16
ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005) Based on Notes from David Boswarthick (ETSI), TISPAN Support [email protected] [Draft v2 completed by Alain Le Roux (France Telecom), TISPAN Chairman, after review at the End of the Meeting]

MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

  • Upload
    haines

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

ATIS & TISPAN JOINT MEETING ON NGN Washington D.C., 1 April 2005 MEETING SUMMARY Draft v2 (4 April 2005). - PowerPoint PPT Presentation

Citation preview

Page 1: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

ATIS & TISPANJOINT MEETING ON NGN

Washington D.C., 1 April 2005MEETING SUMMARY

Draft v2 (4 April 2005)

Based on Notes from David Boswarthick (ETSI), TISPAN Support

[email protected] [Draft v2 completed by Alain Le Roux (France Telecom),

TISPAN Chairman, after review at the End of the Meeting]

Page 2: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

2

MEETING AGENDA1. Introduction, Meeting Objectives, Agenda review2. Overview of ATIS and NGN activities3. Overview of ETSI TISPAN NGN activities4. ATIS NGN Framework document

- General Requirements- Network service enablers- Underlying Network/Support capabilities- Business Model driven requirements- US regulatory requirements- Framework Architecture (for Multimedia, PSTN/ISDN Emulation,

…)

5. Review of the Workshop "IMS over Fixed Access"6. TISPAN feedback on ATIS Framework document7. Next steps (Future cooperation/interactions, Actions, Wrap-up)

Page 3: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

3

1. Introduction, Objectives, Agenda• Opening of meeting

- Alain le Roux (TISPAN Chairman) and Bill O’Shea (ATIS NGN FG Chairman) opened the meeting and welcomed delegates to the joint Meeting

• Meeting Objectives- Presented in [TD_01_ATIS_TISPAN_Objectives]- Exchange of information- Seek areas of commonality, identify differences

in respective NGN standardization initiatives- Next Steps on areas for cooperation

• Agenda- Presented in [TD_06_ATIS_TISPAN_AGENDA]- Agenda and was approved

Page 4: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

4

2. Overview of ATIS_NGN activities• Overview of ATIS

- Presented in [TD_07_ATIS_Overview]- Presents ATIS and their approach to

Standardization- ATIS are streamlining and prioritizing standards work- Removing redundancy and coordinating standards

activities- Introduces the ATIS NGN Framework Part 1- Presents the goals for collaboration

Page 5: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

5

3. Overview of ETSI TISPAN_NGN activities• TISPAN NGN Ongoing activities and plans

- Presented in [TD_02_TISPAN_NGN_status]- Presents the ETSI TISPAN vision of NGN- Explains the TISPAN structure and working methods- Lists the Service requirements for TISPAN NGN- Describes work activities in various working groups- Presents the general TISPAN NGN architecture and

motivators for re-use of 3GPP IMS• Discussions

- 3GPP2 also references 3GPP IMS, and may also need to be involved in these discussions (for global connection scenarios). Similar situation with OMA, this needs to be considered.

- TISPAN plans approve the appropriate H.248 profile for AGW in May 2005

- Number portability could be an area for cooperation between ETSI TISPAN and ATIS.

Page 6: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

6

4. ATIS NGN Framework document• Part 1 – NGN Definitions,

requirements, and Architecture (Issue 1.0, Nov. 2004)

- Full document in [TD_08_ATIS_NGN_Framework]

- Contains the ATIS Issue 1.0 "NGN Framework document", up to Section 3, sent to TISPAN and other SDOs for comments

- Provides a clear description of the various areas covered by the Framework document

- ATIS welcomes comments from ETSI TISPAN on the content of this document

Page 7: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

7

4.1 General requirements, End-user applications

• Overview- Presented in slides 6 to 12 of

[TD_09_ATIS_NGN_Framework_overview]• Interconnection • Convergence (fixed/mobile/enterprise) • Access network criteria • Infrastructure evolution & Legacy services • End-to-end transparency • Services guiding principles (for converged networks)

- Definition of NGN Interconnection requirements suggested as an area of cooperation

Page 8: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

8

4.2 ATIS NGN Network service enablers

- Presented in slides 13 to 18 of [TD_09_ATIS_NGN_Framework_overview]

• QoS– TISPAN_NGN R1 focuses on Access QoS– End-to-End QoS will be addressed in

TISPAN_NGN R2 • Presence and Personal profiles

- TISPAN suggested that ATIS examine some of the work currently being done in TISPAN, 3GPP and OMA

Page 9: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

9

4.3 Underlying Network/Support capabilities

• Presented in slides 19-20 of [TD_09_ATIS_NGN_Framework_overview]

• Security- Need to protect access to both network and

subscriber information.- Main issue is authentication and integrity at all

levels. Confidentiality is less important.- There is an additional threat to

telecommunications from terrorist attack. Need for authentication of the originator (or of the access).

Page 10: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

10

4.4 Business model driven requirements

• Presented in slides 22-30 of [TD_09_ATIS_NGN_Framework_overview]

- 4 Business drivers:- New Retail revenue- New Wholesale revenue- Cost reduction for existing services- Regulatory requirements

- 3 Keys for success- Customization through User Profile- Transparent third Party providers- Seamless service delivery

Page 11: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

11

4.5 US Regulatory requirements• Presented in slides 31-35 of

[TD_09_ATIS_NGN_Framework_overview]

- National Security (LI) and critical infrastructure (ETS)

- Consumer requirements (E9-1-1)- Operation requirements (Number Portability,

Number Pooling, Accounting, FCC rules)

Page 12: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

12

4.6 Framework architecture• Presented in slides 35-47 of

[TD_09_ATIS_NGN_Framework_overview]

- Identifies 4 key "layers"- Network Infrastructure (IP transport functions)- Sessions and Policy control functions- Application and Service capability functions- OAM&P Functions

- Multiple Service Provider environment issues- Multiple Administrative and Technology domains- Interworking between multiple instances of Session,

Policy and Service control- Interworking with legacy signalling/control instances

Page 13: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

13

5. Review of the Workshop"IMS over Fixed Access" results/issues

• Workshop Highlights- Presented in [TD_05_Highlights_from_TISPAN_3GPP]- Presents the highlights of the discussions between TISPAN

and 3GPP relating to the development on Fixed access to 3GPP IMS

- Identifies areas of common work- Defines a mechanism for TISPAN to reference 3GPP IMS

specifications• Discussions

- ATIS supports the goal of a single converged and unique IMS Core applicable to 3G Mobile and Fixed NGN

- ATIS PTSC is looking at re-establishing the relationships with TISPAN to discuss issues incl. IP-IP Connect, Security and H.248

- TISPAN would appreciate being informed of the ATIS timescales

Page 14: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

14

6. TISPAN feedback on ATIS Framework

• There appear, at high level, a full alignment between ATIS NGN Framework and the TISPAN views and approaches:

– Business model, Service enablers, Architecture …– No significant differences are anticipated

concerning Regulatory requirements• ATIS expects to pursue

– On priorities, Release definition and planning– Gap analysis, e.g. on the basis of TISPAN_NGN

Release 1• ETSI TISPAN looking for cooperation

– Will inform ATIS NGN FG of progress on their R1– Send feedback on Release definition and gap

analysis

Page 15: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

15

7. Next steps/Future interactions …• Areas of Common interest between TISPAN /

ATIS- 1) NGN interconnect including SBC (Session Border Control)

functions- 2) Emergency communications including emergency

identification and routing- 3) User identification, number portability, ENUM, and

directory services (including GRX issues)- 4) Security requirements and Access agnostic solutions

(incl. gap analysis). Note – LI requirements are being coordinated thru existing arrangements.

• Future interactions- The 4 areas listed above are to be addressed in NGN Rel-2

scope- ATIS involvement in TISPAN_NGN Rel-1 work is welcome

(incl. potential endorsements)- There is a need for discussions between ATIS & TISPAN

bodies to put in place mechanisms and identify contacts

Page 16: MEETING AGENDA Introduction, Meeting Objectives, Agenda review Overview of ATIS and NGN activities

1 April 2005 Meeting on “NGN Framework” – SUMMARY -

16

8. Future Working arrangements• Existing contacts

- TISPAN-ATIS liaison officers are Susan Sabatier (ETSI) and Tim Jeffries (ATIS)

- Contacts to be put in place for each of the 4 areas of joint activities. They will be responsible for coordinating and tracking progress

• Working arrangements- To be arranged by Liaison officers

Note – The 4 areas of Joint activities do not preclude others to occur (e.g. NGN-OSS, Protocol profiles and interoperability)

Note – The exact arrangements will comply with the ETSI and ATIS cooperation agreements.