32
Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Embed Size (px)

Citation preview

Page 1: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Meeting the Demands of a Power Hungry China through

a Real-time Data Driven Enterprise Platform

Dr. Jun Zha

FibrLINK,

Department of Power and Energy IT

Page 2: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 2

AGENDA

• A Power Hungry China

• How to Face the Challenge

• Power Generation Solution

• T&D Solution

• Q&A

Page 3: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 3

A Power Hungry ChinaHow to sustain China’s GDP Growth Rate:

– Suppose China wants to sustain its GDP at 10% rate for the next decade

– China needs to add additional 50000 MW of new generation capacity per year

– It’s equivalent to 2/3 of current total generation capacity of Great Britain

– This is equivalent to one new 100 MW power plant every week– Total investment of $590 Billion US

--From “China Electricity Council”

Page 4: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 4Confidential to

Power Generation

Year 2005 Year 2010 2006-2010 Avg./year

Energy Gen. (TWH) 2450 3400 6.8%

Increase Energy Gen. (TWH) 955 190

Energy Hydro Gen. (TWH) 363 534.4

Increase Energy Gen. (TWH) 171.4

Energy Coal Gen. (TWH) 1997.3 2661.1

Increase Energy Gen. (TWH) 663.8

Energy NG Gen. (TWH) 35.4 125.5

Increase Energy Gen. (TWH) 90.1

Energy Nuclear Gen. (TWH) 51 64

Increase Energy Gen. (TWH) 13

Energy Others Gen. (TWH) 3.3 15

Increase Energy Gen. (TWH) 11.7

Year 2005 Year 2010 2006-2010 Avg./year

Installed Gen. Capacity (GW) 510 754 8.1%

Increase Capacity (GW) 244 48.8

Hydro Gen. Capacity (GW) 115 172.44

Increase Capacity (GW) 57.44

Coal Gen. Capacity (GW) 375.2 534.5

Increase Capacity (GW) 159.3

NG Gen. Capacity (GW) 10.47 31.22

Increase Capacity (GW) 20.75

Nuclear Gen. Capacity (GW) 7.84 9.84

Increase Capacity (GW) 2

Others Gen. Capacity ( 1.5 6

Increase Capacity (GW) 4.5

State Power Comp (11th 5 year plan)

North China

Northeast China

Northwest China

East China

Central China

South China

National Total

Year 2005

Energy Demand (TWH)

563.80 217.00 187.60 594.50 437.20 437.00 2434

Installed Capacity (GW)

107.70 43.78 37.23 116.46 107.05 88.47 510

Year 2010

Energy Demand (TWH)

781.00 285.30 260.00 834.00 587.50 617.70 3368

Installed Capacity (GW)

163.96 60.68 60.48 173.29 155.28 135.67 753

Page 5: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 5Confidential to

Power Transmission Development

Substation Project Projects that are building year 2005

±500KVDC Qty 2

±500KVDC Capacity (MW) 6,000

750KVAC Qty 2

750KVAC Capacity (MVA) 3,000

500KVAC Qty 46

500KVAC Capacity (MVA) 33,970

330KVAC Qty 11

330KVAC Capacity (MVA) 3,750

220KVAC Qty 161

220KVAC Capacity (MVA) 26,045

State Power Co’ Number(Next 5 Years)

Substation Project One Typical Province Planning (Year 2006 -2010)

500KVAC Qty 22 + 2 (extend)

500KVAC Capacity (MVA) 39,500

220KVAC Qty 145 + 54 (extend)

220KVAC Capacity (MVA) 64,000

Page 6: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 6

FIRST

SECOND

THIRD

FOURTH

FIFTH

NATIONAL CONTROL CENTERS

north centralnorthwest northeast east south

Twenty-three provinces Four duchiesFive municipalities

A B C D

The city under the province 、 municipality, duchy

………..counties

NATIONAL

SIX REGIONALS

OVER THREE HUNDREDS CITIES

OVER 32 PROVINCES LEVEL

OVER THOUSANDS COUNTIES

Five Level Dispatch Architecture

Page 7: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 7

Other Key Factor

Strategy of Industrialized Nation

– City population of 0.33 Billion to 0.65 Billion

– More demand on power, housing, education, transportation and health care

– Emphasis on Productivity instead of Capacity

Page 8: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 8

Power Generation Solution

Supervisory Information System (SIS)

1. Required for New Power Plant with 2*300MW up.

2. All data has to be saved into SIS database3. Plant Level Performance Calculation4. Optimization and Operation Support

Real-time Data Center for Power Plant (RtDC)1. Required for All Power Plant(Can use SIS for

New Plant)2. Gateway to Operation Management and ERP

system

Page 9: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 9

Architecture Overview

#1 DCS #1 PLC #1 RTU #2DCS #2PLC #2RTU

Interface

Firewall

SIS Application SIS Manager SIS OperatorPhysicalIsolator

MirrorServer

MIS/ERPServer

Clients

Internet

SecuredAreaIII

SecuredArea

II

Secured Area

I

DCS Network

SIS Network

MIS Network

Security Level

I

WebServer

SecurityLevel

II

SIS Server

Page 10: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 10

Application

SIS RtPM Time Series

Database

Real-Time Control System

(DCS, PLC, NCS, RTU)

BASE FUNCTION

Operation Support

Real-TimeSuperviso

ry

Performance

Calculation

Control Optimizat

ion

Condition Based

Maintenance

OnlineTest

EXTENDED FUNCTION

Page 11: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 11

Real-Time SupervisoryUnit Overview

Boiler SystemPower Flow

Page 12: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 12

Performance Calculation[[StandardStandard]]::

1.1. ASME StandardASME Standard(( PTCPTC))

2.2. Boiler Performance Test (GB 8117-87Boiler Performance Test (GB 8117-87))3.3. Turbine Performance Test (GB10184-88Turbine Performance Test (GB10184-88))

4.4. Condenser Performance TestCondenser Performance Test(( JB/T3344-JB/T3344-9393))

[[Plant PerformancePlant Performance]]::

1.1. Coal Consumption RateCoal Consumption Rate

2.2. Total Heat RatioTotal Heat Ratio

3.3. Assembly Heat RatioAssembly Heat Ratio

4.4. Thermal EfficiencyThermal Efficiency

5.5. Auxiliary Power RatioAuxiliary Power Ratio

6.6. Total 140 CalculationTotal 140 Calculation

Page 13: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 13

Performance Calculation

Page 14: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 14

Thermal Energy Analysis

ActualTarget Diff

Page 15: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 15

Operation Support

Stability Indictor

Page 16: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 16

Operation Support

Emission Indictor

Page 17: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 17

Condition Based Maintenance

Condition Monitoring

Page 18: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 18

T&D SolutionMassive Construction of T&D Network to Deliver the Power

Requires Applications at Large Scale:

EMS

AMR

WAMS

Power Marketing System

Huge Amount of Real-Time Data from above system

Requires Concentration of Real-Time Data :

RtDC (Real-time Data Center)

Page 19: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 19

State Grid

Southern Grid

Face the Challenge Separation of Transmission into two Power Grid companies

Page 20: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 20

Northeast

Northern

Northwest

EastCentral

Southern

Tibet

Xinjiang

6 Large-Scale Grid

31 Provincial Grid

Confidential to

National Inter-connection Backbone Grid In China

National Grid Area Distribution

Page 21: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 21

3 Transmission Backbone Grid Tunnel from West China to East China

Northern Backbone Tunnel from Northwest to Northern China, and connection with Northeast and Shandong Grid

Central Backbone Tunnel from ChuanYu & Central to East China, and connection with Fujian Grid

Southern Backbone Tunnel from Southwest to Southern China

West to East Interconnection

Page 22: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 22

Northern to Southern Tunnel from Northern China to Central China

Western Backbone Tunnel from Northwest to ChuanYu Grid

Central Backbone Tunnel from Northern to Central China, then to Southern Grid

West to Central/South Interconnection

Page 23: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 23

Specification for Real-time System

Conventional Protection

Wide Area Protection SCADA/EMS

Page 24: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 24

Limit of Relational DB for EMS

• Problem with Real-time Data in Relational DB– SCADA Data, for large T&D Network

• 2 s per each tag → 43200 value/day* 26 bytes → 1.2MB/tag·day

• 100,000 Tag EMS/Day → 112.32 GB/Day

• 100,000 Tag EMS/Year → 40,996.8 GB /Year

• AMR data, 21,000,000 meters, 1 second, 10 variables per meter

– Average Value• 15 m per each tag → 96value/day* 26 bytes →2,496 bytes /tag·day

• 100,000 Tag EMS/Day → 249.6 MB /Day

• 100,000 Tag EMS/Year → 91.1 GB /Year

– Schedule Value• 96Value ×100,000Tag = 9,600,000 Event/Day

• = 3.5 Billion Event/Year

Page 25: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 25

Mission Impossible for WAMS• Problem with Real-time Data in Relational DB

– PMU for One Substation• Value: 48 Vector, 8 Analog and 20 Status → 268B(data Length)

• Bandwidth: 20 ms per frame of data = 50*268= 13KB per second

• Event: 76*50 = 3800 event/per second

– WAMS with 50 PMU• Bandwidth: 13KB * 50 = 650KB/per second

• Event: 3800*50 = 190000 event/per second

– Total Data Size• Data Stream: 650KB*60*3600= 14G/Day

Page 26: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 26

North China WAMS Pilot Project

工作站

前置服务器

PMU

实时数据库

历史数据库

PMU

PMU

1#

7#

2Mbps

方案示意图

100Mbps

数据包

测量数据

在线数据

PI系统接入途径

离线数据

数据网关

高级应用

高级应用

高级应用

PI服务器

PI 接口机

以太网

PI RtDC

WAMS Apps

ORACLE

Page 27: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 27

50

100

150

200

250

300

00.5

11.5

2

0

0.02

0.04

0.06

0.08

t [s]

2004-09-13 10:53:20

f [Hz]

sp

ec

tra

l p

ow

er

WAMS ApplicationProny AnalysisReal-Time FFT

Page 28: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 28

WAMS Trend• By Year 2006

• North China: 65 PMUs

• East China: 44 PMUs

• Central China: 35 PMUs

• South China: N/A

• By Year 2007

• Provincial Level WAMS system will start

Page 29: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 29

EMS Trend

PIRtDC

PIRtDC

EMSEMS

WAMSWAMS

PowerMarket PowerMarket

Metering Metering

Fault RecordFault Record

CriticalAssets

Power System

Control Center

Master Stations

Servers

Networks

Facility Equipment

Time-Series Data

OthersCorp Data

TimestampNameValue

Transactional

Relational

Page 30: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 30

EMS Trend

RtDC

DMZ

Existing EMS(Anhui/Hubei)Real-Time

Database

Historian(Oracle/Sybase)

New EMS(South China Grid)Real-Time

Database

Historian(Oracle/Sybase)

Future Next Generation EMS

Real-TimeDatabase

PI SnapshotDatabase

Page 31: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 31

Next Generation EMS

• Key Features– Single database

– Module database-Analysis Framework

– Fast load flow solutions based on distributed computing

– Surface graphics

– Advanced dispatching and generation control

– Integrated State Estimator

– Advanced damping control

– Reliable

Page 32: Meeting the Demands of a Power Hungry China through a Real-time Data Driven Enterprise Platform Dr. Jun Zha FibrLINK, Department of Power and Energy IT

Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 32

QUESTIONS ?