October 26 to 31 2015 Technical/Design Meetings - Engineer's Office, Lahore
Date Start Time Meeting Parties Participants from Engineer Remarks
26
9:0011:00 Technical/Design Lot 4.1 and 4.2 ENG, PES Maurizio, Sardar, Santos, Sinh, PES representative, Georg Internal meeting13:3015:30
27
9:00 Technical/Design Lot 4.1 and 4.2 ENG, PES Maurizio, Sardar, Santos, Sinh, PES representative, Georg Internal meeting11:0013:3015:30
28
9:00 Technical/Design Lot 4.1 and 4.2 ENG, WAP Maurizio, Sardar, Santos, Sinh, Georg Mr. Georg to invite WAP personally11:0013:30 Technical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar, Santos, Sinh, Georg Reescheduled from November,30 (Mr. Georg to invite NET personally)15:30
29
9:00Technical/Design Interface 3.1/3.2 ENG, AND, SAM, WAP Wazir, Santos, Sinh, GeorgTechnical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar
11:0013:3015:30
30
9:00Technical/Design Interface 3.1/3.2 ENG, AND, SAM, WAP Wazir, Santos, Sinh, GeorgTechnical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar
11:0013:3015:30
31
9:0011:0013:3015:30
Meetings can be done in parallel. Mr. Santos and Mr. Sinh should stay on the Interface 3.1/3.2 meeting and participate on the Lot 41/4.2 meeting if called
Meetings can be done in parallel. Mr. Santos and Mr. Sinh should stay on the Interface 3.1/3.2 meeting and participate on the Lot 41/4.2 meeting if called