Medley
Last updated 16/05/2011 11:12
General description
Perforation
Available only as non-perforated
Surface
Foil-covered with pre-impregnated decorative flecked (grey on white) paper.Tested for fade resistance according to EN 15187.
Edge
Edge AVisible grid
Sizes
600 x 600 x 9.5 mm
Weight
Tile weight:R: 8.1Transportation weight:R: 8.7Installed weight:R: 9.6
Technical properties
Acoustics
Regula: αw: 0.05; NRC: 0.05
Fire rating
Non-perforated: B-s1,d0
Light reflection
Regula: 77.7%
Air quality
Degazification: 10 daysParticulate discharge: low - less than 0.75 mg
Edge A, S24 Edge A, S15
Load bearing capacity
1 / A / No load2 / A / 30N2 / B / No load
Robustness
Able to withstand general handling during mounting and dismounting.Made of robust material with excellent pressure resistance.No decomposition of the material over time.Durable surface, non-susceptible to dirt.
Moisture resistance
Tested at 90% RH and 30°CThe product can withstand temperature conditions of up to 50°C
Hygiene
Dust removal by dry duster or vacuum cleanerRemoval of marks with a damp clothNormal cleaning practice and neutral cleaning solutions Excell hygiene certificate
1
1
2
12
MEDLEY - INSTALLATION GUIDE
Marking and wall angles• Markthelocationofthewallanglesonthewallsandcolumnsinrelationto
therequiredceilingheight.• Installthewallanglesatmax.300mmc/c.Choosethemethodofsecuring
theanglesinaccordancewiththefurringsystem.
Corners• Insidecorners(1):cutthecornerswithafalsemitreandlettheendsoverlap
eachother,unlessanythingtothecontraryisspecified.Finishwithacoverifnecessary.
• Outsidecorners(2):mustalwaysbemitredandfinishedwithacoverifnecessary.
Ceiling layout• Dividetheceilingsurfacefromthecentreoftheroomorinaccordancewith
theexistingceilingplans.• Thelocationoflightfittingsandventilationunitswillhaveaninfluenceon
ceilingdivision.• Installthefirstmainrunneratmax.600mmfromthewall.Theothermain
runnersshouldbeinstalledatmax.1200mmc/c.• Alsoseedistancesinfigure1.
Hangers• Installhangers.• Fixadjustablehangerswitheyescrewsorsimilar(1).• Tightenthefixedhangerstotheceilingandlockthemwithanail.(2)• Installthefirsthangeratmax.400mmfromthewall.Theotherhangers
shouldbeinstalledatmax.1200mmc/c.• Ifloadsfromlightfittings,etc.aretransferredtotheceiling,installadditional
hangers.• Alsoseedistancesinfigure1.
Fig. 1
2
installation• InstalltheelementsbytiltingthepanelsupbetweentheTprofiles.• Alwayswearcleancottongloveswhenhandlingceilingelements.
Cutting• Cuttheelementstosizefromthefrontwithafine-toothedsaw.
reinforCeMent around fittings• Dependingonthesizeofthepanel,unitsofupto3kgcanbeincorporated
intothepanelwithoutreinforcement.(SeeLoad-bearingcapacityatdanoline.com).
• AgypsumreinforcementpanelcanbeinstalledbehindtheMedleyelementinconnectionwithotherpanelsizes.
• Thereinforcementpanelmustextendallthewayintothemainrunnerssothattheweightistransferredtothem.
• Unitsweighingmorethan3kgmustbeinstalledindependently.
MEDLEY - INSTALLATION GUIDE
Cross profiles• Pushthesnap-intongueintotheslotonthemainrunnerusinglightdownward
pressure.• Ifthereisacrossprofileontheoppositesideofthesnap-intonguetobe
pushedintotheslot,thenewonemustbeontherightoftheonealreadyinplace.
• Ifthecrossprofiledoesnotcontinueintotheadjacentmodulethesnap-intonguemustbesplitandbentflat.
• Seedistancesinfigure1.
adjustMent• Checkthatallprofilesareatrightangleswhentheentiresuspensiongridhas
beeninstalled.• Adjustthehangerssothattheyaretightandtheceilingsurfaceislevel.
Main runners• Installthemainrunnersparalleltoeachothersothattheslotsareatright-
anglestoeachother.• Jointhemainrunnerslongitudinallyandlocktheminpositionbybendingthe
endcouplingsbackwards.• Adjustthelengthsoftheprofileswithplateshears,ahacksaworacross-cut
sawwithaspecialblade.• Makesurethereisahangerbetweentheendjointsofthemainrunnersand
thesprinklerheadopening.• Seedistancesinfigure1.
P A R T O F
TRANSPORT & STORAGE GUIDE
Prior to installation, Danoline ceiling and wall lining products must be stored clean and dry, between 0°C and 50°C, and with a relative humidty not exceeding 70% RH, and not subject to any abnormal conditions.
50° C70% RH
It is recommended when transporting and storing Danoline products that they must be: • positioned on a level base• stored indoors• protected from direct moisture• protected from impact and shock• opened carefully without damaging the products• stored at humidities of less than 70% RH• stored at temperatures of less than 50°C
When transporting Danoline products, it is recommended not to stack more than 2 pallets on top of each other.
When storing Danoline products, it is recommended not to stack more than 3 pallets on top of each other.
P A R T O F
[creating expressive ceilings]MEDLEY - MAINTENANCE GUIDE
DEMOUNTABLE CEILING TILE
SURFACE FINISHNon-perforated. Grey flecked foil finish.
UPKEEPDesigned for use under normal conditions, i.e. conditions should not exceed 70% RH and 25°C, e.g. in offices, institutions and similar premises.
In 600x600 format the tiles have been tested for resistance up to 90% RH at 30ºC and therefore can be used under more extreme conditions such as kitchens, laboratories and rooms with frequent and major changes in the temperature and air humidity.
Special purpose, anticorrosion treated suspension systems should be considered in areas of very high humidity. When handling Danoline products, it is recommended that cotton gloves are worn to avoid the occurrence of marks from fingerprints.
MAINTENANCEVacuum clean with a soft brush attachment to remove dust. Dirty surfaces should be wiped off with a damp cloth, using a mild detergent if necessary.
Damages and scratches are difficult to repair and therefore it is recommended to replace damaged tiles with new.
SUSPENSION OF LAMPS AND OTHER INSTALLATIONSLight objects up to a maximum of 3 kg can be suspended using appropriate fixings. Items over 3 kg must be suspended from the grid system, in which case additional hangers must be used.