BILL OF QUANTITIES AIR-CONDITIONING SYSTEMS ANNEXURE - II 11/04/12 Part 'A' Supply of Machine Qty Unit Rate Amount 1 Supply of Blue Star Make 16.5TR Packaged AC 1 Nos 254,334 254,334.22  Model: DPA1983R1 Total 254,334.22  31,791.78  Total of Supply of machine 286,126.00  Part 'B' Insta llatio n, Testi n & Commi ssio nin . 1 REFRIGERANT PIPING: Supply, Installation & commissioning of Hard copper 19Gauge & soft copper 22Gauge Refrigerant piping, complete with Hard Copper Pipe with Superlon Insulation 70 Rmt 1200 84,000.00  2 ELECTRICAL CABLING: Supply, Providing and laying Power & Control electrical cabling from IDU to ODU 75 Rmt 120 9,000.00  3 DRAIN PIPINGS: drain water pipings work out of HDPE PVC pipes, fitting, accessories, bends, elbows.. 5 Rmt 90 450.00  4 FRAME WORK: Supply, fabrication and installation of M.S. Fabricated Plateform Type with Safety Railing Stand for Outdoor Unit -  For Ductable Out Door Units 3 Nos 4500 13,500.00  5 SHEET METAL WORK: Fabrication, supply, installation, testing & commiss ioning of following Ducts complete with splitters, supports etc… of -  a GSS Rectangular duct - 22G 100 Sq.ft 68 6,800.00  c Canvas Connections 1 Nos 1000 1,000.00  6 TESTING & COMMISSIONING:  Testing & commissioning of Air- conditioning system comprisin g indoor unit and outdoor condensing unit with nitrogen pressure testing, Vacumising & Gas charging. -  a 16.5 TR Aircool Packaged AC 1 Nos 17000 17,000.00  b Loading unloading. 1 Nos 800 800.00  c R-22 GAS 20 kgs 550 11,000.00  143,550.00  5,855.12  11,484.00  160,889.12  25,000.00  Total Project Cost with all taxes 422,015.11  a b c Please note that all civil ,electrical, carpentary and Plumbing work has to be arrange by customers, d Payment Terms: For Machines: 100% Advanced along with order. e Validit y of offer : 30 working day s. With Warm Regards FOR AIROFROST HVAC SYSTEMS PVT. LTD. Waseem Khan Project Head Cell: 9167224422 Email: [email protected] Extra piping, cabling & ducting will be charged extra as per rate quoted. Composite VAT @ 8% on Installation Total Installation work Service Tax @ 12.3% on 33% of Installation TOTAL Installation (with all Taxes) - Rs. Mehboob Foujdar Vat @12.5% Less Buy Back of Old 16.5TR x 1Nos Packaged AC Terms & Condition: Price is inclusive of all taxes.

Mehboob Foujdar-Aircooled Packaged

Embed Size (px)

Citation preview

Page 1: Mehboob Foujdar-Aircooled Packaged

 

BILL OF QUANTITIES

AIR-CONDITIONING SYSTEMS

ANNEXURE - II

11/04/12

Part 'A' Supply of Machine Qty Unit Rate Amount

1 Supply of Blue Star Make 16.5TR Packaged AC 1 Nos 254,334 254,334.22 

Model: DPA1983R1

Total 254,334.22 

31,791.78 

Total of Supply of machine 286,126.00 

Part 'B' Installation, Testin & Commissionin .1 REFRIGERANT PIPING: Supply, Installation & commissioning of Hard

copper 19Gauge & soft copper 22Gauge Refrigerant piping, complete with

Hard Copper Pipe with Superlon Insulation 70 Rmt 1200 84,000.00 

2 ELECTRICAL CABLING: Supply, Providing and laying Power & Control

electrical cabling from IDU to ODU75 Rmt 120 9,000.00 

3 DRAIN PIPINGS: drain water pipings work out of HDPE PVC pipes, fitting,

accessories, bends, elbows..5 Rmt 90 450.00 

4 FRAME WORK: Supply, fabrication and installation of M.S. Fabricated

Plateform Type with Safety Railing Stand for Outdoor Unit- 

For Ductable Out Door Units 3 Nos 4500 13,500.00 

5 SHEET METAL WORK: Fabrication, supply, installation, testing &

commissioning of following Ducts complete with splitters, supports etc… of- 

a GSS Rectangular duct - 22G 100 Sq.ft 68 6,800.00 

c Canvas Connections 1 Nos 1000 1,000.00 

6TESTING & COMMISSIONING: Testing & commissioning of Air-

conditioning system comprising indoor unit and outdoor condensing unit

with nitrogen pressure testing, Vacumising & Gas charging.

a 16.5 TR Aircool Packaged AC 1 Nos 17000 17,000.00 

b Loading unloading. 1 Nos 800 800.00 

c R-22 GAS 20 kgs 550 11,000.00 

143,550.00 

5,855.12 

11,484.00 

160,889.12 

25,000.00 

Total Project Cost with all taxes 422,015.11 

a

b

c Please note that all civil ,electrical, carpentary and Plumbing work has to be arrange by customers,

d Payment Terms: For Machines: 100% Advanced along with order.

e Validity of offer : 30 working days.

With Warm Regards

FOR AIROFROST HVAC SYSTEMS PVT. LTD.

Waseem Khan

Project Head

Cell: 9167224422

Email: [email protected]

Extra piping, cabling & ducting will be charged extra as per rate quoted.

Composite VAT @ 8% on Installation

Total Installation work

Service Tax @ 12.3% on 33% of Installation

TOTAL Installation (with all Taxes) - Rs.

Mehboob Foujdar

Vat @12.5%

Less Buy Back of Old 16.5TR x 1Nos Packaged AC

Terms & Condition:

Price is inclusive of all taxes.

Page 2: Mehboob Foujdar-Aircooled Packaged