Meeting Agenda February XX, 2004. AGENDA. White Paper Production System Test System Test Plan Systems Engineering Cost Analysis Questions and Additions. THERMAL PAPER. Were the evaporative cooling calculations I sent correct? Can evaporative cooling be included in the paper? - PowerPoint PPT Presentation
Citation preview
December 30, 2004 HYPERIONERAU
1
Meeting AgendaFebruary XX, 2004
December 30, 2004 HYPERIONERAU
2
AGENDA
• White Paper Production
• System Test
• System Test Plan
• Systems Engineering
• Cost Analysis
• Questions and Additions
December 30, 2004 HYPERIONERAU
3
THERMAL PAPER
• Were the evaporative cooling calculations I sent correct?
• Can evaporative cooling be included in the paper?
• What is the status of the paper?
• Will a copy be ready for submittal on Feb. 15th? Is a copy ready now?
December 30, 2004 HYPERIONERAU
4
PERFORMANCE PAPER
• An abstract was not submitted in time for 05 JPC
• What was the status before work was stopped?
• Can we ready a version for 06 JPC?
December 30, 2004 HYPERIONERAU
5
MONTE CARLO SIM.
• Do we have a 1, 10, 100, 1000, 10000 track run completed, realistic beams, inside/outside shield?
• Is there any graphical data to be documented yet?
• What were the effects to Isp, thrust, ect…• Consider writing a short white paper for 06
JPC on Sim. (authors should only include those involved, i.e. Smith, Cox, Tiradoni)
• $Cost$
December 30, 2004 HYPERIONERAU
6
TEST LOCATION
• Where will test occur? (ERAU PR, Lawrence Livermore, Las Alamos)
• When will the test occur? (rough date)
• These questions may be answered on a component level later in the meeting.
• $Cost$
December 30, 2004 HYPERIONERAU
7
TEST STAND
• Is the Cavendish Balance Complete?• Is the stand calibrated? Do we know how
we are going to calibrate the stand?• Document test stand and calibration
technique• Have we considered how we are going to
interface the thruster/sphere to the stand?• $Cost$
December 30, 2004 HYPERIONERAU
8
VACUUM CHAMBER
• What pressure are we going to test at? Consider effects such as out-gassing, convection currents, ect…
• Will we use our own chamber or use another facility?
• Consider size of penning trap, test stand to fit inside, and power interface requirements
• $Cost$
December 30, 2004 HYPERIONERAU
9
POSITRON STORAGE
• Will we use the Positronics LLC Penning Trap?
• Exactly how many e+’s does the trap store?• Do we know the method of ejecting the e+’s
from the trap?• Does the discharge follow a linear or
gaussian distribution?• What are the power requirements?• $Cost$
December 30, 2004 HYPERIONERAU
10
DATA REDUCTION EQUIPMENT
• Has the methods of data reduction been considered?
• How much if any EMI shielding is needed for the electronics?
• $Cost$
December 30, 2004 HYPERIONERAU
11
SYSTEM TEST PLAN
• We must start looking at integration of subsystems (power, data reduction equipment, test stand, thruster, ect…)
• We must get ready to start writing test procedures
December 30, 2004 HYPERIONERAU
12
SYSTEMS ENGINEERING
• Start documenting all research and white papers.
• Document design and performance of test equipment (i.e. test stand)
• Update Master Schedule (ASAP)
• Update Contact Sheet (ASAP)
• Completion of web site
December 30, 2004 HYPERIONERAU
13
COST ANALYSIS
• Compile receipts of past expenditures and organize into a running list
• Finish analysis of future costs for proposals
• $Cost$
December 30, 2004 HYPERIONERAU
14
QUESTIONS or ADDITIONS
• ???