M P j t M t i th Oil & G I d tMega-Project Management in the Oil & Gas IndustryImproving Collaboration, Managing Costs & Delivering Results
Guy Barlow Kirk BlanchardGuy BarlowIndustry StrategyPower Energy & Process IndustriesOracle Primavera Global Business Unit
Project Controls SpecialistPerformance Contractors, Inc,
Agenda
• “Mega-Project” Overview• What are the Key Challenges?• Resolving the Challenges
• Motiva Project OverviewT Ch ll• Top 5 Challenges
• Moving Forward
• Q&A and Wrap-up• Exit SurveyExit Survey
Mega-Project OverviewManaging Complex Coordination
OwnersGeneral ContractorsOwnersGeneral ContractorsParticipant Activities
Fi iFi i R l tR l t Construction MgrsConstruction Mgrs
ArchitectsEngineersSubcontractors
ArchitectsEngineersSubcontractors
• Financing• Insurance• Financing• Insurance
• Regulatory• Legal• Regulatory• Legal
Supply Chain ActivitiesLabor PoolSuppliersOperators
Labor PoolSuppliersOperators
pp y• Eng. to Order• Manufacturing• Eng. to Order• Manufacturing
• Logistics• Procurement• Logistics• Procurement
Impact
• Poor Financial Performance • Reduced Operational Capabilities• Increased Legal Exposure
• Poor Financial Performance • Reduced Operational Capabilities• Increased Legal Exposure• Greater Political/Regulatory Issues• Greater Political/Regulatory Issues
What are the Key Challenges?5 Distinct Pain Points
Document ControlAre we efficiently managing the thousands of documents?Are we efficiently managing the thousands of documents?
Performance ReportingHow are we measuring and reporting project metrics?
Change Management
How are we measuring and reporting project metrics?
g gAre the hundreds of change orders a growing liability?
Risk ManagementRisk ManagementWho’s managing project risk and what’s the mitigation strategy?
System TurnoverSystem TurnoverAre we able to easily transition to a start-up environment?
Resolving the ChallengesCollaborative, Integrated & Optimized
Operate & MaintainCapital Plan / Project Bid Phase
Change Control
Project Close
Plan, Design& Procure
Project Execution
Business Management
Resolving the ChallengesCollaborative, Integrated & Optimized
Operate & MaintainCapital Plan / Project Bid Phase
Change Control
Project CloseP6 Analytics / P6 ERD / BI / Reporting
Business Process Managementg
Risk AnalysisQuantitative Risk
Analysis
P6Project Management
Risk Management
Contract Management
Change Management
Portfolio Management
Propose, Prioritize &
Plan, Design& Procure
Project Execution
Oracle Universal Content Management(or other content management system)
AnalysisQuantitative Risk
Management
Risk ManagementProject Scheduling
Resource Management
g gContract Management
Claim ManagementIssue Management
Select InitiativesReview, Track & Adjust
Portfolio
Business Management
(or other content management system)
Integration with other core applications (ERP, EAM, AutoVue, etc.)
PERFORMANCE ContractorsKirk Blanchard, Project Controls Specialist
Current States License Held to do BusinessOffice Locations - Baton Rouge, Lake Charles, Freeport & Mobile
Communication
Schedule and Cost
RResource Management
Information Management
Timely Project Close-out
MEGA Projects are cross functional events which requireMEGA Projects are cross-functional events, which require a great deal of communication and resources. There are a number of fundamental task that must be in-place to ensure that information is effectively prepared and fundamental procedures are in place to execute the project.p j
Contractors
PERFORMANCE ContractorsH-Block Project Overview (Motiva Refining, Port Arthur Texas)
• MOTIVA (Owner) Bechtel/Jacobs, (MC) PERFORMANCE
H-Block Consist of Hydrocracker, Power Station, Naphtha, and Cat Feed Units
Contractors (GC)
MOTIVA + Bechtel/Jacobs + PERFORMANCE + Sub-Contractors
• Bechtel/Jacobs Joint Venture, Managing Contractor
Manpower Projections, 2000 Project Personnel on Site for H-Block including Sub-Contractors• PERFORMANCE Contractors, LLC.including Sub Contractors
Top 5 ChallengesMassive, Complex & Risky
• Procedures• Communication• Control
Document ControlControl
• Quality • Timely• Consistency
Performance Reporting Co s ste cy
• Initiation• Estimate• Approvals
Change Management pp
• Guidelines• Monitoring• Mitigation
Risk Management
• Completion• Final Inspection• Pre Commission / Start-up
System Turnover
Moving ForwardBest Practices & Lessons Learned
Risk Management• Scope Creep• Labor
Best Practices• Processes• Analysis
Desired Outcome• Safety• Quality• Labor
• Schedule• Analysis• Reporting
• Quality• Schedule (Cost / Duration)
Moving Forward (continued)Best Practices & Lessons Learned
P6 Analytics / P6 ERD / BI / ReportingP6 Analytics / P6 ERD / BI / Reporting
Risk Management• Scope Creep• Labor
Best Practices• Processes• Analysis
Desired Outcome• Safety• Quality
Business Process Management
Risk Analysis P6 Contract Management
Portfolio Management
Business Process Management
Risk Analysis P6 Contract Management
Portfolio Management• Labor
• Schedule• Analysis• Reporting
• Quality• Schedule (Cost / Duration)
Risk AnalysisQuantitative Risk Analysis
Quantitative Risk Management
Project ManagementRisk ManagementProject Scheduling
Resource Management
ManagementChange ManagementContract Management
Claim ManagementIssue Management
ManagementPropose, Prioritize & Select
InitiativesReview, Track & Adjust
Portfolio
Risk AnalysisQuantitative Risk Analysis
Quantitative Risk Management
Project ManagementRisk ManagementProject Scheduling
Resource Management
ManagementChange ManagementContract Management
Claim ManagementIssue Management
ManagementPropose, Prioritize & Select
InitiativesReview, Track & Adjust
Portfolio
Oracle Universal Content Management(or other content management system)
Integration with other core applications (ERP, EAM, AutoVue, etc.)
Oracle Universal Content Management(or other content management system)
Integration with other core applications (ERP, EAM, AutoVue, etc.)
<Insert Picture Here>
Quote AttributionTitle, Company
“We are what we repeatedly do. Excellence, then, is not an act but a habit....”
AristotleAristotle
Performance Contractors, LLC.For More Information Contact Kirk Blanchard
Baton Rouge, Louisiana225-751-4156
Q&A and Wrap-Up