140
D-Ai3?4 259 A FRAMEWORK TO EVALUA~TE CHANGES TO THE FEDERAL CATALOG 77 SYSTEII(U) LOGISTICS MANAGEMIENT INST WASHINGTON DC D J 0 CONNOR FT AL. MAY 83 LM1I-DL202 MDA9eT-8i-C-ei66 UNCLSSIFIDE D/G 5 /2 N MEEEMONEI mhEE~hhEEE~h

MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

D-Ai3?4 259 A FRAMEWORK TO EVALUA~TE CHANGES TO THE FEDERAL CATALOG 77SYSTEII(U) LOGISTICS MANAGEMIENT INST WASHINGTON DCD J 0 CONNOR FT AL. MAY 83 LM1I-DL202 MDA9eT-8i-C-ei66

UNCLSSIFIDE D/G5

/2 N

MEEEMONEImhEE~hhEEE~h

Page 2: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

-77

III W 12 111122

11111I1.25 I 11.6

MICROCOPY RESOLUTION TEST CHARTNATIONAL BUREAU OF STANDARDS-1963-A

Page 3: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

II rt)

7 .4

i SIw

40I

Page 4: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PeOHi axOWBes IOLV6976 XOR *0 'd

aluiULSmI imwao3vmvw SOLLSIDO

*alnTlsuI Vlxawagvue4 93sioaq woix; pauielqo aq isnw juawnop sTir jo suoTj~-2od aanpoadaa .io woi; a-onb o-4 uo-tssmuwad 'saso.lindiuamuaa&oo i asn iol jd~x -sua;aa ;o wuawl2edaaaqj jo Az>Tod io uotutrdo Tvz3T;o SuTpuasaidaiSe pglaJId~xUT aq jou plnotqs juaamoop sTtj i pauTvjuo3S -tsnIDUOD -1 smE (ZOZ'IQ 11981L) 9109IO- -I8-C06WU4-ON laellUOD asuajaCJ jo quataliedaa 03 juensand pajedaid

SaTlaM *1 U&1TTIL4

£861 Ae4

wais.~s !oIVzvD 1vuI3Uama{. oi SaomVH a.tvfIVAR

01 )flImawvzu V

Page 5: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

EXECUTIVE SUMMNARY

The Federal Catalog System (FCS) catalogs more than 5.5 million items and

handles more than 41 million transactions a year. Changes to the system are

* constantly proposed for such purposes as cutting costs, reducing errors,

improving its responsiveness or increasing its capacity. Such changes can be

* highly advantageous or a complete waste of money.

DLA needs to know how a proposed change to the FCS will affect the total

cost of its operation. On the basis of that knowledge it can decide

* immediately, for example, whether a change intended to reduce costs will

*really do so. It can also place a price tag on changes proposed for other

reasons and decide whether they are worth implementing.

DLA does not now have an adequate measure of the total cost impact of a

change on either the operators or the users of the FCS. To produce such a

measure, it needs a framework for assignment of labor, material, and overhead

costs to the FCS processes: item entry control, provisioning screening, item

* identification, maintenance of National Stock Numbers, issuance of publica-

tions, release of file information, cataloging, management, and training.

Further, it needs well-defined methods to project how changes in the system

will affect costs.

We propose a framework to satisfy these needs. The framework consists

of:

-A cost-estimating approach which provides for the assignment ofappropriate DLA central administrative costs, primarily those of theDefense Logistics Services Center, to the various FCS processes.

-A cost-estimating approach that provides for the application ofstandard costs in evaluating proposed FCS changes to "first-level"users -- the supply centers of the Services, DLA, other DoD agencies,and civilian agencies.

.............

Page 6: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

- A methodology for integrating both approaches, allowing DLA to assessthe total cost of proposed FCS changes. -

A test of the proposed framework indicates that it can be used

effectively to evaluate proposed changes to the FCS. We recommend the follow-

ing steps for further development and implementation of the framework:

1) assignment of DLA cost analysis function to further define and administer

the framework, 2) development of detailed framework procedures, 3) establish-

ment of review responsibility for FCS change analyses, 4) validation of

central administrative costs to be assigned to FCS processes, and 5)

development of a plan to expand standard cost coverage for first-level users.

iii --

Page 7: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

TABLE OF CONTENTS

Page

EXECUTIVE SUMMARY................... .. .. ..... . . ... .. .. .. ......

LIST OF FIGURES .. ......... ...................... v

LIST OF TABLES .. ................. ............. vi

CHAPTER

1. INTRODUCTION................... .. ... . .. .. .. .. . .....-

Size and Complexity of the FCS .. ................ 1-1

Objective and Overview of Report .. ............... 1- 2

2. A FRAMEWORK FOR MEASURING THE COSTS OF FCS CHANGES. ........2- 1

User Community. ......... ................ 2- 1Central Administrative Costs .. ................. 2- 3First-Level User Costs. .......... ........... 2-11Integrating Methodology .. ......... ........... 2-14

3. RECOMMENDATIONS .. ........ ................. 3- 1

APPENDIX A. DLA and DLSC FCS Processes/Functions and Unit Costs

APPENDIX B. Status of User-Defined Processes

iv

Page 8: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

LIST OF FIGURES

FIGURE Page -

2-1 FCS User Commaunity. ........... ........... 2- 2-

2-2 The Framework--A Systems Concept .. .. ............. 2- 4

2-3 Framework DeLail for Assigning Unit Costs to

FCS Processes and Functions. ... .............. 2- 7

2-4 First-Level User Interface with FCS. .. ............ 2-12

vI

Page 9: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

LIST OF TABLES

TABLE Page

2-1 FCS Processes and Functions. .. ................ 2- 6

2-2 Assigniment of Unit Coats to FCS Processes .. .......... 2- 8

vi

Page 10: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

1. INTRODUCTION

SIZE AND COMPLEXITY OF THE FCS

The purpose of the Federal Catalog System (FCS) is to provide a common

identification language for government supply items that are repetitively

procured, stocked, controlled, and subjected to central inventory management

and distribution by DoD and civilian agencies. The FCS is maintained and

operated at the Defense Logistics Services Center (DLSC) in Battle Creek,

Michigan. The Defense Integrated Data System (DIDS) is the automated system

central to the operation of the FCS. DIDS is so complex that 14 volumes are

published to describe it to users.

The Defense Logistics Agency (DLA) manages and administers DLSC and

through it the FCS. DLA.is continually confronted with proposals to change

the FCS. Some are to reduce costs. Others are intended to improve the

quality of the information services provided to FCS users. Users include the

Services, the General Services Administration, and other DoD and civilian

agencies. Any change to DIDS or to any other FCS component or procedure is

reviewed by each user organization, and every attempt is made to ensure that

changes result in the greatest benefit to as many users as possible.

Tracing the expected results of changes to the FCS through the labyrinth

of its information services and user organizations has become increasingly

difficult. It is important, however, for DLA to know how a change will affect

the total cost of FCS operations. If the change is to reduce costs, such

knowledge reveals immediately whether the change is worth implementing. If

the change is for some other purpose, knowledge of the cost implications

provides a basis for judging whether it is worth implementing.

1-1 -

Page 11: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

- - - - . . -

DLA does not now have an adequate measure of the total cost impact of a

change to either the operators or the users of the FCS. To produce such a

measure, it needs a framework for assignment of labor, material, and overhead

costs to the key functional activities of the system.

OBJECTIVE AND OVERVIEW OF REPORT

The objective of this report is to describe a framework to satisfy the

needs of DLA just described. The framework is proposed in Chapter 2. It

includes a description of the user community of the FCS, the costs to be

measured, and the methodology to measure them. Chapter 3 presents

recommendations for implementing the framework.

1-2

Page 12: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

2. A FRAMEWORK FOR MEASURING THE COSTSOF FCS CHANGES

USER COMMUNITY

Proposed changes to the FCS are reviewed by each user organization in an

attempt to ensure that the changes will benefit as many users as possible.

Thus, the framework captures costs related to these FCS users. The relation-

ship of the FCS to its users is shown in Figure 2-1. There are three differ-

ent levels of users: 1) DLSC, the central operators and administrators of the

FCS; 2) the Services and other defense and civilian agencies -- the first-

level users of the system; and 3) those persons in the logistics community who

use FCS products but have no direct contact with it -- the end-users. At the

DLA/DLSC level, changes in costs due to proposed system changes appear to be

entirely measurable. System processes are well identified and documented.

There is also a financial accounting system which allows for the comparison of

actual and proposed costs to the processes. At the second level, the costs of

proposed system changes can be inferred from various work measurement programs

in place or in the process of being implemented.

At the end-user level, however, proposed system changes and their impact

on cost are difficult to develop. Benefits to FCS end-users are intangible,

elusive, hard to measure, and not easily relatable to DLSC FCS processes.

Such benefits flow from the advantages of a centralized cataloging system --

the "one item/one manager/one identifying number" concept -- and include:

- Minimization of procurement costs.

- Standardization and predictability of item performance and reliabilitycharacteristics.

- Common supply language among allies who do not share a common spokenlanguage.

2-1

Page 13: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

FIGURE 2-1. FCS USER COMMUNITY

END-U SE R

~LOGISTICS COMMUNITY I

FIRST-LEVEL USERS/

0?-

100

- FCS

D L A

/ADI Csp

Ic

2-2

Page 14: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

-Minimization of the likelihood that one government uniL will disposeof items which another needs.

We excluded the cost impact of achieving benefits to end-users from the

framework because monetary values cannot be readily assigned to them. To

measure the total cost impact of a change to the FCS for central administra-

tion and first-level user activities, however, we propose a framework

consisting of:

- A cost-estimating approach that identifies and assigns appropriate DLAcentral administrative processes.

- A cost-estimating approach that uses work standards to evaluateproposed FCS changes to "tfirst-.level"f users.

- A methodology for integrating both approaches, allowing DLA to assessthe total cost of proposed FCS changes.

The overall system concept for the framework is illustrated in Figure 2-2. It

shows that through the use of the integrating methodology, both central

administrative costs and first-level user costs are combined to roduce the

total cost of a proposed FCS change.

The following sections describe how costs are recorded and assigned for

each type of cost, and provides the detail for combining them.

CENTRAL ADMINISTRATIVE COSTS

At present, the costs of FCS functions at DLSC and DLA Headquarters

sites, i.e. the central administrative costs, are recorded and reported under

an accounting structure which provides for the accumulation and recording of

costs according to agency organizational units and activities. While some of

these units' costs pertain specifically to FCS functions, many do not. More-

over, many of the costs reported by any one unit are shared among the various

established FCS processes and functions, including item entry control,

g provisioning screening, item identification, and establishing, maintaining and

changing catalog stock numbers. Because it is necessary to know the cost of

2-3

Page 15: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

FIGURE 2-2. THE FRAMEWORK -- A SYSTEMS CONCEPT

CENTRALFIRST LEVELUSE

PROPOSEDFCS CHANGES

2-4

Page 16: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

:.Z..

each of these processes and functions to analyze and determine the impact

of proposed changes, it is necessary to restructure applicable DLA unit

costs according to FCS processes and functions. They are listed in Table 2-1,

are commonly used to describe user activities, and are, therefore, familiar to

FCS users. Appendix A contains a detailed description of the existing DLA

unit costs applicable to FCS processes.

Figure 2-3 displays the proposed structure for assigning unit costs

to FCS processes. Within this structure, DLA unit costs are first

accumulated and recorded under the agency's existing accounting structure,

and then subdivided and allocated to FCS processes and functions (listed

in Table 2-1). The costs of the function, FCS Overall Management are

then assigned to the remaining processes and to the training function

on a pro-rata basis (according to the amount of unit costs assigned to

them).

It should be noted that two FCS processes are aggregations of other

. processes and functions. Item Entry Control ("A", Figure 2-3) is the

aggregation of all costs assigned to the processes of Provisioning Screening

("B") and Item Identification ("C"). Similarly, Establish and Maintain a New

NSN ("D") is the aggregation of all costs assigned to the processes of Item

Identification ("C") and Change an NSN ("E"). To prevent double counting,

no unit or management costs are directly assigned to either of these

processes. Also, these represent total costs. To calculate the average cost

of, for example, establishing one NSN, divide the Item Identification cost for

a year by the number of NSNs established during the year.

Table 2-2 shows, for each FCS process or function, the specific DLA unit

cost category (or portion thereof) to be assigned to it. Appendix A provides a

2-5

Page 17: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

* o . ,* * . * . . . -* .*b .". * , . .- . o . ." '- . * - * . - .. "

TABLE 2-1. FCS PROCESSES AND FUNCTIONS

PROCESS/FUNCTION DEFINITION

A. Item Entry Control The process of assuring that each itemhas one National Stock Number, a combination

of processes "B" and "C", ProvisioningScreening and Item Identification.

B. Provisioning Screening The process of linking all known reference

numbers of items on a provisioning partslist with data in the DIDS.

C. Item Identification The process of writing new item identifi-

cations, including all activities from thetime a Supply Support Request is received

until the NSN is assigned.

D. Establish New NSN and This process is a combination of "C", ItemMaintain it for a Year Identification and "E", Changing an NSN.

E. Change an NSN The process of maintaining an NSN record in

the FCS including revisions of data anddeletions of the record.

F. Provide FCS Publications The process of publishing documents for the

users of the FCS, but excluding internalDLSC publications.

G. Provide File Information The process of extracting data from DIDS torespond to specific data requests by usersconcerning catalogue items.

H. Develop and Maintain The process of developing and maintaining

Cataloging Tools and cataloging tools (handbooks, cross referenceProcedures lists) and procedure manuals to provide

positive identification of every item ofsupply.

I. FCS OveraLl Management The function of planning, managing and

administrating the FCS technical operationsat DLA supply centers, DLSC and DLA head-

quarter units.

J. Training The function of training FCS employees,

excluding on-the-job training.

2-6

Page 18: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

FIGURE 2-3. -FRAMEWORK DETAIL FOR ASSIGNING UNIT COSTSTO FCS PROCESSES AND FUNCTIONS

FCS PROCESSES /FUNCTIONS DLA FCS COSTS

FCS

E. UNIT

I COSTS

F. - - - - -

2-7

Page 19: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

TABLE 2-2. ASSIGNMENT OF UNIT COSTSTO FCS PROCESSES

DLA COST CATEGORY COST CATEGORYFCS PROCESS/FUNCTION CODE DESCRIPTION

A. Item Entry Control See "B", "C" Below

B. Provisioning Screening480.01 Administration of provisioning

program

Overhead 937.60 Special services in support

Cost of computer operations.961 DLSC ADP costs for DIDS screening in962 support of provisioning screening

975 Centrally funded DLCS AUTODIN costs

C. Item Identification422.01 Original item identifications454.01 International Codification451.01 DLSC planning, administrative451.04 direction and processing of

original item identifications

425.01 Furnish technical data fororiginal item identifications

Overhead Costs See "B"

D. Establish and Maintain

New NSN See "C" and "E"

E. Change a NSN422.01 Item identifications other than

original items identifications422.02 Other item identifications actions

422.03 DLSC data base cleanup425.01 Furnish technical data to upgrade

existing DIDS records451.04 )451.01 Process maintenance transactions451.02 for DIDS records

454.01 International Codification

Overhead Costs See "B"

2-8

Page 20: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

TABLE 2-2 (cont.)

DLA COST CATEGORY COST CATEGORYFCS PROCESS/FUNCTION CODE DESCRIPTION

F. Provide FCS Publications452.02 Develop, maintain, and control

descriptive and managementpublication for logistics data

452.01 Administer program for customerservice, customer trainingDLSC products, and services

454.01 International Codification423.01 Develop identification list data951 Print and reproduce FCS descrip-

tive and management publications952 Printing and reproduction costs,

including contractual printing961 DLSC ADP costs for producing FCS962 descriptive and management

publications

G. Provide File Information 452.01 Administer mass data retrieval452.02 and other programs to assist users

in obtaining file information

Overhead Costs See "B"

H. Develop and Maintain 451.02 Manage federal supply classifica-Cataloging Tools tion code structure andand Procedures develop item identification

tools424.01 Develop and coordinate FIIGs

) and item names451.01 Plan, program, and administer452.01 item identification activities452.02 Develop, maintain, and control

descriptive and managementpublications for logistics data

I. Overall FCS Management 411 Overall planning, management, andadministration of technical oper-tions at DLA supply centers

814.30 Obligations incurred for ExecutiveDirector, Technical and LogisticsServices, DLA HQ.

911 Command and general administrativecontrol at DLSC and DLA supplycenters

2-9

Page 21: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

TABLE 2-2 (cont.)DLA COST CATEGORY COST CATEGORY

FCS PROCESS/FUNCTION CODE DESCRIPTION

I. Overall FCS Management 915 Implementation of management(cont.) improvements and standards

916 Other planning and managementoperations costs

961 DLSC ADP costs not attributable962 to other functions976 Autodin narrative/data messages

services", 451.01

451.04452.01 DLS FCS Costs not directly452.02 attributable to other functions454.01

J. Training 453.01 Personnel training, DLSC411.03 Administer and manage--commer-

cial activities includingtraining

412.01 Technical operations training819.20 Personnel training, HQ DLA911.04 Command and staff--commercial

activities including training919.01 Personnel training, headquarters

administration963.01 Personnel training, data systems979.01 Personnel training, telecommunica-

tions services954.01 Personnel training administrative

support

2-10

,-

Page 22: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

detailed description and procedure for this assignment process. The pro-

cedure for the assignment of costs is described below under "Integrating

Methodology." This procedure integrates the central and first-level user

costs and provides an estimate of the cost impact of proposed system changes.

FIRST-LEVEL USER COSTS

There is no standard structure of FCS-related cost codes for first-level

users as there is for central administrative costs. Users work for many

different agencies and interact differently with the FCS. Thus, it is not

possible to use the same approach in developing costs for these users.

Figure 2-4 shows the first-level user interface with the FCS and the flow

to developing costs. First-level users interact with the FCS in two ways, by

supplying data to it and by using its products such as publications and DIDS

file query responses. As a method of measuring and managing their work, these

users are developing work standards for many of their activities.

While very few work standard data have been developed by first-level

users, all first-level users have developed approaches--some users have

well-defined procedures--for work measurement systems pertaining to their FCS

activities. Appendix B contains descriptions of the various approaches used

" by each first-level user, in addition to the procedure documentation itself,

where available. An analyst wishing to evaluate a change in an FCS process

for first-level users would be able to use the work standard procedures for

each user to be affected and "roll up" the estimated costs, both current and

* proposed, to evaluate a change. Until the standards themselves are developed

by each first-level user, however, users must take extra steps to determine

the impact of proposed changes to the system.

*We should add that a given change may affect more than one work standard,

possibly in opposite ways. For example, if a change reduced the number of

2-11

Page 23: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

FIGURE 2-4. FIRST LEVEL USER INTERFACE WITH FCS

r - . ........ .-

SUPPLY DATA USE FCSIN FORMATION PRODUCTS

I II ]ENTER NEW NSN-- t CATALOGS

I HNE S RESPONSES TOINSCREENING REQUESTS I

CRESPONSES TODEET INQUIRES.::I S I

I REINSTATE NSN STATISTICAL II REPORTS

' ETC. ETC. I

L WORK

STANDARDS

FIRST- LEVELUSER COSTS

2-12

Page 24: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

entries for a Federal Item Identification Guide (FIIG), it might reduce the

cost of preparing a FIIG but increase the cost of identifying items. Costs

for all affected standards must be summed for all users.

Appendix B shows the following information about work standards develop-

ment by the first-level users of the FCS:

-The Army has developed standard practice records for admin-istrative functions and work units. Data collection and workstandards analysis are yet to be undertaken; each major commandhas responsibility for undertaking these tasks.

-The Navy (Naval Supply Systems Command) delegates work standardsdevelopment to its local coimmand sites, providing standard costaccount guidance through its NAVSUP Management Handbook.

-The Marine Corps has not yet scheduled Corps-wide work standardsdevelopment but has issued work unit definitions for FCS-relatedactivities carried out by its Technical Operations Division.

-The Air Force's Cataloging and Standardization Office has juststarted a program of developing FCS-related work standards,although formal process descriptions do not exist.

-Defense Supply Centers have developed both procedures and workstandards for FCS-related processes, and work is currently beingreported and measured against the standards.

- NATO and other foreign government cataloging services negotiatestandard cost rate schedules for FCS-related administrativeactivities, from which FCS change costs can be determined.

- The Veterans Administration supplies work-measurement standardswhich are useful in evaluating the costs of changes to thatcivilian agency and others.

- The General Services Administration (GSA) has developed a workmeasurement coding structure but has not yet specified theprocesses themselves.

There are two problems in using user work standards to calculate the

costs of changes in the FCS. One, users organize their work differently and

therefore have different work standards. The costs must be slimmed over all

users. Two, not all users have completed their work standards. The Veterans

Administration has developed and validated some work standards and are devel-

oping more. The Army, Navy, Marine Corps and GSA have developed procedures

* 2-13

Page 25: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

and/or measurement techniques but have not completed work standards. The Air

Force is just beginning to develop them. Obviously, the total impact of a

change cannot be evaluated until work standards are complete. But most of the

important procedures and/or measurement techniques have been developed, and

they can be used as guidelines to evaluate the impact of FCS-related changes

* . now.

INTEGRATING METHODOLOGY

By assigning central administrative costs to FCS processes and using

first-level user work standards to generate standard costs for FCS and related

administrative processes, we ta.'e developed the components of a "total-cost"

approach to estimating the impact of proposed FCS changes. The methodology to

integrate those components to effectively evaluate system changes is

straightforward. It is described below and consists of:

- Establishing baseline costs for both central administrative and first-level user sites when a change to the system is proposed.

- Estimating central administrative and first-level user site costs thatwould be incurred as a result of a change to the system.

-Comparing baseline costs to estimated costs to determine the price tagof the change -- either the savings or increased cost incurred forbenefits to be derived from the change.

Establishing Baseline Costs

Responsibility for the establishment of central administrative and

first-level user costs, as well as the estimation and comparison of proposed

cost changes to the FCS, should be assigned to a DLA cost analysis function,

preferably at DLA headquarters. The analyst(s) would be responsible for the

following steps in determining baseline costs:

* *1. Using the accounting structure defined in Table 2-2 and detailed in

Appendix A, establish the present costs of the central administrative system

2-14

Page 26: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

processes affected by the proposed change. This is accomplished by:

a. Developing current unit costs for the affected processes, usingthe most recent cost data available

b. Allocating costs to the processes according to the structureproposed, contacting appropriate DLA and DLSC department managersto determine costs (costs shared among processes should beallocated to all those processes).

c. Summing all current costs for the administrative processesaffected by the change.

2. Determine the work standards of first-level users that will be

affected by the proposed change. Calculate the cost of the current standards

by:

a. Establishing current work volumes for the cataloging processes tobe affected.

b. Determining the average grade level at which the catalogingprocesses are performed by first-level users.

c. Calculating current standard costs, applying the current workvolumes and cost rates for each affected process, and summing allcosts for affected first-level users (where work standards areavailable).

3. Combine central administrative costs and first-level user costs to

arrive at the total current cost of the processes affected by the proposed

change.

Estimating the Cost of a Proposed FCS Change

Next, the analyst must develop an estimate of the cost that would

. result from the change. The following steps are necessary:

1. Review with central administrative management the changes that would

occur to the various FCS processes if the proposed change were implemented.

Determine the resulting cost increase/decrease and develop total costs for

- each cost category. Allocate costs to processes and sum all costs for all

'" affected processes in the same manner as for establishing baseline costs.

2-15

Page 27: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

" 2. Review with first-level users the changes that would occur in their

FCS-related function if the proposed change were effected. Determine whether

work volumes, cost rates, or work me:.hods would be modified. Determine the

resulting cost increases/decreases and develop total costs for all work

standards affected by summing all costs for all affected users.

Comparing Baseline to Estimated Costs

The final step is to compare the total current cost of the FCS

processes affected by the proposed change to the total estimated cost of the

processes resulting from the change. If a comparison of the cost shows a

savings when the new method is used, the proposed change is worth imple-

menting. If the cost under the new method is greater than the present cost,

the change is probably not worth implementing. However, in both cases the

"price" of the change, either a savings or an increase, must be considered in

conjunction with any intangible aspects (such as improved system respon-

siveness) of the proposed change.

The framework provides the basis for estimating the cost of proposed

changes before they are implemented, as well as tracking the cost of business

as usual. With this framework, the costs of central administration of FCS

processes can be calculated. The costs to first-level users-can be calculated

using work standards under development. Thus, the current cost of FCS

processes and the cost of proposed changes can be evaluated in terms of the

.". total cost to DLA and users of the FCS.

,1

9

' 2-16

0" ' " " - - ... , .. . . ... .. _

Page 28: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

3. RECOMMENDATIONS

During the past few months, the framework described in the preceding

chapter has been tested. The results (described in a separate report) indi-

cate that the framework can be used effectively to compare the total costs of

current FCS processes to the total costs of proposed processes. The test also

indicated that further steps are needed to define and implement the framework

to achieve a full capability for evaluating FCS change proposals. Staffing

actions, procedures development, and data refinement are all needed to develop

the framework to the fully-working status. We recommend that DLA take the

following steps:

1. Assign responsibility for implementing and administering the frame-

work to a cost-analysis function, preferably within the headquarters organiza-

tion. At least one full-time analyst is necessary to perform the analytical

functions. Additional staff may be required to develop initial procedures and

data documentation.

2. Develop detailed procedures for administering the framework. Such

procedures should include, as a minimum, the use of worksheets and checklists

for compiling both current and proposed change costs, contact lists for

obtaining cost estimates, and work standard coverage status reports to track

the status of first-level users' FCS work standards.

3. Determine the responsibility or chain of command for review of FCS

change analyses. The review process should include key managers for all

first-level users affected by a change, a review committee of central

administration managers and a management representative from the group

responsible for the change analysis.

3-1

Page 29: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

4. Review DLA unit cost codes to be used for assigning costs to central

administration processes for appropriateness and currency of cost data.

Develop detailed procedures to further refine the process/function cost

assignment data collection and analysis parts of the framework for central

administrative costs.

5. Encourage first-level users to develop and implement FCS work

standards where they are lacking. As a first step, determine the detailed

status of current work standard coverage with all users so that a plan can be

developed with them to achieve adequate coverage.

3-2

Page 30: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

7 -

APPENDIX A

DLA AND DLSC FCS PROCBESSES/FUNCTIONS AND UNIT COSTS

Page 31: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

APPENDIX A INDEX

Contents Page

* Summary .. ................................. A-i

A. Item Entry Control. ........................... A-4

B. Provisioning Screening. ......................... A-5

C. Item Identification ........................... A-7

D. Cost of Establishing a New National Stock Number (NSN)and Maintaining it for One Year .................... A-9

E. Changing an NSN ............................. A-10

F. Providing FCS Publications. ....................... A-12

G. Providing File Information from DLSC to Users .............. A-14

H. Developing and Maintaining Cataloging...............*Tools and Procedures. ......................... A-15

*I. FCS Overall Management .. ........................ A16

J. Training. ................................ A-18

A-i

Page 32: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNIT COST ELEMENTS OF FCS PROCESSES/FUNCTIONS

SUMMARY

Each of the following line items is defined more fully in terms ofapplication and source beginning on page A-4. Total costs for all

codes, except code 975, are available from the "DLA Expense/Cost Report"(RCS: DLA(M) 48) produced monthly by DLA and available from the Directorof Cataloging and Technical Information (DLA-SC). Code 975 costs are

available from the Chief, Telecommunications Division, Directorate ofTelecommunications and Information Systems (DLA-ZT).

DLA COST

CODE APPLICABLE COST

A. Item Entry Control

Provisioning screening (Functional Area B)Item identification (Functional Area C)

B. Provisioning Screening

(1) 480.01 Administration of the provisioning program(2) 937.60* Special services (including energy usage and

janitorial services) beyond the standardlevel user charges in support of computeroperations

(3) 961 * DLSC ADP costs for DIDS screening in(4) 962 * provisioning screening(5) 975 * Centrally funded DCS AUTODIN costs

C. Item Identification

(1) 422.01* Original item identifications (for DoD users)(2) 454.01* Original item identification (for international

users)(3) 451.01* DLSC planning, administrative direction and(4) 451.04* processing of original item identifications

(5) 425.01* Furnishing technical data for original item

identifications(6) 937.60* Special services (including energy usage and

janitorial services) beyond the standardlevel user charges in support of computer

" operations(7) 961 * DLSC ADP costs of DIDS screening in support of(8) 962 * original item identification(9) 975 * Centrally funded DCS AUTODIN costs

D. Cost of Establishing a New NSN and Maintaining It for a Year

Item identification (Functional Area C)Changing an NSN (Functional Area E)

* Costs in the indicated codes are divided between two or more functions.

A brief description of the relevant portion of each code is given

under "Applicable Cost".

*A-i

Page 33: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLA COSTCODE APPLICABLE COST

E. Changing an NSN

(1) 422.01* Item identifications other than original item identifications(2) 422.02 Other item identification actions(3) 422.03 DLSC data base cleanup(4) 425.01* Furnishing technical data to upgrade existing DIDS records(5) 451.04* Processing maintenance transactions for DIDS records(6) 454.01* Data maintenance for international users(7) 937.60* Special services (including energy usage and janitorial

services) beyond the standard level user charges in) support of computer operations

(8) 961 DLSC ADP costs for processing data maintenance(9) 962 *1 transactions

(10) 975 * Centrally funded DCS AUTODIN costs(11) 451.01*) Item identification activities to upgrade and revise(12) 451.02* DIDS records

F. Providing FCS Publications

(1) 452.02* Development, maintenance, and control of descriptive andmanagement publications for logistics data

(2) 452.01* Administering programs in the FCS for customer service,customer training, DLSC products and services

(3) " 423.01 Development of identification list data(4) 951 * Printing and reproduction costs for FCS descriptive and(5) 952 management publications (including all contractual

_ printing)(6) 961 * DLSC ADP costs for producing FCS descriptive and management(7) 962 * publications(8) 454.01* International codification support of FCS publications

G. Providing File Information from DLSC to Users

(1) 452.01* Administering mass data retrieval and other programs toassist users in obtaining file information

(2) 937.60* Special services (including energy usage and janitorialservices) in support of computer operations beyond the

)._standard level user charges(3) 961 * DLSC ADP costs for providing file information tc(4) 962 * users(5) 975 * Centrally funded DCS AUTODIN costs(6) 452.02* Systems management and publications activities in support

of data retrieval services

* Costs in the indicated codes are divided bewtween two or more functions. A

brief description of the relevant portion of each code is given under

"Applicable Cost".

A-2

Page 34: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLA COSTCODE APPLICABLE COST

H. Developing and Maintaining Cataloging Tools and Procedures

(1) 451.02* Management of the federal supply classification codestructure and development of item identificationtools

(2) 424.01 Development and coordination of FIIGs and item names(3) 451.01* Planning, programming and administrative direction

of item identification activities(4) 452.02* Development, maintenance and control of descriptive

and management publications for logistics data(5) 452.01* Administering programs in the FCS for DLSC products and

services

I. FCS Overall Management

(1) 411 * Overall planning, management, and administration oftechnical operations at DLA supply centers

(2) 814.30 Obligations incurred for Executive Director, Technical andLogistics Services, DLA HQ

(3) 911 * Comand and general administrative control at DLSC andand DLA supply centers

(4) 915 Implementation and supervision of policies and foreffective management improvements and standards

(5) 916 Other planning and management operations(6) 961 DLSC ADP systems management costs(7) 962 * DLSC ADP costs not attributable to other functions(8) 976 Narrative/data messages services including AUTODIN

terminal equipment

(9) 451.01*(10) 451.04* DLSC FCS costs not directly attributable to other(12) 452.02* functions

(13) 454.01*

J. Training

(1) 453.01 Personnel training, DLSC(2) 411.03* Administration and management--commercial activities

including training(3) 412.01* Technical operations training(4) 819.20* Personnel training, HQ DLA(5) 911.04* Command and staff--commercial activities including

training (DLSC only)(6) 919.01* Personnel training, headquarters administration(7) 954.01* Personnel training, administrative support(8) 963.01* Personnel training, data systems(9) 979.01* Personnel training, telecommunications services

Costs in the indicated codes are divided between two or more functions.A brief description of the relevant portion of each code is given under"Applicable Cost".

A-3

Page 35: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

.'

-4

UU

* U2 44

rz4

V4rn >

o0'-44

0440

-4

or

E-4

u 0Cl) 0 -

C: u

0

* rr.

141

* A-4

Page 36: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

0 0'. aU- 'm- 0 z. )

C. a o m uo o -4 -, u0~~~~~= 60-4 .J .)c

000 6w -4 c.J-W .3 C.)A0 o 9

-4 0 w4 C w 0 0 J& )(m -4 Ao0 OJ 0 00 .

Z u ~uw ca = = w = 0ow 0 o~ I"W= T =o Oo u

'JO000=.m CNO4 4)0 j A 0' 0-4 j =

-a0 1(UC 0-J d r-U =-6 W.00.O 0 -. j C0 66.0 J~ u. u z U -= 2

00) UU sw r-0 U4Co 0.00 00U ~~20j 0- ~. LJ <0 U j 61U r.

to. r.oocn z~~ 0J~ 0~J

Ajf cc o0 O -ja Z. 04=- )a j-- .r. 0La Ea u 0 = M

.01r0w cJC W0 c j 0 0ZC G 0

i 000 06 "4u 4 0-* .60.0J

4) 0 0 (1

O 4 Q- r

0*ca~ C - 0 44

0.0 Cc0 tu6 ) 00o-4U L) m~ W -aJ4-

*0 0w 0cw-4 0 0

Ai o= -4 Wr. n 0 4-0uO ;. )- 0 .,-

v4 LA 4 > Uj 4 -4 M~ ~-Ia 0-".oa0 -4 wa co sw 00m.04. b0 m 0 0%~,4LJ- 0 ,-00 .cuo 0> a)

--4- -4 010 4 0 0-41C " -4 .4W W.4 0- 00 D-0 U)0 o ~

c4 La U4 ccJ. ca4- 44 w~ -0 L 0 %6d 0 M ~0

-4O -0 -1.00 -4Q) 0E-4 0 W = wa =a %0W- ( -4 U-

4 3 Lo- o I M- > 0.J W 0. m0 -1 .1> (ua~ -. 0 LaiL .60 'a> 0 Z

. 40 to zo~ = C- =. soWwc.-cto C. 0 0 F.l' L a "m0 0

00dcc M 0 40 =00 0 L0 :-

0?.% 00 000 2

214 m- 04-'

U -T- CL .r -a J- 4 W J - 0 n w41

*0 .0 '-p E0

" -J 4J 4J0 -0 0 4

CL.04 -c

.4 .- 0 - .- r-4A-50

Page 37: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

C: -4 N 0

0 -4 Ck A 0 0

0 (C CJCCQ

4 ) 0C/0 0 0--

-o C)C2 1

wC A) 0 C) -)

A) C) 1C Q <C

u- CO4 6J - Uw 0 Q) to04)>%-40

-4 ~-4JJW4J-0-4 C v 0< C 0w)

z~ 0~l. 0

0o.r 04" wo0M r

-4

0 L0Ai-

4-4

(1) 0

4-1C

-A-

Page 38: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

04 UA 00'( .0 3m -40. 0 !

4.4 u' VAJl J .0 C -4

%6d0 -6 4) -Z.J .0a..

W W-4 ( U 0 CQ.) -YC

.-4 CO 0 lu0O 0 m-4Ai4 QU

c U ..- 4 = ca =C . 0'A'.C 0 r.'4.4 (A. ~ C ~ -0 - 9: W 0 Z ~ JC 0 .C

0-4 m 4 01 w U. W Ua J >sd .6) U OW.6

0 46b4 , 0u W 0 uC~ w. 2:~ *41-4 cj, W 40 "~ 41 a I uc 0m 0 -)

0a)0 c U W o .Q 3(vw(d zc -4 W 0 0-4

ca JU (U mW. C~. 0 O ca 0*0)." 6.)EZ~ 0E ) W 4-440. CCL A

W.0 E 4-0 ~ ,4 .j. 0 0.A w~(4C 00 T)ci 4.4 .61 IU - J0 C C C zU 14$

170 " " A00(U4.4 040 0 00

-4 0)c14 4 Wa 4 c 1-4c0 >=t-4o =

.6J 4J "0 j .ca 0)0 c 0 0 41

-4 4 = 0w - 0) a) -

C W4 ",- 4JC -4 4U w. ) 0 r .w -0. Q) CCF C1 O %a0C 0 0 H0g

cuZ 00 44 4 ut u4

4w 4 4pq 0j U C14 .64.J ra 0) C 4 -,4

FA -4 4C0 c4- CU4.C00-4 00 uJ 0 w w

co) '-4 0( 4W 0C

(3 00 U J 0 4 41 00 0 (

- 3 0)4 c0. C0,) 00L j 0 c>A - 1=00 CO c .~I

V4 cl ~00.4-1 w 0

u- 0C0 0 i.C0 0) U 0 4- 0 0 r. 0

00 -i.C00 W4- 4 - 4 ,TCu U 0 r r -1

> . Ow ww -4 VZ 0 1-4 1

w )w 0 X - 4%4.4 Aj

0 Q r-

m LC0))0 1:j~ r. 044 -

-4 & = 0 co .6J '-4 1 0u~ 0- 0 (, UM 4 - WW-

>4 z.1 *c14

A- 7

Page 39: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

.u r.);io.J

Q. CO I 1) . ,, I . :

.6j 1.4 4 0uc 0 6, 4 1) .6.--4 z W O0 0 -

M M. 00 XU 0 . = )0C,. =- -)

4 00 0 I 0 0 w-, A0 0 .4 0 0 U .- -.JO -4 0 ,-- 0

- -0% 0 0 -

-4W0~ a.~ JA.&J0 w 0 0 -WJ-JM ~ -0. 0 n 4wC

4.4 S -4 L) 0)C-q. U -4 w 00 1 0U~) o-2. c t44 ja u~0 Q.-~- 4. E- ca -

c , a. 0 1*4 "W 0 . L0 >

o0 0=-4 ) 4 0a ( 7% Ac %D ,0 -)0

.0 A-i. .-4 ~0 0. 0 a) o

0i..."-A -a 0 . U m C: , 0

E4 0 0o 0 u w W W IV w o o u

". 0 0 = 10 0 r. 0 4 1..'

4 1 w .61 0 41 .61 0 41.4 0

v.' V- u u u - 0 0 b

4,j 00j j

.2 .> 0 c 0m

0 02 A ,

Q ,-1 0j 0, Wl" P-4 o,-w oW

40 0 "

4; ,v0 C 0 0 0 u. E

.6 0W1.".4 Wc. U (AU4

0 w "w"-,-4r4 V

m0aw100rI m 0 , Z*' X 0 . 0 M W )Q

w - 4 0 0 w 0 " . 0 0 0 n

A-8-

00 wi~ 0 00cl --

,0X t4 i.

co 0 A-8

Page 40: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

* c

ca-

d)-

>4 c

4

0 0

"4

00

0~-

ow

0 4-

-4 )

1~-4

coo0

ow-)

ccC

q A- 9

Page 41: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

c o I'l0c u U2

4-1 u w -oi oo

00 co c

ca 0 L" Q )

co co- 0u ~~iJCu cc n -a)-~u 0 "o C-u-4j a)- -4J - -

a a-W. C cc 0 0Lfm

W, 0 Q) CWu --4 O u ;wZ U - ~ -4 ~-W W.C " c~ 0 ~ 4- z

c0 0 41 L.4u41u =~ CO .6J,4~ U) CC U,

() Eru UI w -. m - t-Qu0W Cu f.& 0)C L C _ >

C: Cuul ..-4 -4CO Cu C

0 r.ICh.4 )w C;0 0

0 = jCACZU 1 a 6j..

u14 @2 Co

C.aJ 0~ LW20 (t 0 =

CN Uu oN U -4 u.C EJ uu C < C' CJ.

u 1 ~ C w cow0),4 - C140 (n to4@20

* w 0 0 -H 0 co UC4 02 (D C4- 04- 00 $4) co( * W

co 0 0J4-~ =C Uu 0JJco C4 = u C.) C -4u C- 0

.4 'T 0C C.j 0'o OUQ ) z a) C C.)0) ".4 co0 U 0- W0 r. w

(DC Dt- ZJ.~ Q)- 00C -H Q)

IV0 0 U4~ .u -H r. )- E 'U0-w0 0IV-4 0 ~41 0 - a)w0)Cu*- ClJ

r. 0 w - c u 0co u z ,41 0 .- 4 A .0 "-4 A0@ Cu co0 000 u r- Q O4 u *- @2f04 4. 0) . Cu 0) 4 0 -- co Ai 4) cu E~ C

A)C cc~ QOC u~ -H D r rCuU 0@ IZ S t U c I-I wLf C0 -H -T

@C w )0 w a) r. Q) "-IA -H O4.1"CD 00 .) u 0(v 0 ) a COO ,Iw o )

w o ) -@2 *r.4C W2 4.4 U0) 1-4 -m2 0 73 c (t 0 004 0 0) Oxu 0 ~ .6J

=20 W U ,4 -4 a-4 m-.. r. Q)4 -2.C 00 ; c ( C

(a o Aj 4 0 0 t0o" 0U. r-C

0

Cu'

A-1

Page 42: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

rn cnz

w~) - -

L) 0 C.C

~~4-j

-. CJ-4 4ji 002C.J 0'4Z aJ 0 b

-40 0C u' Wu-4 4.j &.W-~

W A- 0 ci .6 C

o C7%~ -

4-1 J~ d ONC. O .jU Z

4w ica a k6

cw 0

w -M' m* C Cc

tt m

Aj C)ON CoCko ) z 10 C

-4 = u V Aj-a

C (V .' SCWVc .1U0W W w -Zt*A

0,.~ .61 0 Q

U) w U " MW->

> C 6 c A. t

_-6 C ,

C -A- 11

Page 43: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

ti

1 0

rb n 44 .$4 :C), 0 0

.I C : .

'a .) 0 'a -.? -,00c Vd~ .) 4-

0 0-4 0 -Z

.0 u

Im C C 4

4-1 -.7-4

41 c a a) 47

0 co

0

Co bo w 1)$

44 -, CL . 60 0t C)4

0l 0'1 % 'al "f .w.4- um

-p a r- C) 3. JC)C 4 94 C 1

WoCJ.J4,w4CoC 1W4UC)0 C 4I - CC =(n -H C- UZ CJ N CL U 1- .C14 A .0C -4-4 Q

-L ) co -14 ' V .--4 -,4 to 0 . V) w 4 u -

ti) 4. w --I 0' 4- 4 0 w T c 0 0 -

co M _ to 14 CO m

Urq Ci W Q) 0 CC.C -4 COcoX.6 00-u CL -C)" 0 u 1 4V14coJCu . 4j C.H

U)C rn-4' "z m0 M~o" C:U CC i wu

U) 0 r-() a -w ).-4 co 0 -L 0 to- c - j a) cW - a);> - c C ~ 0-4 -6)0 EQ 4) o

C- 4-1a' -6 -(CO 4 W JO O .04 w .EO 0 W 1~.

to co - E to 4j = m - :5 W LCC -4 U-ICU 4J-4 C'

'aE CC 'aE 2 C~ Q)~t W coC.)cC 0- A > d -

''C C -4 M ) CCZ - ) = C .> a. to L.

- 4 co( . USr 0a) C0 -4~ W W 04J ~ 0C uN.C ECLClC 4~- <i4 ,1 W U)- 4WQ -

W .4

C) u '-

-4 -4

A- 12

Page 44: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

u u

W 0C u (A OU

0 - JJ 0 r"

0 w -- u .C 0 j U-H o - o 0 )•-4 4 -.I4 M

-W .6 " 1 C ) > co (n

• 0 u 0 0 a -

-H -I u ...=1 -

0 a . 0 00

Z A M W , = = 0 o

,., co >u m o C w 5

-4 _ r 4-1 W 4 ,4 -4J4

"z 0 to CL 0 4. A -" = z -

0 0-40 m0 u00 0

• -. r

U CCu- 0 (

4J '4 4J Q - A- &13 M 4

V) - .1

O lJ 004c0ww .10 ctw~ t--4 u

w . -H 0

U U C% 0 trb ) -

44 UU

~L ~ w 00C1.i z 4) 0

-4 co0 W $

a. Lf) .6

L" "-4 -4 =W -4 4W 1 0 c

10c 6)9

0 n C CA - to

Page 45: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

jJw L. 5

Wi -, w 0n 0 J

AjO u~ 5 W c0 u S u 0o

O. 0 =-C~ 0) 0 0 0) m f~wj W- Ai4 o= C 1u z VU.J .61 L"i Li0 Coi 0~g ~O5~ mi 00 ~/&. 0 u Ccoo

0 u~.. Q f u i. 0 0 w 0 '.-4 uC/3 Q) Q0 C - WS 0) 4 *Hw.U4V

0. InJ r.0 4 u L" mJ UP-

uu w u O -4 a =uc~ 4)~ Q) 04 -

m i.- W C W 0 k C %w

Li ~ 0,0041 COW C' 'i Cu. wi. -W * 0- &i ~ C

0z C)

0C~ r0 r=i OJ

00 4-.4 COU uU 0 1w~~C 0'. to Q-o v.) cC*CC 0. 0 a) s-4C 0 CC0 -H" l-4 c 4 U M CuC m ~ L-f-4 4a

4. > 0i 0 fnE 0 )9= C1 C ) m 4 W j 10 w a1- - n0 V)~. 41 wU vc-

r(CC -TJ~C 0 ) ". 0i41 ~ C L" ~L COh V- c) " 1u .6Ji

C-rn 4) MO > wi ZwwC QOW

w 0 L~ A) Cu1 ~ UC to CO WLiCOm u czW C u~

LWV. 100 CC0 0 S~ -4 u Ln -wi.~~ -4 M Li h mq-C14 -H 4'r-0 CJnJcWL6 W 4J Cu- 4.4 CJ L- co\, AM) u

4 ~ ~ ~ W "4 M UCO Q. wQ)m -,Cu OC w w m OCL ) Q . 00~ > uc

044

C)r

0.

C-1

Page 46: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

0: --J=

_- 4-, I 4 4 -

00 IAU U) 0 o-,

0-, L 1 4-I E 0:0 - m C -

. 4. 40~0 u , .. 0 L n

*~ 0 Mc4~I, 4j- ~ U

, i UW W C O U ."4 U -

SQ)

0 C co 0 40c

u 0 41 0Q w ..

o * L,"-' * J.J4-" l . • * , • 0

-4 4-4 Ad-.0u 9 W 0W co = -l

0 Q) 0 4 0 0 0) 0 : cc

41 .6 0.1

I4-1

0-4 AIL j4)4

¢ U Il

a 0. cr. ° 0-

-o -41 1 I01 WCd 0C.0 ~~~ 0 QA-4 c r. to4~ 0~O W0

I V 0 0 4-j c -O~4- Aj > -. 4 -4 c9: -4r.06 41 -4 - c Q)O)4)- =O W ~ 0

,- > 10 V W W 4J W04) 1-4 QJ 0 -4 m 4j c.J z -4 ~ 0U0) w L.4 w-

z 0>s9 > 0 17 V o) M OCO 0I m Ai u

0. C.'.0 "> 0 M0 ) = cc 1-4 0>.J Q ~C0) 0 0 E-~.~ 00 0 0 0 C 4 U)c wa

LC) r_ a*-4 = )* V0 mU 0w00 ~C -O0O 0)W u mm 4 - 0 to 0 c 0 ~ cE00 )

r. M W? -W W - - 0 w ) *.10 -C ~ r.4- (L) 0)0 Q) "-( w- -w04 0 co UCCO. w '-400 o w>0 0~ I' U 60_)nc 0 C

"-1 0 . r 0 r. 4 0 r- 0 00W0 Q)0)C 0U. 00AC 41 - .JU1 )

-4 v. X0~ W~C ~ 4 .C -- -COC z(0)TIO- .61 -W~C 00 c 0 0 0.0

OW ) .61 00) ~ 0-4 Qa - ".4 -4 A-)~

u 00 0 c0 0 ) uc0I 002wI Q) - 00 00.JCOQ41 cc w Z- -5C - W5 00'U40 u r w m W Ai

to (0 u) E Aa C0 0 U-4 c w c

P4I C -4 M - 4 AI0 0 -4 ".4 .1 0 a)C ca "4ccCcc (05 Q0) 41 A C U Q) .6) ( *00) w0 13C02a 1C, -

..60 9 m -W m 0-4 > cc 00 4C r. ct MU ) 4. )WCU0O (00)u.c W 0 u0 i r~. 4 0 r r -~ 0 0 0I0 00 P4 0) - 44c - 4 0- 0 m(0 - 00 ) m r. . 010 ) -4

00 c 44E -0 E >:L'- Uc~2 QE M JC (0CO

C: -4

(0 0

~ca~4-

S r.0

-4 1

Page 47: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Q) C 1 0 V )4 -WiO r.4

U 'p 00 20

W - 00 .4- 0caM4m oA0 0 l 0 0 410 C - cc2(

CtC-4~ w o0 w4U-4wu 0

W~w0- 4. 4 W~u al WU0L 0 U-4~. 0I Q) -t. LJ4

to 04 wu Ij4. 4 .4 Q) 4.4 0 Oc 0 Q .6 L&4

0 to .) M. U .0 M044 -10i =C.U ) IW

0u w OCWC)4 ou0Cu w our_0~U4 G4-d4 . 0 JI 4 c ~ J4J 0.) WJ 1 .61/ (n0) 0 -4 W1 *) C U jU "l

W~u) MCL~ 0. cc2 Lw -Aj 4 0'M ~-H -0 t j4 -a

40 W -H ) AJ 4 4 J4 4W'0)C m .) a)

U ~ ~ ~ ~ O Ou A4UL0L0U0 o UwIV

MC *U~ -F4 0 0o049 m = 4Jc4. > 4-1 .4 (3)C 0>CmCLmO A

r. 6u- CC "- L u Ac 40', :c

U~ wU ucz Qw E I

U0- 0).. "- r.- a) o4 Cu 0e

wC. 0 ) *IIS "4~W to .12 W 1

cc -H . E0 -L4 C EM

C0)~ r. 0 "4. 0* 0 w4-0r'CtO l(4 C14 4 t6 -f 44 Cd Eu) Cu c

m U4 0 r.0)cc LC Cu a.).6

A. -4 75C 0)r. ~ C W2- oa -~W 4.0Elu )

wU 0 0C0.4 mk6= EQ Q 0-H )0 -W 00 a) r. m CO

ti ) 0)J = C 06 4 -U) we4) w - 0 OC E0i ) 1 0 % 40~~ 0C .m0

0 ~ ~ ~ ~ ~ ~ C E C C4wrnU0 ( M(

-4 Ci0C U C6 0.4 0 W - 4

4.1 Q c I-dI. Cu1C 41U '4 4jI 41 0> 0 N

oF4=>"C Ut c40) 14 m 1 CI 1

m 0 w 0 r. 4-4U Ow 0 4 -r 0)w0 A

>~ ~~~~~- 64U 0= 0

Page 48: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

~L

~ I.4

C ~- 0

0 V) Qw~

u0 cr

E.6

0 w-4 .J C

E a)

0 4. A L

0- 0 0inc

- 0 ~ toj~ -4. crA0j WZ1 0~0

U) !u w~C U)>10.

~~l ~ %0 d 0

41 -4 0)C ) . ~~ U2O Q)rcc a-~ C ~ 0

6a ~L 0 )

E. -4*

0~~~ 6, 0)

W 0) C) u6 nA

6 A "4 Z w-

Page 49: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

* C:

0 -0

-6

0-~

E- 0 C2-400

Ui 0i m u0

W. 1. -. 4 0 6

%W .6 SL) %0 0uW ra

0 =

-44 cc. (Pc 10J V ) )

1.4 -1~ = 2)I00 0 0. r. -r_ .. W u. o. a)

to 0 .4N -4 r_ 0Uc10 e D 0 0u-4i T I CCq-4 C 'A#C 0 u 0 0 Q) a

W j 0 m4 004 -4 -4m

r c -6 - - 0) =Q~ 0

0 0 CD M CA M t - 4 C AJ c~-4 0 c 0) 0 )

% > m w.J 0o 4 .j~ ~. 00 w0 1. . 0 1. 2 .4 - 4 CO 2 1 c 0

-. 4 A -" w 4 ) c0 .6 2W O.2 )

.- <O Q co to be U -

LO 0 0) 0)0- W. w. C-6* 0 >. >S 0 0 . 0 L0

w ) 0a w~ w 0 w -Z Q) W wV

0 - cW. 00 0 U. U~ ~ .- .4 .. ,4 ,-C O~

(A c c 0. ' .- ~~2 0

0 C 0. 0a) 0) 0 0 0 0

2 00 .~~6J 20C ~- ~ 0) 2 0~J Z- 1 .U

'.- IOU U 2 ~ 20 2 2 0) .0) W 0

0): Q) L;<- En 2u L;~ Q U U 00

-~~A 18 2 0

Page 50: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

APPENDIX B

STATUS OF USER-DEFINED PROCESSES

Page 51: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

APPEND)IX B TABLE OF CONTENTS

Page

ARMY STATUS .. .............................. B- 1

Extract from Army Report on Methods and Standards ........... B- 3

NAVY STATUS .. .............................. B-21

Extract on Cataloging from Navy Management Handbook ...... B-23

MARINE CORPS STATUS. ........................... B-31

Extract from Marine Corps Document Containing CatalogingWork Definitions and Cost Codes ................... B-33

AIR FORCE STATUS ............................. B-47

DEFENSE SUPPLY CENTER STATUS ....................... B-49

Extract from DLAH 7730.2 Describing FCS Related WorkDefinitions ............................. B-51

NATO STATUS .. .............................. B-63

Rates for NATO Cataloging Services. .................. B-65

VETERANS ADMINISTRATION STATUS ...................... B-69

VA Monthly Work Measurement Summary .................. B-71

GENERAL SERVICES ADMINISTRATION STATUS .................. B-81

GSA Work Measurement Data Collection Form ............... B-83

* B-i

Page 52: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

ARMY STATUS

The Army is developing DARCOM-wide summary-level standards for cataloging

operations at the five major Army Commands. This is a three-phase effort.

The first phase has been completed. It consisted of developing Records of

Standard Practice that describe functions being performed and identify work

units. The other two phases will involve data collection and analysis of the

work standards developed.

The report for the first phase was published in September 1982. It is

titled "DARCOM Integrated Methods & Standards Activity (IMSA); Redstone

Arsenal, Alabama; Standards Development; Cataloging Functions; DARCOM Material

Management Directorate." Following are pages 16-31 of the report, describing

the Records of Standard Practice. Work standards and production statistics

for the following areas can be used to develop FCS costs:

A. Federal Item Identification

- B. General Cataloging Support Functions

E. Collaboration Actions (Excluding Intra-Command)

F. Process Unidentified Requisitions (Ad Rejects)

II

B-1

Page 53: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Extract from Army Report on Methods and Standards

Records of Standard Practice

B-3

Page 54: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-4

Page 55: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART II

RECORD OF STANDARD PRACTICE

A. FEDERAL ITEM IDENTIFICATION.

Summary statement: Screen all reference numbers associated with the itemagainst the Defense Integrated Data System Total Item Record File (DIDS TIR);

determine the appropriate item name, determine the Federal Supply

Classification (FSC) class code; determine the appropriate method of itemidentification; prepare Federal Item Identification.

1. Screen all reference numbers associated with the item against the

Defense Integrated Data System Total Item Record File (DIDS TIR).

a. Verify manufacturers reference numbers prior to use in the Federal

Catalog System.

b. Assign Federal Supply Code for Manufacturers (FSCM) to each

manufacturers number asrociated with the item.

c. Propose new FSCM assignment and/or maintenance of existing codes,as required.

2. Determine the appropriate item name.

a. Analyze the technical data and drawings.

b. Determine appropriate item name utilizing para 232.02, DoD

4130.2M; Chapter 2, Vol 3, DOD 4100.39-M and Federal Item Name Directory(FIND) for Supply Cataloging H6 and H6A Nuclear series (ARRCOM only).

3. Determine the Federal Supply Classification (FSC) class code.

a. Analyze the technical data.

b. Determine the FSC Classification Code for item utilizing Section

3, DoD 4130.2-M; Chapter 2, Vol 4, DOD 4100.39M; and Federal SupplyClassification H2 series catalogs including H2-2A and H2-3A Nuclear series

(ARRCOM only).

4. Determine appropriate method of item idLntification.

a. Complete required technical research.

b. Determine appropriate Major Organizational Entity (MOE) Rule

utilizing para 531.03, DOD 4130.2M; Chapter 6, Vol 13, DOD 4100.39M.

c. Select Federal Item Identification Guide (FIIG) utilizing para232.05, DoD 4130.2M and refer to Cross Reference of Approved Item NamE to FIIGin the Federal Item Name directory for Supply Cataloging H6, and H6A Njclearseries (APRCOM only).

d. Complete determination of method of item identification util1zinqSection 2, DOD 4130.2-M and Chapter 2, Vol 4, DoD 4100.39M.

16

B-5

Page 56: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Federal Item Identification (Continued)

a5. Prepare Federal Item Identification.

a. Select Applicable document Identifier Code (DIC)

b. Determine applicable DIC format.

c. Locate applicable DIC format array.

d. Prepare proposed descriptive item identification utilizing para231.01a and 233.01a, DOD 4130.2-M; Chapter 5, Vol 4, DOD 4100.39-M.

e. Prepare reference type item identification when applicable.

f. Process Requests for NSN/NATO Stock Number when applicable.

(1) Research data furnished by the submitting activity toidentify item depicted.

(2) Complete DA Form 1988.

(a) Receive DA Form 1988, Conduct preliminary review todetermine Federal Supply Class.

(b) Control and route DA Forms 1988.

(c) Conduct research to identify the item to NSN, End Item,Managing Activity, etc. Forward data to applicable area to determine require-ments and/or disposition instructions.

(d) Complete DA Form 1988 and prepare correspondence to sub-mitting activity.

(3) Furnish reply to submitting activity.

g. Transmit all item description data to Defense Logistics ServicesCenter (DISC).

WORKLOAD DRIVERS

1. Number of Item identification transactions.

a. Definition: The total number of item identification transactions4 including reference, partial descriptive, and full descriptive type and the

total number of descriptive and reference type NSN request transactions pre-pared during the reporting period. A Federal Item Identification is specificitem description identified by a National Stock Number, upgraded as follows:

(1) From the reference type item identification (type 2 to the

partial descriptive type item identification (type 4, 4a, 4b) or to a fulldescriptive type item identification (type 1, la, ib).

17

B- 6

Page 57: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Federal Item Identification (Continued)

(2) From the partial descriptive item identification (type 4, 4a,4b) to a full descriptive item identification (type 1, la, 1b).

b. Rationale for Selection: This count identifies a major portion ofthe total workload of logistics data management/cataloqing.

c. Source of Count: A physical count of each item will be necessaryduring the initial reporting period.

B- 7

Page 58: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART II

RECORD OF STANDARD PRACTICE

B. GENERAL CATALOGING SUPPORT FUNCTIONS

*l Summary Statement: Prepare for and attend Provisioning Conference; prepare/

process logistical reassignment (gain/loss); prepare/process incoming/outgoingSupply Support Request (SSR); prepare/process incoming/outgoing NonconsumableItem Materiel Support Request (NIMSR); prepare/process Nonstocknumbered Con-sumable Item Request (one-time-buy item); make Management Control Number (MCN)assignment.

I 1. Prepare for and Attend Provisioning Conferences.

a. Preprovisioning Requirements;

(1) Participate in planning or guidance conferences to insuL,proper data is obtained and system can be supported as directed.

(2) Serve on Data Requirements Review Board.

(3) Provide requirements for LSA/LSAR/contract data requirements

list.

(4) Identify end item model for NSN assignment.

(5) Receive, review, evaluate, and process support lists; i.e.,long lead, vendor, bulk, special tools and test, and ground support equipmentlists pertaining to assigned systems/equipment.

b. Attend Provisioning Conference. Provide cataloging guidance andassistance as outlined in Chapter 5 DARCOM-R 708-2.

c. Prepare and coordinate provisioning conference trip report.

(1) Prepare written provisioning conference trip report.

(2) Identify provisioning problem areas relating to cataloqing

functions and coordinate with concerned activities to resolve problem.

2. Prepare/Process Logistical Reassignment (Gain/Loss).

a. Prepare incoming logistical loss request for cataloger ?rocessinq.I

b. Perform cataloging action for logistical loss.

c. Conduct followup action to monitor logistic loss.

d. Prepare incoming logistical gain request for cataloger processing.I

e. Perform' catilcging action for logi3tical gain.

f. Conduct followup action to monitor logistical gain.

19

* B-8

Page 59: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

General Cataloging Support Functions (Continued)

3. Prepare/Process Incoming/Outgoing Supply Support Request (SSR).

a. Outgoing Supply Support Request (SSR).

(1) Process DLSC prescreening data.

(2) Receive and control SSR documentation. Receive SSR packageand establish suspense file.

(3) Review SSR package.

(4) Prepare SSR package for CCSS input.

(5) Receive and review computer generated SSR package.

(6) Notify potential supporting agency of required support.Prepare and forward correspondence to potential supporting agency advising

*that SSR is being processed for support.

(7) Process automated SSR.

(8) Prepare manual SSR. A manual SSR is prepared for other thantechnical data rejection of support.

b. Incoming Supply Support Request (SSR).

(1) Receive and control incoming SSR documentation.

(2) Review incoming SSR package.

(3) Research files and other cataloging guides and directives.

(4) Prepare CCSS input transactions.

(5) Prepare correspondence to internal activity.

(6) Prepare advice documentation to requestor.

4. Prepare/Process Incoming/Outgoing Nonconsumable Item Materiel SupportRequest (NIMSR).

a. Receive and control incoming/outgoing NIMSR documentation.

O b. Review NIMSR package.

c. Make manual computer transaction.

d. Process completed NIMSR. Upon receipt of NIMSR from PICA/SICA

coordinator.

20

* B-9

Page 60: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

General Cataloging Support Functions (Continued)

5. Prepare/Process Non-stocknumbered Consumable Item Request (One-timebuy item).

a. Receive and review incoming request.

b. Prepare NSNMDR inquiry.

c. Process coordinated request.

6. Make Management Control Number (MCN) Assignment. Assign ManagementControl Number (MCN)/maintain file.

a. Assign MCN's for items not assigned by computer.

b. Maintain file by part number for cross reference.

c. Maintain MCN register.

d. Perform MCN purge of the NSNMDR.

WORKLOAD DRIVERS

1. Number of Manual Outgoing SSRs Completed.

a. Definition: The total number of manual outgoing supply supportrequest completed monthly. A completed outgoing SSR is defined as a requestfor support by an activity to another IMM that has satisfied theadministrative requirements of DoD 4120.26M, all analytical and manualtransactions have been accomplished by the requesting agency and is ready forinput into ARTIS or mailed.

b. Rationale for Selection: This count identifies a major portion ofthe total workload of logistics data management/cataloging.

c. Source of count: Manual count from internal log or registerduring the initial testing phase of this standard.

2. Number of Incoming SSRs Completed.

a. Definition: The total number of incoming SSRs received andprocessed for support monthly. A processed incoming SSR is defined as arequest for support received, coordinated through internal activities and anadvice statement (card) transmitted to the requesting agency.

b. Rationale for Selection: This count identifies a major portion ofthe total workload of logistics data management/cataloging.

I21

B-iO

Page 61: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

General Cataloging Support Functions (Continued)

c. Source of count: Manual count from internal log or registerduring the initial testing phase of this standard.

3. Number of incoming/outgoing NIMSRs Completed.

a. Definition: The total number of incoming/outgoing NonconsumableItem Materiel Support Requests processed monthly. A NIMSR is counted ascomplete when all actions have been taken by Cataloging/Item Manager andforwarded to the requesting or supporting agency.

b. Rationale for Selection: This count identifies a major portion ofthe total workload of logistics data management/cataloging.

c. Source of count: Manual count from internal log or registerduring the initial testing phase of this standard.

22

B-11

Page 62: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART II

RECORD OF STANDARD PRACTICE

C. DEVELOP CATALOG MANAGEMENT/ARMY MASTER DATA FILE TRANSACTIONS

Suimmary statement: Process Army Master Data File (AMDF), Catalog Management

Data (CMD) adds, changes and deletes; coordinate corrections as necessary;

procez special projects; and input to the National Stock Number Master Data

Record (NSNMDR).

1. Process AMDF, CMD Adds, Changes and Deletes.

a. Process monthly Army Master Data File (AMDF), Management Data

Distribution (MDD), bi-weekly Catalog Management Data (CMD) adds, changes and

deletes (including signal rejects).

b. Process quarterly surveillance and purification notifications.

c. Maintain compatibility of the AMDF, NSNMDR, and the DIDS files.

d. Coordinate AMDF, CMD corrections when applicable with other

command elements.

e. Identify systems problems.

f. Initiate system change requests, as required.

2. Process special projects: For example: (Future Segment Scan Sector

22-2401 Scan, Sector 22-00/01 Scan, IMPC ZZ Review,ICP-RIC Management

Transfer, Review for XXX AMDF, Annual Price Surcharge, B&H compatibility, CDA

file purification projects, Manual Interchangeability and substitutability

control, NSNMDR reference number updates (application 499).

POTENTIAL WORKLOAD DRIVERS (S)

I. Number of Catalog Management Data (CMD) adds, changes and deletes

transactions submitted for processing.

a. Definition: The total number of CMD transactions submitted for

processing (including signal rejects).

b. Rationale for selection: This count identifies a major portion ofthe total workload of logistic data management/cataloging.

c. Source of count: A physical count of each transaction as it iscompleted.

2. Number of Army Master Data File (AMDF) adds, changes and deletedtransactions submitted for processing.

a. Definition; The total number of AMDF transactions submitted for

processing (including signal rejects).

23

B-12

Page 63: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Develop Catalog Management/Army Master Data File Transactions (Continued)

b. Rationale for selection: This count identifies a major portionof the total workload of logistic data management/cataloging.

c. Source of count: A physical count of each AMDF reject andnotification transaction as it is completed.

3. Number of Special Project transactions submitted for processing (notaccountable under another category).

a. Definition: The total number of transactions written to support agiven project.

b. Rationale for selection: This count identifies a major portion ofthe total workload of logistics data management/cataloging.

c. Source of count: A physical count of each transaction as it iscompleted.

24

B-13

Page 64: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART-II

RECORD OF STANDARD PRACTICE

D. PREPARE AND MAINTAIN SB 700-20 AND ARMY TYPE CLASSIFICATION/RECLASSIFICATION/COMMERCIAL LINE ITEM PROPOSALS

Summary statement: Prepare and maintain Supply Bulletin 700-20, preparationof data including National Stock Number (NSN) and nomenclature to support theArmy Type Classification Program and processing of commercial non-typeclassified items for assignment of LIN.

1. Process SB 700-20 Transactions.

a. Initiate update transactions for SB 700-20 items - DA Form 3141,DD Form 1392.

(1) Research item to determine correct Federal SupplyClassification (FSC) and management responsibility.

(2) Request cataloger to assign National Stock Number (NSN) when

required; prepare actions to Catalog Data Activity (CDA) for assignment ofLine Item Number (LIN) and for input to SB 700-20.

b. Process all rejects.

c. Process subsequent change or deletion actions to SB 700-20 andNSNMDR.

d. Maintain compatibility with AMDF and NSNMDR.

e. Initiate/answer correspondence.

f. Obtain Developmental Line Item Numbers (LINs) from Catalog DataActivity (CDA) for items being processed for development of Basis of Issue

Plan (BOIP).

g. Maintain historical file of developmental items.

2. Process Army Type Classification/Reclassification/Commercial Line Item

Proposals.

a. Receive and review proposals for validity.

* b. Prepare and coordinate proposal.

c. Prepare and coordinate reclassification proposals with DARCOM andDA elements by IPR process. Resolve nonconcurrences from DA and/or DAelements.

d. Submit approval of type classification and reclassificationactions to DARCOM.

25

B-14

Page 65: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

A

SB 700-20 (Continued)

e, Coordinate commercial items through Directorate of Materiel. Management.

f. Obtain NSNs when required and process data to CDA for assignmentof LIN to CDA for commercial items.

g. Update files.

POTENTIAL WORK LOAD DRIVER(S)

1. Number of SB 700-20 update transactions submitted for processing.

a. Definition: The total number of SB 700-20 transactions submitted.

b. Rationale for selection: This count identifies a major portion of" the total workload of logistic data management/cataloging.

c. Source of count: A physical count of each Transaction Control- Number (TCN) which may include multiple records/DICs.

26

qB-15

Page 66: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

I

PART II

RECORD OF STANDARD PRACTICE

E. COLLABORATION ACTIONS (EXCLUDING INTRA-COMMAND)

Summary statement: Receive and process requests for revision of catalog data.

1. Receive and process requests for revision of catalog data.

a. Receive/generate and process DD Form 1685/correspondencerequesting revision of catalog data, for example: Duplicate NSN (LKDtransaction), change characteristic data (LCC), cancel as invalid (LKU).

b. Research necessary documentation to render decision.

c. Request concurrence/nonconcurrence, if necessary.

d. Prepare reply.

WORKLOAD DRIVER(S)

2. Number of DD Forms 1685, Data Exchange and/or proposed revision ofcatalog data.

a. Definition: The total number of DD Forms 1685/correspondencecompleted or generated during the reporting period.

b. Rationale for selection: This count identifies a major portionof the total workload of logistics data management/cataloging.

c. Source of count: A physical count of each item will benecessary.

q

27

B-16

Page 67: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART II

RECORD OF STANDARD PRACTICE

F. PROCESS UNIDENTIFIED REQUISITIONS (AD REJECTS)

Summary statement: Receive, control, distribute, and process unidentifiedrequisitions with/without exception data.

1. Establish and maintain master file of stock numbers/part numbers for

which technical reviews have been completed and supply actions have been

determined.

2. Count and batci requisitions and maintain count in record book.

3. Forward requisitions received without exception data to Stock Control

* for addition of exception data and return to cataloging.

4. Screen all requisitions through master file.

a. If matched, edit in accordance with previous supply action

decision.

b. If no match, forward to appropriate cataloging branch for

technical review and maintain suspense.

c. Research part number/NSN/Exception Data, annotate decision on

* requisition, and forward for processing.

d. Edit requisition in accordance with technical decision received.

WORKLOAD DRIVER (S)

1. Number of Part Numbers (P/Ns)/National Stock Numbers (NSNs) identified

- for rejected requisitions.

a. Definition: The total number of Part Numbers (P/Ns)/NSNs

identified for rejected requisitions.

b. Rationale for selection: This count identifies a major portion of

the total workload of Cataloging/Logistics Data Management.

*c. Source of count: A physical count of each requisition as it is

submitted to keypunch.

9

9 28

B-17

Page 68: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PART-II

RECORD OF STANDARD PRACTICE

G. ADDITIONAL CATALOGING ACTIVITIES

Summary statement: Provide technical review, guidance, and assistance; proc-ess Systems Change Requests (SCR); monitor and coordinate DLA weapon SystemProgram; manage Defense Inactive Item Program (DIIP); monitor the ArmyFunctional Component System (AFCS) Program; perform quality control of cata-loging functions; develop miscellaneous COSS and DIDS transactions; developand review cataloging tools; receive, review and coordinate WIMM-SICC recur-ring requisitions; distribute output products; perform other activities notlisted in other Records of Standard Practice.

1. Provide Technical Review, Guidance, and Assistance.

a. Collaborate with other functional areas.

(1) Coordinate with other functional areas/activities.

(2) Furnish comments/advice concerning policies, procedures, andcataloging tool revision.

b. Provide technical assistance and instruction concerning catalogingoperations.

c. Review completed transactions and other developed/revised catalogdata for correctness.

d. Control special projects, programs, and provisioning packages.

(1) Furnish statistical reports on special projects, programs,and provisioning packages.

(2) Represent as Point of Contact and team leader various specialprojects and programs.

2. Process Systems Change Requests (SCR). Process changes to ADP systemsutilizing DARCOM Form 2107 to outline system problems, recommended changes,etc.

3. Monitor and Coordinate OLA Weapon System Program.

a. Receive Item Data Status Cards (WS3).

b. Forward cards to Director of Management Information Systems(DMIS).

Lg c. Process critical code (WS1, add/delete) cards.

29

B-18

Page 69: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Additional Cataloging Activities (Continued)

4. Manage Defense Inactive Item Program (DIIP).

a. Monitor the command participation in DIIP.

b. Receive and control DIIP output products.

c. Prepare required coordination and responses.

5. Monitor the Army Functional Component System (AFCS) Program.

a. Manage Stock Item Master File (SIMF).

(1) Maintain appropriate sectors of National Stock Number MasterData Record (NSNMDR).

(2) Process DA Form 2988 pertaining to the Army Functional

Component System program.

6. Perform Quality Control of Cataloging Functions.

a. Technical Review of Input.

(1) Perform technical review of cataloging transactions inaccordance with Federal Item Identification Guide (FIIG) prior to submittal toDefense Logistics Services Center (DLSC).

(2) Review established criteria for stock numbering of items of

supply.

(3) Develop edit routines

(4) Submit transactions.

(5) Review reject transaction and initiate corrective actions.

(6) Perform follow-up action as necessary.

b. Project Control.

(1) Coordinate and consolidate replies to Defense LogisticsService Center (DLSC) letters.

(2) Answer PN/NSN inquiries, both telephone and correspondence.4!

c. Output Product Review.

(i) Assure all Logistical Data Applications are scheduled.

(2) Assure all products have been run.

(3) Attend meetings with Directorate of Management lnformation

Systems (CMIS) personnel to resolve processing problems.

30

B-19

Page 70: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Additional Cataloging Activities (Continued)

7. Develop Miscellaneous CCSS and DIDS Transactions. Prepare, review andsubmit miscellaneous CCSS and DIDS transactions which can not be directlyrelated to other Record of Standard Practices (includes both NSMMDR and PMRupdate/maintenance).

a. Perform necessary review and research for determination of properact ion.

b. Prepare Data Transcript Sheet for tY* and "L" transactions.

c. Input transactions.

d. Review rejects and make error correction when applicable.

8. Develop and Review Cataloging Tools.

a. Develop item names and definition for inclusion in cataloging* tools.

(1) Receive DD Form 61 from contractor through standardizationactivity.

(2) Receive DD Form 61, drawings, and/or specifications.

(3) Develop approved item name on M~ Form 180 or write DF fromDD Form 61, if possible.

b. Assign or revise FIIG to accommodate new item description.

c. Coordinate proposals with DLSC and other interestedservices/agencies.

9 . Receive, Review and Coordinate WIM-SICC Recurring Requisitions.

a. Receive monthly computer notification of other military servicerequisitions received for which there is no recorded service user in theNSNMDR.

0i

b. Review printouts to assure items are valid items of supply.

c. Notify other military services of the recurring requisitions beingreceived and furnish data as specified in DoD regulation.

* d. Coordinate with the item manager, as required, to determine theneed for managemenz transfer.

10. Output Product Distribution. Control, sort, distr~bute output.

a. Separate packages by requestor.

II

b. Match YOO card to listing.

c. Forward to appropriate catalocer.

qI

312

B-20

- - -- - - - - - -]

Page 71: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

NAVY STATUS

The Naval Supply Systems Command (NAVSUP) publishes definitions corres-

ponding to its cost account codes in the NAVSUP Management Handbook, NAVSUP

Publication 285. Work standards specifying the number of work units expected

to be completed are developed at individual commands. They are based on

d historical data and supervisory estimates. They are revised as required and

vary between organizations. Performance data against the standards are

reported via the Universal Management Report (UMR) to NAVSUP.

The following cost account code definitions are taken from the 30

- September 1981 version of NAVSUP Publication 285. These codes are to be used

in structuring FCS-related costs at Navy cataloging facilities:

Code 2521 Item Identification WritingCode 2522 Other Cataloging EffortCode 2523 Federal Item Identification Guides (FIIG)

Development and Review (FMSO only)Code 2525 Item Identification UpgradesCode 2526 Catalog Printing

B-21

Page 72: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-22

Page 73: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Extract on Cataloging from Navy Management Handbook

Cost Account Code Definitions

* B-23

Page 74: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-24

Page 75: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

52202

- - ATALO 2- -

1ITEI !DE':T:FICATION WRIING

'ccpe. This cost account includes the development of all new identifications and e nreference and descriptive type item identifications; and the direct supervisson and clericaleffort related to the foregoing operations. This cost account excludes the upgrading of item

identifications, reference or descriptive, in accordance with the FIIG Program (see Cost

Account #2525, Item Identification Upgrades).

Work Unit. Number of Identifications

(1) Definition. Descriptive and reference type item identifications processed,excluding work units reported under cost account #2525.

(2) Point of Count. Upon completion of processing for submission into the FederalCatalog System or upon completion of additions, deletions, or changes of technical data in the

master technical data files.

(3) Backlog. Will not be reported.

S

9

5-274

B-25

S

Page 76: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

2522 OTHER CATALOGING EF'FCRT

Scope. This cost account includes overall establishment, scheduling and con~trol of the cata_305program; catalog research and classification of items, maintenance of the catalog files; andsubmission of requests for Federal Stock Numbers; fidelity review of document input to themaster technical records file, or other related file, to ensure completeness, accuracy andconsistency of data; includes the costs of acquisition of missing data or corrections oferroneous data when performed by personnel assigned the records custody or fidelity reviewfunction; overall supervision and staff support in Cataloging/Allowance and Load ListComponents; through compilation, editing, layout illustration and make-up of Navy Stock Lists,Navy Management Data Lists, and allied publications.

Work Unit. Cards

(1) Definition. Cards submitted to the Defense Logistics Services Center requestingissuance of Federal Stock Numbers. Trailer cards are to be excluded.

(2) Point of Count. Upon completion of transmission of request card.

(3) Backlog. Will not be reported.

5-275 3(1 >'.p 11,81

B- 26

Page 77: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

52202

l- FE ERAL ITE:: IDE*:T!F:CATIC:; GUIDEZ (FIIG -

Scope. This cost account includes all effort aod cozts r

(1) Initiation and development of those FIIG's for which tre ::s', Is assigneFddevelopment responsibility under the FIIG Improvement Program, incluclrg the Development,Coordination, Reconciliation, Service Test, and FIIG maintenance phases.

(2) Research, evaluation, and restructuring of FIIG's initiated and developed by otherthan Navy Activities, i.e., Defense Logistics Centers, General Services Administration, andother Service/Agencies.

(3) Direct supervision and clerical effort related to the foregoing operations.

Work Unit. Number of FIIG's

(1) Definition. Number of FIIG's developed or researched, evaluated, andrestructured.

(2) Point of Count. For FIIG development, upon release of final draft to the Defense" Logistics Services Center. For FIIG review, at the time comments and recommendations areS•released to the responsible activity.

(3) Backlog. The number of FIIG's scheduled for development or review but notassigned at the end of the reporting period.

5-276

B-27

Page 78: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

. .- .- -. . - ,- -u------.-- - -' . -' i -- , -.- -. -- -, -. - . . - .

52202

2525 ITEM IDE'': . . UPFADE:

Scope. This cost account includes all effort and ccst: related to the preparat= of ILDT(Item Logistics Data Transmittal) Forms (:50 and M51 actions) to retroactivply upgrade (revrae,established Federal Item Identifications to the FIG format, and review of 1LDT's from otheractivities. This cost account excludes preparation of ILDT's for new item identifications 'seeCost Account #2521, Item Identification Writing).

Work Unit. Item Identifications

(1) Definition. Revisions to descriptive or reference item identifications processed

in accordance with FIIG procedures.

(2) Point of Count. Upon completion of processing for submission into the FederalCatalog System or upon completion of additions, deletions, or changes of technical data in t'emaster technical data files.

6I (3) Backlog. The number of descriptive type Federal Item Identifications on hand andremaining to be upgraded in accordance with the DOD FIIG schedule at the end of the reportingperiod.

9

9

5-277 30 Sep 1981

* B-28

Page 79: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

52202

2526 CATALOG PRINTING

Scope. This cost account includes all costs incident to contractor printing of supply catalogpublications.

Work Unit. This cost account is not measured by a specific work unit.

5-278

B- 29

6"

Page 80: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

4

I

I

B-30.4

Page 81: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

MARINE CORPS STATUS

Following are draft FY83 Job Order Number/Work Unit Definitions for

FCS-related activities carried out by the Technical Operations Division;

Marine Corps Logistics Base; Albany, Georgia 31704. Corps-wide work standards

development has not been scheduled. Work counts (documents, transactions,

etc.), are aggregated and used in conjunction with Work Unit Definitions by

the Comptroller to form the Labor Organization Report (LOR).

B

B-31o

Page 82: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

'4

I

C

C

I B-32

Page 83: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Extract from Marine Corps Document

Catalog Work Definitions and Cost Codes

I4

B-33

Page 84: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

C

I

I

I

I

B- 34I

Page 85: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UIT DEFINITIONS

Title D- scription

DIRECT LABOR Work which alters the composition, condition,conformation, or construction of a product; the costof which can be identified with and assessed againsta particular part, product, or group of parts or

products (work unit) accurately and without undueeffort and expense.

Direct Measured Man-hours expended for which a performance standard

has been developed.

2511 Material Management Operations--Includes all costs

specifically identified to review and analysis ofcomputer outputs such as material transaction andstatus reports, and of material records/

provisioning lists, determination/computation ofsystem stock requirements, and the resultinginitiation of supply actions, i.e., procurement,

reallocation from purchases, redistribution ofstocks, repair or disposal; coordination of

provisioning program and making range and depth

decisions on items reuired to support and mnaintainend-items of equipment; review of new supply itemsand application of management criteria for the

purpcse of classifying and management coding ofitems as appropriate; forecast of requirements andrelated effort performed in conjunction with thematerial program/budget process; coordination,

compilation, and publication of equipment allowanceand support/load lists; coordiiation of supplysupport to specific weapons systemn including thecollection, assembly, and analysis of data,monitoring and evaluation of progress , andmaintenance of a central information service forassigned weapons systems; pa ticipation in thecomputation of standard prices and maintenancc ofcurtent price records for items m-naged; 3noinitiation of reouestq for cataloging actions.

511l A Plannina Uocument Review. Effort begins with the-

receipt of the document and ends wi th submittal ofco1i.(nts to the requestor. Includes all effortexpended to review, research, coordinate and r,-spondto ALO's, LAP's, LSAR's. 7SP:3, etc.

Work Unit. Document

Point of Coinn.- Upon submittal of response

B-35

Page 86: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UN1T DEFINITIONS

Title Description

5111BA End Item Data Manaqemqent. The effort begins withthe identification of a reauiremeyL to support themanagement of end item. and ends upon the completion

of the required transaction. Includes Ite,:.'Designator (ID) assignment, logistical reassignment,Demil Codes, ECP's, TAM's, PWR, review of computerlistings, Item Exit Dates, computation of allowanc2and maintaining end item history jackets.

Work Unit: Items

Point of Count: Upon completion of the requiredaction

5111CA Cataloging Data Manacenrent. The effort begins withthe receipt of correspondence or listingsestablishing a requirement and ends with the

submittal and approval of thu various transacLioimssubmitted to satisfy the requirements. Includesinterrogations, research, review, analys is, anrdpreparation of all required dtta tran.iactioia toupdate Ma-ine Corps/DIDS files. Specified t askincluded herein are rejects of systcm g~iceatransactions, file computer listings, specif: ccataloging requirements generaited from othersectionc/branches, etc.

Work Unit: Items

Point of Count: Upon approval of submitteC

transactions

5111EA Non-System Item Review. Effort. b<gins upor, receinlof non-system iteut requisit 'ion and cnds uponsubmittal of required respons . Incluc.!.s , hnheJ

S'O research and review to verify N.arine Cor-:application.

Work Unit: Non-Syst-n RequiLition

Point of Count: Upon submittal of required

respon s'"

*B-36

Page 87: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UNIT DEFINITIONS

Title Description

2512 Technical Support--Includes all costs specificallyidentified to deterLination of technical supplymanagement criteria regarding repairability,interchangeability, and usage factors; determinationof preservation, packagiag, and marking

requirements, and development of weight and cubeinformation; development, maintenance, andfurnishing of drawings or milita yspecifications/standards, item specification

numbers, industry standards, purchase descript:ions,shelf life deterioration codes, or other technicaldata, and effort related to the Value EngineeringProgram (in the current series of DODINST 5010.8).

5112AA Technical Inquiries. Effort begins upon receipt ofthe inquiry and ends upon sub'ittal of response tothe inquiry. These inquiries can be written orverbal; if verbally received, the inquiry must be

documented to support the audit trail. Included istime for file interrogation, research, preparationof data, transmittals to subsystems relat.!,d .o theinquiry, and preparation of the final reply.Examples of technical in luiries include DD685's,phrase codes, MIF verifications, management data forengineering support, suspended receipts, POID's,resolution of substitutability, review of NAV.MC's,and any associated transactions.

Work Unit: Line Items

Point of Count: Upon final response to the

inquiry

5112BA Preparation of Instructions. Effort begins upondetermination of the requirment for an instructionand ends with the final review of Che publishe.]copy. Includes time expended for fileinterrogotion, resealrh, reviux-, analyniz, andpreparation of the instruction. Thcse instructionsinclude MI's, TI's, SI's, LI's, and techiiicalguides.

Work Unit: Instructions

Point of Count: Upon approval of instruction

B-37

Page 88: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UNI- DEFINITIONS

_ Title rxscripticzn

5,12( PPFP/Traffic Management. Effort begins with receiptof requirements and ends with final submittal ofdata to the requestor. Includes the formulation ofPP&P's for inclusion in contrdcts and orders and thedeter-intion of the appropriate data to be includedin purchase item description. Traffic managementincludes all effort expended to effect efficient

procurement distribution and delivery such asmaintenance of freight data base and provi desliaison with servi.ces/agencies, freight contractorsand field activitics.

Work Unit: Items

Point of Count: Upon submittal of data to the

requestor

5112DA Procurement Referrals. Effort begins upon receiptof referral and ends once the docuner: is loggzd outas completed. Includes Lhe review and processin-g ofreferrals and other actions directly related toproviding support required to procure material,

Work Unit: Items

Point of Count: Upon submittal of reply

5112EA 2ualitv Deficiency Reports (QD''s). Effort beginswith the receipt of the QDR reportinT a failur:, ofmaterial(s) or equipment(s). Includes control vie.

the Marine Corps Quality Deficiency InformationSystem (MC-QDIS), research, review, analysis,requests for support (if necessary) from otheragencies and/or branches or divisions, review ofsupport information, resolution of the probec-a and

9 instructions returned to the originsat-r.

Work Unit: QD?

Point of Count: Upon entry of "final" to MC-QDISsignifying resolution has been sent

*. to origir .tor

* B-38

Page 89: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UNIIT DF1.NITIONS

Title Description

5112NA Authentication of Provisionin Techn calDocumentation (PTU & SPTD). Effort begins uponreceipt of PTD, SPTD and ends with submittal of

acceptance, conditional acceptance, or re jection tcProvisioning Division. Includes the review andvalidation of PTD/SPTD to ensure compliance withProvisioning specifications, 14TL-STD 100, DOD 1000,and contractual requirements to ensure that data isadequate to support cataloging and provisioning

efforts. Also includled is the review and commentsto multi-service publications; i.e., M1UP, andTRI-TAC.

Work Unit: Line Items

Point of Count: Upon submittal of acceptance,

conditional acceptanca, orrejection to Provisionin9 Division

5112PA Acquisitioi/Authent.c,-rion of TEcchnical Data. Effortbegins with the pianning for adoption of ne-.equipment. Includes planning for technical da-a tosupport equipment, assis.ance to Acquisition ProjectOfficers, assistance to contracting officers"

guidance to contractors, in prccess review, finalreview, configuation audits and acceptance. includes

microphotograph, keypunching, moati.g, etc,

associated with adding the data to the files.

Work Unit: Drawing or document (one drawing of six

sheets would count as one)

Point of Count: Upon acceptance of the data and ThJe

termination of contractutl.re quirements

B-39

Page 90: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UNI'T DEFI;,'ITIONS

Ti tieDz scriptio;-

5112 RA Confiquration Managcmeint Effort begins upon the

acceptance of a technical ,ata package (TDP) vi. . JON

5112PT or the identification of a TUP involved in a

present contract. Includes the confiquratioui cf th 2,TDP into procurement packaets, the configuraLi.ot of

the Technical Data,Confiqpiration Maiiage-ment Syt r,(TD/C:4S) and all the wozrk involved in inputting the

data into the TD/CMS. A]s-o involve . the

configuration control of the sy -.;tem including thc-

incorporation of any changes.

Work Unit: Control Part (An assc'nby, master part,drawing or docizaent to which subur,i.-,itelevels of configuration or documentationare related.)

Point of Count: Upon acceptance of the work unit

into the TD/C4S

2520 Cataloginq--Includes all costs specificaly

identified to catalog data acqui;itlon; re : Und -

classification of items; maintenancc of -t~l.:

files; preparation of rev7isi on ni ite~identifications for all logistic functions;

compilation of Federal Czataiog Sections and alJicc

publications; and the developmu nt uf Federal -- emnIdentification Guides.

5120AAT NSN Attainment - Provisioning. Proviioni-ng ,f~ur

begins upon return from the Pzzovisit nin/Sourco

Coding Conference or determination of SMR Cotes 1,v

the Desk Provisioning ;ethod. Includes all effortassociated with attainment of the N.1, such -.s _!C!

CodLng, Item Identification Writing, Interrogation,loaijing of raaniaement data to the Marine Co-.c filosand submittal of SSR'2S, NIMFR's, and LVA's.

Work Unit: NSN Attained - Marine Corps manaced(New)

NSN Attained - Marine Cor,)s nt uagad(Est)NSN Attained - Marine Corps ranagcd(New/Est)

Point of Count: Upon vefification that NSN is

resi ient in SS-10

B-40

Page 91: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WORK UNTT DEFINITIONS

Title Description

5120BA NSN Attajnm, wnt - End Item. Efforts hegi nreceipt of a Cataloging Action Request (CAP) andends with the response to the CAR. Includos a(31associated transactions required tc adopt an ,S'1such as Item Manaemr.nt Codinq, NIISR's, SSR's,submittal of manageomnt data, interrcyations, ntc.

Work Unit: NSN Attli.ned (End Item'

Point o~f Covur.4 ;: Upon response to CILR

5120cA NSN Attainment - Non-s tems. Effort beyins u on

receipt of a request for azsinm-,nt of NSN to a Dartnumber identified as a required maintenance item Undends with the submittal of the NSN to the requestor.Includes acquisition of technical data, fileinterrogation, writing of the II's in accordancewith the requirement and submittal of SSP/NI1SR,LVA, and management data, etc. Items fal~inq in

this category are conversion of local stock ,.unb--s,

non-syste% r-eque3ts from Sapply Op-orations, Marin nCorps Field UnJ ts, Trch(i;al Support Branch: ani

D I' s.

Work Uri_t. Nsll's (Non'-system")

Point of Count: Upon forwarding of the I,,N to t'he

requestor

5120rA Develonrnont and Ma4itenance of Catalogino Tocl.s.Effort begins upon ieceiit of requirtII by

correspondence and ends with response to saeo.Development effort begins upon dctormiration t]hat arequirement exists and ends upon the approval of thesubmittecd proposal. Includes the revit,: and/ord -velopo-nti of FIIG'.s, Item Nernayne SC nLiocClass Assi3nn.ents, Colloqruial Namcns, etc.

Work Uni! Docu.ent

Point of Count: Upon submittal ot response to*" initial document

B

• 0B.-4 1

Page 92: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

A CAC/JON JON/WORK UNIT DEFINITIONS

Title [E, scription

5120SA Illustrations - OrJ-icn l Art Work. IncIu cin-

development of illustrations and rough drafts forequipment support publictLions. Encompa±sses inkin jon air brushing final art, flapping and revi-wintjlegend/callout compatibility.

Work Unit: Art board

Point of Count: Upon completion of board

5120TA Illustrations - Updati!,_l_/ ort. Inciudes makini

changes through :estorttion, retouching, lightiDnand background, removal processes regardin g

photographs, changing drawinus and adding ordeleting comiponents. Also includes the asseimbling of

camrera reAdy copies and reviewing legend data. ThisJON also includes all other effort in support ofillustrations not captur2d uinder another JON, i.e.,maintaini-.g and updatiig charts and operatingvarityper an cold type composing machine.

?ork Unit: L1t boar(

Point of Coln.t: Upon co;": letjo:n of L-oirl

2530 Supply Standcdization--Includes all costsspecifically identified to derelopJng andcoordination plans for and conducting projects oninventory item reduction and standard item(simplification) stulies and participotin< in th-DOD Item Entry Control Program (in the currnt

series of DODINST 4120.23).

5130AA Item Redtction studies. Effort begins upon rcceiptof the study docuent ..nd ends with the respoose to

the -uhmitting activity. Inclues fileinterrogation, techi7al analysis of the proposedMilitary Supply Standards for the items where areduction in t,,. type 3nd variety m') be adjusted.All transactions required to cor'plete an itenreduction study are charjeable to this JON, such as:

LDU, LCD, LAD/LDD, and ZCR's.

Work Unit: Items

Point of Count: Upon response to submitting

activity

B4

B-42 .

-I

Page 93: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

:.

CAC/JON JON/WOR JNiT 1)£,VINITIONS

Tile Do scription

Direct Unieasured

51900B General. Man-hours expended for whi.ch noperfoLmance standard has buen developed.

51 1C1B Configuration Manc'Trc.ct Drawinq Research.Reserved for future use.

511C2D Confiq uration Nanaqement ECPs, MIs. reserved forfuture use.

51 C3h Configuration nagerent EcuipnentResecrch. Reserved for fut-ure use.

INDIRECT LABOR Man-hours expended in rendering services or insupport of direct labor effcrts and/or labor hoi'i3rexpended which cannot be specifically assessedagainst a particular product or group of products(work unit) accurately or without undue effort orexpense.

51900C Suparvision. Man-hour z eroend>1 by pcr.onncl in thodischarge of dutias3 coimronsur te with t',(responsibility of directing, controllix( 7 and,/u "

managing an applicable work force.

51900D Clerical. Man-hours exrended in the n-rformance ofgeneral office duties (typing, s JnogCaphic,messenger, etc.) at any organizationi, level.

51900E Non-Supervisory AdminiqtratiLn. an-hours expan ud

in services to or in supporL of direct labor effotL3which cannot he readily defined as supe.!rvision ofclerical.

.9 5100F External Audits. Man--hours podc2 in ccnjunctionwith Genwral Acc:ounting Office Audits, Navy Audits,

Inspoctor General Tspections, on-site surv ,;s , andex:ternal visitors.

- NONPRODUCTIV All available civilian and ilitayy mar-hours wTichare not utilized for '.ither direct or indirectproductive effort. (Fo. military charges, refer tr-ONS for Military Duty and Absence prior to usit'

the following categories ard applicable JONS.

i

0O B-4 3

Page 94: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAC/JON JON/WOFY, U-; Di:EINITIONS

* Title Description

51 9 01L Labor-Manc lenient Mc',tinrs. This JON will he u7--d t-record the timte Ui.icn Officials spend in rmcei.gcwith management to discuss isumes of gencral policyor prohloms not rel-3d to a cpecific grievance,

complaint, etc.

51Y06. Navy Relief. Base wide JOt7 for reporting Civilianand Military time spent on Navy Relief effort.

Contact Administrative Section, Opcrati:ns Office,prior to using.

TRAVEL Man-hours assigned to work c-:nter but not avcilab!for productive effort for reasons whicli areessentially beyond the control of the worl, centersupervisor.

51S30S Training. Hours nonavailable for producLionexpended in fort.a! classroom training either on oroff Base. Include,. passive defense and disa.-tercontrol training. Excludes on-Lhc-jch training and"after hours" eployce self-develpo,;e at traini cug.

59C01 TAD. Hours an6 related Lravel and per diem costsexpended for the following re:,sons: se.irnars;conferences (nonproductive); audit team.s; bricfi nos

and boards and councils, etc. Hours should becharged to related productive ONS wheever

po sible.

51YADT Adrinistrativc Travel. Admbtinistcative trcve. is all

travel tht i.; not mission ess.ntial or (ir-ct.related to job performance. For examplrpe:

Attendance or participation at conferences,meetings, ot sy:iposia of organizations; ac-ndanceat training courses that are not spccific

9 requi reconLs for job npr forminic v i L.s to F' F

organ i zati ons or general survoJ a rnc f thei rope rations; routine or p-riodic rc. ] .;r r no',

personnel; travel to staft retreats. No labor willbe charged to this JON. E/E "E" only.

MATERIAL

5 101 0 This J03is Lo be used by the Aia.L.etaLivt- 0ffice.for the purchase of consumable supplies. It isrestricted to E/E "T" only.

*0 B-44

Page 95: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

CAr/J0N JOr/wop:'K UN' L-ri F., i oNS

* ~~Ti tb I ~ ~ ~ o

920 C>I ihL;ON tq he u' :- h t!. A mn i t-, 3tiv Of"'i c.for the( j!s;F11inro of i rct ts rcor-tri ctoO

1'.i o)9t Thi:; JIUNU i. -; u~x ai r fnding .iz ,-i o 7ir~s

t han 1en( f-icia s urru-c tion an, L-- rcnrit K

1-: LU1 11u. n A

~ rr.,. ,~ovyy -~y l~ot z~v,-L. foe rr_-i ffcrt-:<otV-rncte f1-co zt fo r . t: ito!,

one or :lrh~u

51 oi 1 V 1) ', Ma n - .ur s p ~ -, ii iy as L,._jr'.

suc: as stoc, 'city .?c. o insiYti:,f.

ty a ~n t1 F? rea

150) n- - , 1 J: ' Ii c' Or 12: 1'

Is L t 01 r t L V. Cf C 1o1- ;u6 t iI

5t~' 1 0, A,' x 1.y P., V1' i o

5 1 (M.-V Yrnini nc,. !i20-hoG4rj Ti-JIe~ cn i-, l A,

thd 3r a&" io d'-ip1 iri - * I IL;I l

5 1 0 z ot M~un-rIi' u s;-rn ,':-1 ie' nco n 1 r -'' lo

Ix*J , Ii. no t I v-k a>1 C 1 r-~" u C- I i r~~p-ij:.nvlefirle is Fo- , ( V1 S

512011 An n 1 1 5rif CJ{CiCX 1

* ~~51000:! Sic!-. Si-i-)- lcavc- or prU.ydih1t oA;

51(2003 Hlolid,I. Self explarnatory

B-4 5

Page 96: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

0

'S

a

0

0

0

9 B-46

Page 97: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

AIR FORCE STATUS

The Cataloging and Standardization Office (CASO) at Battle Creek,

Michigan, recently began a program of developing production standards for

FCS-related activities. CASO was formed six years ago by the consolidation of

cataloging activities previously resident in Air Force Logistics Commands

(ALCs). More than 400 employees without previous cataloging experience were

trained in cataloging. There existed, at the time of consolidation, a large

backlog of cataloging actions. Only recently has the situation at CASO

stabilized sufficiently for meaningful production statistics to be collected.

CASO is using the LODC Production Report to develop work standards.

Formal process descriptions for the items on that report do not exist, but the

following are capsule scription of their processes obtained through

interviews.

Work Unit Description

Base 86s Request for cataloging action. CASO is the controlpoint and performs preliminary research. If substitutesexist, the cataloging action can be closed at CASO. Ifnot, it is forwarded to the appropriate Air LogisticsCommand.

• PPLs Provisioning Parts Lists. These are checked for consis-tency by catalogers and then subjected to a cursoryInterchangeability and Standardization review.

TCTO Time Compliance Technical Order. This is a modificationto a weapon system. CASO performs a consistency reviewand provides an alternative if one is available. Ifnot, the suggested item is used.

SERD Support Equipment Recommended Data. The manufacturerhas suggested support equipment for a system. CASO per-forms an Interchangeability and Substitutability review,

9 a consistency review, and a check of the standard main-tenance handbook to verify the recommendation.

B-47

Page 98: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

'4

Work Unit Description

AF601A Request to add to or change a previous allocation pat-tern for an item.

SPEC/STD/CID Specifications, Standards, and Commercial Item Descrip-tion. CASO checks for consistency and for approved itemnames.

DD Form 61 Request for nomenclature.

B-48

Page 99: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

-At34 259 A FRAMEWORK TO EVALUATE CHANGES TO THE FEDERAL CRTAL:OG -'2PrSYSTEM(U) LOGISTICS MANAGEMWENT INST WASHINGTON DCD J O'CONNOR ET AL- MAY 83 LMI-DL202 MDA903-8i-C-8i66

UNCLSSIFIED F/G 5/2 N

EhmhEmhEEmoiEsmmhmhEEmhmhE

Page 100: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

1 L-

S

-- i-" ; -. "i "t .t

-° - 1 0 - 9 J o g

Page 101: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

09FINS SUPPLT CzEnTRS STATLIS

Te Defese Supply Ceters (DSC*) ot DIA are msers at the FC TIey alo

* actively support other msrs sad serve " a IL m betwee thee Users M4 OLI.

Costs related to these activities Can be captured to the sw way other

CS-related DLA costs are captured. Work standards have beeo developed for

, FCS-related processes and have bee retsted to reflect tumctioeal ectviette.

Ref ined work deftaitioss bart been developed for OCS-related proctes. et

DOCs. The following pae sbow those defiitios *lo"# with a title, the

place to take comts, and the 8roup responsible for reporting the umboer of

transactions counted. Based os this data and actual production statistics,

analyst can detrminte the skill level and time required to process

transactions. Because the MCo can colle't data os the basic transactions

that are included in CS processes (item entry coetrol, item ideetificatioo,

etc.). the analyst can evaluate chages to thoe processes by evaluatiag vhicb

transactions would change. Productioe statistics are kept agaimst these work

definitions and reported to DLA.

B-49

Page 102: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

. . . , B-50

3-5

C> -2 ~ ~ ~ ~ ... s.I --- .--

Page 103: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

* - Istract from ULAN 7730.2

* FMS Relatod Work Defiaiaoa4

B-51

Page 104: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

4...

.4

1.

.2.4.

4.

4.

.4

4.

4.

B-52

Page 105: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

97.

,_ DLAi 7730.2

PR G AM 400

. DATA NO. FREQ DUE CfTE DATL EtITERED OnX/OlIiR t.kT(R(ST

i r .... 11 IV: !J.i0) 1913 sr/111• ~TIILE: - .-.! .' "

U.T'llITOa: lo qualify for Inclusion in tht count, th .: !ollowing criteria pxjstibe met:T1) an original or reinstated partial or fully descriptive requtst for

-.lt or P5CM assignment; (2) submitted to DLSC under originator code astf nee

the OSC. Count excludes any resubmission of corrected inputs to DL$C.POINT OF COUNT: When released to Quality Control for submission to DLSC.RrFuT TURM'TrVITIcS: N, 4

**187AE N 1OC I July 1973 SP/CH

TITLE: Original R4 1IDITITIGHi: To qualify for inclusion in the count, the following criteea n$tbe met: n) an original or reinstated reference method (witho-ttcharacteristics) requests for KIIN; (2) submitted to OLSC under originator codeassigned DSC. Count excludes Internal quality control rejects as well as rejectsand returns from DLSC. Count excludes any resubmission of corrected Inputs toDLSC.POINT OF COUNT: When released to Quality Control for suteission to OLSC.REPORTING ACTIVITIES: P, H

*I A74'.3 1 IOC I July 1974 SP/fC4TITLE: ,Cer-:PlleA 11s tubmitte!" TWITIONi: To qualify for inclusion in the count, the followir.g criteria must

Sbe met: (1) the transaction is a Cancel-Invalid. Cancel-Use or Cancel-O'iplicateaction; (2) submitted to DLSC under originator code assigned to DSC. Countexcludes internal quality control rejtcts as well as rejects and returns fromOLSC. Count excludes any resubmission or corrected inputs to LSC.POINfT OF COUNT: When released to Quality Control for submission to OLSC.

"*" REPORTIhNG ACTIVITIES: 0, H

187A9 N 1OC I July 1974 SP/C64TITLE: Off-Line FIIG Revisions SubmittedDEFTTION: To qualify for inclusion in the count, the followig criteria mustbe met: (1) action must have been taken as a result of a 1Notification Listingfrom OLSC and within the approveu DLSC established time frame; (2) related toOff-Line FIIG Revisions; (3) submitted to DLSC under originator code assigned theUSC. Count excludes internal quality control rejects as well as rejects andreturns f rom DLSC. Count excludes any resubmission of corrected inputs to DLSC.

%POIT OF COUNT: When released to Quality Control for submission to DILSC.REPKTING ACTIVITIES: B H

M -OC 1 July 1970 SP/CMTITLE: Revi-el I 5u nittedDEMlllITION: To qualify for inclusion in the count, the following criteria oustbe met: -I) the revised II is a change in item name arid/or FSC and/oraddition/change to characteristics without a change in Typ, IH; (2) submitted toDLSC under originator code assigned the DSC. Count excludes internal qualitycontrol rejects as well as rejects and returns from, CLSC. Count excludes anyresuhmissioti of corrected inputs to DLSf &rid it(i7 identific.,tii d..ta has(clean-up tran,.ctions.

* ~~P0IT:T OF CO('!1 : Mien released tn Q'161 i ' , ti 1 !<:~ ~i ~~IC

-53.. l:J

B-53

Page 106: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAH 7730.?

PROGRAM 400

D'TA NO. FREQ DUE DATE DATE EnTEETE, Or/OTHER INlTEREST

NOTE: Covnt of one is made for each NS?. regardless of nukrer of Input DICs7-4u red.REPORTING ACTIVITIES: f. H

I.S70 10C 1 July 1974 SP/C1iTITLE: I LrAnsfsrs SubsittedDEFTINTION: To qualify for Inclusion In the count, the following criteria mustbe met: 71) the II is a change in Type together with a change in Item Nameand/or FSC and/or addition, change or deletion of Item charjcteristics; (2)submitted to OLSC under originator code assigned the DSC. Count excludesInternal quality control rejects as well as reje:ts and returns fross DLSC. Countexcludes any resubmission of corrected Inputs to DLSC and Item identificationdata base cleanup transactions.POINT OF COUNT: When released to Quality Control for submission to OLSC.NUiT: Count of one is made for each NSN reagardless of number of Input OICsrequired.REPORTING ACTIVITIES: 'e, H

187C1 Fl 10C I July 1975 SP/CiTITLE: Full Descriptive Method of Item Identification Transfers SubmittedULTPIITION: To quaiy for inclusion In the count, the following criteria mustbe met: (1) the 1l is a change to Type I together with a change In Item Nameand/or FSC and/or addition, change or deletion of Item characteristics; (2)submitted to DLSC under originator code assigned the OSC. Count excludesinternal quality control rejects as well as rejects and returns from DLSC. Countexcludes any resubmission of corrected inputs to DLSC and Item identification

. data base cleanup transactions. NOTE: This represents a portion of the 18709count.POINT OF COUNT: When released to Quality Control for submission to OLSC.NOTE: Count of one is made for each NS:4 regardless of number of input OICsre-quired.REPORTING ACTIVITIES: B, H

188F M 10C 1 July 1968 SPTITLE: PEC Codes AssignedU TIRITION: Number of Standard Comnodity Classification codes or PEC codesassigned to inventory reports.POINT OF COUNT: Upon completion of the assignment of the PEC.K" UKIINb ALI. VITIES: G

* 1918 M 1OC 1 July 1968 SP/Ce4TITLE: IL Descriptions Prepared, New and kevised.ET T OtN: Number of new or revised identification list (IL) descriptionsprepared where manual systems require input to delete an item from ILpublication, deletion input actions are also included.

*. POINT OF COUNlT: Work unit count is taken upon completiun of new or revised ILoscription tor an NSH, and where applicable, when input deletion action for anISN is completed by preparer of action.REPORTING. ACTIVITIES: 05

26-403-11B-54

Page 107: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAN 7730.2

PROGRAM 400

DATA NO. FREQ DUE DATE DATE ENTERED OP1/OTWfR INTEPE!'

194 Q 1c 1 July 19aTIILE: NSNs Added (DoD)DETTETION: Number of NSNs added to the Federal catalog DRP for stitch one ormore uou users Is recorded.POINT OF COUNT: This is the cumulative count of DoD NSNs added since the lastreporting period. Count is tUken at the conclusion of the last catalog cycle ofthe reporting period.RErORTING ACTIVITIES: H

195 Q ICC I July 1968 SP/CMTITLE: NSNs Deleted (DoD)ETMIITION: Number of NSWs deleted from the Federal catalog DRP for Which one or

more Uou users is recorded.POINT OF COUNT: This is the cumlative count of DoO NSNs deleted since the lastreporzlng period. Count is tqken at the conclusion of the last catalog cycle ofthe reporting period.REPORTNG ACTIVITIES: H

196 Q ICC 1 July 1968 SP/CMTITLE: Federal Catalog Stock Nuibers, Closing Inventory (DoD Stock Numbers)DEFITTION: Number of NSNs in the Federal catalog ERP for which one or more DoDusers is recorded.POINT OF COUNT: This is a status record of DoD NSNs at the conclusion of thelast catalo9 cycle of the reporting period.REPORTING ACTIVITIES: H

196C H 10C 1 July 1968 SPTITLE: Original DM Ils Processed by DLSCDMFTITION: Number of original ON Ils processed by OLSC.POIT f UNT: This is a cumulative count of DM Ils which have been assigned astocK numBer or coded for return by the computer.REPORTING ACTIVITIES: H

196D M ICC 1 July 1968 SPTITLE: Original RM Ils Processed by DLSCDEFTEITION: Number of original RM Ils processed by DLSC.POIT rF-OUNT: This is a cumulative count of RH Is which have been assigned astock number or coded for return by the computer.REPORTING ACTIVITIES: H

207A1 M 15C 1 August 1968 SPTITLE: Iten rntry Control - Manual MatchesUFMTTITION: Number of items prevented entry into supply system as a result ofmanual matches. Excludes duplicates found by PCO.POINT OF COUNT: When watch is found.KLrUKIINb A3,ILVITIES: B

207B M 15C 1 July 1968 SPTITLE: Iter EnLry Cultr: - F'bstitutc/Rcplacem cnt: ~ffcrid* FTITIOJ: N'umber of substitutes/replacemients offe red to requestor in lieu ofproposed new item.

26-400-12

B-55

. -.-v -- - -. '. .-. ,-.'.'I- I"- ."- .- . -- , ".- , . .T-- ..- •..--. . - , ... . .

Page 108: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAN 7730.2

PROGRAM 4C

DATA NO. FREQ DUE DATE DATE E:JTE .ED OPI/OTHER JIUT[RE5i

POINT OF COUtNT: When offer is made.KLVUKIIbK A.I1VITIES: e

207C K 15C I July 1968 SP* TITLE: Item Entry Control - NSN Requests fcr Error or Inadequate Data

DEFTUITION: Number of requests for NSNs returned to requestor as urprocessable&te to errors or lack of data.

* POINT OF COUNT: When request is returned.REPORTING ACTIVITIES: B

S2070 K 15C I Jul 1968 SPTITLE: Item Entry Control - KSN Requests Approvcd

TEITION: Number of requests for new/reinstated NStls approved for forwardingto ULSDt includes NSN requests for all DLA-managed items on new and reinstatedIls.POINT OF COUNT: When technician approves request.KkPUKIING ACTIVITIES: B

207G N 15C 1 July 1968 SPTITLE: Item Entry Control - Items Assigned Standardization Code 6-Ui FITION: Number of Items authorizbd for procurement in a specific FSCciasslitem name grouping previously approved for assignment of StandardizationCode 6.POINT OF COUNT: When technician or SANDS Item Standardization Applicationassigns Standardization Code 6 to itemREPORTING ACTIVITIES: B

207L M 10C 1 July 1970 SP/C4TITLE: Item Entry Control - DLA-anaged Items Manually ScreenedD FIITION: Number of proposed new/reinstated iten. identifications manuallyscreened to prevent unnecessary items from entering supply system. (For DF3SConly: includes screening of Military Service-managcd items as designated singlesubmitter for FSC class.)POINT OF COUNT: When technician completes revieo of proposed new/,reinstated itemidenti ficati on.REPORTING ACTIVITIES: B

208C K 10C 1 July 1968 SP/Cm4TITLE: Item Reduction - Manually Reviewed Items with Recorded United StatesUsers in the DLSC Total Item RecordDEFINITION: Number of U.S. user items in the DLSC TIR manually reviewed in itemreouction study projects item name grouping to perform technical comparisons andresulting in standardization codes being assigned or changed. Includes items(Code C) reviewed where technical data (specifications, standards, drawings andconrnercial catalogs) were inadequate to make a standardization decision.Excludes items having standardization codes assigned or changed (Codes 6 or E) innew or revised superseding specifications or standards and items in a spcCificFSC class/item name grouping which has little or no potential for elimin.ation ofitems through reduction studies.

26-400-13

B-56

Page 109: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

I'.*

LAN 773U.Z

PROGRAM 400

DATA NO. FREQ DUE DATE DATE EITE'ED OP1/OIILn IL rST

314U1 Q 1SC 1 July 19I STITLE: Part Types Reviewed With No ReconmendationDEFM lTION: Number of part types for which no recommendation was made by the*Pr bi~ause of lack of information or the part was not under the purview of theMPCAG.POINT OF COUNT: When the information is sent to the design activity or when acomputer generated report is received. Computed by 314111 equals 314U minus314V.REPORTING ACTIVITIES: None. Computed at HQ OLA.

314V Q 15C 1 July 1981 Cp

TITLE: Part Control Evaluations Leading to a Recommendation*- ]aFrITION: Number of part types evaluated for which sufficient information

exists upon which to make a decision.POINT OF COUNT: When the total part types are reviewed and determined to haveaaequate Data.REPORTING ACTIVITIES: B (35)

314V1 Q 15C 1 July 1981 SPTITLE: Standard Part Types VerifiedD" T-ITION: Number of part types proposed for listing on Program Parts Selection-LI JTP s) by design activities and determined by MPCAG to be standard andpreferred part types for use in new design.POINT OF COUHT: When a MPCAG recommendation is sent to the design activity orwnen a computer generated report is received. Computed by 314V1 equals 314Vminus 314V2.

]. REPORTING ACTIVITIES: None. Computed by HQ DLA.

314V2 Q 15C 1 July 1981 SPTITLE: Total Nonstandard Part Types EvaluatedU-MM-ITION: Number of Part types proposed for listing on PPSLs by designactivities and determined by MPCAG to be nonstandard.POINT OF COUNT: When a MPCAG nonstandard determination is sent to the designactivities or when a coputcr generated report is received.REPORTING ACTIVITIES: B (BS)

314V3 Q 15C 1 July 1931 SPTITLE: Nonstandard Part Types Replaced-DITMITION: Number of nonstandard part types subnitted by design activitiesrecommended for replacemcnt by MPCAG with standard and preferred part types foruse in new design.POINT OF COUNT: When a MPCAG recoimendation is sent to the design activity or*wnen a comput"r generated report is received.REPORTIN;G ACTIVITIES: B (B5)

314V4 Q 15C 1 July 1931 SPTITLE: Percent Iornstandard Part Types rPcplkcedI UI2FTTTITION: Derivcd by dividing 314V3 by .1 '2.RLPU- =I ACTIVITIES: W.cne. HQ DLA co:A;-t_.

26-400-23

B-57

....................................

Page 110: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAH 7730.2

PROGRAM 400

DATA KO. FREQ DUE DATE DI.TE ENTEP'Rj O]/OTHIF: lIJEP25"

314W Q 15 I July 19"41 SFTITLE: Contracts Active - End of Period7rTIITION: Number of contracts/programs assigned to a MPCAG at the end of thequarter, Tor which parts control activity has been perforu'd over the past 6months, in one or more of the following phases: Preliminary advisory servicesprior to the award of a contract (e.g., proposed statements of work, sourceselection boards, postaward parts control organization meetings. etc.);evaluation of part types; evaluation of drawings; evaluation of PPSLs.POINT OF COUNT: When a count is made of contracts which are still active at theend of the quarter.REPORTING ACTIVITIES: B (85)

566 M IOC 1 October 1976 SP/CIITITLE: Item Identification Data Base CleanupDF-NITION: To qualify for inclusion in the count the transaction oust be (1)taken as a result of a Notification Listing from DLSC related to Data BaseCleanup or as a result of FIIG page change or workload not completed under DataElement 187A9 by the required time frame; (2) submitted to DLSC under theoriginator code assigned to the DSCs. Count excludes resubmission oftransactions which have been rejected o.r returned to DLSC as well as interndiQuality Control rejects.POINT OF COUNT: When released to Quality Control for submission tu MS.REPORTING ATVITIES: B. H

SCO Q 10C I October 1977 SETITLE: Principles and Application of Value Engineering (PAVE) TrainingDEFIWITION: Number of persons trained in PAVEat an accredited course ofinstruction of 40 hours or more DRP.POINT OF COUNT: On completion of course by individual.REPORTING ACTIVITIES: B, BS, BS, BST

581 Q IOC 1 October 1977 SETITLE: Contractual Aspects of VE (CAVE) TrainingDETMTION: Number of persons trained in CAVE at an accredited course ofInstruction of 40 hours or more DRP.POINT OF COUNT: On completion of course by individual.REPORTING ACTIVITIES: B, B5? , 85S, BST

582 Q ICC 1 October 1977 SETITLE: VE OrientationDEFTU=TION: Number of persons receiving orientation in Principles of VE DRP.F FONTF-OUN'T: On completion of orientation by individuals.REPORTING ACiIVITIES: B, BEM1, BSS, B5T

583 Q 10C 1 October 1977 SETITLE: Full-Tir, VE Staff, M,,,atr

=LElrNITION: Nu-,ber of full-ti-me employees, other than secretarial or clerical inthke VL oftice.POI.T OF COUNT: E0c of rcport period.I-IT5: L B51,, ET

1 26-400-2-4B-58

. ..

Page 111: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAH 7730.2

PROGRAM 400

DATA NO. FREQ DUE DATE DATE ENTERED OPI/OTICZR INiTEfrST

POINT CF COUNT: On implementation of first procurement under the modifiedcontract.REPORTING ACTIVITIES: C, B514, 85S, B5T

595 Q 1OC 1 October 1977 SETITLE: VECP Actual Savings ($000)UEFITITION: The Government share of savings actually realized as the result ofVLL"s be -g implemented DRP. Includes follow-on savings developed as a result ofa subsequent procurement during the sharing per- from implementation.POINT OF COUNT: On determination that an audit e savings has been made.KEPURIINU AMIVITIES: B, B5M, B5S, B5T

596 Q 10C 1 Oct 197/ SETITLE: VECP Costs ($000)* iMNITION: The costs to develop and implement - VECP as reported by thecontrdctor. Includes Government nonrecurring costs to develop and implement theVECP or costs expended or disapproved VECPs.POINT OF COUNT: On implementation of the VECP or determination that the VECP isdisapproved.REPORTING ACTIVITIES: B, 85M, BS, BST

597 Q IOC 1 October 1977 SETITLE: VECPs On HandDEFITITION: A contractor-generated proposal that has been assigned a VE projectnumber wNich is still in piocess at ERP.POINT OF COUNT: End of report period.REPORTING ACTIVITIES: 6, B5M, 85S, B5T

598 14 10C 1 January 1978 SPTITLE: Redistributions, ItemsDE FiITION: Item shipped or transferred from idle to package, idle to active,active to active, active to package (where item was not previously packaged item)and package items in storage to use.POINT OF COUNT: When item is actually shipped, transferred or transferred-in-place.REPCRTING ACTIVITIES: G

599 ri 0C 1 January 1978 CPTITLE: Certificate of NonavailabilityUEFTTTITION: Formal replies to D Forms 1419 (DoO IPE Requisition) or equivalentsDR? that assets are not available to fill a rcquirement.POINT OF COUNT: Count is made when reply is forwarded.KLFUKIINb AI'VITIES: G

60? M 1OC 1 October 1978 SCTITLE: R e tr-crs AddEd by Sp:cizl Prcic:tflTI10ITIOlJ: To qualify for inclusion in t;i- count, the fullu.h:iric criterid ;;;stbe met: (l) mst be a special effort strictly for the purpose of ed-ingreference nubcrs; (2) not part of normal razlntenance of th2 transfer progr;m and(3) submitted tc DLSC under originator cod assigned thc USC. Count eclu1'2sinternal quality control rejccts as -. ll as rcjects and returns frc" DLSC. Count

26-40'-27B-59

Page 112: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAH 7730.2

PROGRA 4 400

DATA Ne. FREQ DUE DATE DATE RTEr' iILP _,__

excludes any resubmission of corrected ir.puIts to DLSC.POINT OF COUNT: When released to quality control for suhmiss icn to DLSC.REPURIING AClIVITIES: B

610 M 10C I October 1978 ScTITLE: Cancellation Resulting from Adding Reference Numbers by Special ProjectfEFTTITION: To qualify for inclusion in the count, the following criteria mustbe met: (1) the cancellation is a result of adding reference numbers by specialproject, and (2) referred to normal processing under CAC 422.01. Count excludescancellation generated by other than special project on reference numbers.POINT OF COUNT: When released to II personnel for processing as normalcancel lation action.REPORTING ACTIVITIES: B

611 M I0C 1 October 1978 SCTITLE: Line Items of Output for DLA-SC Approved ProjectsFT=NTITION: To qualify for inclusion in the count the line item must be: (1) asa result of effort chargeable to CAC 422.04, (2) submitted to OLSC underoriginator code assigned to DSC. Count excludes counts not related to approvedprojects chargeable to CAC 422.04.POINT OF COUNT: When released to quality control for submission to DLSC.REPORTING ACTIVITIES: B

6!AQ lOC I January 19C) SPTITLE: NSNs with Unapproved Names ReviewedDEFTNITION': To qualify for inclusion in the count, the NSN mutt be related toProject D-2 and reviewed to determine approved nime and classification.POINT OF COUNT: When decision is made on action to be taken.REPORTING ACTIVITIES: BI, B2, B3, B4

614B Q lOC 1 January 190 SPTITLE: NSNs with Unapproved Names Identified to an Approved NareDEFI=ITION: To qualify for inclusion in the count, the NSN mist be related toProject U-2, identified to an approved name.POINT OF COUNT: When released for collaboration to Intcrested activities.REPORTING ACTIVITIES: B1, B2, B3, C-1

61C Q 10C 1 January 1980 SPTITLE: NSNs with Unapproved Names Identified to be Cancelled as Replaced orDuplicate ItemsDEFINITION: To qualify for inclusion in the count, the NSN must be related toProject 0-2 and determined to be replaced by or duplicate or an existing item inthe system.POINT OF COUNT: When released to Quality Control for submission to DLSC.REPORTING ACTIVITIES: BI, B2, B3, E-.

5" Q 10C I January P

TITLE: Items with Unapproved Nir.,s with Nr) UsersU. FIITION: To qualify for inclusion in the count, the S --st be relatid toilrojict 0-2 and dczer;, incd to have no users.

3-60

Page 113: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

PROGRAM 400

DATA NO. FF.EQ Out DWET ." "! I,.,[ w' ,tLb . !

I POINT OF COUNT: When d:ternined to hv .o 4-ers.-" REiURTI4 AcTIVITIES: 0 '. OZ. 93. L.

" 614: Q 10C I January 19J SPTITLE: NSIs Identified to an Approved kjr* ani Subeitted to ht*C by IfRevi-ewing DSCDEFINITION: To qualify for inclusiOn in r - Co.4-i. the IiS.U fl t ti relaeid toProject 0-2. identified to an approved naft. colilJorsted ,ilb appv'1sfitc

activities and submitted to ." by the revi- .Ai'.g .

POINT OF CO'INT: When released to Quality Cortr*,- ' bls$$on c .KtYW(IIN9 ALIIITIES: 81. 52. 83. 84

6 14 F Q I~ -ry 1TITLE: NSNs Identified to an Ap:'rovre aoj . I to D. [ ty citcr thlkn

OEFINITICI: To qualify for Inclusion In the cOint, I,'t %I-% nvst te. relatet tovroject U-2. identified to an ap;-ove. naae. collab "tea itwi appro leactivities and submitted to CLSC by other than te r e.iei, I Dv ''.

POINT OF COUNT: When determinti to have been stitt. I to .KECLRTIN AGTIVITIES: 81. 82. 83. a.

614^ Q 1'. 1 January 19&TITLE: NSNi Submitted to wtilitary Services for Input to 1 iACt wi areVa-Et7oggedDEFINITION: To qualify for inclusion in the cont. the 3

41h "%*," le related tOProject U-i, identified to an acproved nae, collaborated wi .0 irreit(dactivities. sent to a Military Service for action, but artior, ha ntt been

taken.POINT OF COUNT: NSJs remainir.g In the 3oilitary Services and n suftitted toDLSC at the end of the report period.REPORTING ACTIVITIES: 81. 82. 83, B

- 614H 0 IZ I Sp.* TITLE: NSNs which are Correctly Classified %,tIdc the 11Orv FS,

I)TFIRTION: To qualify for inclusion in tte ccur.t. the IS eit b1 'at- 1 toProject 9-2, determined to be correctl rla,,, ifieI ou*.01dc the 411nV 1)

POINT OF COUNT: Upon determinaticn to be ccrrP:'y clr.~fled.KE'UKIINL ALIiVITIES: BI. B, 83.

C11 Q I OC 1 2arjzry 19y j SP

TITLE: NSNs Retaincd for Developing 'Je.: %;.-2

* UFD=ITION:: To qualify for inclusion in th. crint, thi N4JU onust be relatedProject 0-2, io approved name can be dete,-inc,, his technical data to Aovclo,characteristics and referrcd to nare/FIi, devclo: 'z.t oroanizatin, frr ,,-ve'approved name upcn coer'letio-, of basi- r, " to Prnject D-Z.POINT OF COUNfT: Upon referral to n, r , .R ,0T !,1-I -, 1-'ITIES: El, -. 3, "

-

B-61

Page 114: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

DLAHI 773U.Z

DATA [LE ;:T TITLE ,,

KV Technical Item Identification ktwv.- ,-

90A Awards Not Subject to Coipetition. Vilut Iv-

906 Awards Not Subject to Coetition. kuamr of k~tions L-Iu -19

93A Requisition L/| Manually Processei 26?00-5

93,1 Requisition Followups Manually Processei 76-200-6

93A2 Requisition Cancellations 4anaally Prokci-sed

93A3 Customer Support 26-?UU-b

938 Inventory Recording and Adjustacnts L/! Processd ?6-7UO-b

9381 Inventory Accounting Actions Processel 26-?U0-7

Provisioning SSRs:T3L1 With Positive Final Advice. Procese. 26-40U-39.2 With Rejected Final Advice, Processel 41-40U-4

T 3:: For Established Items With NS Assigned 26-AUU-49.1 For Items With PSCM Assigned ?6-40D-493.%2 For New Items Without USN Assigned 26-400-4

MIPRs:93N3 Processed by PCO 26-C,12-493N4 Requiring PCO Action 26-42>-

Procurement Documents:9315 Reviewed by PCO 26-40U-593N6 Requiring PCO Action 26-4C)IO-5

93N7 Conferences Established by PCO 26-4)-S

93N7A Provisioning Support Actions - DLA-Owned and 26-4 '-5Operating Equipment

93!. Provisioning Conferences or Meetings Attended 2&-.'-5by PCO

193:-) Provisioning Offers of Alterndte/Substitute Ites 26-490-5

S,.,0n New National Stock Numbers (?!Shs) Resulting froi, .SRs 26-4UD-G

93,111 SSRs Output for Technician Revic. 26-401-6

L/I Receivcd for Stock:aLA Con,oities, Total Syste. 2,-J -7

94A LA llateri:1, Includes IPE -"K -

B-62

Page 115: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

NATO STATUS

The Directorate of Cataloging at DLSC perform cataloging services for

NATO and other foreign governments. In accordance with DoD policy on Foreign

Pilitary Sales (FMU), total costs for the NATO Codification function must be

recovered.

Following is the FY82 rate schedule for performing FCS-related activi-

ties. Production statistics upon which these rates are based should be

obtained each fiscal year from DLSC.

B-63

Page 116: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-64

Page 117: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Rates for NATO Cataloging Services

'4

B-65

Page 118: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

w- F. - - - . -.-- '--- -

S

I

p-4.

.4.-

'A

B-66

4. - 4. - 4 . - - - - -

Page 119: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

Revised Rates for NATO and Other Foreign Governments Cataloging Services

1. Statistics from October 1980 through March 198l were used as the base for thisstudy. Costs were increased by 4.8% for personnel and 10% for non-personnel dollarsto allow for anticipated inflation during FY 82. Costs for functions not directlyrelated to requests for stock number assigment were excluded. Increased productivityattributed to the slight decrease in rates. Proposed rates have been rounded towhole cents. DLSC anticipates recovery of total costs for the NATO Codificationfunction in accordance with DoD policy on Foreign Military Sales (FtS) based on these* revised rates.

2. Transaction Rates-

FY82FY81 Proposed

Type of Transaction DIC Rate Rate

Descriptive Method LNC/Item Identification LNR $33.9912 $33.13

Reference Method L

Item Identification LNK $12.0401 $11.86

Add MOE Rule LAU $ 9.1501 $ 8.96Add Reference Number LAR $ 9.141-7 $ 8.96Add MOE Rule and

Reference Number LMD $ 9.1521 $ 8.96Change PSCN to NIIN LCP $ 9.1501 $ 8.96Return to Country - - No Charge No Charge

Machine Generated LAU LAU $ .0568 $ .05

Direct Submittals:Screen Reference Number LSN $ .0568 $ .05Screen NSN/NIIN LTI $ .0568 $ .OSAdd MOE Rule LAU $ .0568 $ .05Add Reference Number LAR $ .0568 .05Add MOE Rule andReference Number LMD $ .0568 $ .05Delete NOE Rule LDU No Charge No Charge

Delete Reference Number LDR No Charge No Charge

B-67 Encl

Page 120: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-68

Page 121: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

....... . . .. ~ ... . .

VETERANS ADMINISTRATION STATUS

The following Work Measurement Standards were obtained from: Veterans

Administration, Cataloging Division (901S), VA Supply Depot, P. 0. Box 27,

Hines, Illinois 60141, and were current as of December 1982. FCS processes

are contained in the following VA standards:

Unit 1 - Item Added for Marketing (LOG & DIDS)

Unit 2 - Item Added for Medical Center (LOG & DIDS)

Unit 4 - Maintenance Actions to Federal Catalog System (DIDS)

Unit 7 - NX Items Added (Category Cataloging)

Unit 7A - NX Items Matched (Category Cataloging)

B-69

Page 122: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-70

Page 123: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

VA Mlonthly Work Measurement Suary

B- 71

Page 124: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

* - - - -- -. -. .4 - .. ... -

-t

n

-Sb5-

.1'

B-72

Page 125: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

oS'

PRATT TOTAL

I'% " ACTIO'" VOL"! PER HOUR HOUPS

1 - Itm Added for IMarketing (LOG P TIDS) .36

IA - Item Adc4ed for tlarketing (LOG Only .55

' - Item Added for fledical Center (LOG r PIDS'__ .39

" 2A - Item Added for Medical Center (LOG Only) .50

3 - Maintenance Actions to Master GeneralCatalog (LOr.) (Excludes Category R. .' 3.00

. 4 - Maintenance Actions to Federal Catalog

System (DIDS) .69

S - Catalog Requests on Hatched Items (LOG,) 3.36

* 6 - Actions PreDared 6 Processed to VA-3,"Parts I X IV" - 1.25

7 - XX Items Added (Category Cataloging) .... 31

7A - IX Items 14atche- (Category Cataloging) 1.20

*-7B - NX Item Maintenance Actions (CategoryCataloging) 1.60

9 - Collaboration Actions (168S's, 180'sFIIG's) .32

9 - Item Reduction Studies .25

ALLO1;ANCE HOURS - TOTAL:

- .No. of Positions

No. of Hours Available During th'e Mont.

Minus Leave Taken Duri'te the Morth

in - Minus Unmeasured Allowance(Standard 1.S3 x Pays x Positions)

11 - Mainus Su'ervision/Administrative Functions(Office of Chief, Actual Time Snent on Duty__

Net Measured ",an-Hours Availablc:

Divide Net Hours Available into Total Allowance Hours

Equals Percentage of Effectiveness

B-73

Page 126: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

L.

UNIT 1 ITfM ADDSD !OP MARKETING (LOG C D]DV)

Includes any and all functions involved in adding new Centra ly Managed(Medical and Subsistence) items to the VA and DID systems. IncludesreceivinF 10-2063's (M1A's). lon.inp in, assirninr control number, dis-tributin,; reviewing MA, specifications, purchase cescription, contact-ing Marketing; researching of MCRL, rILDR, Report 696, Report 688,manufacturer's literature, Cataloging Handbooks. etc; locating approveditem name or develop name, replying to FIIG; prepare and file manufac-tumer's cross reference card., brand name cross reference card, preparealpha index cp':i; preparation of DOD form 2051 - Request for manufac-turer's cod-; assign VASCM; preparation of DOD Form 1982 - verifyingmanufacturer's product no.; pulling DIDS procedures manuals; completingcatalog uorksheet; preparation of Log CodeSheets - 1232a and 1232b;preparation of DIDS Code Sheets - 7919, 7919A and 7920; posting toReport 696; obtain DCSN fro register and post action to DIDS Register,post to index card, review DD-146; release code sheets to DPC Key PunchUnit; preparing folder and label for History File and filin. data in"istrF= File; tying data on HA; tvyinR index card; filir. index car-d;logging out KA to Parketin.; lo~ginR in KA fr om Central Office; ccm-pleted action loned out to Marxeting; typing of any coresponaencepertaining to a new VA-3 item.

UXIT IA ITEM ADDED TOR MRKET'ING (LOG ONLY)

Includes any and all functions involved in adding a new Centrally Man-aged (General Supplj item to the VA (LOG) system. Includes r-eceivin710-2063's ( A's). lo7ging in, assizning control number, distributin-;

' reviewing HA, specifications, purcnase description, contacting iarxet-ing; researching of MCRL, FILDR, Report 696, manufacturer's literature,Cataloging Handbooks, etc; locatin, approved item name or developname; replying to FIIG; prepare and file manufacturer's cross referencecard, brand name cross reference card; prepare alpha index card; assignVASCH; completing cat.log worksheet; prepa-ration of LOG Code Sheets -1232a and 1232b; posting to Report 696; release code -heets to DPC KeyPunch Unit; typirp data on HA; tvvinr index card; filing index card;logging out Y4A to Marxeting; ].ogginz in KA -rmm Central orfic¢; com-pleted action icgzed out to arketin7; t-,inc or any ccrr-t3ncnuanccpertaining to a new VA-3 item;. posting new item to VA-3 master.

Catalogers - Record time, as applicable

Clerks - Record time doing portion underlined

07

Page 127: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNT? 2 IT ADD-rD roPICCAL CZ??tP (Lo D!P)

Includes any and all functions involved in adding a now VARC item tothe VA and DID systems, lcludes receivinr 1O-2.16 - Caalor keoutst.date steaing, sorting. coqmt~nc, distribmuinr; rovievat Ct.&O rw-quest, contacting hod~cAl Center or manuiactvrr; riseching ofHCRL, T LDR Report 69G *mufactura-'s i terew . Cataloging Mand-books, ete; locating approve item mam or develop nam, roplying tor71G; prepare and file mu acters cross reference card. Ora Namcross zeference carTpepar alpha Inde: card; prparetLo of DODTam 2051 - Request foro asactwux- a code; assign VASC; propartioof DOD ram 1982 - veifJying maufacttjil product No.; puLLing D 1DSprocedu'es anuals; completing catalog vwrksheet; prepaation of LOGCode Sbeets - 1232a and 1232b; prepartion of DIDS Code UAet* - 7919.

S19A and 7920; posting to Report 696; process SS tt amSbC~t tozelease data to Medical Center; obtain DC frm rogLate ad postaction to DIDS zegist; release code sbee" to DrC way Punch Unit;Zrep.rin folder and label for misto r ile and fume date "u sistofYrLls; typing index crd, filing in.: card; ty . or_ wrin it. any cY?,

Jn[a it" to the stes. (}&=to: Taain rtN78s me- Unt *

CXIT 2A ITEM ADDED frO MEDICAL C==Tl

Includes any and all fnctions involved L adding now VPIc iten to theZOG system. Includes rceivin 10-216 - Catalog Reouest, date sta >-:In,- sortinR, counting, distributin; review g cataLog Fequest. CoO-

uwctJojii~caL Center or nnuractw; researchins or NcRL, rn.DR,10port 5961, ur~fc~i~~ ataloging Manmolw * etc;locating approved it.. nan or develop name; replying to rXG; assignVASCH; copleting catalog worksbeet; preparatiom of LOWG Code Seets -

1232a and 1232b; posting to Report 696; process S transaction torelease data to Medical Cetmer; rlease Code Sheeos to DPC Key PunchUnit; typing Index card, filing index card; tnine or writinir envcarresondence to hedical Center or wanuracrwr vnicn pertains toadding an item to tne systes. reparing work shoeet tar the typizof 1303's

Catalogers - Record time, as applicable

Clerks - Record time doing portion underlined

P,-750 4if1

Page 128: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

'41

VNT 3 HAIT UAUC ACTIONS TO HASTV C:rRAL CATALOG .LC)

A Mitenance actaons affecting the LOG I Meter General and/or extandedS records - action which wil add. change or delete any fields or ser-

mts in the LOG I System. Includes actions affecting VA-3 items. suchD ias, rceivnt KA, reviewing KA, dare stamina, distribution; includes

ao . addin or deletin, data to keep it. e. ,7-he ife code,special handling code etc.; process stock number changes; includes

* reviev of documents which cause change to item, such as CataloC Requerts,Cataloging Handbooks, Federal Supply Scheduleo specifications, manutac-ti4n's literetw'e, DD-2460s, etc.; reviewing Source I "U Status item;deletion of itsm.such as Source, no nst anar Item * etc.; actionresulting from an approved Item Reduction Study; ontactin or vrt-In Nedical Center or nanfacuawr; preparil or cemputer Gessage cowooets, change code sheets. expanded code sheets; code sheets to KeyPunch basket; posting to index card, Report 696 and 688; peoare and'file aipha index card; tpi of a.L corresoondence relatin e t~ o emre;includes review of output f LOG prior to filing.

UnT 0 PAXWMfANCE ACTIONS TO MEAL CATM SYSTD (DIDs)

Wintenance actions affecting the Total Iten Record (T) at DLSC -actions which will add, change, or delete any of the segments or partsthereof pertaining to an Item. (Includes LWU, DIJ, LCU). Includesactions, such as, preparing DOD Form 180 - Vame Development; preparingDOD Far 20S1 - Request for %anufactrer s code; preparing DOD Fora1982 - verifying mnulactw4e's product No.; preparing of DOD Form1685 - Data Exchange ad/or proposed revision of catalog data; col-laboration a required; action required as a result of an approvedItem Reduction Study; review and resowch of literature, schedules,specifications, KCMm, FIL , L's, CHD file, DD-146's, Handbooks,etc.; obtain DCSN from register and post action to DIDS register; pre-pare code sbeets and release to Key Punch Unit; tvin! of all cores-poMdence related to maintenance; filne of outout in vren hictorvfile; cudes review of all output fr DLSC (printouts and DD-146's).

Catalogers - Record time, as applicable

Clerks - Record time doing portion underlined

*:O B-76

Page 129: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNIT 5 CATALOG REQUrSTS ON MATCHrD ITEMS (LOG)

Catalog "equests (VA Form 10-2116 received for cataloging which areintched to item already in the VA LOG System. Includes receivinr10-21167. sortinp, c-onuting, date stamoing and distribution;.CataLoger

kIng/reviewing Report 696, cR., FLCK. Report 688, manufactureritr e, includes contacts with manufacturer or Medical Center,

preparing code s.eet for telecom message to Medical Center; code sheetto My Punch Unit; Request to Historv/Hold file. (Hote: If you matchan Item to DIDS, FILDRoo and it. is' not in VA system you consider itaa new Item under Unit 2A and LAU action is considered as a main-tenance action under Unit 4). Typing of corresiondence related tomatched items.

1

Catalogers - Record tie, as applicable

Clerks - Record time doing portion underlined

B-77

Page 130: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNI 6 ACTIONS PREPAPXD & PROCESSrD TO VA-3, SEtTION/PART I ', IV

Includes any and al duties and functions related to preParing achange or revision to VA-3 publications "Part I and IV", such asreceiving MA and posting action (add, change, or delete) to MasterVA-3;'maintaining MA LOG; maintaining publication schedule; review-Ing Master VA-3; vulling panels, making chances to flex-O-printcards, retyping flex-O-print cards, tvning flex-O-Drint cards on And assew items; checking against MA's,- emoving car s on deleted ite=s, Varl icabtmo~lI Fex-orinT caras to finl rarels, adding or removing illus- !,s ing. ations; locating ilnustrations To publish, composing forewords, Editwriteproofing ,anels, making corrections; Eyning draft of foreword,p- oofini forew.. d, preparing cover v.iae, xeroxing .Daneis and /

nakgpnl, tinq 3019, releasing paneiLs To GPO,/arofing negatives; tvin Form 3-7700, releasing negatives andhi evoids to Central Office, filing published chane/revision inMaster binder waking the necessary additions, changes, etc.,flling and/or distri.buting additional copies received. Includesany contacts with Marketing or Central Office in regards topublication.

Catalogers - Record time, as applicable

Clerks -Record time doing portion underlined

B-78

Page 131: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNIT 7 WY ITEMS ADDED - (Category Catalooino)

Includes any and al! functions involved in adding an item to the NX Cate-gory Cataloging Program, such as, receiving, sorting, counting, datestanoing the 1O-211b reauests; locating approved item name in H6, H2,etc., developing name and concept, developing item requirements; research-ing Report 696, MCRL, Manufacturer's Literature; VA-3 Section VII; pull-ing FIIGs, Contacting VAMC or Manufacturer by phone or letter, discuss-ing .ite with Supervisor/Cataloger; complete catalog worksheet, prepare-VAMP Log out and forward VADP with backup to VACO for approval, assignindex number and stock number, prepare 10-1232a and 10-1232b; preparetransaction 545, add cross reference to Section VI, release code sheetsfor keypunching, typuino of approved VADP; typino of index card, preparingof folder for item file, typing of any correspondence relating to theitem.

UNIT 7A NX ITEMS MATCHED (Catecory Catalocrina)

Includes any and all functions involved in matching an item request(10-2116) to an existing item in the system. Such as, receiving, post-ing, counting, date staming- the 10-2116; researching MCRL, Report 696,VAEP's, etc., preparing 545 transactions, code sheet to keypunchingunit.

EMIT 'S NX ITEM MAINTENANCE ACTIONS (Cateoorv Catalooina)

Includes any and all duties pertaining to maintaining the master recordand/or files on existing NX Items, such as, reviewing VADP's, Master - " o

:so Printouts, Report 696, 10PL; revising VADP's, changing reauirements, Z

Schanging concepts, preparing change notices;r lng new manufactureros, Xhcludes snake, model, to VADP backup, posting to, Report 696, Index Cards, print-

?reparing outs; phone calls, letters, discussions -on existing XX items; typing ofm"uter suoerseded VADP's, reolacing file folders; posting to VA-3 Section V11,ssage code preparing code sheets, releasing code sheets for keypunching; typing of

:-eets all corresoondence relating to the maintenance of an item.

Catalooers - Record time, as applicable

Clerks - Record time doing portion underlined

B-79

. .,, ..

Page 132: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

UNI TB CO.LABORATION Ar11O,I (]605 ', ]Osl FITG' RF.rTFIVr FRfli OCA'S

Includes any and all functions resulting from the receipt of collabora-tion actions from other Government Agencies, such as Forms DD-1685 -Data Exchange and/or proposed revision of catalog data, DD-18O - Name. Development, FIIG's, letter's, etc. for the purpose of concurrence ornonconcurrence. This action involves maintaining a Log-in and Log-outRegister. Upon receipt of a 1685 check MG to verify VA is user; reviewDD-146, Index Cards, 688's; process 481 action; research characteristicdata requisition change. Upon receipt of 180, check H-6, 696; reviewname or names; analyze delimitation; determine agreement or nonagree-zjent; review advance change to H-6, H-2. Upon receipt of FIIG, reviewadvance change to H-6, H-2. Upon. receipt of FIIG, review item namesadded, changed or deleted; analyze all pac's - are they still appliable;should pac's be added, changed or deleted. Contact users, manufacturers,etc. prepare and tyoinq of all correspondence-or replies of concurrence,nonconcurrence, recoimendations, etc.; filinQ of copies of all corres-pondence-in history files.

UNIT 9 ITEM REDUCTION STUDIES (IRS)

Includes any and all functions dealing with Item Reduction Studies origi-nated by VA or any other agency. Includes the proposed Item Reduction

*" Studies as well as the VA approved Item Reduction Study. This actioninvolves maintaining a Log-in and Log-out register; Reviewing MG tolocate items VA is using; reviewing DD-146, Index Card, 688's; process-ing transaction 481 code sheets; contact user, manufacturer and market---g; determining standarditem; prepare ad type correslondence regardingactlo n -esulting -frb research and review of items on IRS. Filiro, ofcopies of all corremondence oertainin2 to IRS. (Note: Establishuentof a new standard item not in LOG must be recorded under Unit 2A. Pre-paration and processing of messages, changing item status and sourcesetc. must be recorded under maintenance Unit 3.

Catalooers - Record time, as applicable

Clerks - Record time doing portion underlined

B

e. B- 80

Page 133: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

GENERAL SERVICES ADMINISTRATION STATUS

Following is an input form for the Employee/Organization Work Measurement

. System used by the GSA to monitor production in FCS-related work areas. This

was obtained from the Office of Personal Property; Office of Supply;

Cataloging Division (YSC); Crystal City, Virginia. The GSA has not specified

in narrative form the processes represented by its work measurement codes.

This document is used to collect data that may be used in work standards. The

Document Identifier Codes (DICs) and phrases adjacent to each code, can be

used to relate GSA tasks to FCS processes.

B

bB-,

Page 134: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

jI

Y

4

B-82

a~. ~ - - --- - - -

Page 135: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

GSA Work Measurement Data Collection Form

B-83

Page 136: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

B-84

Page 137: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

iri

a Col

.o t o -J w

#4)~V AS o -

imi

£ l~~O-r clU~ z * -

* ~ 89 b....... r

~ 2 ~ ~44+

Id adt 4 ~i~

:;~~4 41 H r-'~

4 c

a 00 0

-uI = -

tic 00 a- a*-

0 LO

E. o 3* J a

J -

GO 2 *j -

9L~ ~ CO0.-r

a It ILI o-O j -

>, go - - - -Cd -1 -1

~~ -4? e .)- t4 #

0r 0 Z q N . C.4 CJ &

0a 0 04d2W? o cc).c.

~ .-. B-85

Page 138: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

in

oa At

Ki..

%_-u

J

0* 44

I0 0

B6

6 a.

- 0- I

cic

It.

.44s0

51 v

.J.Jh-

r-C~- ao+ ol- 4W

Page 139: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

SECURITY CLASSIFICATION OF THIS PAGE ('ten Date Entered)REPORT DOCUMENTATION PAGE READ INSTRUCTIONS

BEFORE COMPLETING FORMI. REPORT NUMB3ER 2. 3. RECIPIENT'S CATALOG NUMBER

4. TITLE (aid Subtitle) 5. TYPE OF REPORT a PERIOD COVERED

A Framework to Evaluate Changes to the FederalCatalog System

6. PERFORMING ORG, REPORT NUMBER

LMI TASK DL2027. AUTHOR(s) 8. CONTRACT OR GRANT NUMBER()

Marilyn T. Welles MDA903-81-C-0166Dennis J. O'Connor

9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK

AREA & WORK UNIT NUMBERSLogistics Management Institute4701 Sangamore Road, P. 0. Box 9489Washington, D.C. 20016

11. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE

Defense Logistics Agency April 1983

Cameron Station 13. NUMBER OF PAGESAlexandria, Virginia 22314 140

14. MONITORING AGENCY NAME & ADDRESS(If different from Controlling Office) IS. SECURITY CLASS. (of this report)

UnclassifiedIS&. DECLASSIFICATION/DOWNGRADING

SCHEDULE

NIA" 16. DISTRIBUTION STATEMENT (of thi Report)

"A" Approved for public release; distribution unlimited

17. DISTRIBUTION STATEMENT (of the abstract entered In Block 20, If differer I from Report)

IS. SUPPLEMENTARY NOTES

19. KEY WORDS (Continu3 on reverse aide If r. sary and Identify by block number)

Federal Catalog System, )-fense Logistics Supply Center

20. ABSTRACT (Continue an reverse aide If neceeaey end identify by block ntmber)'The Defense Logistics Agency (DLA) has an ongoing need to choose amongproposed changes to the Federal Catalog System (FCS). A prototype frameworkfor evaluating changes by assigning labor, material and overhead costs tothe FCS processes is described. A methodology for integrating centraladministrative costs and "first-level" user costs estimate is presented.

SD 1 1473 EDITION OF INOV 65 IS OBSOLETE Unclassified

SECURITY CLASSIFICATION OF THIS PAGE (When Data Entered)

Page 140: MEEEMONEI mhEE~hhEEE~huse FCS products but have no direct contact with it -- the end-users. At the DLA/DLSC level, changes in costs due to proposed system changes appear to be entirely

0

- A

S

I...

I ~q*~~A

':4

S

-C - ~ ~,

0. ~ AA.jv

A N' '-~

* ~ I, r J~;A ?AA

A . I jA.~ A~I~'

'4 A) ~

0 , ~ I 4 ~At.

* 'I p ~ $

A,, .i

4 '~ A

A~ -~ I

)\~ ~T& A~ 4* 4,

.A~. A,

I ~

4L~Y~ ~ A

0i'.tii. /