20
VOID CUT OPENING IN WALL PRECAST CONCRETE WALL FOR ACCESS BETWEEN BUILDING 1 & 2 ROLLER DOORS TO FIRST FLOOR OF BUILDING 2 TO BE REMOVED OPEN TO GROUND KITCHENETTE & BATHROOM TO BE REMOVED EXISTING PRECAST CONCRETE WALL TO BE CUT FOR PROPOSED OPENING GROUND FLOOR LEVEL BELOW CUT OPENINGS IN PRECAST CONCRETE WALL FOR PROPOSED WINDOWS CUT OPENINGS IN PRECAST CONCRETE WALL FOR PROPOSED WINDOWS A A006 B A006 A A006 B A006 A A006 B A006 A A006 B A006 BELMONT AVENUE BELMONT AVENUE CLEAVER TERRACE BUILDING 1 RL 16.000 FFL 16.480 RL 19.480 BUILDING 2 REMOVE AND REDIRECT EXISTING DOWNPIPE NOTE: RL: -.-- REFERENCE TO AUSTRRALIAN HEIGHT DATUM LEGEND: ITEMS TO BE DEMOLISHED AND REMOVED SHOWN DASHED. GARDEN TO BE REMOVED Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale Project Number Date Drawn By Drawing Size CAD Reference A1 DEVELOPMENT APPLICATION ONLY NOT FOR CONSTRUCTION Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. 7KLV GUDZLQJ DQG LWV FRQWHQWV UHPDLQ WKH FRS\ULJKW RI :0. $UFKLWHFWXUH 3W\ /WG k ABN 85 164 151 491 Telephone 03 9999 1610 wmkarchitecture.com WMK Architecture L5 165 Flinders Lane Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14 A DA ISSUE 15/12/14 CHURCH OF SCIENTOLOGY AUSTRALIA 12 -22 BELMONT AVENUE, RIVERVALE, PERTH. EXISTING FIRST FLOOR PLAN & DEMOLITION PLAN A003 A 1:200 @ A1 1:400 @ A3 14122 15/12/2014 KF & DD DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

Embed Size (px)

Citation preview

Page 1: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

V

O

I

D

CUT OPENING IN WALL PRECAST

CONCRETE WALL FOR ACCESS

BETWEEN BUILDING 1 & 2

ROLLER DOORS TO

FIRST FLOOR OF

BUILDING 2 TO BE

REMOVED

O

P

E

N

T

O

G

R

O

U

N

D

KITCHENETTE &

BATHROOM TO BE

REMOVED

EXISTING PRECAST

CONCRETE WALL TO BE

CUT FOR PROPOSED

OPENING

G

R

O

U

N

D

F

L

O

O

R

L

E

V

E

L

B

E

L

O

W

CUT OPENINGS IN

PRECAST

CONCRETE WALL

FOR PROPOSED

WINDOWS

CUT OPENINGS IN

PRECAST

CONCRETE WALL

FOR PROPOSED

WINDOWS

AA006

BA006

AA006

BA006

AA006

BA006

AA006

BA006

BE

LM

ON

T A

VE

NU

EB

ELM

ON

T A

VE

NU

E

C

L

E

A

V

E

R

T

E

R

R

A

C

E

BUILDING 1

RL 16.000

FFL 16.480

RL 19.480

BUILDING 2

REMOVE AND

REDIRECT EXISTING

DOWNPIPE

NOTE:

RL: -.-- REFERENCE TO AUSTRRALIAN

HEIGHT DATUM

LEGEND:

ITEMS TO BE DEMOLISHED AND

REMOVED SHOWN DASHED.

GARDEN TO BE REMOVED

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 -22 BELMONT AVENUE,

RIVERVALE, PERTH.

EXISTING FIRST FLOOR

PLAN & DEMOLITION PLAN

A003 A

1:200 @ A1 1:400 @ A3

14122 15/12/2014 KF & DD

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 2: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

CONCRETE FOOTPATH

BELMONT AVENUE

(PARKING AT GROUND FLOOR LEVEL)

RAMP TO PARKING 34 CARPARKS

CAR PARK

GROUND FLOOR

LEVEL(UNCOVERED)

LOT 603

NO 10

SIT

E B

OU

ND

AR

Y

S

IT

E

B

O

U

N

D

A

R

Y

SITE BOUNDARY

NO 27-33

EXISTING

LANDSCAPING TO BE

REFURBISHED

IN

OUT

IN

OUT

2500

EXISTING CAR PARKING:

BUILDING 2 BASEMENT -- 34 BAYS

BUILDING 2 GROUND -- 3 BAYS

BUILDING 1 GROUND -- 32 BAYS

(CAR PARK OFF BELMONT AVE)

TOTAL 69 EXISTING BAYS

PROPOSED CAR PARKING:

BUILDING 2 BASEMENT -- 32 BAYS

BUILDING 2 GROUND -- 3 BAYS

BUILDING 1 GROUND -- 50 BAYS

(CAR PARK OFF BELMONT AVE)

TOTAL 85 PROPOSED BAYS

NEIGHBORING

CAR PARK

TWO WAY

AISLE

ONE WAY

AISLE

13 BAYS

TWO WAY

AISLE

PARKING

14 BAYS

SITE BOUNDARY

54

00

58

00

54

00

54

00

2

5

0

0

NEW ROOF SHEETING

TO REPLACE EXISTING

ROOF LIGHTS

NEW SUN

SHADES

NEW SUN

SHADES AND

SURROUNDS

NEW SUNSHADES/

ROOF TO NEW WINDOWS

NEW SUNSHADE AND

SURROUND TO NEW WINDOW

58

00

1.

NEW ENTRY PAVING

NEW FEATURE WALL

E

X

IS

T

IN

G

L

A

N

D

S

C

A

P

IN

G

T

O

B

E

R

E

F

U

R

B

IS

H

E

D

EXISTING LANDSCAPING TO

BE REFURBISHED

NEIGHBORING

CAR PARK

NEIGHBORING

BUILDING

NEIGHBORING

BUILDING

METAL ROOF

BUILDING

EXISTING BUILDING 1

LOT 601

GROUND FLOOR RL 16.000

FIRST FLOOR RL 19.480

29

55

0

CO

NF

IR

M O

N S

IT

E

36

74

0

CO

NF

IR

M O

N S

IT

E

31

04

5

CO

NF

IR

M O

N S

IT

E

6080

CONFIRM ON SITE

27260

CONFIRM ON SITE

8540

CONFIRM ON SITE

6400

CONFIRM ON SITE

11091

CONFIRM ON SITE

AREAS:

SITE AREA: 5380 m² 100 %

BUILDING 1

SITE COVERAGE: 805 m² 15%

BUILDING 2

SITE COVERAGE: 1640 m² 30.5%

TOTAL COVERAGE: 2445 m² 45.5%

AREAS APPROPRIATE ONLY.

TO BE CONFIRMED BY SITE SURVEYOR.

EASEMENT

IN

OUT

3 BAYS

43560

CONFIRM ON SITE

17590

CONFIRM ON SITE

UP

RIGHT OF

CARRIAGE

WAY

2

4

0

0

5

8

0

0

NEW

ACCESSIBLE

PATH

A A601

BA601

A A601

BA601

20

20

18.5

18

17.5 17

19.5

19

19

18.5

18

17.5

17

16.5

16

MAIN ENTRANCE

TO BUILDING 1

2.

x2 ACCESSIBLE

PARKING

TOTAL 60 BICYCLE

SPACES

NEW BOLLARDS

TO EXIT

BIN

COLLECTION

PAILING FENCE

TO BIN

ENCLOSURE

BUILDING 1 ACCESS LIMITED TO

CSA MEMBERS & STAFF ONLY

33

38

51

65

68

37

64

50

67

82

34

46 BICYCLE

SPACES

32 CAR PARKS + 14

BICYCLES SPACES

MAIN

ENTRANCE

(FIRST FLOOR LEVEL)

EXISTING

LOADING BAY

EXISTING LANDSCAPING

TO REMAIN

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 - 22 BELMONT AVENUE,

RIVERVALE, PERTH.

PROPOSED SITE PLAN A100 B

1:250 @ A1 1:500 @ A3

14122 09/01/2015 KF & DD

B AMENDMENTS SHOWN CLOUDED 11/02/2015

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 3: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 4: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 5: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

NORTH ELEVATION

BO

UN

DA

RY

BUILDING 1

FIRST FFL RL 16.000

9028

SUNSHADE OVER PROPOSED

FLOOR WINDOWS

DARK GREY PAINT FINISH

TO BASE OF PRECAST

LIGHT GREY PAINT FINISH

TO TOP OF PRECAST

POWDER COATED

MULLIONS TO WINDOWS

SPANDREL / SILL BEHIND

GLASS

BUILDING 2

GROUND FFL 16.651

FIRST FFL 19.480

2829

SOUTH ELEVATION

RAMP TO GROUND FLOOR

NGL

8162

BO

UN

DA

RY

BO

UN

DA

RY

LIGHT GREY PAINT FINISH

TO TOP OF PRECAST

SUNSHADE SURROUND

TO WINDOW

DARK GREY PAINT FINISH

TO BASE OF PRECAST

SUNSHADE TO

PROPOSED SLOT

WINDOW

CLADDING TO BUILDING 1 SOUTH FACADE

TO MATCH SUNSHADE (BEYOND)

PROPOSED NEW

WINDOWS

PROPOSED NEW WINDOWS

PROPOSED NEW

SIGNAGE ZONE

BLOCK UP EXISTING

OPENINGS AND PAINT TO

MATCH ADJOINING SURFACES

EAST ELEVATION

WEST ELEVATION

BO

UN

DA

RY

FFL 16.65

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

BUILDING 1

FFL 16.00

BUILDING 2

FIRST

FLOOR

TOP OF ROOF

PARAPET

GROUND

FLOOR

FFL 19.48

4950

9028

GROUND

FLOOR

2830

8107

LIGHT GREY PAINT

FINISH TO TOP OF

PRECAST

SUNSHADE SURROUND

TO WINDOW

ENTRY

DARK GREY PAINT

FINISH TO BASE OF PRECAST

SUNSHADE TO PROPOSED

FIRST FLOOR WINDOWS

BLACK POWDER

COATED MULLIONS

TO WINDOWS

EXISTING BASEMENT

ENTRY TO REMAIN

EXISTING WINDOW

TO REMAIN

POWDER COATED

MULLIONS TO WINDOW

SUNSHADE TO

PROPOSED WINDOW

NGL

WALL ON BOUNDARY

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

8891

2829

BUILDING 1

GROUND FFL 16.00

GROUND FFL 16.651

8268

TOP OF

ROOF PARAPET

FIRST FFL 19.480

4950

NGL

CLADDING TO BUILDING 1 SOUTH

FACADE TO MATCH SUNSHADE

LIGHT GREY PAINT FINISH

TO TOP OF PRECAST

DARK GREY PAINT FINISH

TO BASE OF PRECAST

NEW SLOT

WINDOW

NEW FEATURE

ENTRY WALL

BUILDING 1

OUTLINE

PRE-FINISHED METAL

CLADDING

SUN SHADING EXTENDS

TO ROOF PARAPET LEVEL

SPANDREL / SILL

BEHIND GLASS

PRE-FINISHED METAL

CLADDING

POWDER COATED ALUMINIUM

MULLIONS

NEW GLAZING

SPANDREL (BEHIND GLAZING)

PRE-FINISHED METAL

CLADDING

LEGEND

LIGHT GREY PAINT FINISH

TO PRECAST

NEW METAL SUNSHADE

DARK GREY PAINT FINISH

TO PRECAST

4950

NEW FLYING DOWNPIPE IN

BUILDING 2 CEILING SPACE.

EXISTING RAINWATER

HEAD TO BE REMOVED.

PATCH OPENING IN WALL

CONNECT NEW DOUNPIPE

TO EXISTING SITE

STORMWATER MAIN

3474

2700

2700

3474

GROUND FFL RL 19.480

FIRST FFL 19.480

FFL 19.48

FIRST

FLOOR

3435

2700

NEW MAIN ENTRY

TO BUILDING 1

SUNSHADING EXTENDS TO

ROOF PARAPET LEVEL

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 - 22 BELMONT AVENUE,

RIVERVALE, PERTH.

PROPOSED ELEVATIONS A501 B

1:200 @ A1 1:400 @ A3

14122 09/01/2015 KF & DD

B ENTRY AMENDMENTS 11/02/2015

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 6: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

PROPOSED

BOUNDARY

EXISTING FLOOR SLAB

EXISTING CAR PARK

EXISTING ROOF STRUCTURE

NEW SUSPENDED CEILING

NEW CONCRETE FLOOR SLAB

EXISTING CONCRETE FLOOR SLAB

NEW SUSPENDED CEILING

FFL 16.480

FFL 19.480

FFL 16.000

FFL 19.480

BUILDING 2

SECTION A-A

BUILDING - 1

AP

PR

OX

27

00

78

0

27

00

AP

PR

OX

30

00

AP

PR

OX

49

50

AP

PR

OX

EXISTING ROOF STRUCTURE

NEW SUSPENDED CEILING

EXISTING COLUMNS

NEW INTERNAL LINING

TO EXISTING WALLS

NEW INTERNAL LINING

TO EXISTING WALLS

EXISTING

BUILDING

NEW SPANDREL PANEL

TO BUILDING INTERIOR

SECTION A-A

BUILDING - 1

SECTION B-B

FFL 16.000

FFL 19.480

27

00

AP

PR

OX

78

0

27

00

AP

PR

OX

NEW CONCRETE FLOOR SLAB

NEW CEILING

EXISTING CONCRETE FLOOR SLAB

EXISTING ROOF STRUCTURE

PROPOSED COLUMN

NEW SUSPENDED CEILING

NEW INTERNAL LINING

TO EXISTING WALLS

NEW INTERNAL LINING

TO EXISTING WALLS

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 -22 BELMONT ANVENUE,

RIVERVALE, PERTH

PROPOSED SECTION AA A601 A

1:100 @ A1 1:200 @ A3

14122 15/12/2014 KF & DD

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 7: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

BOUNDARY

EXISTING FLOOR SLAB

EXISTING CONCRETE FLOOR SLAB

EXISTING CAR PARK

FIRST FFL 19.480

GROUND FFL 16.480

EXISTING ROOF STRUCTURE

FFL 16.000

BUILDING 2

BUILDING 1

8891 A

PP

RO

X

7971 A

PP

RO

X

FFL 16.000

8891 A

PP

RO

X

REMOVE EXISTING ROOF LIGHTS

EXISTING CONCRETE FLOOR SLAB

SECTION A-A

SECTION B-B

BUILDING 1

EXISTING ROOF STRUCTURE

REMOVE EXISTING ROOF LIGHTS

EXISTING ROOF STRUCTURE

CUT OPENING IN WALL FOR ACCESS

BETWEEN BUILDING 1 & 2

EXISTING PRECAST CONCRETE WALL

TO BE CUT FOR PROPOSED OPENING

3000

EXISTING COLUMN

EXISTING COLUMN

EXISTING COLUMNS

NOTE:

RL: -.-- REFERENCE TO AUSTRRALIAN

HEIGHT DATUM

LEGEND:

ITEMS TO BE DEMOLISHED AND

REMOVED SHOWN DASHED.

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 -22 BELMONT AVENUE,

RIVERVALE, PERTH.

EXISTING SECTION A006 A

1:100 @ A1 1:200 @ A2

14122 15/12/2014 KF & DD

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 8: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

BUILDING 1

NORTH ELEVATION

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

FFL 16.00

GROUND

FLOOR

6902 A

PP

RO

X

8891 A

PP

RO

X

GROUND FFL 16.651

FIRST FFL 19.480

2829

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

EAST ELEVATION

BUILDING 2

BUILDING 1

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

CAR PAKING ONLY

GROUND FFL 16.651

GROUND FFL 16.00

FIRST FFL 19.480

2763

6456 A

PP

RO

X

8107 A

PP

RO

X

6902 A

PP

RO

X

8891 A

PP

RO

X

BUILDING 2

SOUTH ELEVATION

WEST ELEVATION

W

A

L

L

O

N

B

O

U

N

D

A

R

Y

BUILDING 2

UNDERSIDE

ROOF BEAM

TOP OF ROOF

PARAPET

6902 A

PP

RO

X

2829

AP

PR

OX

BUILDING 1

9358 A

PP

RO

X

GROUND FFL 16.00

GROUND FFL 16.651

UNDERSIDE

ROOF BEAM

8268 A

PP

RO

X

TOP OF ROOF

PARAPET

FIRST FFL 19.480

6527 A

PP

RO

X

R

A

M

P

T

O

G

R

O

U

N

D

F

L

O

O

R

NGL

8162 A

PP

RO

X

NGL

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

NGL

NGL

CUT, DEMOLISH AND REMOVE

PRECAST WALLING FOR NEW

OPENINGS

REMOVE EXISTING ROLLER

SHUTTER DOORS

REMOVE EXISTING DOOR

REMOVE EXISTING ROLLER

SHUTTER DOORS

CUT, DEMOLISH AND REMOVE

PRECAST WALLING FOR NEW

OPENINGS

CUT, DEMOLISH AND

REMOVE PRECAST WALLING

FOR NEW OPENINGS

REMOVE EXISTING ROLLER

SHUTTER DOORS

DEMOLISH AND REMOVE EXISTING

AWNING

EXISTING RAINWATER

HEAD AND DOWNPIPE TO

BE REMOVED.

Issue Description Date Issue Description Date Client Project Title Drawing No. Issue

Scale

Project Number Date Drawn By

Drawing Size

CAD Reference

A1

D

E

V

E

L

O

P

M

E

N

T

A

P

P

L

IC

A

T

IO

N

O

N

L

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

IO

N

Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions

on site before construction. All inconsistencies to be reported to the Architect immediately.

This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

ABN 85 164 151 491

Telephone 03 9999 1610

wmkarchitecture.com

WMK Architecture

L5 165 Flinders Lane

Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14

CHURCH OF SCIENTOLOGY

AUSTRALIA

12 -22 BELMONT AVENUE,

RIVERVALE, PERTH.

EXISTING / DEMOLITION

ELEVATIONS

A005 A

1:200 @ A1 1:400 @ A3

14122 15/12/2014 KF & DD

DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015

Page 9: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

LG Ref: 826/2014/A DoP Ref: DAP/14/00699 Enquiries: Development Assessment Panels Telephone: (08) 6551 9919

Mr Aaron Lohman Rowe Group Level 3, 369 Newcastle Street Northbridge WA 6003

Dear Mr Lohman

Metro Central JDAP – City of Belmont – DAP Application 826/2014/A Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices.

Thank you for your application and plans submitted to the City of Belmont on 27 April 2017 for the above development at the abovementioned site.

This application was considered by the Metro Central Joint Development Assessment Panel at its meeting held on 21 June 2017, where in accordance with the provisions of the City of Belmont Local Planning Scheme No.15, it was resolved to approve the application as per the attached notice of determination.

Should the applicant not be satisfied by this decision, a DAP Form 2 application may be made to amend or cancel this planning approval in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011.

Please also be advised that there is a right of review by the State Administrative Tribunal in accordance with Part 14 of the Planning and Development Act 2005. Such an application must be made within 28 days of the determination, in accordance with the State Administrative Tribunal Act 2004.

Should you have any queries with respect to the conditions of approval, please contact Ms Helen Taylforth at the City of Belmont on (08) 9477 7175.

Yours sincerely,

Zoe Hendry DAP Secretariat

26/06/2017

Encl. DAP Determination Notice Approved plans

Cc: Ms Helen Taylforth City of Belmont

Postal address: Locked Bag 2506 Perth WA Street address: 140 William Street Perth WA 6000 Tel: (08) 6551 9919 Fax: (08) 6551 9961 TTY: 6551 9007 Infoline: 1800 626 477

[email protected] www.planning.wa.gov.au ABN 35 482 341 493

Page 10: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

Planning and Development Act 2005

City of Belmont Local Planning Scheme No.15

Metro Central Joint Development Assessment Panel

Determination on Development Assessment Panel Application for Planning Approval

Location: Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale Description of proposed Development: Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices. In accordance with regulation 8 of the Planning and Development (Development Assessment Panels) Regulations 2011, the above application for planning approval was granted on 21 June 2017, subject to the following: 1. Accept that the DAP Application reference 826/2014/A as detailed on the DAP

Form 2 dated 28 April 2017 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;

2. Approve the DAP Application reference 826/2014/A as detailed on the DAP

Form 2 dated 28 April 2017 and accompanying plans – Elevations dated 27 April 2017, Site plan dated 2 June 2017 and Basement car park plan dated 8 June 2017 - (Attachment 2) in accordance with Clause 68 of the Planning and Development (Local Planning Schemes) Regulations 2015 and the provisions of Clause 10.3 of the City of Belmont Local Planning Scheme No.15, for the proposed two year extension of time and minor modifications to the approved Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices at No.22 (Lot 64) Belmont Avenue, corner Cleaver Terrace, Rivervale, subject to:

Amended Conditions 1. Deletion of Condition 2 and the associated Footnotes 6 and 7 of the original

planning approval, which required the amalgamation of Lot 601 and 603, on the basis that the two original lots are now amalgamated into the current Lot 604.

2. Deletion of Condition 14 of the original planning approval with respect to the

contribution to public art and replace planning condition 14 with two new conditions, which reflect the City’s upgraded planning condition for public art contribution and also to reflect the increased public art contribution ($) dollar value due to the increased value of the estimated cost of the development.

Additional Conditions 1. The removal of the electrical substation from within the 7.5m Cleaver Terrace

setback or unless otherwise approved by the City.

2. The colour of the hydrant booster cabinet and the electrical substation shall be consistent with the proposed colour of the development/building to the satisfaction of the City.

Page 1 of 2

Page 11: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

3. Within 120 days of the date of this approval, the owner/applicant shall elect to

either:

a) Seek approval from the City of Belmont for an artist to provide public art on the development site to a minimum value of 1% of the estimated cost of the development (exclusive GST); or

b) Make arrangements with the City of Belmont for a cash-in-lieu payment of

1% of the estimated cost of the development (exclusive GST).

to the satisfaction of the City. 4. Where public art will be provided on the development site in accordance with

the Condition above, the approved concept/strategy shall be thereafter implemented and the artwork constructed and maintained for the life of the development to the satisfaction of the City.

Additional Advice Notes 1. With regard to the relocation of the electrical substation, the City’s preferred

external/free standing location for the substation is within the landscape area abutting the northern corner of the site and subject to modifications to ground levels to accommodate Western Power access to the structure. Landscaping should be provided along the Belmont Ave frontage to assist screening of the structure. Should this site not be acceptable after further investigation with Western Power, then the site within the Cleaver Terrace setback area will be reconsidered.

2. With regard to the required 1% contribution to public art, the City acknowledges

the applicant/owner has made a cash-in-lieu payment of $60,000 to the City. The City now seeks the balance of the 1% public art contribution based on the upgraded estimated cost of the development.

All other conditions and requirements detailed on the previous approval determined by the Metro Central Joint Development Assessment Panel (JDAP) on 31 May 2015 shall remain unless altered by this application. Where an approval has so lapsed, no development shall be carried out without further approval having first been sought and obtained, unless the applicant has applied and obtained Development Assessment Panel approval to extend the approval term under regulation 17(1)(a) of the Planning and Development (Development Assessment Panels) Regulations 2011.

Page 2 of 2

Page 12: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

CLEAR

5800 1000

7500

CLEAR

5800

5400

CLEAR5800

540

NEW POWDERCOATED ALUMINIUM FENCE WHERE FALL EXCEEDS 900mm. CONFIRM EXTENT ON SITE

CO

S

6105

COS

16300

NEW LINEMARKING TO CARBAYS TYPICALLY

NEW KERB TO MATCH EXISTING KERB HEIGHT AND PROFILE

CAR

BAY

TYP

5400

x 2

500

5800

MIN

CLE

AR

5835

5400

5400

5800

5400

NEW RETAINING WALL TO ACCOMMODATE CARBAYS. RE-USE EXISTING RETAINING WALL MATERIALS WHERE POSSIBLE. NEW FINISHES TO MATCH EXISTING

NEW 150 H x 300 W KERB TO BUILDING FACE

NEW GARDEN BED. REFER LANDSCAPE ARCHITECT

NEW 150mm HIGH KERB TO MATCH EXISTING PROFILE

300

ALIG

N

NEW GARDEN BED. REFER LANDSCAPE ARCH.

NEW BOLLARDS TO EXIT

BIN ENCLOSURE

EXISTING ACCESS EASEMENT

NEW POWDERCOATED ALUMINIUM FENCE WHERE FALL EXCEEDS 900mm. CONFIRM EXTENT ON SITE

NEW SUNSHADES TO EXTERNAL FACADE GLAZING

CARBAY 5400 x 2400

ALLOW TO RECTIFY ANY POTHOLES CREATED IN CARPARK AND RAMP SURFACES DURING CONSTRUCTION AND RESURFACE CARPARK AND RAMPS WITH BITUMEN FINISH

REPLACE CROSSOVER TO COUNCIL'S REQUIREMENTS IF DAMAGED DURING CONSTRUCTION

1200

4500

NEW ACCESSIBLE PATH

32500

2500

BOL BOL

EXIST POWER POLE

EXIST POWER POLE

EXIST POWER POLE

EXIST POWER POLE

MH

MH

MH

REFER LANDSCAPE ARCHITECT'S DOCUMENTATION FOR EXTENT OF LANDSCAPE WORKS.

NEW HYDRANT BOOSTER CABINET

HOT WATER PLANT

35KL

FIR

E TA

NK

ON

SER

VIC

ES

PLAT

FOR

M

STEEL GRATED DECK FOR SERVICES PLANT OVER CAR PARK SHOWN HATCHED

NEW

DIS

TRIC

T SU

BSTA

TIO

N

NEW EXTERNAL MSB

NEW CONC SLAB FOR RELOCATED CARBAYS

NEW CONCRETE SLAB TO SUIT NEW RETAINING WALL POSITION

NEW CONC KERB

7300 1400

1000

ALIGN

150

700

NEW 800H RAISED PLANTERS

NEW LARGE FORMAT PAVERS TO ENTRY FORECOURT

PUMP ROOM

4M HIGH ACOUSTIC LOUVER SYSTEM TO SURROUND MECHANICAL DECK AND ENTRANCE AREA

ALLOW TO RECTIFY ANY POTHOLES CREATED IN CARPARK AND RAMP SURFACES DURING CONSTRUCTION AND RESURFACE CARPARK AND RAMPS WITH BITUMEN FINISH

4700

5900

NEW MAIN ENTRANCE TO BUILDING 1C

L E

A V

E R

T E

R R

A C

E

B E L M O N T A V E N U E

4055

EXISTING BUILDING 1 GROUND FLOOR RL 16.000

FIRST FLOOR RL 19.565

EXISTING BUILDING 2 GROUND FLOOR RL 16.670

FIRST FLOOR RL 19.490

33 CAR PARKS + 60 BICYCLE SPACES

BUILDING 1 ACCESS LIMITED TO CSA MEMBERS AND STAFF ONLY

EXTERNAL PLANT REQUIRED FOR MECHANICAL, ELECTRICAL, HYDRAULIC AND FIRE SERVICES EQUIPMENT. ACOUSTIC WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION

FIRE SERVICES TANK ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION

FIRE PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION

HYDRANT BOOSTER CABINET ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION

RAISED PLANTERS ADDED IN LIEU OF FEATURE WALL TO SOFTEN ENTRY AND INCREASE LANDSCAPE

SUBSTATION AND EXTERNAL MSB ADDED TO ELECTRICAL ENGINEER'S RECOMMENDATION

KERB ADDED FOR WALL PROTECTION

EXISTING CARBAYS RELOCATED TO CREATE ENTRY FORECOURT

REQUIRED FOR BCA COMPLIANCE

REQUIRED FOR BCA COMPLIANCE

CANOPY ADDED FOR WEATHER PROTECTION OF ENTRY

LOADING BAY

AREAS:SITE AREA:

BUILDING 1SITE COVERAGE:

BUILDING 2 SITE COVERAGE:

TOTAL COVERAGE:AREAS APPROXIMATE ONLY.TO BE CONFIRMED BY A LICENSED SURVEYOR

5,380m²

805m²

1,640m²

2,445m²

100%

15%

30.5%

45.5%

EXISTING CAR PARKING:BUILDING 2 BASEMENT:BUILDING 2 GROUND:

BUILDING 1 GROUND:(CARPARK OFF BELMONT AVE)

TOTAL

34 BAYS3 BAYS

32 BAYS

69 BAYS

PROPOSED CAR PARKING:BUILDING 2 BASEMENT:BUILDING 2 GROUND:

BUILDING 1 GROUND:(CARPARK OFF BELMONT AVE)

TOTAL

33 BAYS2 BAYS

50 BAYS

85 BAYS(INCL. 1 LOADING AND 3 DDA BAYS)

0 8m1:200

2 4 6

FOR APPROVAL

N

Issue Description Date Client Project Title Drawing No. Issue

Scale Drawing Size

Drawn ByProject No.

CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1

Issue Description Date

KEY PLAN

2

1

E

1 : 200@A1

14122 TD

PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT

CHURCH OF SCIENTOLOGYINTERNATIONAL

BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103

DA100PROPOSED SITE PLAN

DDA CARBAY RELOCATED FROM BASEMENT TO ENTRY FORECOURT

P 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14B AMENDMENTS SHOWN CLOUDED 11/02/2015

C EXTERNAL AMENDMENTS FOR COUNCIL REVIEW 14/02/2017

D JDAP RESUBMISSION 19.04.17E LOADING BAY DESIGNATION ADDED 30.05.17

Page 13: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

BUILDING 1 GROUNDRL 16000

BUILDING 1 PARAPETRL 25090

BUILDING 1 LEVEL 1RL 19565

P11P11

SC4SC4SC4

GL2

GL3

GL2

GL2

GL3

P11 SC1

SPANDREL

SPANDREL

1. RETURN LEG ADDED FOR CONSISTENT AWNING DESIGN2. CANOPY ADDED FOR WEATHER PROTECTION

BUILDING 2 LOWERGROUND

RL 16670BUILDING 2 GROUNDRL 19490

BUILDING 2 PARAPETRL 27690

SC4

P11

GL2

GL2

GL3

P11GL2

P11

P11

RENDER AND PAINT FINISH TO EXISTING BRICK WALL AND SLAB/BEAM EDGE

P11

SC4

SC1

SC1

P11DP & RWHCANOPY TO NEW WINDOWS

NEW SLOT WINDOW EXISTING BASEMENT ENTRY TO REMAIN

EXISTING LOUVER SCREEN TO BE REPAINTED AND MADE GOOD

NEW MAIN ENTRY TO BUILDING 1

NEW SUNSHADES OVER WINDOWS.

SUNSHADE EXTENDS TO ROOF PARAPET LEVEL

NEW WINDOWS WITH BLACK POWDERCOATED ALUMINIUM MULLIONS

1. VERTICAL LEG OF UPPER CANOPY REMOVED2. SLOT WINDOW WIDTH REDUCED FOR FIRE SEPARATION TO BOUNDARY3. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY AND PROVIDE COVERED WALKWAY TO DDA CARBAY

WIDTH OF GLAZING ELEMENT REDUCED TO ACCOMMODATE EXISTING RETAINING WALL

BUILDING 1 GROUNDRL 16000

BUILDING 1 PARAPETRL 25090

BUILDING 1 LEVEL 1RL 19565

P11

MT4

GL2

GL3

GL2

GL3

SC1

SC4

GL2 GL2

P11P11

P11

P13

NEW SUNSHADES OVER WINDOWS.

NEW WINDOWS WITH BLACK POWDERCOATED ALUMINIUM MULLIONS

SUNSHADE EXTENDS TO ROOF PARAPET LEVEL

LINE OF EXISTING BUILDING 2 PARAPET BEYOND

NEW SUBSTATIONBLOCK WALLS WITH CEMENT RENDER + PAINT FINISH TO MATCH BUILDING FACADE

PREFINISHED METAL CLADDING

SPANDREL

SPANDREL

SUBSTATION + EXTERNAL MSB ADDED ON BOUNDARY TO ELECTRICAL ENGINEER'S RECOMMENDATION

BIN ENCLOSURE

BUILDING 2 GROUNDRL 19490

BUILDING 2 PARAPETRL 27690

P11

EXISTING OPENINGS TO BE INFILLED, RENDERED AND PAINTED TO MATCH ADJOINING SURFACES

P11

P11

PROPOSED PUMP ROOM. HEIGHT OF ROOM TO BE CONFINED BY SERVICES ENGINEER.BLOCK WALLS WITH CEMENT RENDER + PAINT FINISH TO MATCH MAIN BUILDING FACADEP11

NEW AWNING OVER WINDOW SLOT. REFER DETAILS ON DRAWING A12.47

NEW CANOPIES OVER WINDOWS.

NEW BLACK POWDERCOATED ALUMINIUM ACOUSTIC LOUVRE SCREEN TO 4m ABOVE PLANT DECK

WALL ON BOUNDARY

1. VERTICAL LEG OF UPPER CANOPY REMOVED2. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY

ACOUSTIC SCREEN WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION

PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION

BUILDING 1 GROUNDRL 16000 BUILDING 2 LOWER

GROUND

RL 16670

BUILDING 2 GROUNDRL 19490

BUILDING 2 PARAPETRL 27690

BUILDING 1 PARAPETRL 25090

BUILDING 1 LEVEL 1RL 19565

P11

P11

NEW ACOUSTIC LOUVERS. TOP OF LOUVERS TO BE 4m ABOVE MECHANICAL PLANT DECK

NEW COLUMNS FOR MECHANICAL DECK BEHIND ACOUSTIC SCREEN

HEAD HEIGHT 23.390

WALL ON BOUNDARY

ACOUSTIC SCREEN WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION

BIN ENCLOSURE

BUILDING 1 GROUNDRL 16000BUILDING 2 LOWER

GROUND

RL 16670BUILDING 2 GROUNDRL 19490

BUILDING 2 PARAPETRL 27690

BUILDING 1 PARAPETRL 25090

BUILDING 1 LEVEL 1RL 19565

P11

P11

P11

P11

NEW SUBSTATION TO BOUNDARY

EXISTING BUILDING 1

EXISTING BUILDING 2

NEW PUMP ROOM ALIGNED WITH FRONT FACE OF BUILDING 1

NEW ACOUSTIC SCREEN TO PLANT

NEW PREFINISHED METAL SUNSHADES TO NEW WINDOWS

NEW CANOPIES TO NEW WINDOWS

RAISED PLANTERS ADDED IN LIEU OF FEATURE WALL TO INCREASE LANDSCAPE AREA

FIRE PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION

SUBSTATION + EXTERNAL MSB ADDED ON BOUNDARY TO ELECTRICAL ENGINEER'S RECOMMENDATION

1. VERTICAL LEG OF UPPER CANOPY REMOVED2. SLOT WINDOW WIDTH REDUCED FOR FIRE SEPARATION TO BOUNDARY3. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY

P11

P13

SC1

SC4

MT4

GL3

GL2

FINISHES LEGEND:NEW GLAZING - VISION PANEL

NEW GLAZING - SPANDREL PANEL

PREFINISHED METAL CLADDING

PAINT FINISH - SAND COLOUR

PAINT FINISHED - DARK GREY COLOUR

ALUMINIUM WINDOW FRAME - POWDERCOAT CHARCOAL

METAL SUNSHADE/CANOPY - POWDERCOAT CHARCOAL

0 8m1:200

2 4 6

FOR APPROVALIssue Description Date Client Project Title Drawing No. Issue

Scale Drawing Size

Drawn ByProject No.

CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1

Issue Description Date

D

1 : 200@A1

14122 TD

PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT

CHURCH OF SCIENTOLOGYINTERNATIONAL

BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103

DA501PROPOSED ELEVATIONS

1 : 200EAST ELEVATION2

1 : 200NORTH ELEVATION3

1 : 200SOUTH ELEVATION5

1 : 200WEST ELEVATION4

1 : 200CLEAVER TCE STREETSCAPE1

P 1 PRELIMINARY DA ISSUE 11/12/14

A DA ISSUE 15/12/14B AMENDMENTS SHOWN CLOUDED 11/02/2015

C EXTERNAL AMENDMENTS FOR COUNCIL REVIEW 14/02/2017

D JDAP RESUBMISSION 19.04.17

PROPOSED PAINT SCHEME TO BE CONSISTENT WITH EXISTING - SINGLE WALL COLOUR

Page 14: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

STAFFSTAFFSTAFF STAFFSTAFFSTAFF STAFF STAFFSTAFFSTAFFSTAFF

STAFFSTAFFSTAFF STAFFSTAFFSTAFF STAFF STAFFSTAFFSTAFFSTAFF

1 2 3 4 5 6 7

A

D

E

F

G

H

7250 9250 7600 4520 8080 7000

LIFT

REFER DRAWING A02.00.02

REFER DRAWING A02.00.01

B

C

0 8m1:200

2 4 6

TENDER

N

Issue Description Date Client Project Title Drawing No. Issue

Scale Drawing Size

Drawn ByProject No.

CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©

WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1

Issue Description Date

KEY PLAN

2

1

B

1 : 200@A1

14122 Author

PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT

CHURCH OF SCIENTOLOGYINTERNATIONAL

BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103

PROPOSED PLANGROUND FLOOR KEY PLAN

A02.00.00

LEGENDPARTITION TYPE:REFER DRAWINGS A12.01 -12.03 FOR DETAILS

DOOR NUMBER:REFER DRAWINGS A00.30 -A00.31 FOR DETAILS

D

1.12 ROOM NUMBER

EXISTING WALL

NEW PARTITION

CHAIR RAIL TO WALL REFER FINISHES SCHEDULEFOR DETAILS

PARTITION NOTESTHIS DRAWING IS TO BE READ IN CONJUNCTION WITH SPECIFICATION AND PARTITION PLANS. REFER TO REFLECTED CEILING PLANS FOR CEILING LEVELS.

ALL NEW PARTITIONS TO COMPLY WITH ALL RELEVANT BCA REQUIREMENTS, AUSTRALIAN STANDARDS AND MANUFACTURERS INSTRUCTIONS

ALL PARTITIONS TO BE SET OUT FROM THE CENTRELINE OF EXISTING PARTITIONS, CEILING GRID OR CENTRELINE OF EXISTING WINDOW MULLIONS UNLESS OTHERWISE NOTED.

ALL PARTITIONS, WORKSTATIONS AND FURNITURE LOCATIONS TO BE MARKED ON SITE FOR SUPERINTENDANT'S REVIEW PRIOR TO CONSTRUCTION/INSTALLATION.

ALL DIMENSIONS TO BE CONFIRMED ON SITE PRIOR TO FABRICATION OF ANY ITEMS.

NOGGINGS ARE TO BE PROVIDED IN PLASTERBOARD STUD WALLS WHERE REQUIRED FOR BUILT-IN JOINERY AND FIXING OF WHITEBOARDS, HOOKS AND OTHER WALL MOUNTED FIXTURES. REFER TO FURNITURE AND EQUIPMENT PLANS FOR EXTENT.

GLAZING MATERIALS TO COMPLY WITH AS1288.

PROVIDE REFLECTIVE FILM TO WINDOWS WHERE FURNITURE ITEMS ABUT.

HEAD CONTRACTOR IS TO ALLOW FOR AND PROVIDE ALL MATERIALS, LABOUR AND ACCESSORIES NECESSARY TO COMPLETE THE WORKS TO THE SPECIFIED PERFORMANCE. NO VARIATIONS WILL BE CONSIDERED FOR THE PROJECT UNLESS IT IS A CLEAR CHANGE TO THE INTENT AND SCOPE OF THE WORKS INITIATED IN WRITING BY THE SUPERINTENDENT

ALL WALL TYPES TO COMPLY TO BCA AND AUSTRALIAN STANDARD REQUIREMENTS.

A PRELIMINARY TENDER ISSUE 06.02.17

B TENDER ISSUE 09.02.17

Page 15: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK
Page 16: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK
Page 17: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK
Page 18: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

ATTACHMENT 3 – Minutes Metro Central JDAP and

Responsible Authority Report of Meeting 21 June 2017. Address: Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale LG Reference: 826/2014/A DAP Reference: DAP/14/00699

Page 19: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

Meeting No. MCJDAP/244

21 June 2017

Minutes of the Metro Central Joint Development Assessment Panel

Meeting Date and Time: 21 June 2017; 3.00pm Meeting Number: MCJDAP/244 Meeting Venue: City of Belmont 215 Wright Street Cloverdale Attendance

DAP Members Mr Ian Birch (Presiding Member) Mr Chris Antill (Deputy Presiding Member) Mr Lou D’Alessandro (Specialist Member) Cr Robert Rossi (Local Government Member, City of Belmont) Cr Janet Powell (Local Government Member, City of Belmont) Officers in attendance Mr Dean Pettit (City of Belmont) Mr Wilmot Loh (City of Belmont) Mr Murray Ralph (City of Belmont) Ms Janet Lankester (City of Belmont) Mr David Richards (City of Belmont) Mr Steve Harling (City of Belmont) Ms Uma Rajaram (City of Belmont) Ms Denise Morton (City of Belmont) Mr Steve Morrison (City of Belmont) Local Government Minute Secretary Ms Erin Cashman (City of Belmont) Applicants and Submitters Mr Aaron Lohman (Rowe Group) Mr Steve Cook (Arup) Mr Nik Hidding (Peter Webb & Associates) Mr Behnam Bordbar (Transcore) Mr Tom Carroll (SITE Planning & Design) Mr Peter Betz Mr Axel Kraft Mr James Farquhar Mr Terence O’Meara

Mr Ian Birch Presiding Member, Metro Central JDAP Page 1

Page 20: Meeting agenda template - Western Australian Planning ... daps/metro central... · Issue Description Date Issue Description Date Client Project Title Drawing No. Issue Scale ... DARK

Meeting No. MCJDAP/244

21 June 2017

Mr Trevor Atkins Mr Tim Margieson Mr Brian Ralph Mr Steven Halls (Squire Patton Boggs (AU)) Mr Tim Reynolds (Herring Storer Acoustics) Members of the Public / Media There were 20 members of the public in attendance. Jessica Wariner from the Southern Gazette was in attendance. 1. Declaration of Opening

The Presiding Member, Mr Ian Birch declared the meeting open at 3.00pm on 21 June 2017 and acknowledged the past and present traditional owners and custodians of the land on which the meeting was being held.

Due to the leave of absence of the Mr Charles Johnson Presiding Member and in accordance with regulation 27(3A) of the Planning and Development (Development Assessment Panel) Regulations 2011, Mr Ian Birch has been appointed as Presiding Member for this meeting. The Presiding Member announced the meeting would be run in accordance with the DAP Standing Orders 2017 under the Planning and Development (Development Assessment Panels) Regulations 2011.

The Presiding Member advised that in accordance with Section 5.16 of the DAP Standing Orders 2017; No Recording of Meeting, which states: 'A person must not use any electronic, visual or audio recording device or instrument to record the proceedings of the DAP meeting unless the Presiding Member has given permission to do so.', the meeting would not be recorded.

2. Apologies

Mr Charles Johnson (Presiding Member) Cr Phil Marks (City of Belmont)

3. Members on Leave of absence Nil

4. Noting of minutes

Minutes of the Metro Central JDAP meeting no. 242 held on 14 June 2017 and Metro Central JDAP meeting no. 243 held on 21 June 2017 were not available for noting at the time of meeting.

Mr Ian Birch Presiding Member, Metro Central JDAP Page 2