
PLACED ON PUBLIC RECORD
2
PROBLEM OR OPPORTUNITY (APPENDIX 1)
DETERMINE APPLICABILITY OF
NOTICE OF COMPLETION TO REVIEW AGENCIES
AND PUBLIC
COPY OF
IF NOORDER*,
MAY PROCEEDINVENTORY NATURAL,
SOCIAL, ECONOMIC ENVIRONMENT
2
ECONOMIC ENVIRONMENT
IDENTIFY IMPACT OF ALTERNATIVE DESIGNS ON
3
PROCEED TO CONSTRUCTION AND
OPERATION
2PLACED ON PUBLIC RECORDPROBLEM OR OPPORTUNITY (APPENDIX 1)
DETERMINE APPLICABILITY OF
NOTICE OF COMPLETION TO REVIEW AGENCIES
AND PUBLIC
COPY OF
IF NOORDER*,
MAY PROCEEDINVENTORY NATURAL,
SOCIAL, ECONOMIC ENVIRONMENT
2 INVENTORY NATURAL, SOCIAL, ECONOMIC
ENVIRONMENT
2
ECONOMIC ENVIRONMENTECONOMIC ENVIRONMENT
IDENTIFY IMPACT OF ALTERNATIVE DESIGNS ON
3 IDENTIFY IMPACT OF ALTERNATIVE DESIGNS ON
3
PROCEED TO CONSTRUCTION AND
OPERATION
2 PROCEED TO CONSTRUCTION AND
OPERATION
2PLACED ON PUBLIC RECORDPLACED ON PUBLIC RECORD
MASTER PLAN APPROACH
(See Section A.2.7) ORDER*GRANTED,
PROCEED WITH INDIVIDUAL
COPY OFNOTICE OF COMPLETION
TO MOE-EA BRANCH
ENVIRONMENT
IDENTIFY IMPACT OF ALTERNATIVE SOLUTIONS
3
ALTERNATIVE DESIGNS ON ENVIRONMENT, AND
MITIGATING MEASURES
MONITOR FORENVIRONMENTAL PROVISIONS
AND COMMITMENTS
3
MASTER PLAN APPROACH
(See Section A.2.7) ORDER*GRANTED,
PROCEED WITH INDIVIDUAL
COPY OFNOTICE OF COMPLETION
TO MOE-EA BRANCH
ENVIRONMENTENVIRONMENT
IDENTIFY IMPACT OF ALTERNATIVE SOLUTIONS
3 IDENTIFY IMPACT OF ALTERNATIVE SOLUTIONS
3
ALTERNATIVE DESIGNS ON ENVIRONMENT, AND
MITIGATING MEASURES
ALTERNATIVE DESIGNS ON ENVIRONMENT, AND
MITIGATING MEASURES
MONITOR FORENVIRONMENTAL PROVISIONS
AND COMMITMENTS
3 MONITOR FORENVIRONMENTAL PROVISIONS
AND COMMITMENTS
3
EVALUATE ALTERNATIVE
E.A. OR ABANDON PROJECT
ON THE ENVIRONMENT, AND MITIGATING MEASURES
4
EVALUATE ALTERNATIVE DESIGNS: IDENTIFY
RECOMMENDED DESIGN
4
OPPORTUNITY TOREQUEST MINISTER WITHIN
30 DAYS OF NOTIFICATION TO
3
EVALUATE ALTERNATIVE
E.A. OR ABANDON PROJECT
ON THE ENVIRONMENT, AND MITIGATING MEASURES
ON THE ENVIRONMENT, AND MITIGATING MEASURES
4
EVALUATE ALTERNATIVE DESIGNS: IDENTIFY
RECOMMENDED DESIGN
4 EVALUATE ALTERNATIVE DESIGNS: IDENTIFY
RECOMMENDED DESIGN
4
OPPORTUNITY TOREQUEST MINISTER WITHIN
30 DAYS OF NOTIFICATION TO
3 OPPORTUNITY TOREQUEST MINISTER WITHIN
30 DAYS OF NOTIFICATION TO
3
SOLUTIONS: IDENTIFY RECOMMENDED SOLUTIONS
OPPORTUNITYFOR ORDER*REQUEST TO
MINISTERWITHIN
30 DAYS OFO C O
OPTIONALO OCONSULT REVIEW5
CONSULT REVIEW AGENCIES & PREVIOUSLY INTERESTED & DIRECTLY
AFFECTED PUBLIC
5
30 DAYS OF NOTIFICATION TO REQUEST AN ORDER*SOLUTIONS: IDENTIFY
RECOMMENDED SOLUTIONSOPPORTUNITYFOR ORDER*REQUEST TO
MINISTERWITHIN
30 DAYS OFO C O
OPTIONALO OCONSULT REVIEW5 CONSULT REVIEW5
CONSULT REVIEW AGENCIES & PREVIOUSLY INTERESTED & DIRECTLY
AFFECTED PUBLIC
5 CONSULT REVIEW AGENCIES & PREVIOUSLY INTERESTED & DIRECTLY
AFFECTED PUBLIC
5
30 DAYS OF NOTIFICATION TO REQUEST AN ORDER*
30 DAYS OF NOTIFICATION TO REQUEST AN ORDER*
ORDER*
NOTIFICATION
NOTICE OFCOMPLETION TO REVIEW
FORMAL MEDIATION(see Section A.2.8.2)
CONSULT REVIEW AGENCIES AND PUBLIC
re: PROBLEM OR OPPORTUNITY AND
ALTERNATIVE SOLUTIONS
5
SELECT PREFERREDDESIGN
6
ORDER*
NOTIFICATION
NOTICE OFCOMPLETION TO REVIEW
FORMAL MEDIATION(see Section A.2.8.2)
CONSULT REVIEW AGENCIES AND PUBLIC
re: PROBLEM OR OPPORTUNITY AND
ALTERNATIVE SOLUTIONS
5 CONSULT REVIEW AGENCIES AND PUBLIC
re: PROBLEM OR OPPORTUNITY AND
ALTERNATIVE SOLUTIONS
5
SELECT PREFERREDDESIGN
6SELECT PREFERRED
DESIGN
6
REVIEW ENVIRONMENTAL SIGNIFICANCE &
DISCRETIONARY PUBLIC
CONSULTATION TO REVIEW PREFERRED
DESIGN
ORDER GRANTED, PROCEED
AS PER MINISTER’S
DIRECTION OR ABANDON
MATTER REFERRED
TOMEDIATION
ORDER*DENIED
WITH ORWITHOUT
MINISTER’S CONDITIONS
AGENCIES & PUBLIC
SCHEDULE B
SELECT PREFERREDSOLUTION
6
REVIEW ENVIRONMENTAL SIGNIFICANCE &
DISCRETIONARY PUBLIC
CONSULTATION TO REVIEW PREFERRED
DESIGN
ORDER GRANTED, PROCEED
AS PER MINISTER’S
DIRECTION OR ABANDON
MATTER REFERRED
TOMEDIATION
ORDER*DENIED
WITH ORWITHOUT
MINISTER’S CONDITIONS
AGENCIES & PUBLIC
SCHEDULE B
SELECT PREFERREDSOLUTION
6SELECT PREFERRED
SOLUTION
6
SIGNIFICANCE & CHOICE OF SCHEDULE
REVIEW AND CONFIRM
CHOICE OF SCHEDULE
PROJECT
INDIVIDUAL E.A.
SCHEDULE C
INDICATES POSSIBLE EVENTSINDICATES MANDATORY EVENTSINDICATES PROBABLE EVENTS
7
SIGNIFICANCE & CHOICE OF SCHEDULE
REVIEW AND CONFIRM
CHOICE OF SCHEDULE
PROJECT
INDIVIDUAL E.A.
SCHEDULE C
INDICATES POSSIBLE EVENTSINDICATES MANDATORY EVENTSINDICATES PROBABLE EVENTS
INDICATES POSSIBLE EVENTSINDICATES MANDATORY EVENTSINDICATES PROBABLE EVENTS
77
WE ARE HERE
MANDATORY PUBLIC CONTACT POINTSDECISION POINTS ON CHOICE OF SCHEDULEOPTIONALPART II ORDER*
PRELIMINARY FINALIZATION OF PREFERRED DESIGN
7 MANDATORY PUBLIC CONTACT POINTSDECISION POINTS ON CHOICE OF SCHEDULEOPTIONALPART II ORDER*
MANDATORY PUBLIC CONTACT POINTSDECISION POINTS ON CHOICE OF SCHEDULEOPTIONALPART II ORDER**
PRELIMINARY FINALIZATION OF PREFERRED DESIGN
7PRELIMINARY FINALIZATION
OF PREFERRED DESIGN
7
Ph 1 P bl / O t it St t tPhase 1 – Problem/ Opportunity Statement
Problem/ Opportunity Statement:Problem/ Opportunity Statement:
“The Block 33 transportation network, in its current configuration:p gWill not adequately accommodate the projected local traffic within and traveling between the communities of the Study Area; andIs not in keeping with the City’s approved Official Plan objectives related to community connectivity and the provision of efficient transitrelated to community connectivity and the provision of efficient transit service.
Therefore, the opportunity exists to address these operational problems within Block 33, and to promote sustainable multi-modal transportation options (including cycling/ pedestrian traffic and transit service) to traveloptions (including cycling/ pedestrian traffic and transit service) to travel within and around Block 33.”
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Ph 2 St d A E i ti C ditiPhase 2 – Study Area Existing Conditions
A number of documents were reviewed in determining the Study Area’s existing environmental conditions:
• Traffic studies/counts• York Region Transportation Master Plan
Vaughan Pedestrian and Bicycle Master Plan• Vaughan Pedestrian and Bicycle Master Plan• Vaughan Vision 2020 Strategic Planaug a s o 0 0 St ateg c a• Land Use Policy including:
• York Region Official PlanCity of Vaughan Official Plan• City of Vaughan Official Plan
• Vaughan OPA 400/600 and associated Transportation Studiesg p• Block 33 Development Plan Supporting Studies:
• Planning Basis Report and Transportation Studies• Natural Environment Inventory• Natural Environment Inventory• Noise/Acoustics studies, Archaeology/Cultural Heritage studies, etc
• Planned and Approved development applications within the Study Area
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
2021 AM Peak Hour – V/C Ratios Across Screenline
Teston Road
0.950.76
Corridor 2021 (AM Peak Hour)East West Both
Volume 1831 2149 3980Teston Road E - E of Hwy 400
Volume 1831 2149 3980# Lanes 2 2 4Capacity 1800 1800 3600V/C ti 1 02 1 19 1 11
Canada DriveV/C ratio 1.02 1.19 1.11
M j M k iVolume 1605 1982 3587
Major Mackenzie Dr. E - E of Hwy 400
# Lanes 2 2 4Capacity 1800 1800 3600V/C ratio 0 89 1 10 1 00V/C ratio 0.89 1.10 1.00
Volume 3436 4131 7567# L 4 4 8Both corridors # Lanes 4 4 8Capacity 3600 3600 7200V/C ratio 0.95 1.15 1.05
LEGEND
1.150 92
0.95 V/C in the year 2021 (without proposed over pass)0.92
Major Mackenzie Dr. 0.76
proposed over pass)
V/C in the year 2021 (with proposed 2 lanes over pass)
30
proposed 2-lanes over pass)
30
Ph 2 Id tif Alt ti S l tiPhase 2 – Identify Alternative Solutions
1. Do Nothing - No changes or improvements to Block 33 transportation t knetwork
2 Reduce Auto Demand – Improve public transit cycling and Travel Demand2. Reduce Auto Demand – Improve public transit, cycling and Travel Demand Management initiatives within and around the Study Area
3. Upgrade/ Improve Other Roadways - Improvements to other local roadways within the study area in conjunction with the ongoing Westernroadways within the study area in conjunction with the ongoing Western Vaughan Transportation Improvements Individual EA.
4. Build Hwy 400 Overpass - mid-block connection over Highway 400 between America Avenue and Canada Drive
* Combinations of the above may be implemented, should the evaluation Combinations of the above may be implemented, should the evaluation prove this to be a viable option.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Ph 2 A t f Alt ti S l tiPhase 2 – Assessment of Alternative Solutions
Take existing environment into consideration and comparatively evaluate the Alternative Solutions using a descriptive or qualitative assessment based on criteria developed within the following categories (representingbased on criteria developed within the following categories (representing the broad definition of the environment as described in the EA Act):
TechnicalS i iSocio-economicFinancialFinancial
Suggested Criteria have been put forward based on their ability to identify th t ti l i t l ff t f h lt ti d di ti i h ththe potential environmental effects of each alternative and distinguish the advantages and disadvantages between them.advantages and disadvantages between them.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Ph 2 A t f Alt ti S l tiPhase 2 – Assessment of Alternative Solutions
Once finalized, the evaluation criteria will be used to comparatively evaluate the Alternative Solutions and identify a Recommended Solution through a net effects analysis consisting of the following steps:through a net effects analysis consisting of the following steps:
1. Apply the evaluation criteria to each of the Alternative Solutions to identify the potential effects on the environment.
2 Identify reasonable mitigation measures available to avoid or minimize2. Identify reasonable mitigation measures available to avoid or minimize any potential negative environmental effects on the environment.
3. Apply the mitigation measures to identify the net positive or negative ff t th i teffects on the environment.
4 Identify the relative advantages and disadvantages for each Alternative4. Identify the relative advantages and disadvantages for each Alternative Solution based on the net environmental effects.
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Ph 2 A t f Alt ti S l tiPhase 2 – Assessment of Alternative Solutions
Suggested Criteria may include:gg y
TechnicalPotential to improve future transportation needsP t ti l t i f t f th t lli bliPotential to improve safety for the travelling publicPhysical & operational feasibility including availability of right-of-wayPhysical & operational feasibility, including availability of right-of-waySupport for alternative modes, including transit, cycling and walkingpp , g , y g gPotential to improve emergency services response times( fire, police, & ambulance services)
North Maple Comm nit Bridge Class EANorth Maple Community Bridge Class EA
Ph 2 A t f Alt ti S l tiPhase 2 – Assessment of Alternative Solutions
Suggested Criteria may include:Suggested Criteria may include:Socio-economic
Potential for disturbing existing residences, community and recreation facilities thro gh temporar and/ or permanent effects (i e constr ction/ traffic noise d stthrough temporary and/ or permanent effects (i.e. construction/ traffic noise, dust, traffic disruption, property access disruption, etc)Potential for property impactsD f tibilit ith R i l d M i i l Offi i l Pl T t tiDegree of compatibility with Regional and Municipal Official Plans, Transportation Plans, and other PoliciesPotential to affect future development proposalsPotential effects on existing community character and sustainabilityPotential connectivity improvementsPotential connectivity improvements
FinancialPotential cost of acquiring propertyPotential Capital costs of implementationPotential maintenance costs
North Maple Comm nit Bridge Class EAPotential maintenance costs
North Maple Community Bridge Class EA
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Hi h 417/C ill R d B idHighway 417/Cyrville Road Bridge ReplacementReplacement
Traffic Network Study S f th R ltSummary of the Results
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Ogilvie Road
Cyrville Road Bridge
1 Study AreaSignalized Intersections
1. Study AreaSignalized Intersections
Unsignalized Intersections
Innes Road
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
PPurpose
The purpose of the Traffic Network Study was:The purpose of the Traffic Network Study was:
• to assess traffic impacts of a temporary closure of Cyrville Road at the Highway 417 bridge location to the adjacent roadRoad at the Highway 417 bridge location to the adjacent road network, and
bilit f th t k t d t th lt d t ffi• ability of the network to accommodate the altered traffic patters (flows and intersection volumes) resulted from the p ( )closure.
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Study ApproachStudy Approach
1. Assess existing traffic operations within the study area network -Synchro ModelSynchro Model
2 Re assign traffic crossing the Cyrville Road bridge during construction2. Re-assign traffic crossing the Cyrville Road bridge during construction closure to the adjacent road network (detour) – Area Transportation Model
3. Analyze traffic operations during the bridge construction closure period –modified Synchro Model - identify traffic impacts and measures requiredmodified Synchro Model - identify traffic impacts and measures required to accommodate changed traffic patterns/volumes and mitigate impacts during the closure of Cyrville Road;
f f / f4. Develop specific recommendations for improvements/modifications to intersection configurations/signal controls, and other traffic managementintersection configurations/signal controls, and other traffic management measures, required during the Cyrville Road closure.
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
DataData
1. Intersection turning movements, traffic signal control settings (phasing and timing) provided by the City of Ottawa Traffic Operations Sectionand timing) provided by the City of Ottawa Traffic Operations Section.
2 Intersection turning movements obtained from recent traffic counts were2. Intersection turning movements obtained from recent traffic counts were rationalized and balanced for the study area.
3. The City of Ottawa Transportation EMME/3 Model traffic forecasts for the study area
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Traffic Forecast MethodologyTraffic Forecast Methodology
1. The City of Ottawa Transportation EMME/3 Model traffic forecasts for the study area (simulations with and without Cyrville Road Bridge)study area (simulations with and without Cyrville Road Bridge)
2 Validation of Model results by comparing model simulated traffic volumes2. Validation of Model results by comparing model simulated traffic volumes to observed volumes (recent traffic counts) – significant differences
3. Decision – Develop a specific Transportation Model for the study area (TransCAD Model)
4. Use the TransCAD model to estimate O-D matrix for the study area (based on existing link/intersection traffic volumes – 100% coverage of the studyon existing link/intersection traffic volumes 100% coverage of the study area intersections and roadway links by obtained traffic data)
5. Assign the estimated O-D matrix to the modified network (with the C ill R d li k th H 417 b id l d) t bt i i t tiCyrville Road link on the Hwy 417 bridge closed) to obtain intersection turning movements and link volumes within the study area suitable for g yfurther operational analyses
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Existing Traffic Operation Conditions at the Study Area Intersections
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Intersection Level of Service - Existing Conditions
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Traffic Network AnalysisTraffic Network AnalysisDevelopment and Calibration of the TransCAD Modelp
(Network with Cyrville Road Bridge)
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Study Area Road Network and Traffic Zones System
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Road Network Characteristics in Study Area
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Observed Link Flows – AM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Estimated Link Flows (with Cyrville Road Bridge) – AM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Classification of Vehicular Trips within the Study Area
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Cyrville Road Bridge Selected Link Analysis – AM Peak
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Cyrville Road Bridge Selected Link Analysis – PM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Traffic Network AnalysisTraffic Network AnalysisTraffic Forecast/Re-assignment by the TransCAD Modelg y
(Network without Cyrville Road Bridge)
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Estimated Link Flows (without Cyrville Road Bridge) – AM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Traffic Diverted During Cyrville Road Bridge Closure – AM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
Traffic Operations Conditions• Cyrville Road Bridge Closed• Cyrville Road Bridge Closed• Existing Intersection Configurationsg g• Existing and Optimised Signal Plans
City of Ottawa Progress Meeting – Dec 16, 2008
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Estimated Turning Movements - AM Peak Hour
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Level of Service - Existing Conditions
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Level of Service – Cyrville Bridge Closed (Existing Signal Plans)
Hwy 417/Cyrville Road Bridge Replacement - Traffic Network Study
City of Ottawa Progress Meeting – Dec 16, 2008 Level of Service – Cyrville Bridge Closed (Optimised Signal Plans)
Due to increased commuter service demand on Lakeshore East Corridor and an increase demand for capacity to maintain a growing fleet of rail equipment Metrolinx initiated an environmental fleet of rail equipment, Metrolinx initiated an environmental assessment to extend train service from Oshawa to the Town of Bowmanville in Clarington
AECOM is responsible to develop the final track & train service AECOM is responsible to develop the final track & train service plan and designs for full train service extension to Central Oshawa
d ith i iti l k t i i t di t B ill hi h and with initial peak train service extending to Bowmanville, which could further be expanded to full service to Bowmanville as demand pgrows.
AECOM’s additional major responsibility is to develop an j p y pEnvironmental Assessment of these two expansions and determine the impacts they would have on the surrounding areas and develop the impacts they would have on the surrounding areas and develop mitigation plans for those issues which may be created by the implementation of this infrastructure and the attendant train serviceservice.
AECOM’s overall responsibility is to finalize the Environmental R t d bt i l t d ith i l t ti d t Report and obtain approval to proceed with implementation, and to provide a preliminary design which can be used as the basis for the p p y gdetailed design and implementation of this project.
RitsonThornton
sitesite
MartinMartinsite
Courticesite
Legend
Potential GO Station SitesPotential GO Station Sites
Existing Oshawa GO Station
FIGURE 1GO Service expansion EA, Oshawa-Parking and traffic Study Not to Scale
Site Location
Mehemed Delibasic P EngMehemed Delibasic P. EngP j t MProject Manager
Transportation Planning and Traffic Engineering
AECOM CANADA LTD