6
1199 VILLAGE ROAD CARBONDALE, CO. 81623 MEDICAL OFFICE BUILDING INTERNATIONAL BUILDING CODE (IBC 2009) INTERNATIONAL PLUMBING CODE (IPC 2009) IBC GROUP B IBC TYPE V-B - ANY CONSTRUCTION PERMITTED BY IBC BUILDING CODES: OCCUPANCY: CONSTRUCTION TYPE: SPRINKLER SYSTEM: NFPA 72 - NATIONAL FIRE ALARM CODE NFPA 70 - NATIONAL ELECTRICAL CODE (NEC 2014) INTERNATIONAL MECHANICAL CODE (IMC 2009) NFPA 13 - INSTALLATION OF FIRE SPRINKLER SYSTEMS ALLOWED: PROVIDED: BUILDING AREA: ICC/ANSI A117.1-2003 ACCESSIBLE & USABLE BUILDINGS AMERICANS WITH DISABILITIES ACT (ADA) INTERNATIONAL FUEL GAS CODE (IFGC 2009) INTERNATIONAL ENERGY CONSERVATION CODE (IECC 2009) INTERNATIONAL FIRE CODE (IFC 2009) IBC TABLE 503 ALLOWS 9,000 SQUARE FEET TABULAR BASE AREA FOR B OCCUPANCY. BUILDING AREA MODIFICATIONS PERMITTED BY IBC SECTION 506 ARE APPLICABLE: AUTOMATIC FIRE SPRINKLER: 200% AREA INCREASE ALLOWED FRONTAGE INCREASE: 47.9% AREA INCREASE ALLOWED TOTAL ALLOWED AREA WITH INCREASES = 31,311 SF THE BUILDINGS WILL BE FULLY PROTECTED BY AN AUTOMATIC FIRE SPRINKLER SYSTEM MEETING NFPA 13. NOT REQUIRED BY IBC FOR B OCCUPANCY. PORTABLE FIRE EXTINGUISHERS: THE BUILDING WILL BE EQUIPPED WITH PORTABLE FIRE EXTINGUISHERS MEETING NFPA 10. REQUIRED BY IBC 906.1 FOR GROUP B FIRE ALARM SYSTEM: AUTOMATIC FIRE ALARM SYSTEM WITH OCCUPANT NOTIFICATION SYSTEM PROVIDED (NO MANUAL FIRE ALARM BOXES) & CONNECTED TO FIRE SPRINKLER SYSTEM PER NFPA 72 IBC SECTION 907.2.2 - EXCEPTION: MANUAL FIRE ALARM IS NOT REQUIRED FOR A BUILDING EQUIPPED WITH A FIRE SPRINKLER SYSTEM FOR B OCCUPANCY. BUILDING HEIGHT: 2 STORY PROVIDED. CURRENT BUILDING HEIGHT IS 31'-6" FROM GRADE TO HIGHEST PORTION OF THE ELEVATOR TOWER ROOF. IBC TABLE 503 ALLOWS 2 STORY AND 40 FEET PLUS AN INCREASE OF 1 STORY AND 20 FEET PER IBC 504.2 FOR A BUILDING EQUIPPED WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM. ROOF STRUCTURES: ROOF LINE IS LESS THAN 20 FEET ABOVE ALLOWABLE BUILDING HEIGHT. IBC 504.3 PERMITS COMBUSTIBLE ROOF STRUCTURES HEIGHTS OF UP TO 20 FEET ABOVE ALLOWABLE BUILDING HEIGHT. TYPE OF CONSTRUCTION: TYPE V-B IBC TABLE 601 NO FIRE-RESISTANT RATING REQUIRED FOR BUILDING ELEMENTS. EXTERIOR WALLS DO NOT HAVE TO BE FIRE-RATED IBC TABLE 602: WEST WALL: X>30 NO RATING REQUIRED EAST WALL: 10<X<30 NO RATING REQUIRED NORTH WALL: X>30 NO RATING REQUIRED SOUTH WALL: X>30 NO RATING REQUIRED EXTERIOR WALL FIRE-RESISTANT RATING BASED ON FIRE SEPARATION DISTANCE: IBC SECTION 705.8 EXCEPTION 2. BUILDINGS WHOSE EXTERIOR BEARING WALLS, EXTERIOR NONBEARING WALLS AND EXTERIOR PRIMARY STRUCTURAL FRAME ARE NOT REQUIRED TO BE FIRE-RESISTANCE RATED SHALL BE PERMITTED TO HAVE UNLIMITED UNPROTECTED OPENINGS. IBC TABLE 705.8 FOR UNPROTECTED OPENINGS IN A FULLY SPRINKLERED BUILDING: WEST WALL: 30 OR GREATER: NO LIMITS PORTION OF EAST WALL: 10 TO LESS THAN 15: 45% NORTH WALL: 30 OR GREATER: NO LIMITS SOUTH WALL: 30 OR GREATER: NO LIMITS MAXIMUM OPENINGS IN EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: FINISHES THROUGHOUT SHALL BE MIN. CLASS C EXCEPT IN EXIT ENCLOSURES & EXIT PASSAGEWAYS WHICH SHALL BE MIN. CLASS B PER IBC TABLE 803.9 INTERIOR FINISHES: EGRESS WIDTH: OCCUPANT LOAD ON FIRST FLOOR IS: OCCUPANT LOAD ON SECOND FLOOR IS: IBC 1005.1 THE MEANS OF EGRESS WIDTH SHALL NOT BE LESS THAN THE OCCUPANT LOAD SERVED BY THE MEANS OF EGRESS TIMES 0.2" (0.3" FOR STAIRWAYS) ACCESSIBLE MEANS OF EGRESS: IBC 1007.1 ONE ACCESSIBLE MEANS OF EGRESS IS REQUIRED IN NEW BUILDINGS WHERE ONLY ONE MEANS OF EGRESS IS REQUIRED. IBC 1014.3 - EXCEPTION 1. 100 FEET FOR GROUP B EQUIPPED WITH AN AUTOMATIC SPRINKLER SYSTEM. COMMON PATH OF EGRESS TRAVEL: IBC TABLE 1015.1 ONE EXIT OR EXIT ACCESS DOORWAY IS ALLOWED FROM B OCCUPANCY WHEN THEIR OCCUPANT LOAD IS 49 OR LESS. NUMBER OF EXITS: IBC TABLE 1016.1 - FOR BUILDING WITH SPRINKLER: 300 FEET ALLOWED FROM B OCCUPANCIES EXIT ACCESS TRAVEL DISTANCE: IBC TABLE 1018.2 - NOT LESS THAN 44" OR EXCEPTION 2 - 36" WHEN SERVING LESS THAN 50 OCCUPANTS. MINIMUM CORRIDOR WIDTH: PER TABLE 508.4 NO SEPARATION IS REQUIRED BETWEEN B OCCUPANCIES. GROUP B - BUSINESS AND OUTPATIENT CLINIC WHERE PATIENTS ARE NOT RENDERED INCAPABLE OF SELF PRESERVATION BY THE SERVICES PROVIDED. OCCUPANCY GROUP: CORRIDOR FIRE RESISTANCE RATING NOT REQUIRED WITH FIRE SPRINKLER SYSTEM FOR B OCCUPANCIES PER IBC TABLE 1018.1 CORRIDOR FIRE RESISTANCE: EXISTING GROSS BUILDING AREA FOR BUILDING IS 10,703 S.F. INTERNATIONAL GREEN CONSTRUCTION CODE (IGCC 2012) WITH TOWN OF CARBONDALE AMENDMENTS 10,703 SF TOTAL GROSS BUILDING AREA BUILDING AREA: THE OCCUPANT LOAD OF EACH FLOOR IS LESS THAN 49 AND ONE MEANS OF EGRESS IS REQUIRED. ONE ACCESSIBLE MEANS OF EGRESS IS PROVIDED. IBC 708.4 FIRE RESISTANCE RATING OF SHAFTS SHALL BE 1 HOUR WHERE CONNECTING LESS THAN FOUR STORIES. IBC 708.1 EXCEPTION 11: A SHAFT ENCLOSURE IS NOT REQUIRED FOR FLOOR OPENINGS CREATED BY UNENCLOSED STAIRS IN ACCORDANCE WITH EXCEPTION 3 OR 4 IN SECTION 1016.1 IBC 708.14.1 EXCEPTION 4: ENCLOSED ELEVATOR LOBBIES ARE NOT REQUIRED WHERE THE BUILDING IS EQUIPPED BY AN AUTOMATIC SPRINKLER SYSTEM PER NFPA 13. SHAFT ENCLOSURE: IBC 1016.1 EXCEPTION 3: 50% OF EXITS IS PERMITTED THROUGH UNENCLOSED EXIT ACCESS STAIRWAY WHEN CONNECTING A MAXIMUM OF TWO STORIES. EXIT THROUGH OPEN LOBBY: 2 EXITS ARE PROVIDED FROM EACH FLOOR SINCE THE UNENCLOSED EXIT ACCESS STAIRWAY IS USED IN THE LOBBY PER 1016.1 EXCEPTION 3. 2 EXITS ARE PROVIDED IBC 1022.1 STAIRWAY CONNECTING LESS THAN FOUR STORIES SHALL HAVE AN EXIT ENCLOSURE OF NOT LESS THAN 1 HOUR RATING. INTERIOR EXIT STAIRWAY: THE SECOND REAR EXIT STAIRWAY IS ENCLOSED IN A 1 HR RATED ENCLOSURE. THE ELEVATOR SHAFT AND REAR EXIT STAIR ARE ENCLOSED WITH A 1HR RATED ENCLOSURE. THE LOBBY STAIR IS EXEMPT FROM BEING ENCLOSED IN A FIRE RATED ENCLOSURE. THE LOBBY IS EXEMPT FROM BEING ENCLOSED IN A FIRE RATED ENCLOSURE. CORRIDORS PROVIDED ARE NOT LESS THAN 44" OCCUPANT LOAD: IBC TABLE 1004.1.1 BUSINESS AREA 100SF/OCCUPANT ACCESSORY,STORAGE& MECH. ROOMS 300SF/OCCUPANT OCCUPANT LOAD CALCULATION: 1ST FLOOR OFFICE SPACE: 4,778 / 100 = 48 OCCUPANTS 1ST FLOOR ACCESSORY SPACE: 693 / 300 = 3 OCCUPANTS 2ND FLOOR OFFICE SPACE: 4,012 / 100 = 41 OCCUPANTS 2ND FLOOR ACCESSORY SPACE: 1,121 / 300 = 4 OCCUPANTS TOTAL BUILDING OCCUPANT LOAD: 96 OCCUPANTS A ONE HOUR RATED SEPARATION IS PROVIDED BETWEEN THE FIRST AND SECOND FLOORS AND AT THE PERIMETER OF SUITE #4 ON THE SECOND FLOOR. IBC 1018.4 EXCEPTION #4 - IN GROUP B WITH AN AUTOMATIC SPRINKLER SYSTEM THE LENGTH OF THE DEAD END CORRIDOR SHALL NOT EXCEED 50 FEET. DEAD ENDS: NO DEAD END CORRIDOR EXCEEDS 50 FEET. THESE PLANS ARE INSTRUMENTS OF PROFESSIONAL SERVICE AND ARE PROTECTED BY COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS INCLUDING COPYRIGHT. THEY MAY NOT BE REPRODUCED OR USED FOR ANY PURPOSE WITHOUT THE WRITTEN CONSENT OF THE DESIGN PROFESSIONAL©2014

MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

1199

VIL

LAG

E R

OA

DC

AR

BO

ND

ALE

, CO

. 816

23

ME

DIC

AL

OFF

ICE

BU

ILD

ING

INTE

RN

ATI

ON

AL

BU

ILD

ING

CO

DE

(IB

C 2

009)

IN

TER

NA

TIO

NA

L P

LUM

BIN

G C

OD

E (I

PC

200

9)

IBC

GR

OU

P B

IBC

TY

PE

V-B

- A

NY

CO

NS

TRU

CTI

ON

PE

RM

ITTE

D B

Y IB

C

BU

ILD

ING

CO

DE

S:

OC

CU

PA

NC

Y:

CO

NS

TRU

CTI

ON

TY

PE

:

SP

RIN

KLE

R S

YS

TEM

:

NFP

A 7

2 - N

ATI

ON

AL

FIR

E A

LAR

M C

OD

EN

FPA

70

- NA

TIO

NA

L E

LEC

TRIC

AL

CO

DE

(NE

C 2

014)

INTE

RN

ATI

ON

AL

ME

CH

AN

ICA

L C

OD

E (I

MC

200

9)

NFP

A 1

3 - I

NS

TALL

ATI

ON

OF

FIR

E S

PR

INK

LER

SY

STE

MS

ALL

OW

ED

:P

RO

VID

ED

:

BU

ILD

ING

AR

EA

:

ICC

/AN

SI A

117.

1-20

03 A

CC

ES

SIB

LE &

US

AB

LE B

UIL

DIN

GS

AM

ER

ICA

NS

WIT

H D

ISA

BIL

ITIE

S A

CT

(AD

A)

INTE

RN

ATI

ON

AL

FUE

L G

AS

CO

DE

(IFG

C 2

009)

IN

TER

NA

TIO

NA

L E

NE

RG

Y C

ON

SE

RV

ATI

ON

CO

DE

(IE

CC

200

9)

INTE

RN

ATI

ON

AL

FIR

E C

OD

E (I

FC 2

009)

IBC

TA

BLE

503

ALL

OW

S 9

,000

SQ

UA

RE

FE

ET

TAB

ULA

R B

AS

E A

RE

AFO

R B

OC

CU

PA

NC

Y.

BU

ILD

ING

AR

EA

MO

DIF

ICA

TIO

NS

PE

RM

ITTE

DB

Y IB

C S

EC

TIO

N 5

06 A

RE

AP

PLI

CA

BLE

: AU

TOM

ATI

C F

IRE

SP

RIN

KLE

R:

200%

AR

EA

INC

RE

AS

E A

LLO

WE

DFR

ON

TAG

E IN

CR

EA

SE

:

47.9

% A

RE

A IN

CR

EA

SE

ALL

OW

ED

TOTA

L A

LLO

WED

AR

EA W

ITH

INC

REA

SES

= 31

,311

SF

THE

BU

ILD

ING

S W

ILL

BE

FU

LLY

PR

OTE

CTE

D B

Y A

NA

UTO

MA

TIC

FIR

E S

PR

INK

LER

SY

STE

M M

EE

TIN

G N

FPA

13.

NO

T R

EQ

UIR

ED

BY

IBC

FO

R B

OC

CU

PA

NC

Y.

PO

RTA

BLE

FIR

E E

XTI

NG

UIS

HE

RS

:TH

E B

UIL

DIN

G W

ILL

BE

EQ

UIP

PE

D W

ITH

PO

RTA

BLE

FIR

EE

XTI

NG

UIS

HE

RS

ME

ETI

NG

NFP

A 1

0.R

EQ

UIR

ED

BY

IBC

906

.1 F

OR

GR

OU

P B

FIR

E A

LAR

M S

YS

TEM

:A

UTO

MA

TIC

FIR

E A

LAR

M S

YS

TEM

WIT

H O

CC

UP

AN

TN

OTI

FIC

ATI

ON

SY

STE

M P

RO

VID

ED

(NO

MA

NU

AL

FIR

EA

LAR

M B

OX

ES

) & C

ON

NE

CTE

D T

O F

IRE

SP

RIN

KLE

RS

YS

TEM

PE

R N

FPA

72

IBC

SE

CTI

ON

907

.2.2

- E

XC

EP

TIO

N: M

AN

UA

L FI

RE

ALA

RM

ISN

OT

RE

QU

IRE

D F

OR

A B

UIL

DIN

G E

QU

IPP

ED

WIT

H A

FIR

ES

PR

INK

LER

SY

STE

M F

OR

B O

CC

UP

AN

CY

.

BU

ILD

ING

HE

IGH

T:2

STO

RY

PR

OV

IDE

D.

CU

RR

EN

T B

UIL

DIN

G H

EIG

HT

IS31

'-6" F

RO

M G

RA

DE

TO

HIG

HE

ST

PO

RTI

ON

OF

THE

ELE

VA

TOR

TO

WE

R R

OO

F.

IBC

TA

BLE

503

ALL

OW

S 2

STO

RY

AN

D 4

0 FE

ET

PLU

S A

NIN

CR

EA

SE

OF

1 S

TOR

Y A

ND

20

FEE

T P

ER

IBC

504

.2 F

OR

AB

UIL

DIN

G E

QU

IPP

ED

WIT

H A

N A

UTO

MA

TIC

FIR

E S

PR

INK

LER

SY

STE

M.

RO

OF

STR

UC

TUR

ES

:R

OO

F LI

NE

IS L

ES

S T

HA

N 2

0 FE

ET

AB

OV

E A

LLO

WA

BLE

BU

ILD

ING

HE

IGH

T.IB

C 5

04.3

PE

RM

ITS

CO

MB

US

TIB

LE R

OO

F S

TRU

CTU

RE

SH

EIG

HTS

OF

UP

TO

20

FEE

T A

BO

VE

ALL

OW

AB

LE B

UIL

DIN

GH

EIG

HT.

TYP

E O

F C

ON

STR

UC

TIO

N:

TYP

E V

-B

IB

C T

AB

LE 6

01 N

O F

IRE

-RE

SIS

TAN

T R

ATI

NG

RE

QU

IRE

D F

OR

BU

ILD

ING

ELE

ME

NTS

.

EX

TER

IOR

WA

LLS

DO

NO

T H

AV

E T

O B

E F

IRE

-RA

TED

IBC

TA

BLE

602

:W

ES

T W

ALL

: X

>30

NO

RA

TIN

G R

EQ

UIR

ED

EA

ST

WA

LL:

10<X

<30

NO

RA

TIN

G R

EQ

UIR

ED

NO

RTH

WA

LL: X

>30

NO

RA

TIN

G R

EQ

UIR

ED

SO

UTH

WA

LL: X

>30

NO

RA

TIN

G R

EQ

UIR

ED

EX

TER

IOR

WA

LL F

IRE

-RE

SIS

TAN

TR

ATI

NG

BA

SE

D O

N F

IRE

SE

PA

RA

TIO

ND

ISTA

NC

E:

IBC

SE

CTI

ON

705

.8 E

XC

EP

TIO

N 2

. BU

ILD

ING

S W

HO

SE

EX

TER

IOR

BE

AR

ING

WA

LLS

, EX

TER

IOR

NO

NB

EA

RIN

GW

ALL

S A

ND

EX

TER

IOR

PR

IMA

RY

STR

UC

TUR

AL

FRA

ME

AR

E N

OT

RE

QU

IRE

D T

O B

E F

IRE

-RE

SIS

TAN

CE

RA

TED

SH

ALL

BE

PE

RM

ITTE

D T

O H

AV

E U

NLI

MIT

ED

UN

PR

OTE

CTE

D O

PE

NIN

GS

.

IBC

TA

BLE

705

.8 F

OR

UN

PR

OTE

CTE

D O

PE

NIN

GS

IN A

FU

LLY

SP

RIN

KLE

RE

D B

UIL

DIN

G:

WE

ST

WA

LL:

30

OR

GR

EA

TER

: NO

LIM

ITS

PO

RTI

ON

OF

EA

ST

WA

LL:

10

TO L

ES

S T

HA

N 1

5: 4

5%N

OR

TH W

ALL

: 30

OR

GR

EA

TER

: NO

LIM

ITS

SO

UTH

WA

LL: 3

0 O

R G

RE

ATE

R: N

O L

IMIT

S

MA

XIM

UM

OP

EN

ING

S IN

EX

TER

IOR

WA

LLS

BA

SE

D O

N F

IRE

SE

PA

RA

TIO

ND

ISTA

NC

E:

FIN

ISH

ES

TH

RO

UG

HO

UT

SH

ALL

BE

MIN

. CLA

SS

C E

XC

EP

T IN

EX

IT E

NC

LOS

UR

ES

& E

XIT

PA

SS

AG

EW

AY

S W

HIC

H S

HA

LL B

EM

IN. C

LAS

S B

PE

R IB

C T

AB

LE 8

03.9

INTE

RIO

R F

INIS

HE

S:

EG

RE

SS

WID

TH:

OC

CU

PA

NT

LOA

D O

N F

IRS

T FL

OO

R IS

:O

CC

UP

AN

T LO

AD

ON

SE

CO

ND

FLO

OR

IS:

IBC

100

5.1

THE

ME

AN

S O

F E

GR

ES

S W

IDTH

SH

ALL

NO

T B

E L

ES

STH

AN

TH

E O

CC

UP

AN

T LO

AD

SE

RV

ED

BY

TH

E M

EA

NS

OF

EG

RE

SS

TIM

ES

0.2

" (0.

3" F

OR

STA

IRW

AY

S)

AC

CE

SS

IBLE

ME

AN

S O

F E

GR

ES

S:

IBC

100

7.1

ON

E A

CC

ES

SIB

LE M

EA

NS

OF

EG

RE

SS

IS R

EQ

UIR

ED

IN N

EW

BU

ILD

ING

S W

HE

RE

ON

LY O

NE

ME

AN

S O

F E

GR

ES

S IS

RE

QU

IRE

D.

IBC

101

4.3

- E

XC

EP

TIO

N 1

. 100

FE

ET

FOR

GR

OU

P B

EQ

UIP

PE

DW

ITH

AN

AU

TOM

ATI

C S

PR

INK

LER

SY

STE

M.

CO

MM

ON

PA

TH O

F E

GR

ES

STR

AV

EL:

IBC

TA

BLE

101

5.1

ON

E E

XIT

OR

EX

IT A

CC

ES

S D

OO

RW

AY

IS A

LLO

WE

D F

RO

M B

OC

CU

PA

NC

Y W

HE

N T

HE

IR O

CC

UP

AN

T LO

AD

IS 4

9 O

R L

ES

S.

NU

MB

ER

OF

EX

ITS

:

IBC

TA

BLE

101

6.1

- FO

R B

UIL

DIN

G W

ITH

SP

RIN

KLE

R:

300

FEE

T A

LLO

WE

D F

RO

M B

OC

CU

PA

NC

IES

EX

IT A

CC

ES

S T

RA

VE

L D

ISTA

NC

E:

IBC

TA

BLE

101

8.2

- N

OT

LES

S T

HA

N 4

4" O

R E

XC

EP

TIO

N 2

- 36

"W

HE

N S

ER

VIN

G L

ES

S T

HA

N 5

0 O

CC

UP

AN

TS.

MIN

IMU

M C

OR

RID

OR

WID

TH:

PE

R T

AB

LE 5

08.4

NO

SE

PA

RA

TIO

N IS

RE

QU

IRE

DB

ETW

EE

N B

OC

CU

PA

NC

IES

.G

RO

UP

B -

BU

SIN

ES

S A

ND

OU

TPA

TIE

NT

CLI

NIC

WH

ER

EP

ATI

EN

TS A

RE

NO

T R

EN

DE

RE

D IN

CA

PA

BLE

OF

SE

LFP

RE

SE

RV

ATI

ON

BY

TH

E S

ER

VIC

ES

PR

OV

IDE

D.

OC

CU

PA

NC

Y G

RO

UP

:

CO

RR

IDO

R F

IRE

RE

SIS

TAN

CE

RA

TIN

G N

OT

RE

QU

IRE

D W

ITH

FIR

E S

PR

INK

LER

SY

STE

M F

OR

B O

CC

UP

AN

CIE

S P

ER

IBC

TAB

LE 1

018.

1

CO

RR

IDO

R F

IRE

RE

SIS

TAN

CE

:

EX

ISTI

NG

GR

OS

S B

UIL

DIN

G A

RE

A F

OR

BU

ILD

ING

IS10

,703

S.F

.

INTE

RN

ATI

ON

AL

GR

EE

N C

ON

STR

UC

TIO

N C

OD

E (I

GC

C 2

012)

WIT

H T

OW

N O

F C

AR

BO

ND

ALE

AM

EN

DM

EN

TS

10,7

03 S

F TO

TAL

GR

OS

S B

UIL

DIN

G A

RE

AB

UIL

DIN

G A

RE

A:

THE

OC

CU

PA

NT

LOA

D O

F E

AC

H F

LOO

R IS

LE

SS

TH

AN

49

AN

D O

NE

ME

AN

S O

F E

GR

ES

S IS

RE

QU

IRE

D. O

NE

AC

CE

SS

IBLE

ME

AN

S O

F E

GR

ES

S IS

PR

OV

IDE

D.

IBC

708

.4 F

IRE

RE

SIS

TAN

CE

RA

TIN

G O

F S

HA

FTS

SH

ALL

BE

1H

OU

R W

HE

RE

CO

NN

EC

TIN

G L

ES

S T

HA

N F

OU

R S

TOR

IES

.

IBC

708

.1 E

XC

EP

TIO

N 1

1: A

SH

AFT

EN

CLO

SU

RE

IS N

OT

RE

QU

IRE

D F

OR

FLO

OR

OP

EN

ING

S C

RE

ATE

D B

Y U

NE

NC

LOS

ED

STA

IRS

IN A

CC

OR

DA

NC

E W

ITH

EX

CE

PTI

ON

3 O

R 4

IN S

EC

TIO

N10

16.1

IBC

708

.14.

1 E

XC

EP

TIO

N 4

: EN

CLO

SE

D E

LEV

ATO

R L

OB

BIE

SA

RE

NO

T R

EQ

UIR

ED

WH

ER

E T

HE

BU

ILD

ING

IS E

QU

IPP

ED

BY

AN

AU

TOM

ATI

C S

PR

INK

LER

SY

STE

M P

ER

NFP

A 1

3.

SH

AFT

EN

CLO

SU

RE

:

IBC

101

6.1

EX

CE

PTI

ON

3: 5

0% O

F E

XIT

S IS

PE

RM

ITTE

DTH

RO

UG

H U

NE

NC

LOS

ED

EX

IT A

CC

ES

S S

TAIR

WA

Y W

HE

NC

ON

NE

CTI

NG

A M

AX

IMU

M O

F TW

O S

TOR

IES

.

EX

IT T

HR

OU

GH

OP

EN

LO

BB

Y:

2 E

XIT

S A

RE

PR

OV

IDE

D F

RO

M E

AC

H F

LOO

R S

INC

E T

HE

UN

EN

CLO

SE

D E

XIT

AC

CE

SS

STA

IRW

AY

IS U

SE

D IN

TH

ELO

BB

Y P

ER

101

6.1

EX

CE

PTI

ON

3.

2 E

XIT

S A

RE

PR

OV

IDE

D

IBC

102

2.1

STA

IRW

AY

CO

NN

EC

TIN

G L

ES

S T

HA

N F

OU

RS

TOR

IES

SH

ALL

HA

VE

AN

EX

IT E

NC

LOS

UR

E O

F N

OT

LES

STH

AN

1 H

OU

R R

ATI

NG

.

INTE

RIO

R E

XIT

STA

IRW

AY

:TH

E S

EC

ON

D R

EA

R E

XIT

STA

IRW

AY

IS E

NC

LOS

ED

IN A

1 H

R R

ATE

D E

NC

LOS

UR

E.

THE

ELE

VA

TOR

SH

AFT

AN

D R

EA

R E

XIT

STA

IR A

RE

EN

CLO

SE

D W

ITH

A 1

HR

RA

TED

EN

CLO

SU

RE

.

THE

LO

BB

Y S

TAIR

IS E

XE

MP

T FR

OM

BE

ING

EN

CLO

SE

D IN

A F

IRE

RA

TED

EN

CLO

SU

RE

.

THE

LO

BB

Y IS

EX

EM

PT

FRO

M B

EIN

G E

NC

LOS

ED

IN A

FIR

E R

ATE

D E

NC

LOS

UR

E.

CO

RR

IDO

RS

PR

OV

IDE

D A

RE

NO

T LE

SS

TH

AN

44"

OC

CU

PA

NT

LOA

D:

IBC

TA

BLE

100

4.1.

1 B

US

INE

SS

AR

EA

100

SF/

OC

CU

PA

NT

AC

CE

SS

OR

Y,S

TOR

AG

E&

ME

CH

. RO

OM

S 3

00S

F/O

CC

UP

AN

TO

CC

UP

AN

T LO

AD

CA

LCU

LATI

ON

:1S

T FL

OO

R O

FFIC

E S

PA

CE

: 4,7

78 /

100

= 48

OC

CU

PA

NTS

1ST

FLO

OR

AC

CE

SS

OR

Y S

PA

CE

: 693

/ 30

0 =

3 O

CC

UP

AN

TS2N

D F

LOO

R O

FFIC

E S

PA

CE

: 4,0

12 /

100

= 41

OC

CU

PA

NTS

2ND

FLO

OR

AC

CE

SS

OR

Y S

PA

CE

: 1,1

21 /

300

= 4

OC

CU

PA

NTS

TOTA

L B

UIL

DIN

G O

CC

UP

AN

T LO

AD

: 96

OC

CU

PA

NTS

A O

NE

HO

UR

RA

TED

SE

PA

RA

TIO

N IS

PR

OV

IDE

DB

ETW

EE

N T

HE

FIR

ST

AN

D S

EC

ON

D F

LOO

RS

AN

D A

T TH

EP

ER

IME

TER

OF

SU

ITE

#4

ON

TH

E S

EC

ON

D F

LOO

R.

IBC

101

8.4

EX

CE

PTI

ON

#4

- IN

GR

OU

P B

WIT

H A

N A

UTO

MA

TIC

SP

RIN

KLE

R S

YS

TEM

TH

E L

EN

GTH

OF

THE

DE

AD

EN

DC

OR

RID

OR

SH

ALL

NO

T E

XC

EE

D 5

0 FE

ET.

DE

AD

EN

DS

:N

O D

EA

D E

ND

CO

RR

IDO

R E

XC

EE

DS

50

FEE

T.

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14

Page 2: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

PR

OJE

CT

SC

OP

E O

F W

OR

K

SIT

E S

AFE

TY N

OTE

S

WE

CE

RTI

FY T

HA

T TO

TH

E B

ES

T O

F O

UR

KN

OW

LED

GE

AN

D IN

FOR

MA

TIO

N, A

ND

IN A

CC

OR

DA

NC

E W

ITH

AC

CE

PTE

D P

RO

FES

SIO

NA

L S

TAN

DA

RD

S, W

E H

AV

E C

OM

PLI

ED

WIT

H A

PP

LIC

AB

LE G

OV

ER

NIN

G C

OD

ES

PE

RTA

ININ

G T

O B

UIL

DIN

G A

CC

ES

SIB

ILIT

Y F

OR

TH

E P

HY

SIC

ALL

Y H

AN

DIC

AP

PE

D A

ND

TH

E A

ME

RIC

AN

S W

ITH

DIS

AB

ILIT

IES

AC

T (A

DA

) TIT

LE II

I AC

CE

SS

IBIL

ITY

GU

IDE

LIN

ES

FO

R B

UIL

DIN

G A

ND

FA

CIL

ITIE

S.

IN T

HE

EV

EN

T O

F C

ON

FLIC

TS, E

XP

LAN

ATO

RY

NO

TES

IN T

HE

DR

AW

ING

S T

AK

E P

RE

CE

DE

NC

E O

VE

R G

RA

PH

ICIN

DIC

ATI

ON

S; L

AR

GE

-SC

ALE

DR

AW

ING

S A

ND

DE

TAIL

S T

AK

E P

RE

CE

DE

NC

E O

VE

R S

MA

LLE

R S

CA

LE D

RA

WIN

GS

,A

ND

FIG

UR

ED

DIM

EN

SIO

NS

TA

KE

PR

EC

ED

EN

CE

OV

ER

SC

ALE

D D

IME

NS

ION

S.

IF A

ND

TO

TH

E E

XTE

NT

OF

AN

Y IN

CO

NS

ISTE

NC

Y, A

MB

IGU

ITY

, DIS

CR

EP

AN

CY

, OR

ER

RO

R IN

TH

E C

ON

TRA

CT

DO

CU

ME

NTS

(RE

FER

RE

D T

O A

S "D

ISC

RE

PA

NC

Y" C

OLL

EC

TIV

ELY

IN T

HIS

PA

RA

GR

AP

H),

THE

CO

NTR

AC

TOR

SH

ALL

IMM

ED

IATE

LY S

EE

K C

LAR

IFIC

ATI

ON

TH

RO

UG

H T

HE

CO

NS

TRU

CTI

ON

MA

NA

GE

R W

HO

MA

Y IN

TU

RN

SE

EK

CLA

RIF

ICA

TIO

N F

RO

M T

HE

AR

CH

ITE

CT.

IN

INTE

RP

RE

TIN

G T

HE

CO

NTR

AC

T D

OC

UM

EN

TS, A

LL T

ER

MS

AN

DC

ON

DIT

ION

S S

HA

LL B

E H

AR

MO

NIZ

ED

AN

D E

FFE

CTU

ATE

D, A

ND

NO

NE

SH

ALL

BE

RE

ND

ER

ED

SU

PE

RFL

UO

US

OR

ME

AN

ING

LES

S.

IN T

HE

EV

EN

T O

F A

DIS

CR

EP

AN

CY

TH

AT

CA

NN

OT

BE

HA

RM

ON

IZE

D, T

HE

INTE

RP

RE

TATI

ON

TH

AT

IMP

OS

ES

TH

E M

OS

T S

TRIN

GE

NT

PE

RFO

RM

AN

CE

OB

LIG

ATI

ON

ON

TH

E C

ON

TRA

CTO

R S

HA

LL C

ON

TRO

L.

ALL

DIM

EN

SIO

NS

ON

CO

RE

AN

D S

HE

LL D

RA

WIN

GS

AR

E T

O T

HE

EX

TER

IOR

FA

CE

OF

FOU

ND

ATI

ON

WA

LL O

RS

TRU

CTU

RA

L G

RID

LIN

ES

U.N

.O.

INS

TALL

SE

ALA

NT

AT

EX

TER

IOR

SID

E O

F A

LL J

OIN

TS, S

EA

MS

, CO

NN

EC

TIO

NS

OR

OP

EN

ING

S A

S W

ELL

AS

SID

EW

ALK

S A

BU

TTIN

G T

O B

UIL

DIN

G, W

HIC

H W

OU

LD A

LLO

W W

ATE

R O

R A

IR IN

FILT

RA

TIO

N E

XC

EP

T A

S N

OTE

DO

THE

RW

ISE

. SE

ALA

NT

CO

LOR

TO

MA

TCH

AD

JAC

EN

T S

UR

FAC

E.

DO

OR

OP

EN

ING

S IN

FR

AM

E C

ON

STR

UC

TIO

N W

HIC

H A

RE

NO

T D

IME

NS

ION

ED

AR

E E

ITH

ER

CE

NTE

RE

D IN

TH

EW

ALL

OR

LO

CA

TED

4" F

RO

M T

HE

FA

CE

OF

STU

D T

O T

HE

FIN

ISH

ED

JA

MB

ON

TH

E H

ING

ED

SID

E.

ALL

SP

EC

IAL

AC

CE

SS

IBLE

FA

CIL

ITIE

S S

HA

LL B

E ID

EN

TIFI

ED

WIT

H A

PP

RO

VE

D S

IGN

AG

E.

THE

CO

NTR

AC

TOR

IS R

ES

PO

NS

IBLE

FO

R P

RO

DU

CIN

G A

WE

ATH

ER

TIG

HT

BU

ILD

ING

- - D

ETA

ILS

AN

D O

MIS

SIO

NS

TO D

RA

WIN

GS

NO

T W

ITH

STA

ND

ING

. A

LL D

RA

WIN

G C

ON

FLIC

TS W

HIC

H M

AY

NO

T A

LLO

W T

HIS

AR

E T

O B

EB

RO

UG

HT

TO T

HE

IMM

ED

IATE

ATT

EN

TIO

N O

F TH

E A

RC

HIT

EC

T A

ND

CO

NS

TRU

CTI

ON

MA

NA

GE

R.

DIS

CR

EP

AN

CIE

S B

ETW

EE

N A

CTU

AL

CO

ND

ITIO

NS

AN

D P

LAN

S S

HA

LL B

E B

RO

UG

HT

TO T

HE

IMM

ED

IATE

ATT

EN

TIO

N O

F TH

E A

RC

HIT

EC

T A

ND

CO

NS

TRU

CTI

ON

MA

NA

GE

R.

ALL

FLO

OR

S W

ITH

DR

AIN

S A

RE

SLO

PE

D A

MIN

IMU

M O

F 1/

8" P

ER

FO

OT

TO D

RA

IN U

NLE

SS

NO

TED

OTH

ER

WIS

E.

LOC

ATI

ON

OF

EX

ISTI

NG

UTI

LITI

ES

AR

E S

HO

WN

TO

TH

E B

ES

T O

F O

UR

KN

OW

LED

GE

. CO

NTR

AC

TOR

SH

ALL

HA

VE

THE

RE

SP

ON

SIB

ILIT

Y O

F V

ER

IFY

ING

IN T

HE

FIE

LD B

EFO

RE

CO

NS

TRU

CTI

ON

STA

RTS

, AN

D C

OO

RD

INA

TIN

G A

LLN

EW

UTI

LITY

LO

CA

TIO

NS

, CO

NN

EC

TIO

NS

, AN

D P

EN

ETR

ATI

ON

S.

ALL

RE

QU

IRE

D E

XIT

S S

HA

LL B

E O

PE

RA

BLE

FR

OM

TH

E IN

SID

E W

ITH

OU

T S

PE

CIA

L K

NO

WLE

DG

E O

R T

HE

US

E O

F A

KE

Y.

PR

OV

IDE

BLO

CK

ING

AS

RE

QU

IRE

D &

CA

LLE

D O

UT

ON

PLA

NS

TO

SE

CU

RE

LY A

NC

HO

R A

LL W

ALL

MO

UN

TED

EQ

UIP

ME

NT

(E.G

., C

AB

INE

TS, T

OIL

ET

RO

OM

, AC

CE

SS

OR

IES

, HA

RD

WA

RE

, ETC

.) B

LOC

KIN

G S

HA

LL P

RO

VID

E A

RIG

ID C

ON

NE

CTI

ON

CA

PA

BLE

OF

SU

PP

OR

TIN

G L

OA

DS

AS

DE

TER

MIN

ED

BY

MA

NU

FAC

TUR

ER

. PR

OV

IDE

SO

LID

BLO

CK

ING

SE

CU

RE

D T

O 2

MA

IN W

ALL

STU

DS

TO

SE

CU

RE

LY S

UP

PO

RT

ALL

WA

LL S

TOP

S (D

OO

R B

UM

PE

R).

THE

GE

NE

RA

L C

ON

TRA

CTO

R S

HA

LL V

ER

IFY

AN

D C

OO

RD

INA

TE W

ITH

ALL

TR

AD

ES

, SIZ

ES

AN

D L

OC

ATI

ON

S O

F A

LLO

PE

NIN

GS

ME

CH

AN

ICA

L &

ELE

CTR

ICA

L E

QU

IPM

EN

T, E

QU

IPM

EN

T P

AD

S O

R B

AS

ES

, AS

WE

LL A

S P

OW

ER

, WA

TER

,A

ND

DR

AIN

INS

TALL

ATI

ON

S, B

EFO

RE

PR

OC

EE

DIN

G W

ITH

WO

RK

. AN

Y C

ON

CE

RN

S O

R S

TRU

CTU

RA

L C

ON

FLIC

TS,

SH

ALL

BE

BR

OU

GH

T TO

TH

E A

TTE

NTI

ON

OF

THE

AR

CH

ITE

CT.

ALL

FLO

OR

OR

WA

LL O

PE

NIN

GS

RE

QU

IRE

D F

OR

PIP

ES

, DU

CTS

, CO

ND

UIT

S, E

TC. S

HA

LL B

E S

EA

LED

IN A

NA

PP

RO

VE

D M

AN

NE

R.

STR

UC

TUR

AL

NO

TES

GO

VE

RN

TY

PIC

AL

CO

ND

ITIO

NS

WH

ETH

ER

OR

NO

T S

PE

CIF

ICA

LLY

DE

TAIL

ED

OR

NO

TED

.

CO

NTR

OL

JOIN

TS S

HA

LL B

E P

RO

VID

ED

IN C

ON

CR

ETE

FLO

OR

SLA

BS

AN

D M

AS

ON

RY

WA

LLS

WH

ETH

ER

OR

NO

TS

PE

CIF

ICA

LLY

RE

FER

EN

CE

D O

N P

LAN

S. T

HE

MA

XIM

UM

AR

EA

PE

RM

ITTE

D B

ETW

EE

N J

OIN

TS S

HA

LL B

E 4

00S

QU

AR

E F

EE

T FO

R R

EIN

FOR

CE

D C

ON

CR

ETE

SLA

BS

, 250

SQ

UA

RE

FE

ET

FOR

NO

N-R

EIN

FOR

CE

D S

LAB

S A

ND

400

SQ

UA

RE

FE

ET

FOR

MA

SO

NR

Y U

NLE

SS

SH

OW

N O

THE

RW

ISE

.

ALL

FIR

E S

PR

INK

LER

, ELE

CTR

ICA

L, M

EC

HA

NIC

AL

AN

D P

LUM

BIN

G W

OR

K S

HA

LL B

E C

ON

CE

ALE

D F

RO

M V

IEW

EX

CE

PT

WH

ER

E E

XP

OS

ED

TO

STR

UC

TUR

E. L

OC

ATE

PIP

ING

AN

D S

UP

PO

RTS

IN A

NE

AT

AN

D C

ON

SIS

TEN

TM

AN

NE

R.

IT IS

TH

E C

ON

TRA

CTO

RS

RE

SP

ON

SIB

ILIT

Y T

O F

OLL

OW

DR

AW

ING

S F

OR

LO

CA

TIO

N O

F E

LEC

TRIC

AL

RE

CE

PTA

CLE

S O

R S

WIT

CH

ES

TO

AV

OID

CA

SE

WO

RK

, DO

OR

S, E

TC.

PR

OV

IDE

FIR

E E

XTI

NG

UIS

HE

RS

IN T

YP

E, S

IZE

, QU

AN

TITY

AN

D L

OC

ATI

ON

S A

S R

EQ

UIR

ED

BY

TH

E B

UIL

DIN

G A

ND

FIR

E D

EP

AR

TME

NTS

.

CO

NTR

AC

TOR

TO

PR

OV

IDE

ALL

LA

BO

R &

EQ

UIP

ME

NT

TO P

ER

FOR

M T

HE

WO

RK

IND

ICA

TED

ON

TH

ES

E D

RA

WIN

GS

.P

ER

MIT

S W

ILL

BE

PR

OV

IDE

D B

Y T

HE

OW

NE

R.

CO

NTR

AC

TOR

SH

ALL

VIS

IT T

HE

SIT

E F

OR

VE

RIF

ICA

TIO

N O

F A

LLC

ON

DIT

ION

S T

HA

T M

AY

AFF

EC

T TH

E P

RO

JEC

T, P

RIO

R T

O T

HE

STA

RT

OF

CO

NS

TRU

CTI

ON

.

ALL

EX

CA

VA

TIO

N A

ND

BA

CK

FILL

SH

ALL

FO

LLO

W A

LL G

EO

TEC

HN

ICA

L (S

OIL

S) R

EP

OR

TS R

EC

OM

ME

ND

ATI

ON

S.

GE

NE

RA

L C

ON

TRA

CTO

R IS

RE

SP

ON

SIB

LE F

OR

AN

Y D

AM

AG

E (A

BO

VE

OR

BE

LOW

GR

AD

E) T

O T

HIS

FA

CIL

ITY

,D

UR

ING

CO

NS

TRU

CTI

ON

.

GE

NE

RA

L C

ON

TRA

CTO

R T

O W

AR

RA

NTY

ALL

WO

RK

AS

OU

TLIN

ED

IN T

HE

RE

QU

ES

T FO

R P

RO

PO

SA

L (R

FP)

THE

SE

PLA

NS

AR

E S

CH

EM

ATI

C O

NLY

. GE

NE

RA

L S

CO

PE

IS D

EFI

NE

D. H

OW

EV

ER

, TH

E O

WN

ER

RE

SE

RV

ES

TH

ER

IGH

T TO

ALT

ER

OR

EX

PA

ND

TH

E S

CO

PE

OF

WO

RK

.

ALL

WO

RK

TO

BE

IN A

CC

OR

DA

NC

E W

ITH

ALL

AP

PLI

CA

BLE

CO

DE

S,

AN

D P

ER

ALL

LO

CA

L R

EQ

UIR

EM

EN

TS.

SIG

NA

GE

CO

NTR

AC

TOR

IS R

ES

PO

NS

IBLE

FO

R P

RO

VID

ING

SH

OP

DR

AW

ING

S T

O O

WN

ER

AN

D C

ITY

AG

EN

CIE

S,

FOR

AP

PR

OV

AL

PR

IOR

TO

FA

BR

ICA

TIO

N A

ND

INS

TALL

ATI

ON

.

GE

NE

RA

L C

ON

TRA

CTO

R T

O P

RO

VID

E T

EM

PO

RA

RY

ON

-SIT

E R

ES

TRO

OM

FA

CIL

ITIE

S D

UR

ING

ALL

CO

NS

TRU

CTI

ON

PH

AS

ES

.

GE

NE

RA

L C

ON

TRA

CTO

R S

HA

LL B

E R

ES

PO

NS

IBLE

FO

R C

OO

RD

INA

TIO

N O

F A

LL T

AS

KS

AN

D IT

EM

S R

EQ

UIR

ED

WIT

HIN

TH

E E

NTI

RE

CO

NS

TRU

CTI

ON

DO

CU

ME

NT

PA

CK

AG

E F

OR

ALL

TR

AD

ES

.

CO

NTR

AC

TOR

SH

ALL

FO

LLO

W R

EQ

UIR

EM

EN

TS O

UTL

INE

D IN

TH

E C

ON

TRA

CTO

R B

ID P

AC

KA

GE

.

WH

EN

TH

E C

ON

TRA

CTO

R B

ELI

EV

ES

TH

AT

ALL

CO

NTR

AC

TUA

L W

OR

K O

N T

HIS

PR

OJE

CT

IS C

OM

PLE

TED

, TH

EY

SH

ALL

NO

TIFY

TH

E A

RC

HIT

EC

T A

ND

CO

NS

TRIC

TIO

N M

AN

AG

ER

(CM

) IN

WR

ITIN

G.

THE

AR

CH

ITE

CT

AN

D C

M S

HA

LLR

ES

PO

ND

PR

OM

PTL

Y W

ITH

AC

CE

PTA

NC

E, O

R A

SP

EC

IFIC

LIS

TIN

G O

F D

EFI

CIE

NC

IES

. CO

NTR

AC

TUA

L W

OR

KS

HA

LL B

E D

EE

ME

D C

OM

PLE

TE T

O A

DE

GR

EE

SU

FFIC

IEN

T TO

PE

RM

IT T

HE

OP

ER

ATO

R T

O C

OM

ME

NC

E IN

ITIA

LO

PE

RA

TIO

N. T

HE

CO

NTR

AC

TOR

SH

ALL

INC

LUD

E IS

SU

AN

CE

TO

TH

E A

RC

HIT

EC

T A

ND

CM

BY

TH

E C

ITY

A V

ALI

D"C

ER

TIFI

CA

TE O

F O

CC

UP

AN

CY

" TO

SU

BS

TAN

TIA

TE P

RO

JEC

T C

OM

PLE

TIO

N.

AT

THE

BE

GIN

NIN

G O

F TH

E P

RO

JEC

T, T

HE

GE

NE

RA

L C

ON

TRA

CTO

R S

HA

LL S

UB

MIT

A C

OM

PLE

TE L

IST

OF

RE

QU

IRE

D "C

ITY

AG

EN

CY

" BU

ILD

ING

PE

RM

IT IN

SP

EC

TIO

NS

PE

R R

EC

EIV

ED

PE

RM

ITS

AN

D S

PE

CIF

IC P

RO

JEC

TS

CO

PE

OF

WO

RK

.

THE

CO

NTR

AC

TOR

SH

ALL

IDE

NTI

FY A

T TH

E T

IME

OF

BID

, AN

Y O

F TH

E IT

EM

S IN

CLU

DE

D IN

TH

IS P

RO

JEC

TR

EQ

UIR

ING

A "S

PE

CIA

L O

RD

ER

", E

XTE

ND

ED

LE

AD

-TIM

E O

R S

PE

CIA

L D

OC

UM

EN

TATI

ON

WIT

H D

RA

WIN

GS

TO

CO

MP

LETE

TH

E A

TTA

CH

ED

SC

OP

E O

F W

OR

K.

AD

EQ

UA

TE T

IME

SH

ALL

BE

GIV

EN

TO

TH

E A

RC

HIT

EC

T TO

RE

VIE

W A

LL S

HO

P D

RA

WIN

GS

AN

D S

UB

MIT

TALS

.

IT S

HA

LL B

E T

HE

RE

SP

ON

SIB

ILIT

Y O

F E

AC

H S

UB

CO

NTR

AC

TOR

INV

OLV

ED

IN T

HIS

PR

OJE

CT,

RE

QU

IRIN

G A

NY

TYP

E O

F FI

ELD

INS

PE

CTI

ON

S D

UR

ING

AN

Y P

AR

T O

F TH

E C

ON

STR

UC

TIO

N P

RO

CE

SS

, TO

BE

PR

ES

EN

T O

N T

HE

CO

NS

TRU

CTI

ON

SIT

E A

T TH

E T

IME

OF

INS

PE

CTI

ON

TO

PR

OV

IDE

DIR

EC

T R

ES

PO

NS

E T

O Q

UE

STI

ON

S A

ND

CO

MM

EN

TS O

F TH

E F

IELD

INS

PE

CTO

R. T

HIS

INC

LUD

ES

BU

T IS

NO

T LI

MIT

ED

TO

ELE

CTR

ICA

L, P

LUM

BIN

G,

ME

CH

AN

ICA

L, S

TRU

CTU

RA

L S

TEE

L, C

ON

CR

ETE

, AS

WE

LL A

S A

NY

AD

DIT

ION

AL

ITE

MS

IND

ICA

TED

BY

TH

EG

EN

ER

AL

CO

NTR

AC

TOR

.

PR

OJE

CT

GE

NE

RA

L N

OTE

S

STD

. MA

TER

IAL

IND

ICA

TIO

NS

STD

. RE

FER

EN

CE

SY

MB

OLS

NO

RTH

THE

GE

NE

RA

L C

ON

TRA

CTO

R IS

RE

SP

ON

SIB

LE T

O M

AIN

TAIN

A D

AIL

Y "O

N-S

ITE

" SA

FETY

LO

G B

OO

K A

S W

ELL

AS

THE

"SIT

E S

AFE

TY P

LAN

"

THE

GE

NE

RA

L C

ON

TRA

CTO

R IS

RE

SP

ON

SIB

LE F

OR

ALL

SA

FETY

AC

TIV

ITIE

S R

EQ

UIR

ED

DA

Y-T

O-D

AY

AN

D S

HA

LLB

E R

ES

PO

NS

IBLE

TO

MA

INTA

IN A

ND

PR

OV

IDE

SA

FE W

OR

KIN

G C

ON

DIT

ION

S F

OR

ALL

OW

NE

R E

MP

LOY

EE

S,

SU

BC

ON

TRA

CTO

R'S

EM

PLO

YE

ES

, VE

ND

OR

S, A

S W

ELL

AS

HIS

OR

HE

R O

WN

EM

PLO

YE

ES

.

AN

Y N

OTI

CE

AB

LE S

AFE

TY V

IOLA

TIO

N S

HA

LL B

E R

EC

OR

DE

D IN

TH

E D

AIL

Y "S

AFE

TY L

OG

" BY

TH

E G

EN

ER

AL

CO

NTR

AC

TOR

.

GE

NE

RA

L C

ON

TRA

CTO

R IS

RE

QU

IRE

D T

O C

OM

PLY

WIT

H A

ND

EN

FOR

CE

ALL

O.S

.H.A

. AN

D O

THE

R R

EC

OG

NIZ

ED

SA

FETY

PR

AC

TIC

E G

UID

ELI

NE

S.

GE

NE

RA

L C

ON

TRA

CTO

R IS

RE

SP

ON

SIB

LE T

O P

RO

VID

E A

DD

ITIO

NA

L O

N-S

ITE

HA

RD

-HA

TS A

T A

LL T

IME

S.

K.

LC

UU.N

.O.

U.B

.C.

UN

FIN

.U

.L.

U.G

.T.

U.G

.E.

UP

PE

RU

NLE

SS

NO

TED

OTH

ER

WIS

EU

NIF

OR

M B

UIL

DIN

G C

OD

EU

NFI

NIS

HE

DU

ND

ER

WR

ITE

RS

LA

BO

RA

TOR

IES

UN

DE

RG

RO

UN

D T

ELE

PH

ON

EU

ND

ER

GR

OU

ND

ELE

CTR

ICA

L

V.F

.V

.C.T

.V

ES

T.

V.I.

F.

WD

.W

/OW

/W

.GL.

WTH

.W

.F.

W.

W.W

.M.

WT.

WP

.W

.C.

WS

CT.

WO

OD

WIT

HO

UT

WIT

HW

IRE

GLA

SS

WID

THW

IDE

FLA

NG

EW

ES

TW

ELD

ED

WIR

E M

ES

HW

EIG

HT

WA

TER

PR

OO

FIN

G, W

EA

THE

RP

RO

OF

WA

TER

CLO

SE

TW

AIN

SC

OT

VIN

YL

FAB

RIC

VIN

YL

CO

MP

OS

ITE

TIL

EV

ES

TIB

ULE

VE

RIF

Y IN

FIE

LD

TYP

.TR

.D.

T.O

.W.

T.O

.S.

T.O

.M.

T.O

.F.

T.O

.D.

T.O

.C.

T.O

.B.

T.&

B.

T.&

G.

T.P

.D.

TOIL

., TL

TTH

K.

THE

RM

O.

TER

.

TYP

ICA

LTR

EN

CH

DR

AIN

TOP

OF

WA

LLTO

P O

F S

TEE

LTO

P O

F M

AS

ON

RY

TOP

OF

FOO

TIN

GTO

P O

F D

EC

KTO

P O

F C

UR

BTO

P O

F B

EA

MTO

P A

ND

BO

TTO

MTO

NG

UE

AN

D G

RO

OV

ETO

ILE

T P

AP

ER

DIS

PE

NS

ER

TOIL

ET

THIC

K, T

HIC

KN

ES

STH

ER

MO

STA

TTE

RR

AZZ

O

DW

G.

DW

R.

DR

.D

.S.

DN

.D

WL.

HO

T W

ATE

RH

OR

IZO

NTA

LH

OS

E B

IBB

H.W

.H

OR

IZ.

H.B

.

RU

ST.

RU

B.

R.O

.R

M.

RFG

.R

.S.

R.D

.L.

R.D

.

RE

T.R

.O.W

.

RE

SIL

.R

EQ

'D.,

RE

QR

LF.

RE

INF.

RE

G.

RE

FR.

RW

D.

R.F

.D.

RC

PT

RU

STI

CA

TIO

NR

UB

BE

RR

OU

GH

OP

EN

ING

RO

OM

RO

OFI

NG

RO

OF

SC

UP

PE

RR

OO

F D

RA

IN L

EA

DE

RR

OO

F D

RA

IN

RE

TUR

NR

IGH

T O

F W

AY

RE

SIL

IEN

TR

EQ

UIR

ED

RE

LIE

FR

EIN

FOR

CE

, RE

INFO

RC

ING

RE

GIS

TER

RE

FER

, RE

FER

EN

CE

RE

DW

OO

D

RE

CE

SS

ED

FLO

OR

DR

AIN

RE

CE

PTA

CLE

KD

.K

IT.

JOIS

T B

EA

RIN

GJO

IST

JOIN

TJA

NIT

OR

KN

OC

K D

OW

NK

ITC

HE

NK

IP =

1,0

00 L

B. F

OR

CE

LOU

VE

RLO

CK

ER

LOC

ATE

, LO

CA

TIO

N

LIG

HT

LEN

GTH

LAV

ATO

RY

LAM

INA

TELA

BO

RA

TOR

Y

EX

T.E

XP

O.

E.J

.E

XP

.E

XIS

T.E

XH

.E

XC

.E

QU

IV.

EQ

UIP

.E

Q.

EN

T.E

NG

R.

EN

CL.

EM

ER

.E

L.E

LEV

.E

.W.C

.E

LEC

.E

.E

.W.

E.F

.E

A.

LVR

.LK

R.

LOC

.

LT.

LGTH

.LA

V.

LAM

.LA

B.

JST.

BR

G.

JST.

JT.

JAN

.

INT.

INS

UL.

I.F.

I.D.

I.M.H

.

IN.

ILLU

M.

INTE

RIO

RIN

SU

LATI

ON

INS

IDE

FA

CE

INS

IDE

DIA

ME

TER

(DIM

EN

SIO

N)

INLE

T M

AN

HO

LE

INC

HIL

LUM

INA

TIO

N

PR

OP

ER

TY L

INE

PR

OP

ER

TY

PR

EFA

BR

ICA

TED

PR

EC

AS

TP

OW

ER

PO

LEP

OU

ND

S P

ER

SQ

UA

RE

INC

HP

OU

ND

S P

ER

SQ

UA

RE

FO

OT

PO

UN

DP

OR

TLA

ND

CE

ME

NT

PO

LYV

INY

L C

HLO

RID

EP

OIN

TP

LYW

OO

D

P.L

.P

RO

P.

PR

EFA

B.

PR

CS

T.P

.P.

P.S

.I.P

.S.F

.LB

.P

.C.

PV

C.

PT.

PLY

WD

.

T.V

.TE

L.T.

BD

.

TELE

VIS

ION

TELE

PH

ON

ETA

CK

BO

AR

D

NU

MB

ER

NO

T TO

SC

ALE

NO

T IN

CO

NTR

AC

TN

OR

THW

ES

TN

OR

THE

AS

TN

OR

THN

OM

INA

L

H.M

.F.

H.M

.H

.C.

HT.

HD

.WD

.H

DW

R.

PLU

MB

ING

PLA

TELAM

INA

TEP

LAS

TIC

PLA

STE

RP

EN

NY

PA

RTI

TIO

N

PA

NE

LP

AIR

PA

INT,

PA

INTE

D

OV

ER

HE

AD

OU

TSID

E F

AC

E

(DIM

EN

SIO

N)

OU

TSID

E D

IAM

ETE

R,

OU

NC

E

OP

PO

SIT

E

OP

EN

ING

ON

CE

NTE

RO

FFIC

EO

BS

CU

RE

GW

BG

YP

.BD

.G

YP

.G

ND

.G

.BM

.G

R.

G.B

.G

L.

GE

N.

GA

.G

.I.G

ALV

.G

AL.

NO

. OR

#N

.T.S

.

N.I.

C.

N.W

.N

.E.

N.

NO

M.

PLB

G.

PL.

P.L

AM

.P

LAS

.P

.P

TN.

PN

L.P

R.

PN

T, P

TD.

O.H

.O

.F.

O.D

.O

Z.

OP

P.

OP

NG

.O

.C.

OFF

.O

BS

.

FUT.

FUR

R.,

FUR

FUR

N.

F.S

.FD

N.

FTG

.FL

UO

R.

F.L.

F.D

.FL

R.

FLA

SH

.FI

XT.

F.S

TP.

F.H

.F.

H.C

.

F.E

.C.

F.E

.F.

DP

R.

F.F.

FIN

.FT

.F.F.

O.W

.F.

O.S

.F.

O.F

.F.

O.C

.FA

B.

SY

M.

SU

SP

.S

UR

F.S

PT.

SU

P.

S.C

.T.

STR

UC

T.S

T.S

.S

TIR

.S

TL.

STA

.S

TD.

S.S

.S

.F.

SQ

.S

PR

.S

P.G

R.

SP

.BLK

.S

PE

CS

.S

.W.

S.B

.C.

S.E

.S

.T.C

.S

.S

.C.

S.D

.S

IM.

SH

.B.

SH

LVS

., S

SH

F.S

HT.

SH

THG

.S

.SK

.S

EC

T.S

CH

ED

.S

A.S

.S

.N.D

.S

AN

.S

.B.

S.R

.

SY

MM

ETR

ICA

LS

US

PE

ND

SU

RFA

CE

SU

PP

OR

TS

UP

PLY

STR

UC

TUR

AL

CLA

Y T

ILE

STR

UC

TUR

AL

STO

RM

SE

WE

RS

TIR

RU

PS

TEE

LS

TATI

ON

STA

ND

AR

DS

TAIN

LES

S S

TEE

LS

QU

AR

E F

EE

TS

QU

AR

ES

PR

INK

LER

SP

LAS

H G

RA

TES

PLA

SH

BLO

CK

SP

EC

IFIC

ATI

ON

SS

OU

THW

ES

TS

OU

THE

RN

BU

ILD

ING

CO

DE

SO

UTH

EA

ST

SO

UN

D T

RA

NS

MIS

SIO

N C

LAS

SS

OU

THS

OLI

D C

OR

ES

OA

P D

ISP

EN

SE

RS

IMIL

AR

SH

OW

ER

BE

NC

HS

HE

LVE

S, S

HE

LVIN

GS

HE

LFS

HE

ET

SH

EA

THIN

GS

ER

VIC

E S

INK

SE

CTI

ON

SC

HE

DU

LES

AN

ITA

RY

SE

WE

RS

AN

ITA

RY

NA

PK

IN D

ISP

EN

SE

RS

AN

ITA

RY

SA

ND

BLA

ST

SA

G R

OD

MU

L.M

TD.

MIS

C.

MIN

.M

M.

M.

M.T

.P.

M.S

.C.

MTL

.M

EM

B.

ME

M.

ME

CH

.M

AX

.M

.O.

MA

S.

MFR

.M

.H.

MU

LLIO

NM

OU

NTE

DM

ISC

ELL

AN

EO

US

MIN

IMU

MM

ILLI

ME

TER

ME

TER

PA

RTI

TIO

NM

ETA

L TO

ILE

T

CO

MP

AR

TME

NT

ME

TAL

SH

OW

ER

ME

TAL

ME

MB

RA

NE

ME

MB

ER

ME

CH

AN

ICA

LM

AX

IMU

MM

AS

ON

RY

OP

EN

ING

MA

SO

NR

YM

AN

UFA

CTU

RE

RM

AN

HO

LE

DR

AW

ING

DR

AW

ER

DR

AIN

DO

WN

SP

OU

TD

OW

ND

OW

EL

EX

TER

IOR

EX

PO

SE

DE

XP

AN

SIO

N J

OIN

TE

XP

AN

SIO

NE

XIS

TIN

GE

XH

AU

ST

EX

CA

VA

TEE

QU

IVA

LEN

TE

QU

IPM

EN

TE

QU

AL

EN

TRA

NC

E, E

NTE

RE

NG

INE

ER

EN

CLO

SE

, EN

CLO

SU

RE

EM

ER

GE

NC

YE

LEV

ATO

RE

LEV

ATI

ON

ELE

CTR

IC W

ATE

R C

OO

LER

ELE

CTR

ICE

AS

TE

AC

H W

AY

EA

CH

FA

CE

EA

CH

B.O

.C.A

BLD

G.

B.L

.B

R.

BR

KT.

B.O

.C.

BO

T.B

.S.

BD

.B

LKG

.B

LK.

BIT

UM

.B

EV

.B

TWN

.B

.M.

BM

.B

SM

T.

C

ON

GR

ES

S O

F A

ME

RIC

AB

UIL

DIN

G O

FFIC

IALS

BU

ILD

ING

BR

ICK

LE

DG

EB

RIC

KB

RA

CK

ET

BO

TTO

M O

F C

UR

BB

OTT

OM

BO

TH S

IDE

SB

OA

RD

BLO

CK

ING

BLO

CK

BIT

UM

INO

US

BE

VE

LB

ETW

EE

NB

EN

CH

MA

RK

BE

AM

BA

SE

ME

NT

D.G

L.D

.A.

DB

L.

DIS

P.

DIM

.D

IFF.

DIA

.D

IAG

.D

TL.,

DE

TD

EP

T.

DE

MO

.

DB

.D

.P.

DP

R.

HO

LLO

W M

ETA

L FR

AM

EH

OLL

OW

ME

TAL

HO

LLO

W C

OR

EH

EIG

HT

HA

RD

WO

OD

HA

RD

WA

RE

GY

PS

UM

WA

LL B

OA

RD

GY

PS

UM

BO

AR

DG

YP

SU

MG

RO

UN

DG

RA

DE

BE

AM

GR

AD

EG

RA

B B

AR

GLA

SS

GE

NE

RA

LG

AU

GE

, GA

GE

GA

LVA

NIZ

ED

IRO

NG

ALV

AN

IZE

DG

ALL

ON

DO

UB

LE G

LAS

SD

OU

BLE

AC

TIN

GD

OU

BLE

DIS

PE

NS

ER

DIM

EN

SIO

ND

IFFU

SE

RD

IAM

ETE

RD

IAG

ON

AL

DE

TAIL

DE

PA

RTM

EN

T

DE

MO

LIS

H, D

EM

OLI

TIO

N

DE

CIB

EL

DA

MP

PR

OO

FD

AM

PE

R

C.Y

.C

NTR

., C

CO

RR

.

C.J

.C

ON

TR.

CO

NT.

CS

.JT.

CO

NS

T.C

ON

N.

C.M

.U.

CO

NC

.

CO

L.C

.W.

CL.

CLR

.C

.O.

CH

AM

.C

.T.

CE

R.

CM

.C

TR.,

CN

TRC

EM

.C

LG.

C.B

.C

.I.P

.C

.I.C

PT.

CA

B.

CE

NTE

R L

INE

CU

BIC

YA

RD

CO

UN

TER

CO

RR

IDO

R

CO

NTR

OL

JOIN

TC

ON

TRA

CTO

RC

ON

TIN

UO

US

CO

NS

TRU

CTI

ON

JO

INT

CO

NS

TRU

CTI

ON

CO

NN

EC

TIO

NC

ON

CR

ETE

MA

SO

NR

Y U

NIT

CO

NC

RE

TE

CO

LUM

NC

OLD

WA

TER

CLO

SE

TC

LEA

RC

LEA

NO

UT

CH

AM

FER

CE

RA

MIC

TIL

EC

ER

AM

ICC

EN

TIM

ETE

RC

EN

TER

CE

ME

NT

CE

ILIN

GC

ATC

H B

AS

INC

AS

T IN

PLA

CE

CA

ST

IRO

NC

AR

PE

TC

AB

INE

T

FUTU

RE

FUR

RIN

GFU

RN

ISH

FULL

SIZ

EFO

UN

DA

TIO

NFO

OTI

NG

FLU

OR

ES

CE

NT

FLO

W L

INE

FLO

OR

DR

AIN

FLO

OR

FLA

SH

ING

FIX

TUR

EFI

RE

STA

ND

PIP

EFI

RE

HY

DR

AN

T, F

IRE

HO

SE

FIR

E H

OS

E C

AB

INE

TC

AB

INE

TFI

RE

EX

TIN

GU

ISH

ER

FI

RE

EX

TIN

GU

ISH

ER

FIR

E D

AM

PE

RFI

NIS

H F

LOO

RFI

NIS

HFE

ET,

FO

OT

FAH

RE

NH

EIT

FAC

E O

F W

ALL

FAC

E O

F S

TUD

FAC

E O

F FI

NIS

HFA

CE

OF

CO

LUM

NFA

BR

ICA

TE

AU

TO.

AS

PH

.A

SB

.A

.DR

.

AR

CH

.

A.B

.A

PP

'D.

ALU

M.

ALT

.A

GG

R.

AD

J.A

DH

.A

.C.T

.A

CO

US

T.A

.P.

A.F

.F.

AU

TOM

ATI

C

AS

PH

ALT

AS

BE

STO

SA

RE

A D

RA

IN

AR

CH

ITE

CT,

AR

CH

ITE

CTU

RA

L

AN

CH

OR

BO

LTA

PP

RO

VE

D

ALU

MIN

UM

ALT

ER

NA

TEA

GG

RE

GA

TEA

DJU

STA

BLE

AD

HE

SIV

EA

CO

US

TIC

AL

CE

ILIN

G T

ILE

AC

OU

STI

CA

LA

CC

ES

S P

AN

EL

AB

OV

E F

INIS

H F

LOO

R

AB

BR

EV

IATI

ON

S

QU

AR

RY

TIL

EQ

.T.

ELE

VA

TIO

N

RE

FLE

CTE

D C

EIL

ING

PLA

N

SY

MB

OL

DE

SIG

NA

TOR

SD

ES

CR

IPTI

ON

SE

CTI

ON

/ P

LAN

#

NA

ME

# #

DW

G

###P1

LB #

#

DW

G

ELE

VD

ES

CR

IPTI

ON

#

DW

G

###

BM

= C

OO

RD

INA

TE, E

LEV

ATI

ON

, OR

STA

TIO

N S

EQ

UE

NC

E D

ES

IGN

ATI

ON

NO

=D

ETA

IL N

UM

BE

RD

WG

= S

HE

ET

NU

MB

ER

ELE

V =

ELE

VA

TIO

N

# =

ALP

HA

NU

ME

RIC

GR

IDD

ES

IGN

ATI

ON

# =

DE

TAIL

NU

MB

ER

DW

G =

SH

EE

T N

UM

BE

R

###

= D

OO

R N

UM

BE

R

# =

EQ

UIP

ME

NT

DE

SIG

NA

TIO

N

DIM

= D

ISTA

NC

E, F

AC

E O

F FR

AM

ING

TO F

AC

E O

F FR

AM

ING

, GR

ID L

INE

TO

GR

ID L

INE

, GR

ID L

INE

TO

FR

AM

ING

ELE

V =

FIN

ISH

GR

AD

E E

LEV

ATI

ON

ELE

V =

EX

ISTI

NG

GR

AD

E E

LEV

ATI

ON

P =

FIN

ISH

DE

SIG

NA

TIO

NF

= FL

OO

R F

INIS

H D

ES

IGN

ATI

ON

B =

BA

SE

DE

SIG

NA

TIO

N

# =

GLA

SS

TY

PE

OR

OP

EN

ING

DE

SIG

NA

TIO

N

# =

NO

TE D

ES

IGN

ATI

ON

INC

OR

PO

RA

TED

INTO

TIT

LE B

LOC

K

# =

PA

RTI

TIO

N T

YP

E D

ES

IGN

ATI

ON

# =

RE

VIS

ION

DE

SIG

NA

TIO

N

NA

ME

= N

AM

E O

F S

PA

CE

# =

RO

OM

DE

SIG

NA

TIO

N

# =

AC

CE

SS

OR

Y D

ES

IGN

ATI

ON

FIN

= F

INIS

H S

CH

ED

ULE

DE

SIG

NA

TIO

N

#= D

ETA

IL N

UM

BE

RD

WG

= S

HE

ET

NU

MB

ER

RE

AD

AN

D U

ND

ER

STA

ND

TH

E S

OIL

S R

EP

OR

T P

RIO

R T

O T

HE

STA

RT

OF

CO

NS

TRU

CTI

ON

.

VE

RIF

Y A

LL IN

VE

RT

ELE

VA

TIO

NS

PR

IOR

TO

INS

TALL

ING

SA

NIT

AR

Y O

R S

TOR

M L

INE

S.

THE

GE

NE

RA

L C

ON

TRA

CTO

R S

HA

LL B

E R

ES

PO

NS

IBLE

FO

R R

EV

IEW

ING

HIS

/HE

R S

UB

CO

NTR

AC

TOR

S B

IDS

TO E

NS

UR

E T

HA

T A

LL IT

EM

S ID

EN

TIFI

ED

ON

TH

ES

E D

RA

WIN

GS

HA

VE

BE

EN

BID

.

MIS

CE

LLA

NE

OU

S S

TEE

L IS

SH

OW

N A

ND

DE

TAIL

ED

ON

TH

E A

RC

HIT

EC

TUR

AL

DR

AW

ING

S O

R S

TRU

CTU

RA

LD

RA

WIN

GS

.

CO

NTR

AC

TOR

AN

D A

LL S

UB

-CO

NTR

AC

TOR

S A

RE

RE

QU

IRE

D T

O H

AV

E F

ULL

KN

OW

LED

GE

OF

THE

CO

DE

AN

D A

LL L

OC

AL

RE

QU

IRE

ME

NTS

. IG

NO

RA

NC

E O

F TH

E C

OD

E A

ND

RE

QU

IRE

ME

NTS

BY

CO

NTR

AC

TOR

OR

AN

Y S

UB

-CO

NTR

AC

TOR

SH

ALL

NO

T G

IVE

RIS

E T

O A

NY

CH

AN

GE

, EX

TRA

S,

OR

CH

AN

GE

OR

DE

RS

AT

THE

CO

ST

OF

THE

OW

NE

R O

R D

EV

ELO

PE

R.

IMP

OR

TAN

T:

B.R

.G.

BE

AR

ING

#

DW

G

NO

=D

ETA

IL N

UM

BE

RD

WG

= S

HE

ET

NU

MB

ER

WD

WW

IND

OW

VFY

VE

NT

VA

C

VE

RIF

YV

EN

TILA

TIO

NV

AC

UU

M

VTR

VE

NT

THR

OU

GH

RO

OF

VE

RT.

VE

RTI

CA

L

UC

UN

DE

R C

OU

NTE

R

UR

.U

RIN

AL

TEM

PTE

MP

ER

ED

TRTM

TTR

EA

TME

NT

SID

LTS

IDE

LIG

HT

RE

V.

RE

F

RE

C

R.

RE

VE

RS

E

RE

FRIG

ER

ATO

R

RE

CE

SS

ED

RA

DIU

S

RD

RO

D

QU

AR

TER

QTR

PA

RTI

CLE

PA

RT

PR

OJE

CT

PR

OJ

AT

(TH

E R

ATE

OF)

AN

GLE

WIT

HO

UT

BY

(AS

6"x

8")

RO

UN

D /

DIA

ME

TER

W/O

LP W/

PLA

TE

WIT

H

@

Den

tal E

quip

men

t Sup

plie

r

Impo

rtant

not

e fo

llow

ing.

OP

ER

ATO

RY

OP

.

OW

NE

R S

UP

PLI

ED

/ C

ON

TR IN

STA

LLE

DO

SC

I

NA

TUR

AL

GA

SN

ATU

RA

LN

GN

AT

NO

T IN

CO

NTR

AC

T / C

ON

TR IN

STA

LLE

DN

ICIC

MG

ME

DIC

AL

GA

SE

S

LIN

OLE

UM

LIN

LOW

ER

CA

BIN

ET

LIND

IND

ICA

TES

HC

HA

ND

ICA

P(P

ED

)

HD

HE

AV

Y D

UTY

HO

UR

HR

HV

AC

HE

ATI

NG

, CO

OLI

NG

&A

IR C

ON

DIT

ION

ING

GC

GE

NE

RA

L C

ON

TRA

CTO

R

DE

DD

ED

ICA

TED

DE

SD

EN

TAL

EQ

UIP

ME

NT

SU

PP

LIE

R

DR

DO

OR

DW

DIS

HW

AS

HE

R

CA

CO

MP

RE

SS

ED

AIR

CO

OR

DC

OO

RD

INA

TE

BTU

(/H)

BR

ITIS

H T

HE

RM

AL

UN

IT (P

ER

HO

UR

)

AW

IA

RC

H. W

OO

DW

OR

K IN

STI

TUTE

AS

ST

AS

SIS

TAN

T

AN

SI

AM

ER

. NA

T'L

STA

ND

AR

DS

INS

TITU

TE

CC

HA

NN

EL

poin

t of c

oord

inat

ion.

#= E

LEV

ATI

ON

CH

AN

GE

IN IN

CH

ES

PR

OP

OS

ED

DE

NT

AL

OFF

ICE

WIT

H U

NFI

NIS

HE

D O

FFIC

E A

BO

VE

:TH

E P

RO

JEC

T C

ON

SIS

TS O

F O

NE

10,

604

S.F

.OFF

ICE

BU

ILD

ING

, CO

NS

TRU

CTE

D O

F S

TEE

L P

OS

T A

ND

EN

GIN

EE

RE

DW

OO

D B

EA

M F

RA

MIN

G, A

ND

EN

GIN

EE

RE

D W

OO

D J

OIS

TS.

THE

RO

OF

STR

UC

TUR

E W

ILL

CO

NS

IST

OF

PR

E-M

AN

UFA

CTU

RE

D W

OO

D T

RU

SS

ES

WIT

H A

STA

ND

ING

SE

AM

ME

TAL

RO

OF

SY

STE

M.

THE

ME

CH

AN

ICA

LS

YS

TEM

SH

ALL

INC

LUD

E, B

UT

NO

T B

E L

IMIT

ED

TO

, DO

ME

STI

C W

ATE

R D

ISTR

IBU

TIO

N, S

AN

ITA

RY

SE

WE

R A

ND

RO

OF

MO

UN

TED

VE

NTS

. TH

E E

LEC

TRIC

AL

SY

STE

M S

HA

LL IN

CLU

DE

, BU

T N

OT

BE

LIM

ITE

D T

O, E

XTE

RIO

R S

ITE

LIG

HTI

NG

, EX

TER

IOR

AN

D IN

TER

IOR

BU

ILD

ING

LIG

HTI

NG

, ELE

CTR

ICA

L P

AN

ELS

INC

LUD

ING

TH

E S

ER

VIC

EE

NTR

AN

CE

.

DE

SIG

N B

UIL

D E

LEM

EN

TS

:FI

RE

SP

RIN

KLE

R S

YS

TEM

FIR

E A

LAR

M S

YS

TEM

EM

S S

YS

TEM

FO

R M

ETE

RIN

G M

ON

ITO

RIN

G A

ND

RE

PO

RTI

NG

RO

UTI

NG

OF

THE

AU

TO-D

EM

AN

D R

ES

PO

NS

ER

AD

ON

EX

HA

US

T S

YS

TEM

SO

LAR

PH

OTO

-VO

LTA

IC S

YS

TEM

LAN

DS

CA

PE

IRR

IGA

TIO

N S

YS

TEM

PR

IMA

RY

STA

IR IN

EN

TRY

LO

BB

Y

DE

SIG

N-B

UIL

D P

AR

AM

ETE

RS

:FI

RE

SY

STE

M D

ES

IGN

MU

ST

ME

ET

ALL

GO

VE

RN

ING

CO

DE

S.

DE

SIG

NS

MU

ST

BE

SU

BM

ITTE

D T

O O

WN

ER

FO

RR

EV

IEW

AN

D A

PP

RO

VA

L P

RIO

R T

O S

UB

MIT

TIN

G T

O L

OC

AL

RE

VIE

W A

GE

NC

Y F

OR

PE

RM

ITTI

NG

. A

LL C

OS

TS F

OR

DE

SIG

N, E

NG

INE

ER

ING

, SH

OP

DR

AW

ING

S, I

NS

TALL

ATI

ON

, IN

SP

EC

TIO

N, E

TC. T

O B

E P

AID

FO

R B

Y T

HE

CO

NTR

AC

TOR

AN

D IN

CO

RP

OR

ATE

D IN

TO T

HE

SC

HE

DU

LE.

FOR

TH

E F

IRE

ALA

RM

, EA

CH

SY

STE

M M

US

T IN

CLU

DE

NO

N-P

RO

PR

IETA

RY

FIR

E A

LAR

M P

AN

EL

AN

D D

EV

ICE

S S

UC

H A

S, B

UT

NO

T LI

MIT

ED

TO

, FIR

ELI

TE C

ON

TRO

L P

AN

EL,

AD

T M

AN

UA

L P

ULL

STA

TIO

NS

, CH

EM

ETR

ON

IC H

EA

T D

ETE

CTO

RS

, SY

STE

M S

EN

SO

R S

MO

KE

AN

D D

UC

TD

ETE

CTO

RS

; HO

RN

S A

ND

STR

OB

ES

. FO

R T

HE

FIR

E S

PR

INK

LER

SY

STE

M, P

RO

VID

E A

N A

UTO

MA

TIC

WE

T P

IPE

SY

STE

M T

HR

OU

GH

OU

T TH

E E

NTI

RE

BU

ILD

ING

, CO

MP

LETE

IN A

LL A

SP

EC

TS A

ND

RE

AD

Y F

OR

OP

ER

ATI

ON

INC

LUD

ING

TE

ST

AN

D D

RA

IN L

INE

S, P

RE

SS

UR

E G

AU

GE

S, H

AN

GE

RS

, SU

PP

OR

TS, S

IGN

S A

ND

OTH

ER

RE

QU

IRE

DA

PP

UR

TEN

AN

CE

S.

WIR

ING

SH

ALL

BE

PR

OV

IDE

D U

ND

ER

TH

E E

LEC

TRIC

AL

DIV

ISIO

N.

BA

SIS

OF

DE

SIG

N S

HA

LL B

EN

FPA

13

OR

DIN

AR

Y H

AZA

RD

, HO

WE

VE

R, D

ES

IGN

/BU

ILD

CO

NTR

AC

TOR

SH

ALL

VE

RIF

Y A

LL R

EQ

UIR

EM

EN

TS W

ITH

THE

AU

THO

RIT

IES

HA

VIN

G J

UR

ISD

ICTI

ON

PR

IOR

TO

BID

DIN

G, D

ES

IGN

, AN

D C

ON

STR

UC

TIO

N.

SIT

E /

BU

ILD

ING

DE

MO

LIT

ION

:N

ON

E R

EQ

UIR

ED

.

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14

Page 3: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

FE

FE

FE

SU

ITE

520

5

SU

ITE

120

1

JAN

ITO

R20

8

30'-0

"

SU

ITE

420

4

AR

EA

1,15

3 S

FO

CC

UP

AN

T LO

AD

=

12R

EQ

UIR

ED

EX

IT 1

AR

EA

564

SF

OC

CU

PA

NT

LOA

D =

6

RE

QU

IRE

D E

XIT

1

AR

EA

2,29

5 S

FO

CC

UP

AN

T LO

AD

=

23

RE

QU

IRE

D E

XIT

1

COMMON PATH OF EGRESS TRAVEL 34'-0"

MA

XIM

UM

TR

AV

EL

TO E

XIT

130

'-4"

12 O

C.

2.4"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

6 O

C.

1.2"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

8 O

C.

1.6"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

7 O

C.

1.4"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

8 O

C.

1.6"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

21 O

C.

6.3"

RE

Q. E

XIT

STA

IR W

IDTH

44" P

RO

VID

ED

20 O

C.

6" R

EQ

. EX

ITS

TAIR

WID

TH44

" PR

OV

IDE

D

20 O

C. S

EC

ON

D F

LOO

R4.

8" R

EQ

. EX

IT W

IDTH

34" P

RO

VID

ED

EX

IT #

2

OC

CU

PA

NT

LOA

D =

48

SU

ITE

110

1

VE

STI

BU

LE10

0

STA

IR

FIR

E R

ISE

R

STO

RA

GE 51'-9"

MA

XIM

UM

TR

AV

EL

TO E

XIT

118

'-3"

DIAGONAL

DIS

TANCE

= 10

6'-4"

DISTANCE BETWEEN EXITS = 72'-0"

SU

ITE

# 1

01O

CC

UP

AN

T LO

AD

48

NU

MB

ER

OF

EX

IT R

EQ

UIR

ED

: 1

EX

ITS

PR

OV

IDE

D:

2M

AX

IMU

M T

RA

VE

L D

ISTA

NC

E T

O E

XIT

= 11

8'-3

"M

AX

IMU

M C

OM

MO

N P

ATH

OF

EG

RE

SS

TR

AV

EL

TO E

XIT

=

51'-9

"

24 +

20

= 4

4 O

C.

EX

IT #

1

EX

IT #

2

24+

21=

45

OC

.9"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

FIR

ST

FLO

OR

24

OC

.4.

8" R

EQ

. EX

ITE

XIT

WID

TH34

" PR

OV

IDE

D

24 O

C.

4.8"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

21 O

C.

4.2"

RE

Q. E

XIT

WID

TH34

" PR

OV

IDE

D

SE

CO

ND

FLO

OR

20

OC

.4.

8" R

EQ

. EX

IT W

IDTH

34" P

RO

VID

ED

MA

XIM

UM

TR

AV

EL

DIS

TAN

CE

TO

EX

IT

LEG

EN

D:

MA

XIM

UM

CO

MM

ON

PA

TH O

F E

GR

ES

S T

RA

VE

L TO

EX

IT

EX

IT L

IGH

T FI

XTU

RE

, WA

LL M

OU

NTE

DD

IRE

CTI

ON

AL

AS

SH

OW

N, S

HA

DE

DQ

UA

DR

AN

T IN

DIC

ATE

FA

CE

S O

F FI

XTU

RE

S.

FIR

E E

XTI

NG

UIS

HE

RS

:1)

PR

OV

IDE

TY

PE

"2A

-10B

C" R

ATE

D F

IRE

EX

TIN

GU

ISH

ER

FO

R E

VE

RY

1,5

00 S

FA

ND

NO

MO

RE

TH

AN

75

FEE

T TR

AV

EL

DIS

TAN

CE

TO

EX

TIN

GU

ISH

ER

AS

AP

PR

OV

ED

BY

TH

E F

IRE

DE

PA

RTM

EN

T.2)

RE

CE

SS

ALL

CA

BIN

ETS

. CE

NTE

R A

T 3'

-6" A

FF3)

PR

OV

IDE

FIR

E R

ATE

D C

AB

INE

TS W

HE

N IN

STA

LLE

D IN

FIR

E R

ATE

D W

ALL

S.

FE

FLO

OR

1 O

CC

UP

AN

T LO

AD

:51

OC

CU

PA

NTS

OFF

ICE

S @

100

SF/

PE

RS

ON

4,77

8 S

F/10

0 =

48

OC

CU

PA

NTS

AC

CE

SS

OR

Y S

PA

CE

@ 3

00 S

F/P

ER

SO

N

693

SF/

300

= 3

OC

CU

PA

NTS

FLO

OR

2 O

CC

UP

AN

T LO

AD

:45

OC

CU

PA

NTS

OFF

ICE

S @

100

SF/

PE

RS

ON

4,01

2 S

F/10

0 =

41

OC

CU

PA

NTS

AC

CE

SS

OR

Y S

PA

CE

@ 3

00 S

F/P

ER

SO

N1,

120

SF/

300

= 4

OC

CU

PA

NTS

TOTA

L B

UIL

DIN

G O

CC

UP

AN

T LO

AD

:

96

OC

CU

PA

NTS

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14

Page 4: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

CO

MPL

IAN

CE

WIT

H T

HE

2012

IGC

C:

GE

NE

RA

L N

OTE

S:

GE

NE

RA

L C

ON

TRA

CTO

R IS

HE

RE

BY

AD

VIS

ED

TH

AT

CO

MP

LIA

NC

E W

ITH

TH

E 2

012

IGC

C IN

CLU

DIN

G A

PP

LIC

AB

LE A

ME

ND

EM

EN

TS B

YTH

E T

OW

N O

F C

AR

BO

ND

ALE

IS M

AN

DA

TOR

Y A

ND

MU

ST

BE

INC

OR

PO

RA

TED

IN A

LL P

HA

SE

S O

F D

ES

IGN

, BID

DIN

G, C

ON

STR

UC

TIO

N,

AN

D P

OS

T O

CC

UP

AN

CY

OF

THIS

PR

OJE

CT.

TH

E G

EN

ER

AL

CO

NTR

AC

TOR

WIL

L H

AV

E T

HE

PR

IMA

RY

RO

LE O

F M

AN

AG

ING

,V

ER

IFY

ING

, AN

D D

OC

UM

EN

TIN

G C

OM

PLI

AN

CE

WIT

H T

HE

201

2 IG

CC

.

AN

IND

EP

EN

DE

NT

CO

MM

ISS

ION

ING

AG

EN

T W

ILL

BE

RE

TAIN

ED

BY

TH

E O

WN

ER

TO

RE

VIE

W T

HE

DO

CU

ME

NTA

TIO

N A

ND

TE

ST

RE

SU

LTS

PR

OV

IDE

D B

Y T

HE

GE

NE

RA

L C

ON

TRA

CTO

R A

T C

OM

PLE

TIO

N O

F TH

E P

RO

JEC

T TO

CO

NFI

RM

CO

MP

LIA

NC

E W

ITH

TH

EC

OD

E R

EQ

UIR

EM

EN

TS. I

TEM

S N

OT

ME

ETI

NG

TH

E R

EQ

UIR

EM

EN

TS W

ILL

BE

RE

JEC

TED

AN

D T

HE

GE

NE

RA

L C

ON

TRA

CTO

R S

HA

LLH

AV

E T

HE

OB

LIG

ATI

ON

TO

CO

RR

EC

T A

LL N

ON

CO

MP

LIA

NT

ITE

MS

AT

NO

AD

DIT

ION

AL

CO

ST

TO T

HE

OW

NE

R.

ALT

HO

UG

H T

HE

INTE

NT

OF

THE

201

2 IG

CC

HA

S B

EE

N IN

CO

RP

OR

ATE

D IN

TH

IS S

ET

OF

DR

AW

ING

S, C

OM

PLI

AN

CE

WIT

H T

HIS

CO

DE

RE

MA

INS

TH

E R

ES

PO

NS

IBIL

ITY

OF

THE

GE

NE

RA

L C

ON

TRA

CTO

R, A

ND

TH

US

A F

ULL

PR

OA

CTI

VE

INV

OLV

EM

EN

T A

ND

MA

NA

GE

ME

NT

BY

GE

NE

RA

L C

ON

TRA

CTO

R O

F A

LL A

SP

EC

T O

F TH

IS P

RO

JEC

T TO

INS

UR

E C

OM

PLI

AN

CE

WIT

H A

LL R

EQ

UIR

EM

EN

TS O

F TH

E C

OD

EIS

CR

ITIC

AL.

TH

IS IN

CLU

DE

S B

UT

IS N

OT

LIM

ITE

D T

O: P

RE

PA

RIN

G, D

OC

UM

EN

TIN

G A

ND

SU

BM

ITTI

NG

MA

NA

GE

ME

NT

PLA

NS

AS

SE

CIF

IED

IN T

HE

CO

DE

, VE

RIF

YIN

G T

HA

T S

ELE

CTE

D M

ATE

RIA

LS T

O B

E IN

CO

RP

OR

ATE

D IN

TO T

HE

PR

OJE

CT

WIL

L M

EE

T C

OD

E,

MA

NA

GIN

G, S

UP

ER

VIS

ING

AN

D E

DU

CA

TIN

G S

UB

CO

NTR

AC

TOR

ON

CO

MP

LIA

NC

E W

ITH

TH

E R

EQ

UIR

EM

EN

T O

F TH

E C

OD

E,

VE

RIF

YIN

G A

ND

DO

CU

ME

NTI

NG

TH

AT

PU

RC

HA

SE

D M

ATE

RIA

L A

ND

EQ

UIP

ME

NT

ME

ET

THE

CO

DE

RE

QU

IRE

ME

NTS

, MA

NA

GIN

G O

FS

YS

TEM

S T

O B

E D

ES

IGN

-BU

ILT

BY

GC

OR

HIS

SU

BC

ON

TRA

CTO

R, T

ES

TIN

G S

YS

TEM

S A

ND

CO

MP

ON

EN

TS A

S R

EQ

UIR

ED

BY

TH

EC

OD

E, A

SC

ER

TAIN

ING

TH

AT

TES

T R

ES

ULT

S M

EE

T TH

E C

OD

E IN

TEN

T, D

OC

UM

EN

TIN

G A

LL T

ES

T R

ES

ULT

S A

ND

MA

TER

IALS

INC

OR

PO

RA

TED

INTO

TH

E W

OR

K, P

RE

PA

RIN

G O

PE

RA

TIO

NS

MA

NU

ALS

AN

D O

THE

R D

ELI

VE

RA

BLE

S T

O T

HE

OW

NE

R, T

HE

BU

ILD

ING

OFF

ICIA

L, A

ND

TH

E C

OM

MIS

SIO

NIN

G A

GE

NT.

IGN

OR

AN

CE

OF

THE

CO

DE

SHA

LL N

OT

REL

IEF

THE

GC

FR

OM

TH

E R

ESPO

NSI

BIL

ITY

OF

CO

MPL

YIN

G W

ITH

ALL

TH

E A

PPLI

CA

BLE

SEC

TIO

N O

F TH

E 20

12 IG

CC

.

Land

scap

e Irr

igat

ion:

Out

door

land

scap

e irr

igat

ion

syst

ems s

hall

be d

esig

ned

and

inst

alle

d to

redu

ce p

otab

le w

ater

use

by

50 p

erce

nt fr

om a

calc

ulat

ed m

id-s

umm

er b

asel

ine

in a

ccor

danc

e w

ith S

ectio

n 40

4.1.

2 of

the

IGCC

.In

-gro

und

irrig

atio

n sy

stem

shal

l com

ply

with

all

of th

e fo

llow

ing:

1. T

he d

esig

n an

d in

stal

latio

n of

out

door

irrig

atio

n sy

stem

s sha

ll be

und

er th

e su

perv

ision

of a

n irr

igat

ion

prof

essio

nal a

ccre

dite

dor

cer

tifie

d by

an

appr

opria

te lo

cal o

r nat

iona

l bod

y.2.

Lan

dsca

pe ir

rigat

ion

syst

ems s

hall

not d

irect

wat

er o

nto

build

ing

exte

rior s

urfa

ces,

foun

datio

ns o

r ext

erio

r pav

ed su

rfac

es.

Syst

ems s

hall

not g

ener

ate

runo

ff.3.

Irrig

atio

n co

ntro

l sys

tem

shal

l reg

ulat

e irr

igat

ion

base

d on

wea

ther

, clim

atol

ogic

al o

r soi

l moi

stur

e st

atus

dat

a. T

he c

ontr

olle

rsh

all h

ave

inte

grat

ed o

r sep

arat

e se

nsor

s to

susp

end

irrig

atio

n ev

ents

dur

ing

rain

fall.

4. Ir

rigat

ion

zone

s sha

ll be

bas

ed o

n pl

ant w

ater

nee

ds w

ith p

lant

s of s

imila

r nee

d gr

oupe

d to

geth

er. T

urfg

rass

shal

l not

be

grou

ped

with

oth

er p

lant

ings

on

the

sam

e zo

ne.

5. M

icro

-irrig

atio

n zo

nes s

hall

be e

quip

ped

with

pre

ssur

e re

gula

tors

that

ens

ure

zone

pre

ssur

e is

not g

reat

er th

an 4

0 ps

i, fil

ters

,an

d flu

sh e

nd a

ssem

blie

s.6.

Spr

inkl

ers s

hall:

Hav

e no

zzle

s with

mat

ched

pre

cipi

tatio

n ra

tes.

Be

pro

hibi

ted

on la

ndsc

ape

area

s les

s tha

n 4

feet

(123

0 m

m) i

n an

y di

men

sion.

Be

proh

ibite

d on

slop

es g

reat

er th

an 1

uni

t ver

tical

to 4

uni

ts h

orizo

ntal

(25-

perc

ent s

lope

).

Exce

ptio

n: W

here

the

appl

icat

ion

rate

of t

he sp

rinkl

ers i

s les

s tha

n or

equ

al to

0.5

inch

es (1

2.7

mm

) per

hou

r.Be

per

mitt

ed fo

r use

on

turf

gras

s and

cro

p ar

eas o

nly

exce

ptin

g m

icro

spra

ys o

f a fl

ow le

ss th

an 4

5 ga

llons

(170

lite

rs) p

erho

ur.

If of

the

pop-

up c

onfig

urat

ion,

pop

-up

to a

hei

ght o

f not

less

than

4 in

ches

(101

mm

).O

nly

be in

stal

led

in zo

nes c

ompo

sed

excl

usiv

ely

of sp

rinkl

ers a

nd sh

all b

e de

signe

d to

ach

ieve

a lo

wer

qua

rter

dist

ribut

ion

unifo

rmity

of n

ot le

ss th

an 0

.65.

Soil

and

wat

er q

ualit

y pr

otec

tion.

Soil

and

wat

er q

ualit

y sh

all b

e pr

otec

ted

in a

ccor

danc

e w

ith S

ectio

ns 4

05.1

.1 th

roug

h 40

5.1.

6. o

f the

IGCC

Soil

and

wat

er q

ualit

y pr

otec

tion

plan

.A

soil

and

wat

er q

ualit

y pr

otec

tion

plan

shal

l be

subm

itted

by

the

Gene

ral C

ontr

acto

r and

app

rove

d pr

ior t

o co

nstr

uctio

n. T

hepr

otec

tion

plan

shal

l add

ress

the

follo

win

g:1.

A so

ils m

ap, s

ite p

lan,

or g

radi

ng p

lan

that

indi

cate

s des

igna

ted

soil

man

agem

ent a

reas

for a

ll sit

e so

ils, i

nclu

ding

, but

not

limite

d to

:1.

1. S

oils

that

will

be

reta

ined

in p

lace

and

des

igna

ted

as v

eget

atio

n an

d so

il pr

otec

tion

area

s (VS

PAs)

.1.

2. T

opso

ils th

at w

ill b

e st

ockp

iled

for f

utur

e re

use

and

the

loca

tions

for t

he st

ockp

iles.

1.3.

Soi

ls th

at w

ill b

e di

stur

bed

durin

g co

nstr

uctio

n an

d pl

ans t

o re

stor

e di

stur

bed

soils

and

und

erly

ing

subs

oils

to so

il re

fere

nce

cond

ition

s.1.

4. S

oils

that

will

be

rest

ored

and

re-v

eget

ated

.1.

5. S

oils

dist

urbe

d by

pre

viou

s dev

elop

men

t tha

t will

be

rest

ored

in p

lace

and

re-v

eget

ated

.1.

6. L

ocat

ions

for a

ll la

ydow

n an

d st

orag

e ar

eas,

par

king

are

as, h

aul r

oads

and

con

stru

ctio

n ve

hicl

e ac

cess

, tem

pora

ry u

tiliti

esan

d co

nstr

uctio

n tr

aile

r loc

atio

ns.

New

land

scap

ing

inst

alle

d sh

all b

e 10

0 pe

rcen

t nat

ive

or a

dapt

ive

plan

t spe

cies

.

Build

ing

site

was

te m

anag

emen

t pla

n.A

build

ing

site

was

te m

anag

emen

t pla

n sh

all b

e de

velo

ped

and

impl

emen

ted

by th

e GC

to d

iver

t not

less

than

75

perc

ent o

f the

land

-cle

arin

g de

bris

and

exca

vate

d so

ils. L

and-

clea

ring

debr

is in

clud

es ro

ck, t

rees

, stu

mps

and

ass

ocia

ted

vege

tatio

n. T

he p

lan

shal

l inc

lude

pro

visio

ns th

at a

ddre

ss a

ll of

the

follo

win

g:1.

Mat

eria

ls to

be

dive

rted

from

disp

osal

by

effic

ient

usa

ge, r

ecyc

ling

or re

use

on th

e bu

ildin

g sit

e sh

all b

e sp

ecifi

ed.

2. D

iver

ted

mat

eria

ls sh

all n

ot b

e se

nt to

site

s tha

t are

agr

icul

tura

l lan

d, fl

ood

haza

rd a

reas

or g

reen

field

site

s whe

rede

velo

pmen

t is p

rohi

bite

d by

Sec

tion

402.

1 of

the

IGCC

exc

ept w

here

app

rove

d by

the

code

offi

cial.

3. T

he e

ffect

ive

dest

ruct

ion

and

disp

osal

of i

nvas

ive

plan

t spe

cies.

4. W

here

con

tam

inat

ed so

ils a

re re

mov

ed, t

he m

etho

ds o

f rem

oval

and

loca

tion

whe

re th

e so

ils a

re to

be

trea

ted

and

disp

osed

.5.

The

am

ount

of m

ater

ials

to b

e di

vert

ed sh

all b

e sp

ecifi

ed a

nd sh

all b

e ca

lcul

ated

by

wei

ght o

r vol

ume,

but

not

bot

h.7.

Rec

eipt

s or o

ther

doc

umen

tatio

n re

late

d to

div

ersio

n sh

all b

e m

aint

aine

d th

roug

h th

e co

urse

of c

onst

ruct

ion.

Whe

nre

ques

ted

by th

e co

de o

fficia

l, ev

iden

ce o

f div

ersio

n sh

all b

e pr

ovid

ed.

Cons

truc

tion

was

te.

Cons

truc

tion

mat

eria

ls an

d w

aste

and

har

dsca

pe m

ater

ials

rem

oved

dur

ing

site

prep

arat

ion

shal

l be

man

aged

in a

ccor

danc

ew

ith S

ectio

n 50

3 of

the

IGCC

.

Stor

age

and

hand

ling

of m

ater

ials

.M

ater

ials

stor

ed a

nd h

andl

ed o

nsite

dur

ing

cons

truc

tion

shal

l com

ply

with

the

appl

icab

le m

anuf

actu

rer's

prin

ted

inst

ruct

ions

.W

here

man

ufac

ture

r's p

rinte

d in

stru

ctio

ns a

re n

ot a

vaila

ble,

app

rove

d st

anda

rds o

r gui

delin

es sh

all b

e fo

llow

ed.

Cons

truc

tion

phas

e m

oist

ure

cont

rol.

Poro

us o

r fib

rous

mat

eria

ls an

d ot

her m

ater

ials

subj

ect t

o m

oist

ure

dam

age

shal

l be

prot

ecte

d fr

om m

oist

ure

durin

g th

eco

nstr

uctio

n ph

ase.

Mat

eria

l dam

aged

by

moi

stur

e or

that

are

visi

bly

colo

nize

d by

fung

i eith

er p

rior t

o de

liver

y or

dur

ing

the

cons

truc

tion

phas

e sh

all b

e cl

eane

d an

d dr

ied

or, w

here

dam

age

cann

ot b

e co

rrec

ted

by su

ch m

eans

, sha

ll be

rem

oved

and

repl

aced

.Co

nstr

uctio

n m

ater

ial a

nd w

aste

man

agem

ent p

lan.

Not

less

than

50

perc

ent o

f non

haza

rdou

s con

stru

ctio

n w

aste

shal

l be

dive

rted

from

disp

osal

, exc

ept w

here

oth

er p

erce

ntag

esar

e in

dica

ted

in T

able

302

.1 o

f the

IGCC

. A C

onst

ruct

ion

Mat

eria

l and

Was

te M

anag

emen

t Pla

n sh

all b

e de

velo

ped

and

impl

emen

ted

by th

e GC

to re

cycl

e or

salv

age

cons

truc

tion

mat

eria

ls an

d w

aste

. The

Con

stru

ctio

n M

ater

ial a

nd W

aste

Man

agem

ent P

lan

shal

l com

ply

with

all

of th

e fo

llow

ing:

1. T

he lo

catio

n fo

r col

lect

ion,

sepa

ratio

n an

d st

orag

e of

recy

clab

le c

onst

ruct

ion

was

te sh

all b

e in

dica

ted.

2. M

ater

ials

to b

e di

vert

ed fr

om d

ispos

al b

y ef

ficie

nt u

sage

, rec

yclin

g, re

use,

man

ufac

ture

r's re

clam

atio

n, o

r sal

vage

for f

utur

eus

e, d

onat

ion

or sa

le sh

all b

e sp

ecifi

ed.

3. T

he p

erce

ntag

e of

mat

eria

ls to

be

dive

rted

shal

l be

spec

ified

and

shal

l be

calc

ulat

ed b

y w

eigh

t or v

olum

e, b

ut n

ot b

oth.

4. R

ecei

pts o

r oth

er d

ocum

enta

tion

rela

ted

to d

iver

sion

shal

l be

mai

ntai

ned

thro

ugh

the

cour

se o

f con

stru

ctio

n. W

here

requ

este

d by

the

code

offi

cial,

evid

ence

of d

iver

sion

shal

l be

prov

ided

.

For t

he p

urpo

ses o

f thi

s sec

tion,

con

stru

ctio

n m

ater

ials

and

was

te sh

all i

nclu

de a

ll m

ater

ials

deliv

ered

to th

e sit

e an

d in

tend

edfo

r ins

talla

tion

prio

r to

the

issua

nce

of th

e ce

rtifi

cate

of o

ccup

ancy

, inc

ludi

ng re

late

d pa

ckag

ing.

Con

stru

ctio

n an

d w

aste

mat

eria

ls sh

all n

ot in

clud

e la

nd-c

lear

ing

debr

is, e

xcav

ated

soils

and

fill

and

base

mat

eria

ls su

ch a

s, b

ut n

ot li

mite

d to

, top

soil,

sand

and

gra

vel.

Land

-cle

arin

g de

bris

shal

l inc

lude

tree

s, st

umps

, roc

ks, a

nd v

eget

atio

n. E

xcav

ated

soil,

fill

mat

eria

l and

land

-cle

arin

g de

bris

shal

l be

man

aged

in a

ccor

danc

e w

ith S

ectio

n 40

6.1

of th

e IG

CC.

Not

less

than

55

perc

ent o

f the

tota

l bui

ldin

g m

ater

ials

used

in th

e pr

ojec

t, ba

sed

on m

ass,

vol

ume

or c

ost,

shal

l com

ply

with

Sect

ion

505.

2.1,

505

.2.2

, 505

.2.3

, 505

.2.4

or 5

05.2

.5 o

f the

IGCC

. Whe

re a

mat

eria

l com

plie

s with

mor

e th

an o

ne se

ctio

n, th

em

ater

ial v

alue

shal

l be

mul

tiplie

d by

the

num

ber o

f sec

tions

that

it c

ompl

ies w

ith. T

he v

alue

of t

otal

bui

ldin

g m

ater

ial m

ass,

volu

me

or c

ost s

hall

rem

ain

cons

tant

rega

rdle

ss o

f whe

ther

mat

eria

ls ar

e ta

bula

ted

in m

ore

than

one

sect

ion.

The

mer

cury

con

tent

in la

mps

shal

l com

ply

with

Sec

tion

506.

2 or

506

.3 o

f the

IGCC

.Ex

cept

ion:

App

lianc

e, b

lack

ligh

t, bu

g, c

olor

ed, g

erm

icid

al, p

lant

, sha

tter

-res

istan

t/sh

atte

rpro

of/s

hatt

erpr

otec

ted,

show

case

, UV,

T-8

and

T-12

lam

ps w

ith a

col

or re

nder

ing

inde

x of

87

or h

ighe

r, la

mps

with

RDC

bas

es, a

nd la

mps

use

d fo

r spe

cial

-nee

ds li

ghtin

gfo

r ind

ivid

uals

with

exc

eptio

nal n

eeds

.

Moi

stur

e pr

even

tativ

e m

easu

res s

hall

be in

spec

ted

in a

ccor

danc

e w

ith IG

CC S

ectio

ns 9

02 a

nd 9

03 fo

r the

cat

egor

ies l

isted

inIte

ms 1

thro

ugh

7. In

spec

tions

shal

l be

exec

uted

in a

met

hod

and

at a

freq

uenc

y as

list

ed in

IGCC

Tab

le 9

03.1

.1.

Fou

ndat

ion

sub-

soil

drai

nage

syst

em.

2. F

ound

atio

n w

ater

proo

fing.

3. F

ound

atio

n da

mpp

roof

ing.

4. U

nder

slab

wat

er v

apor

pro

tect

ion.

5. F

lash

ings

: Win

dow

s, e

xter

ior d

oors

, sky

light

s, w

all f

lash

ing

and

drai

nage

syst

ems.

6. E

xter

ior w

all c

over

ings

.7.

Roo

f cov

erin

gs, r

oof d

rain

age,

and

flas

hing

s

Ener

gy C

onse

rvat

ion‚

Effi

cien

cy a

nd C

O2e

Em

issi

on R

educ

tion

Build

ings

des

igne

d on

a p

resc

riptiv

e ba

sis sh

all c

ompl

y w

ith th

e re

quire

men

ts o

f IGC

C Se

ctio

ns 6

05, 6

06, 6

07, 6

08, 6

09, 6

10 a

nd61

1.Th

e Bu

ildin

g sh

all b

e pr

ovid

ed w

ith m

eter

ing

com

plyi

ng w

ith IG

CC S

ectio

n 60

3, a

nd c

omm

issio

ning

com

plyi

ng w

ith IG

CC S

ectio

n61

1. T

he b

uild

ing

shal

l be

prov

ided

with

aut

omat

ed-d

eman

d re

spon

se c

ompl

ying

with

IGCC

Sec

tion

604.

The

ener

gy d

istrib

utio

n sy

stem

shal

l be

desig

ned

and

cons

truc

ted

to a

ccom

mod

ate

the

futu

re in

stal

latio

n of

sub-

met

ers a

ndot

her a

ppro

ved

devi

ces i

n ac

cord

ance

with

IGCC

Sec

tion

603.

4. T

his i

nclu

des,

but

is n

ot li

mite

d to

, pro

vidi

ng a

cces

s to

dist

ribut

ion

lines

and

ens

urin

g ad

equa

te sp

ace

for t

he in

stal

latio

n of

sub-

met

ers a

nd o

ther

app

rove

d de

vice

s.

A bu

ildin

g en

ergy

man

agem

ent a

nd c

ontr

ol sy

stem

(EM

CS) s

hall

be p

rovi

ded

and

inte

grat

ed w

ith b

uild

ing

HVAC

syst

ems c

ontr

ols

and

light

ing

syst

ems c

ontr

ols t

o re

ceiv

e an

ope

n an

d in

tero

pera

ble

auto

mat

ed d

eman

d-re

spon

se (A

uto-

DR) r

elay

or I

nter

net

signa

l. Bu

ildin

g HV

AC a

nd li

ghtin

g sy

stem

s and

spec

ific

build

ing

ener

gy-u

sing

com

pone

nts s

hall

inco

rpor

ate

prep

rogr

amm

edde

man

d re

spon

se st

rate

gies

that

are

aut

omat

ed w

ith a

dem

and

resp

onse

aut

omat

ion

Inte

rnet

soft

war

e cl

ient

.Al

l bui

ldin

gs sh

all b

e re

quire

d to

roug

h-in

AU

TO-D

R, in

clud

ing:

ther

mos

tat w

ire to

all

appl

ianc

es a

nd c

ondu

it m

eter

to e

lect

rical

room

.

The

build

ing

ther

mal

env

elop

e sh

all b

e du

rabl

y se

aled

to li

mit

air l

eaka

ge in

acc

orda

nce

with

Sec

tion

C402

.4 o

f the

Inte

rnat

iona

lEn

ergy

Con

serv

atio

n Co

de a

nd th

e pr

ovisi

ons o

f thi

s sec

tion.

A co

ntin

uous

air

barr

ier s

hall

be p

rovi

ded

acco

rdan

ce w

ith S

ectio

n C4

02.4

.1 o

f the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

. The

exce

ptio

n in

Sec

tion

C402

.4.1

of t

he In

tern

atio

nal E

nerg

y Co

nser

vatio

n Co

de sh

all n

ot a

pply

.

2012

IGC

C R

EQ

UIR

EM

EN

TS

The

build

ing

ther

mal

env

elop

e ai

r tig

htne

ss sh

all b

e co

nsid

ered

to b

e ac

cept

able

whe

re th

e te

sted

air

leak

age

of th

e to

tal a

rea

of th

e bu

ildin

g th

erm

al e

nvel

ope

is le

ss th

an 0

.25

cfm

/ft2

und

er a

pre

ssur

e di

ffere

ntia

l of 0

.3 in

wat

er c

olum

n (1

.57

lb/f

t2.

Test

ing

shal

l occ

ur a

fter

roug

h-in

and

aft

er in

stal

latio

n of

pen

etra

tions

of t

he b

uild

ing

enve

lope

, inc

ludi

ng p

enet

ratio

ns fo

rut

ilitie

s, h

eatin

g, v

entil

atin

g an

d ai

r-co

nditi

onin

g (H

VAC)

syst

ems,

plu

mbi

ng, a

nd e

lect

rical

equ

ipm

ent a

nd a

pplia

nces

. Tes

ting

shal

l be

done

in a

ccor

danc

e w

ith A

STM

E 7

79.

The

tota

l lig

htin

g in

the

elev

ator

cab

shal

l be

not l

ess t

han

35 lu

men

s per

wat

t, ba

sed

on th

e to

tal l

umen

s fro

m la

mps

div

ided

by th

e to

tal w

atta

ge o

f the

lum

inai

res i

n th

e ca

b, b

ut n

ot in

clud

ing

lum

inai

res o

f sig

nals

and

disp

lays

.In

duct

ion

mot

or w

ith a

Cla

ss IE

2 ef

ficie

ncy

ratin

g, a

s def

ined

by

IEC

EN 6

0034

-30,

or a

ltern

ativ

e te

chno

logi

es, s

uch

aspe

rman

ent m

agne

t syn

chro

nous

mot

ors t

hat h

ave

equa

l or b

ette

r effi

cien

cy, s

hall

be u

sed

for t

he e

leva

tor.

Tran

smiss

ions

shal

lno

t red

uce

the

effic

ienc

y of

the

com

bine

d m

otor

/tra

nsm

issio

n be

low

that

show

n fo

r the

Cla

ss IE

2 m

otor

. Gea

rless

mac

hine

ssh

all b

e as

sum

ed to

hav

e a

100-

perc

ent t

rans

miss

ion

effic

ienc

y. P

oten

tial e

nerg

y re

leas

ed d

urin

g m

otio

n sh

all b

e re

cove

red.

The

build

ing

shal

l be

equi

pped

with

a so

lar p

hoto

volta

ic re

new

able

ene

rgy

syst

em th

at h

as th

e ca

paci

ty to

pro

vide

not

less

than

10

perc

ent o

f the

tota

l cal

cula

ted

annu

al e

nerg

y us

e of

the

build

ings

as d

eter

min

ed b

y th

e m

echa

nica

l eng

inee

r. Th

eph

otov

olta

ic sy

stem

shal

l be

Desig

n-Bu

ild b

y th

e GC

usin

g a

com

pete

nt d

esig

n en

gine

er sp

ecia

lized

in p

hoto

volta

ic sy

stem

s.Th

e in

stal

latio

n, in

spec

tion,

mai

nten

ance

, rep

air a

nd re

plac

emen

t of s

olar

pho

tovo

ltaic

syst

ems a

nd sy

stem

com

pone

nts s

hall

com

ply

with

the

man

ufac

ture

r's in

stru

ctio

ns, I

GCC

Sect

ion

610.

2.2.

1, th

e In

tern

atio

nal F

ire C

ode,

the

Inte

rnat

iona

l Bui

ldin

gCo

de a

nd N

FPA

70.

Sola

r pho

tovo

ltaic

syst

ems s

hall

be te

sted

on

inst

alla

tion

to v

erify

that

the

inst

alle

d pe

rfor

man

ce m

eets

the

desig

nsp

ecifi

catio

ns. A

repo

rt o

f the

test

ed p

erfo

rman

ce sh

all b

e pr

ovid

ed to

the

build

ing

owne

r and

Com

miss

ioni

ng A

gent

.Th

e PV

syst

em sh

all b

e m

eter

ed a

nd m

onito

red

in a

ccor

danc

e w

ith IG

CC S

ectio

ns 6

10.5

.1 a

nd 6

10.5

.2 a

nd s

hall

be m

onito

red

to m

easu

re th

e pe

ak e

lect

ric o

r the

rmal

ene

rgy

gene

rate

d du

ring

the

build

ing'

s ant

icip

ated

pea

k el

ectr

ic o

r fos

sil fu

elco

nsum

ptio

n pe

riod

in a

ccor

danc

e w

ith IG

CC S

ectio

n 60

3.EN

ERGY

SYS

TEM

S CO

MM

ISSI

ON

ING

AND

COM

PLET

ION

With

in 2

0 da

ys fr

om a

ppro

val c

ondu

ctin

g th

e fin

al m

echa

nica

l ins

pect

ion

the

GC sh

all p

rovi

de th

e O

wne

r and

the

Com

miss

ioni

ng A

gent

all

mec

hani

cal s

yste

m d

ocum

enta

tion,

man

uals,

test

ing

and

bala

ncin

g re

port

s, a

nd a

repo

rt o

f all

varia

tion

and

field

cha

nges

form

the

orig

inal

con

stru

ctio

n do

cum

ents

. The

GC

shal

l sch

edul

e a

conv

enie

nt ti

me

to m

eet o

n sit

ew

ith th

e Co

mm

issio

n Ag

ent a

nd to

per

form

any

add

ition

al te

st re

ques

ted

by C

omm

issio

ning

Age

nt a

s nec

essa

ry fo

r the

com

plet

ing

the

Com

miss

ioni

ng C

ertif

icat

ion.

With

in 6

0 da

ys fr

om a

ppro

val c

ondu

ctin

g th

e fin

al m

echa

nica

l ins

pect

ion,

the

Com

miss

ioni

ng A

gent

shal

l pro

vide

evi

denc

e of

mec

hani

cal s

yste

ms c

omm

issio

ning

and

com

plet

ion

of th

e m

echa

nica

l sys

tem

inst

alla

tion

to th

e co

de o

fficia

l, in

acc

orda

nce

with

the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

.

Draw

ing

note

s sha

ll cl

early

indi

cate

pro

visio

ns fo

r com

miss

ioni

ng a

nd c

ompl

etio

n re

quire

men

ts in

acc

orda

nce

with

this

sect

ion

and

are

perm

itted

to re

fer t

o sp

ecifi

catio

ns fo

r fur

ther

requ

irem

ents

. Cop

ies o

f all

docu

men

tatio

n sh

all b

e gi

ven

to th

e ow

ner

and

mad

e av

aila

ble

to th

e co

de o

fficia

l upo

n re

ques

t.A

com

miss

ioni

ng p

lan

shal

l be

deve

lope

d by

the

Com

miss

ioni

ng A

gent

and

shal

l inc

lude

as a

min

imum

all

of th

e fo

llow

ing

item

s:1.

A n

arra

tive

desc

ribin

g th

e ac

tiviti

es th

at w

ill b

e ac

com

plish

ed d

urin

g ea

ch p

hase

of c

omm

issio

ning

, inc

ludi

ng g

uida

nce

onw

ho a

ccom

plish

es th

e ac

tiviti

es a

nd h

ow th

ey a

re c

ompl

eted

.2.

Equ

ipm

ent a

nd sy

stem

s to

be te

sted

incl

udin

g, b

ut n

ot li

mite

d to

, the

spec

ific

equi

pmen

t, ap

plia

nces

or s

yste

ms t

o be

test

edan

d th

e nu

mbe

r and

ext

ent o

f tes

ts.

3. F

unct

ions

to b

e te

sted

incl

udin

g, b

ut n

ot li

mite

d to

, cal

ibra

tions

and

eco

nom

izer c

ontr

ols.

4. C

ondi

tions

und

er w

hich

the

test

shal

l be

perf

orm

ed in

clud

ing,

but

not

lim

ited

to, a

ffirm

atio

n of

win

ter a

nd su

mm

er d

esig

nco

nditi

ons a

nd fu

ll ou

tsid

e ai

r.5.

Mea

sura

ble

crite

ria fo

r per

form

ance

.Th

e GC

shal

l cau

se th

e HV

AC sy

stem

s to

be b

alan

ced

in a

ccor

danc

e w

ith g

ener

ally

acc

epte

d en

gine

erin

g st

anda

rds.

Air

and

wat

er fl

ow ra

tes s

hall

be m

easu

red

and

adju

sted

to d

eliv

er fi

nal f

low

rate

s with

in th

e to

lera

nces

pro

vide

d in

the

prod

uct

spec

ifica

tions

. Tes

t and

bal

ance

act

iviti

es sh

all i

nclu

de, a

t a m

inim

um, t

he p

rovi

sions

of I

GCC

Sect

ions

611

.1.2

.1 a

nd 6

11.1

.2.2

.Ea

ch su

pply

air

outle

t and

zone

term

inal

dev

ice

shal

l be

equi

pped

with

a m

eans

for a

ir ba

lanc

ing

in a

ccor

danc

e w

ith th

eIn

tern

atio

nal M

echa

nica

l Cod

e. D

ischa

rge

dam

pers

are

pro

hibi

ted

on c

onst

ant v

olum

e fa

ns a

nd v

aria

ble

volu

me

fans

with

mot

ors o

f 10

hp a

nd la

rger

. Air

syst

ems s

hall

be b

alan

ced

in a

man

ner t

o fir

st m

inim

ize th

rott

ling

loss

es th

en, f

or fa

ns w

ithsy

stem

pow

er o

f gre

ater

than

1 h

p, fa

n sp

eed

shal

l be

adju

sted

to m

eet d

esig

n flo

w c

ondi

tions

.Fu

nctio

nal p

erfo

rman

ce te

stin

g sh

all b

e in

acc

orda

nce

with

the

requ

irem

ents

of I

GCC

Sect

ions

611

.1.3

.1, 6

11.1

.3.2

and

611.

1.3.

3.Eq

uipm

ent:

Equi

pmen

t fun

ctio

nal p

erfo

rman

ce te

stin

g sh

all d

emon

stra

te th

e in

stal

latio

n an

d op

erat

ion

of c

ompo

nent

s,sy

stem

s, a

nd sy

stem

-to-

syst

em in

terf

acin

g re

latio

nshi

ps in

acc

orda

nce

with

app

rove

d pl

ans a

nd sp

ecifi

catio

ns so

that

oper

atio

n, fu

nctio

n, a

nd m

aint

enan

ce se

rvic

eabi

lity

for e

ach

of th

e co

mm

issio

ned

syst

ems i

s con

firm

ed. T

estin

g sh

all i

nclu

deal

l spe

cifie

d m

odes

of c

ontr

ol a

nd se

quen

ce o

f ope

ratio

n, in

clud

ing

unde

r ful

l-loa

d, p

art-

load

and

all

of th

e fo

llow

ing

emer

genc

y co

nditi

ons:

1. E

ach

mod

e as

des

crib

ed in

the

sequ

ence

of o

pera

tion.

2. R

edun

dant

or a

utom

atic

bac

kup

mod

e.3.

Per

form

ance

of a

larm

s.4.

Mod

e of

ope

ratio

n up

on a

loss

of p

ower

and

rest

orat

ion

of p

ower

Cont

rols

: HVA

C co

ntro

l sys

tem

s sha

ll be

test

ed to

doc

umen

t tha

t con

trol

dev

ices

, com

pone

nts,

equ

ipm

ent,

and

syst

ems a

reca

libra

ted,

adj

uste

d an

d op

erat

ed in

acc

orda

nce

with

the

appr

oved

pla

ns a

nd sp

ecifi

catio

ns. S

eque

nces

of o

pera

tion

shal

l be

func

tiona

lly te

sted

to d

ocum

ent t

hat t

hey

oper

ate

in a

ccor

danc

e w

ith th

e ap

prov

ed p

lans

and

spec

ifica

tions

.Ec

onom

izer

s: A

ir ec

onom

izers

shal

l und

ergo

a fu

nctio

nal t

est t

o de

term

ine

that

they

ope

rate

in a

ccor

danc

e w

ith th

em

anuf

actu

rer's

spec

ifica

tions

.

A pr

elim

inar

y re

port

of c

omm

issio

ning

test

pro

cedu

res a

nd re

sults

shal

l be

com

plet

ed a

nd c

ertif

ied

by th

e Co

mm

issio

ning

Agen

t and

pro

vide

d to

the

GC a

nd b

uild

ing

owne

r. Th

e re

port

shal

l be

iden

tifie

d as

"Pre

limin

ary

Com

miss

ioni

ng R

epor

t” a

ndsh

all i

dent

ify a

ll of

the

follo

win

g:1.

Item

izatio

n of

def

icie

ncie

s fou

nd d

urin

g te

stin

g re

quire

d by

this

sect

ion

that

hav

e no

t bee

n co

rrec

ted

at th

e tim

e of

repo

rtpr

epar

atio

n.2.

Def

erre

d te

sts t

hat c

anno

t be

perf

orm

ed a

t the

tim

e of

repo

rt p

repa

ratio

n be

caus

e of

clim

atic

con

ditio

ns.

3. C

limat

ic c

ondi

tions

requ

ired

for p

erfo

rman

ce o

f the

def

erre

d te

sts.

Build

ings

, or p

ortio

ns th

ereo

f, sh

all n

ot p

ass t

he fi

nal m

echa

nica

l ins

pect

ion

until

such

tim

e as

the

code

offi

cial h

as re

ceiv

ed a

lett

er o

f tra

nsm

ittal

from

the

GC a

ckno

wle

dgin

g th

at th

e bu

ildin

g ow

ner h

as re

ceiv

ed th

e Pr

elim

inar

y Co

mm

issio

ning

Rep

ort.

At th

e re

ques

t of t

he co

de o

fficia

l, a

copy

of t

he P

relim

inar

y Co

mm

issio

ning

Rep

ort s

hall

be m

ade

avai

labl

e fo

r rev

iew

.

The

GC sh

all p

rom

ptly

rect

ify a

ll de

ficie

ncie

s ide

ntifi

ed in

the

Prel

imin

ary

Com

miss

ioni

ng R

epor

t, an

d co

mpl

ete

all o

ther

test

sor

re-t

estin

g as

requ

este

d by

the

Com

miss

ioni

ng A

gent

.

Upo

n sa

tisfa

ctor

y co

mpl

etio

n of

all

defic

ienc

ies i

dent

ified

in th

e Pr

elim

inar

y Co

mm

issio

ning

Rep

ort t

he C

omm

issio

ning

Age

ntsh

all i

ssue

a si

gned

and

seal

ed c

ertif

icat

ion,

doc

umen

ting

that

the

mec

hani

cal a

nd se

rvic

e w

ater

hea

ting

syst

ems c

ompl

y w

ithSe

ctio

ns C

403

and

C404

of t

he In

tern

atio

nal E

nerg

y Co

nser

vatio

n Co

de, w

hich

shal

l be

prov

ided

by

the

GC to

the

code

offi

cial.

COM

PLET

ION

REQ

UIR

EMEN

TSW

ithin

90

days

of t

he d

ate

of re

ceip

t of t

he c

ertif

icat

e of

occ

upan

cy th

e GC

sha

ll pr

ovid

e th

e bu

ildin

g ow

ner t

he fo

llow

ing:

Draw

ings

: Con

stru

ctio

n do

cum

ents

that

incl

ude

the

loca

tion

of a

nd p

erfo

rman

ce d

ata

pert

aini

ng to

eac

h pi

ece

of e

quip

men

t.M

anua

ls: A

n op

erat

ing

and

mai

nten

ance

man

ual i

n ac

cord

ance

with

indu

stry

-acc

epte

d st

anda

rds s

hall

be p

rovi

ded

and

shal

lin

clud

e al

l of t

he fo

llow

ing:

1. S

ubm

ittal

dat

a st

atin

g eq

uipm

ent s

ize a

nd se

lect

ed o

ptio

ns fo

r eac

h pi

ece

of e

quip

men

t req

uirin

g m

aint

enan

ce.

2. M

anuf

actu

rer's

ope

ratio

n m

anua

ls an

d m

aint

enan

ce m

anua

ls fo

r eac

h pi

ece

of e

quip

men

t req

uirin

g m

aint

enan

ce, e

xcep

teq

uipm

ent n

ot fu

rnish

ed a

s par

t of t

he b

uild

ing

proj

ect.

Requ

ired

rout

ine

mai

nten

ance

shal

l be

clea

rly id

entif

ied.

3. N

ames

and

add

ress

es o

f not

less

than

one

serv

ice

agen

cy.

A sy

stem

s man

ual s

hall

be p

rovi

ded

and

shal

l inc

lude

all

of th

e fo

llow

ing:

1. H

VAC

cont

rols

syst

em m

aint

enan

ce a

nd c

alib

ratio

n in

form

atio

n, in

clud

ing

wiri

ng d

iagr

ams,

sche

mat

ics,

and

con

trol

sequ

ence

des

crip

tions

. Des

ired

or fi

eld-

dete

rmin

ed se

tpoi

nts s

hall

be p

erm

anen

tly re

cord

ed o

n co

ntro

l dra

win

gs a

tco

ntro

l dev

ices

or,

for d

igita

l con

trol

syst

ems,

in p

rogr

amm

ing

com

men

ts.

2. A

com

plet

e na

rrat

ive

of h

ow e

ach

syst

em is

inte

nded

to o

pera

te, i

nclu

ding

reco

mm

ende

d se

tpoi

nts,

seas

onal

chan

geov

er in

form

atio

n an

d em

erge

ncy

shut

dow

n op

erat

ion.

3. C

ontr

ol se

quen

ce d

escr

iptio

ns fo

r lig

htin

g, d

omes

tic h

ot w

ater

hea

ting

and

all r

enew

able

ene

rgy

syst

ems c

ompl

ete

with

a d

escr

iptio

n of

how

thes

e sy

stem

s con

nect

to, a

nd a

re c

ontr

olle

d in

con

junc

tion

with

, the

ove

rall

build

ing

syst

em.

Syst

em B

alan

cing

Rep

ort:

A w

ritte

n re

port

des

crib

ing

the

activ

ities

and

mea

sure

men

ts c

ompl

eted

in a

ccor

danc

e w

ith IG

CCSe

ctio

n 61

1.1.

2 sh

all b

e pr

ovid

ed.

Fina

l Com

mis

sion

ing

Repo

rt: A

com

plet

e re

port

of t

est p

roce

dure

s and

resu

lts id

entif

ied

as "F

inal

Com

miss

ioni

ng R

epor

t” sh

all

be c

ompl

eted

and

pro

vide

d to

the

build

ing

owne

r. Th

e re

port

shal

l inc

lude

all

of th

e fo

llow

ing:

1. R

esul

ts o

f all

func

tiona

l per

form

ance

test

s.2.

Disp

ositi

on o

f all

defic

ienc

ies f

ound

dur

ing

test

ing,

incl

udin

g de

tails

of c

orre

ctiv

e m

easu

res u

sed

or p

ropo

sed.

3. A

ll fu

nctio

nal p

erfo

rman

ce te

st p

roce

dure

s use

d du

ring

the

com

miss

ioni

ng p

roce

ss in

clud

ing

mea

sura

ble

crite

ria fo

r tes

tac

cept

ance

, pro

vide

d he

rein

for r

epea

tabi

lity.

Exce

ptio

n: D

efer

red

test

s tha

t wer

e no

t per

form

ed a

t the

tim

e of

repo

rt p

repa

ratio

n be

caus

e of

clim

atic

con

ditio

ns.

Post

-Occ

upan

cy R

ecom

mis

sion

ing:

The

com

miss

ioni

ng a

ctiv

ities

spec

ified

in IG

CC S

ectio

ns 6

11.1

.2 th

roug

h 61

1.1.

5 sh

all b

ere

peat

ed 1

8 to

24

mon

ths a

fter

cer

tific

ate

of o

ccup

ancy

. The

GC

shal

l ini

tiate

such

act

iviti

es b

y sc

hedu

ling

all n

eces

sary

test

ing

and

mee

tings

with

the

Ow

ner a

nd C

omm

issio

ning

Age

nt. S

yste

ms a

nd c

ontr

ol d

evic

es th

at a

re n

ot fu

nctio

ning

pro

perly

shal

lbe

repa

ired

or re

plac

ed b

y GC

, at n

o co

st to

bui

ldin

g O

wne

r. Ad

just

men

ts to

cal

ibra

tion

sett

ings

shal

l be

docu

men

ted.

Thi

sdo

cum

enta

tion

shal

l be

prov

ided

to th

e bu

ildin

g ow

ner a

nd C

omm

issio

ning

Age

nt.

Sequ

ence

of O

pera

tion:

A se

quen

ce o

f ope

ratio

n sh

all b

e de

velo

ped

and

final

ized

by th

e GC

upo

n co

mm

issio

ning

, whe

n th

eop

erat

iona

l det

ails

are

initi

alize

d an

d va

lidat

ed. A

sequ

ence

of o

pera

tion

shal

l be

the

final

reco

rd o

f sys

tem

ope

ratio

n, a

ndsh

all b

e in

clud

ed o

n th

e co

ntro

l dia

gram

"as-

built

s,”

or a

s par

t of t

he e

duca

tion

and

oper

atio

n an

d m

aint

enan

ce d

ocum

ent

that

is p

rovi

ded

to th

e ow

ner.

Ligh

ting

and

elec

tric

al sy

stem

s com

mis

sion

ing

and

com

plet

ion

requ

irem

ents

: Prio

r to

issua

nce

of a

cer

tific

ate

of o

ccup

ancy

,th

e Co

mm

issio

ning

Age

nt sh

all p

rovi

de e

vide

nce

of li

ghtin

g an

d el

ectr

ical

syst

ems c

omm

issio

ning

and

com

plet

ion

inac

cord

ance

with

the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

and

the

prov

ision

s of t

his s

ectio

n.

Draw

ing

note

s sha

ll sp

ecify

the

prov

ision

s for

com

miss

ioni

ng a

nd c

ompl

etio

n re

quire

men

ts in

acc

orda

nce

with

this

sect

ion

and

are

perm

itted

to re

fer t

o sp

ecifi

catio

ns fo

r fur

ther

requ

irem

ents

. Cop

ies o

f all

docu

men

tatio

n sh

all b

e gi

ven,

by

the

GC, t

o th

eow

ner a

nd m

ade

avai

labl

e to

the

code

offi

cial u

pon

requ

est i

n ac

cord

ance

with

IGCC

Sec

tions

611

.2.4

and

611

.2.5

Prec

onst

ruct

ion

docu

men

tatio

n, li

ghtin

g: C

onst

ruct

ion

and

owne

r edu

catio

n do

cum

ents

shal

l inc

lude

floo

r pla

ns, d

iagr

ams

and

nota

tions

of s

uffic

ient

cla

rity

desc

ribin

g th

e ty

pes o

f, lo

catio

n an

d op

erat

iona

l req

uire

men

ts o

f all

light

ing

cont

rols

incl

udin

g a

sequ

ence

of o

pera

tion

and

prel

imin

ary

inte

nded

setp

oint

s for

all

dim

min

g sy

stem

s and

aut

omat

ic d

aylig

ht co

ntro

ls,de

mon

stra

ting

conf

orm

ance

to th

e pr

ovisi

ons o

f thi

s cod

e, re

leva

nt la

ws,

ord

inan

ces,

rule

s and

regu

latio

ns, a

s ap

prov

ed b

y th

eco

de o

fficia

l.

Verif

icat

ion:

The

app

rove

d ag

ency

con

duct

ing

com

miss

ioni

ng sh

all v

erify

that

con

trol

s hav

e be

en in

stal

led

in a

ccor

danc

e w

ithth

e ap

prov

ed c

onst

ruct

ion

docu

men

ts. A

ny d

iscre

panc

ies s

hall

be re

view

ed fo

r com

plia

nce

with

Sec

tion

608

and

the

requ

irem

ents

of S

ectio

n C4

05.2

of t

he In

tern

atio

nal E

nerg

y Co

nser

vatio

n Co

de.

Ligh

ting

Cont

rols

Com

mis

sion

ing:

Occ

upan

t sen

sors

: Ver

ifica

tion

that

the

func

tiona

l tes

ting

of o

ccup

ant s

enso

rs h

as b

een

perf

orm

ed, i

n ac

cord

ance

with

Sec

tion

C405

.2 o

f the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

, sha

ll be

con

duct

ed.

Auto

mat

ic d

aylig

ht c

ontr

ols:

Aut

omat

ic d

aylig

ht co

ntro

ls sh

all b

e co

mm

issio

ned

in a

ccor

danc

e w

ith a

ll of

the

follo

win

g:1.

It sh

all b

e ve

rifie

d th

at th

e pl

acem

ent a

nd o

rient

atio

n of

eac

h se

nsor

is c

onsis

tent

with

the

man

ufac

ture

r's in

stru

ctio

ns. I

fno

t, th

e se

nsor

shal

l be

relo

cate

d or

repl

aced

.2.

Con

trol

syst

ems s

hall

be in

itial

ly c

alib

rate

d to

mee

t set

tings

and

des

ign

inte

nt e

stab

lishe

d in

the

cons

truc

tion

docu

men

ts.

3. P

rior t

o ca

libra

tion

of sy

stem

s con

trol

ling

dim

mab

le lu

min

aire

s, a

ll la

mps

shal

l be

seas

oned

in a

ccor

danc

e w

ith th

ere

com

men

datio

ns o

f the

lam

p m

anuf

actu

rer.

4. W

here

loca

ted

insid

e bu

ildin

gs, c

alib

ratio

n of

ope

n-lo

op d

aylig

ht co

ntro

ls, w

hich

rece

ive

illum

inat

ion

from

nat

ural

ligh

t onl

y,sh

all n

ot o

ccur

unt

il fe

nest

ratio

n sh

adin

g de

vice

s suc

h as

blin

ds o

r sha

des h

ave

been

inst

alle

d an

d co

mm

issio

ned.

5. C

alib

ratio

n of

clo

sed-

loop

day

light

cont

rols,

that

rece

ive

illum

inat

ion

from

bot

h na

tura

l and

art

ifici

al li

ght,

shal

l not

occ

ur u

ntil

furn

iture

syst

ems a

nd in

terio

r fin

ishes

hav

e be

en in

stal

led,

and

any

fene

stra

tion

shad

ing

devi

ces s

uch

as b

linds

or s

hade

s hav

ebe

en in

stal

led

and

com

miss

ione

d.6.

Cal

ibra

tion

proc

edur

es sh

all b

e in

acc

orda

nce

with

the

man

ufac

ture

r's in

stru

ctio

ns.

The

tota

l lig

htin

g in

the

elev

ator

cab

shal

l be

not l

ess t

han

35 lu

men

s per

wat

t, ba

sed

on th

e to

tal l

umen

s fro

m la

mps

div

ided

by

the

tota

l wat

tage

of t

he lu

min

aire

s in

the

cab,

but

not

incl

udin

g lu

min

aire

s of s

igna

ls an

d di

spla

ys.

Indu

ctio

n m

otor

with

a C

lass

IE2

effic

ienc

y ra

ting,

as d

efin

ed b

y IE

C EN

600

34-3

0, o

r alte

rnat

ive

tech

nolo

gies

, suc

h as

perm

anen

t mag

net s

ynch

rono

us m

otor

s tha

t hav

e eq

ual o

r bet

ter e

ffici

ency

, sha

ll be

use

d fo

r the

ele

vato

r. Tr

ansm

issio

ns sh

all

not r

educ

e th

e ef

ficie

ncy

of th

e co

mbi

ned

mot

or/t

rans

miss

ion

belo

w th

at sh

own

for t

he C

lass

IE2

mot

or. G

earle

ss m

achi

nes

shal

l be

assu

med

to h

ave

a 10

0-pe

rcen

t tra

nsm

issio

n ef

ficie

ncy.

Pot

entia

l ene

rgy

rele

ased

dur

ing

mot

ion

shal

l be

reco

vere

d.Th

e bu

ildin

g sh

all b

e eq

uipp

ed w

ith a

sola

r pho

tovo

ltaic

rene

wab

le e

nerg

y sy

stem

that

has

the

capa

city

to p

rovi

de n

ot le

ss th

an10

per

cent

of t

he to

tal c

alcu

late

d an

nual

ene

rgy

use

of th

e bu

ildin

gs a

s det

erm

ined

by

the

mec

hani

cal e

ngin

eer.

The

phot

ovol

taic

syst

em sh

all b

e De

sign-

Build

by

the

GC u

sing

a co

mpe

tent

des

ign

engi

neer

spec

ializ

ed in

pho

tovo

ltaic

syst

ems.

The

inst

alla

tion,

insp

ectio

n, m

aint

enan

ce, r

epai

r and

repl

acem

ent o

f sol

ar p

hoto

volta

ic sy

stem

s and

syst

em c

ompo

nent

s sha

llco

mpl

y w

ith th

e m

anuf

actu

rer's

inst

ruct

ions

, IGC

C Se

ctio

n 61

0.2.

2.1,

the

Inte

rnat

iona

l Fire

Cod

e, th

e In

tern

atio

nal B

uild

ing

Code

and

NFP

A 70

.So

lar p

hoto

volta

ic sy

stem

s sha

ll be

test

ed o

n in

stal

latio

n to

ver

ify th

at th

e in

stal

led

perf

orm

ance

mee

ts th

e de

sign

spec

ifica

tions

. A re

port

of t

he te

sted

per

form

ance

shal

l be

prov

ided

to th

e bu

ildin

g ow

ner a

nd C

omm

issio

ning

Age

nt.

The

PV sy

stem

shal

l be

met

ered

and

mon

itore

d in

acc

orda

nce

with

IGCC

Sec

tions

610

.5.1

and

610

.5.2

and

sha

ll be

mon

itore

dto

mea

sure

the

peak

ele

ctric

or t

herm

al e

nerg

y ge

nera

ted

durin

g th

e bu

ildin

g's a

ntic

ipat

ed p

eak

elec

tric

or f

ossil

fuel

cons

umpt

ion

perio

d in

acc

orda

nce

with

IGCC

Sec

tion

603.

ENER

GY S

YSTE

MS

COM

MIS

SIO

NIN

G AN

D CO

MPL

ETIO

NW

ithin

20

days

from

app

rova

l con

duct

ing

the

final

mec

hani

cal i

nspe

ctio

n th

e GC

shal

l pro

vide

the

Ow

ner a

nd th

eCo

mm

issio

ning

Age

nt a

ll m

echa

nica

l sys

tem

doc

umen

tatio

n, m

anua

ls, te

stin

g an

d ba

lanc

ing

repo

rts,

and

a re

port

of a

llva

riatio

n an

d fie

ld c

hang

es fo

rm th

e or

igin

al c

onst

ruct

ion

docu

men

ts. T

he G

C sh

all s

ched

ule

a co

nven

ient

tim

e to

mee

t on

site

with

the

Com

miss

ion

Agen

t and

to p

erfo

rm a

ny a

dditi

onal

test

requ

este

d by

Com

miss

ioni

ng A

gent

as n

eces

sary

for t

heco

mpl

etin

g th

e Co

mm

issio

ning

Cer

tific

atio

n.W

ithin

60

days

from

app

rova

l con

duct

ing

the

final

mec

hani

cal i

nspe

ctio

n, th

e Co

mm

issio

ning

Age

nt sh

all p

rovi

de e

vide

nce

ofm

echa

nica

l sys

tem

s com

miss

ioni

ng a

nd c

ompl

etio

n of

the

mec

hani

cal s

yste

m in

stal

latio

n to

the

code

offi

cial,

in a

ccor

danc

ew

ith th

e In

tern

atio

nal E

nerg

y Co

nser

vatio

n Co

de.

Draw

ing

note

s sha

ll cl

early

indi

cate

pro

visio

ns fo

r com

miss

ioni

ng a

nd c

ompl

etio

n re

quire

men

ts in

acc

orda

nce

with

this

sect

ion

and

are

perm

itted

to re

fer t

o sp

ecifi

catio

ns fo

r fur

ther

requ

irem

ents

. Cop

ies o

f all

docu

men

tatio

n sh

all b

e gi

ven

to th

e ow

ner

and

mad

e av

aila

ble

to th

e co

de o

fficia

l upo

n re

ques

t.A

com

miss

ioni

ng p

lan

shal

l be

deve

lope

d by

the

Com

miss

ioni

ng A

gent

and

shal

l inc

lude

as a

min

imum

all

of th

e fo

llow

ing

item

s:1.

A n

arra

tive

desc

ribin

g th

e ac

tiviti

es th

at w

ill b

e ac

com

plish

ed d

urin

g ea

ch p

hase

of c

omm

issio

ning

, inc

ludi

ng g

uida

nce

onw

ho a

ccom

plish

es th

e ac

tiviti

es a

nd h

ow th

ey a

re c

ompl

eted

.2.

Equ

ipm

ent a

nd sy

stem

s to

be te

sted

incl

udin

g, b

ut n

ot li

mite

d to

, the

spec

ific

equi

pmen

t, ap

plia

nces

or s

yste

ms t

o be

test

edan

d th

e nu

mbe

r and

ext

ent o

f tes

ts.

3. F

unct

ions

to b

e te

sted

incl

udin

g, b

ut n

ot li

mite

d to

, cal

ibra

tions

and

eco

nom

izer c

ontr

ols.

4. C

ondi

tions

und

er w

hich

the

test

shal

l be

perf

orm

ed in

clud

ing,

but

not

lim

ited

to, a

ffirm

atio

n of

win

ter a

nd su

mm

er d

esig

nco

nditi

ons a

nd fu

ll ou

tsid

e ai

r.5.

Mea

sura

ble

crite

ria fo

r per

form

ance

.Th

e GC

shal

l cau

se th

e HV

AC sy

stem

s to

be b

alan

ced

in a

ccor

danc

e w

ith g

ener

ally

acc

epte

d en

gine

erin

g st

anda

rds.

Air

and

wat

er fl

ow ra

tes s

hall

be m

easu

red

and

adju

sted

to d

eliv

er fi

nal f

low

rate

s with

in th

e to

lera

nces

pro

vide

d in

the

prod

uct

spec

ifica

tions

. Tes

t and

bal

ance

act

iviti

es sh

all i

nclu

de, a

t a m

inim

um, t

he p

rovi

sions

of I

GCC

Sect

ions

611

.1.2

.1 a

nd 6

11.1

.2.2

.Ea

ch su

pply

air

outle

t and

zone

term

inal

dev

ice

shal

l be

equi

pped

with

a m

eans

for a

ir ba

lanc

ing

in a

ccor

danc

e w

ith th

eIn

tern

atio

nal M

echa

nica

l Cod

e. D

ischa

rge

dam

pers

are

pro

hibi

ted

on c

onst

ant v

olum

e fa

ns a

nd v

aria

ble

volu

me

fans

with

mot

ors o

f 10

hp a

nd la

rger

. Air

syst

ems s

hall

be b

alan

ced

in a

man

ner t

o fir

st m

inim

ize th

rott

ling

loss

es th

en, f

or fa

ns w

ithsy

stem

pow

er o

f gre

ater

than

1 h

p, fa

n sp

eed

shal

l be

adju

sted

to m

eet d

esig

n flo

w c

ondi

tions

.Fu

nctio

nal p

erfo

rman

ce te

stin

g sh

all b

e in

acc

orda

nce

with

the

requ

irem

ents

of I

GCC

Sect

ions

611

.1.3

.1, 6

11.1

.3.2

and

611.

1.3.

3.Eq

uipm

ent:

Equi

pmen

t fun

ctio

nal p

erfo

rman

ce te

stin

g sh

all d

emon

stra

te th

e in

stal

latio

n an

d op

erat

ion

of c

ompo

nent

s,sy

stem

s, a

nd sy

stem

-to-

syst

em in

terf

acin

g re

latio

nshi

ps in

acc

orda

nce

with

app

rove

d pl

ans a

nd sp

ecifi

catio

ns so

that

oper

atio

n, fu

nctio

n, a

nd m

aint

enan

ce se

rvic

eabi

lity

for e

ach

of th

e co

mm

issio

ned

syst

ems i

s con

firm

ed. T

estin

g sh

all i

nclu

de a

llsp

ecifi

ed m

odes

of c

ontr

ol a

nd se

quen

ce o

f ope

ratio

n, in

clud

ing

unde

r ful

l-loa

d, p

art-

load

and

all

of th

e fo

llow

ing

emer

genc

yco

nditi

ons:

1. E

ach

mod

e as

des

crib

ed in

the

sequ

ence

of o

pera

tion.

2. R

edun

dant

or a

utom

atic

bac

kup

mod

e.3.

Per

form

ance

of a

larm

s.4.

Mod

e of

ope

ratio

n up

on a

loss

of p

ower

and

rest

orat

ion

of p

ower

Cont

rols

: HVA

C co

ntro

l sys

tem

s sha

ll be

test

ed to

doc

umen

t tha

t con

trol

dev

ices

, com

pone

nts,

equ

ipm

ent,

and

syst

ems a

reca

libra

ted,

adj

uste

d an

d op

erat

ed in

acc

orda

nce

with

the

appr

oved

pla

ns a

nd sp

ecifi

catio

ns. S

eque

nces

of o

pera

tion

shal

l be

func

tiona

lly te

sted

to d

ocum

ent t

hat t

hey

oper

ate

in a

ccor

danc

e w

ith th

e ap

prov

ed p

lans

and

spec

ifica

tions

.Ec

onom

izer

s: A

ir ec

onom

izers

shal

l und

ergo

a fu

nctio

nal t

est t

o de

term

ine

that

they

ope

rate

in a

ccor

danc

e w

ith th

em

anuf

actu

rer's

spec

ifica

tions

.

A pr

elim

inar

y re

port

of c

omm

issio

ning

test

pro

cedu

res a

nd re

sults

shal

l be

com

plet

ed a

nd c

ertif

ied

by th

e Co

mm

issio

ning

Agen

t and

pro

vide

d to

the

GC a

nd b

uild

ing

owne

r. Th

e re

port

shal

l be

iden

tifie

d as

"Pre

limin

ary

Com

miss

ioni

ng R

epor

t” a

ndsh

all i

dent

ify a

ll of

the

follo

win

g:1.

Item

izatio

n of

def

icie

ncie

s fou

nd d

urin

g te

stin

g re

quire

d by

this

sect

ion

that

hav

e no

t bee

n co

rrec

ted

at th

e tim

e of

repo

rtpr

epar

atio

n.2.

Def

erre

d te

sts t

hat c

anno

t be

perf

orm

ed a

t the

tim

e of

repo

rt p

repa

ratio

n be

caus

e of

clim

atic

con

ditio

ns.

3. C

limat

ic c

ondi

tions

requ

ired

for p

erfo

rman

ce o

f the

def

erre

d te

sts.

Build

ings

, or p

ortio

ns th

ereo

f, sh

all n

ot p

ass t

he fi

nal m

echa

nica

l ins

pect

ion

until

such

tim

e as

the

code

offi

cial h

as re

ceiv

ed a

lett

er o

f tra

nsm

ittal

from

the

GC a

ckno

wle

dgin

g th

at th

e bu

ildin

g ow

ner h

as re

ceiv

ed th

e Pr

elim

inar

y Co

mm

issio

ning

Rep

ort.

At th

e re

ques

t of t

he co

de o

fficia

l, a

copy

of t

he P

relim

inar

y Co

mm

issio

ning

Rep

ort s

hall

be m

ade

avai

labl

e fo

r rev

iew

.

Tim

e sw

itch

and

prog

ram

mab

le sc

hedu

le c

ontr

ols:

Lig

htin

g co

ntro

ls in

stal

led

in a

ccor

danc

e w

ith IG

CC S

ectio

n 60

8 sh

all b

epr

ogra

mm

ed. S

ched

ulin

g sh

all i

ncor

pora

te w

eekd

ay, w

eeke

nd a

nd h

olid

ay o

pera

ting

times

, inc

ludi

ng le

ap y

ear a

nd d

aylig

htsa

ving

s tim

e co

rrec

tions

. It s

hall

be v

erifi

ed th

at sy

stem

ove

rrid

es w

ork

and

are

loca

ted

in c

ompl

ianc

e w

ith S

ectio

n C4

05.2

of

the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

.

Dim

min

g sy

stem

s with

pre

set s

cene

s: F

or p

rogr

amm

able

dim

min

g sy

stem

s, it

shal

l be

verif

ied

that

aut

omat

ic sh

utof

f and

man

ual o

verr

ides

are

wor

king

and

that

pro

gram

min

g is

com

plet

e. P

rior t

o pr

ogra

mm

ing,

all

lam

ps sh

all b

e se

ason

ed in

acco

rdan

ce w

ith N

EMA

LSD

23.

Post

-com

mis

sion

ing

docu

men

tatio

n: T

he fo

llow

ing

docu

men

tatio

n sh

all b

e pr

ovid

ed b

y th

e GC

to th

e bu

ildin

g ow

ner i

nac

cord

ance

with

Sec

tion

903.

1. S

ettin

gs d

eter

min

ed d

urin

g co

mm

issio

ning

act

iviti

es o

utlin

ed in

Sec

tion

611.

3.3.

2. A

nar

rativ

e de

scrib

ing

the

inte

nt a

nd fu

nctio

nalit

y of

all

cont

rols

incl

udin

g an

y ca

pabi

lity

for u

sers

to o

verr

ide

a sc

hedu

le o

rm

aste

r com

man

d.3.

Spe

cific

atio

n sh

eets

for a

ll lig

htin

g eq

uipm

ent a

nd c

ontr

ols.

4. O

pera

tion

man

uals

for e

ach

light

ing

cont

rol d

evic

e. R

equi

red

mai

nten

ance

and

mai

nten

ance

sche

dule

s sha

ll be

cle

arly

iden

tifie

d. D

ocum

enta

tion

and

inst

ruct

ions

nec

essa

ry fo

r bui

ldin

g m

aint

enan

ce p

erso

nnel

to m

aint

ain

and

reca

libra

te li

ghtin

gsy

stem

s and

con

trol

s.5.

An

annu

al in

spec

tion

sche

dule

for l

ight

ing

cont

rols.

6. T

roub

lesh

ootin

g in

form

atio

n fo

r flu

ores

cent

dim

min

g sy

stem

s and

the

rem

edia

tion

of sw

itchi

ng is

sues

such

as f

alse

-ons

and

false

-offs

.

Post

-occ

upan

cy R

ecom

mis

sion

ing:

The

com

miss

ioni

ng a

ctiv

ities

in S

ectio

n 61

1.3.

3 sh

all b

e re

peat

ed 1

8 to

24

mon

ths a

fter

issua

nce

of th

e ce

rtifi

cate

of o

ccup

ancy

. The

GC

shal

l ini

tiate

such

act

iviti

es b

y sc

hedu

ling

all n

eces

sary

test

ing

and

mee

tings

with

the

Ow

ner a

nd C

omm

issio

ning

Age

nt. C

ontr

ol d

evic

es th

at a

re n

ot fu

nctio

ning

pro

perly

shal

l be

repa

ired

or re

plac

ed b

yth

e GC

at n

o co

st to

Ow

ner.

Adju

stm

ents

to c

alib

ratio

n se

ttin

gs sh

all b

e do

cum

ente

d. T

his d

ocum

enta

tion

shal

l be

prov

ided

toth

e bu

ildin

g ow

ner a

nd C

omm

issio

ning

Age

nt.

Build

ing

enve

lope

syst

ems c

omm

issi

onin

g an

d co

mpl

etio

n re

quire

men

ts: P

rior t

o iss

uanc

e of

a c

ertif

icat

e of

occ

upan

cy, t

heCo

mm

issio

ning

Age

nt sh

all p

rovi

de e

vide

nce

of b

uild

ing

ther

mal

env

elop

e sy

stem

s com

miss

ioni

ng a

nd c

ompl

etio

n to

the

build

ing

owne

r in

acco

rdan

ce w

ith th

e In

tern

atio

nal E

nerg

y Co

nser

vatio

n Co

de a

nd th

e pr

ovisi

ons o

f thi

s sec

tion.

Cons

truc

tion

docu

men

ts sh

all s

peci

fy th

e pr

ovisi

ons f

or c

omm

issio

ning

and

com

plet

ion

requ

irem

ents

in a

ccor

danc

e w

ith th

isse

ctio

n an

d ar

e pe

rmitt

ed to

refe

r to

spec

ifica

tions

for f

urth

er re

quire

men

ts. C

opie

s of a

ll do

cum

enta

tion

shal

l be

give

n, b

y G

C,to

the

build

ing

owne

r and

mad

e av

aila

ble

to th

e co

de o

fficia

l upo

n re

ques

t in

acco

rdan

ce w

ith IG

CC S

ectio

ns 6

11.4

.1 a

nd61

1.4.

2.

Prec

onst

ruct

ion

docu

men

tatio

n, b

uild

ing

ther

mal

env

elop

e: C

onst

ruct

ion

and

owne

r edu

catio

n do

cum

ents

shal

l ind

icat

e th

elo

catio

n, n

atur

e an

d ex

tent

of t

he w

ork

prop

osed

and

show

the

func

tiona

l req

uire

men

ts a

nd o

pera

tion

of a

ll bu

ildin

g th

erm

alen

velo

pe sy

stem

s dem

onst

ratin

g co

nfor

man

ce to

the

prov

ision

s of t

his c

ode,

rele

vant

law

s, o

rdin

ance

s, ru

les a

nd re

gula

tions

,as

app

rove

d by

the

code

offi

cial.

Verif

icat

ion:

The

app

rove

d ag

ency

con

duct

ing

com

miss

ioni

ng sh

all v

erify

that

bui

ldin

g th

erm

al e

nvel

ope

syst

ems h

ave

been

inst

alle

d in

acc

orda

nce

with

the

appr

oved

con

stru

ctio

n do

cum

ents

. Any

disc

repa

ncie

s sha

ll be

revi

ewed

for c

ompl

ianc

e w

ithre

quire

men

ts o

f the

Inte

rnat

iona

l Ene

rgy

Cons

erva

tion

Code

and

this

code

.

INDO

OR

ENVI

RON

MEN

TAL

QU

ALIT

Y AN

D CO

NFO

RT

Indo

or a

ir qu

ality

man

agem

ent p

lan

requ

ired:

An

indo

or a

ir qu

ality

man

agem

ent p

lan

shal

l be

deve

lope

d by

the

GC. S

uch

plan

shal

l add

ress

the

met

hods

and

pro

cedu

res t

o be

use

d du

ring

desig

n an

d co

nstr

uctio

n to

obt

ain

com

plia

nce

with

Sec

tions

802

thro

ugh

805.

Cons

truc

tion

phas

e re

quire

men

ts: T

he v

entil

atio

n of

bui

ldin

gs d

urin

g th

e co

nstr

uctio

n ph

ase

shal

l be

in a

ccor

danc

e w

ith IG

CCSe

ctio

ns 8

03.1

.1 th

roug

h 80

3.1.

3.Du

ct o

peni

ngs:

Duc

t and

oth

er re

late

d ai

r dist

ribut

ion

com

pone

nt o

peni

ngs s

hall

be c

over

ed w

ith ta

pe, p

last

ic, s

heet

met

al o

rsh

all b

e cl

osed

by

an a

ppro

ved

met

hod

to re

duce

the

amou

nt o

f dus

t and

deb

ris th

at c

olle

cts i

n th

e sy

stem

from

the

time

ofro

ugh-

in in

stal

latio

n an

d un

til st

artu

p of

the

heat

ing

and

cool

ing

equi

pmen

t. Du

st a

nd d

ebris

shal

l be

clea

ned

from

duc

top

enin

gs p

rior t

o sy

stem

flus

h ou

t and

bui

ldin

g oc

cupa

ncy.

Indo

or a

ir qu

ality

dur

ing

cons

truc

tion:

Tem

pora

ry v

entil

atio

n du

ring

cons

truc

tion

shal

l be

prov

ided

in a

ccor

danc

e w

ith IG

CCSe

ctio

ns 8

03.1

.2.1

thro

ugh

803.

1.2.

3.Ve

ntila

tion:

Ven

tilat

ion

durin

g co

nstr

uctio

n sh

all b

e ac

hiev

ed th

roug

h op

enin

gs in

the

build

ing

enve

lope

usin

g on

e or

mor

e of

the

follo

win

g m

etho

ds:

1. N

atur

al v

entil

atio

n in

acc

orda

nce

with

the

prov

ision

s of t

he In

tern

atio

nal B

uild

ing

Code

or t

he In

tern

atio

nal M

echa

nica

l Cod

e.2.

Fan

s tha

t pro

duce

a m

inim

um o

f thr

ee a

ir ch

ange

s per

hou

r.3.

Exh

aust

in th

e w

ork

area

at a

rate

of n

ot le

ss th

an 0

.05

cfm

/ft2

(0.2

4 L/

s/in

2) a

nd n

ot le

ss th

an 1

0 pe

rcen

t gre

ater

than

the

supp

ly a

ir ra

te so

as t

o m

aint

ain

nega

tive

pres

suriz

atio

n of

the

spac

e.

Prot

ectio

n of

HVA

C sy

stem

ope

ning

s: H

VAC

supp

ly a

nd re

turn

duc

t and

equ

ipm

ent o

peni

ngs s

hall

be p

rote

cted

dur

ing

dust

-pro

duci

ng o

pera

tions

.Re

turn

air

filte

rs.

Whe

re a

forc

ed a

ir HV

AC sy

stem

is u

sed

durin

g co

nstr

uctio

n, n

ew re

turn

air

filte

rs sh

all b

e in

stal

led

prio

r to

syst

em fl

ush

out

and

build

ing

occu

panc

y.Co

nstr

uctio

n ph

ase

duct

less

syst

em o

r filt

er: W

here

spac

es a

re c

ondi

tione

d du

ring

the

cons

truc

tion

phas

e, sp

ace

cond

ition

ing

syst

ems s

hall

be o

f the

duc

tless

var

iety

, or f

ilter

s for

duc

ted

syst

ems s

hall

be ra

ted

at M

ERV

8 or

hig

her i

n ac

cord

ance

with

ASHR

AE 5

2.2,

and

syst

em e

quip

men

t sha

ll be

des

igne

d to

be

com

patib

le. D

uct s

yste

m d

esig

n sh

all a

ccou

nt fo

r pre

ssur

e dr

opac

ross

the

filte

r.Th

erm

al e

nviro

nmen

tal c

ondi

tions

for h

uman

occ

upan

cy: B

uild

ings

shal

l be

desig

ned

in c

ompl

ianc

e w

ith A

SHRA

E 55

, Sec

tions

6.1,

"Des

ign,

” an

d 6.

2, "D

ocum

enta

tion.

”En

viro

nmen

tal t

obac

co sm

oke

cont

rol:

Smok

ing

shal

l not

be

allo

wed

insid

e of

bui

ldin

gs. A

ny e

xter

ior d

esig

nate

d sm

okin

g ar

eas

shal

l be

loca

ted

not l

ess t

han

25 ft

aw

ay fr

om b

uild

ing

entr

ance

s, o

utdo

or a

ir in

take

s, a

nd o

pera

ble

win

dow

s.Is

olat

ion

of p

ollu

tant

sour

ces:

The

isol

atio

n of

pol

luta

nt so

urce

s rel

ated

to p

rint,

copy

and

jani

toria

l roo

ms,

gar

ages

and

hang

ars s

hall

be in

acc

orda

nce

with

Sec

tion

803.

4.1.

Prin

ter,

copi

er a

nd ja

nito

rial r

oom

s: E

nclo

sed

room

s or s

pace

s tha

t are

ove

r 100

squa

re fe

et (9

.3 m

2) in

are

a an

d th

at a

re u

sed

prim

arily

as a

prin

t or c

opy

faci

lity

cont

aini

ng fi

ve o

r mor

e pr

inte

rs, c

opy

mac

hine

s, sc

anne

rs, f

acsim

ile m

achi

nes o

r sim

ilar

mac

hine

s in

any

com

bina

tion,

and

room

s use

d pr

imar

ily a

s jan

itoria

l roo

ms o

r clo

sets

whe

re th

e us

e or

stor

age

of c

hem

ical

soc

curs

, sha

ll co

mpl

y w

ith a

ll of

the

follo

win

g:1.

The

enc

losin

g w

alls

shal

l ext

end

from

the

floor

surf

ace

to th

e un

ders

ide

of th

e flo

or, r

oof d

eck

or so

lid c

eilin

g ab

ove

and

shal

lbe

con

stru

cted

to re

sist t

he p

assa

ge o

f airb

orne

che

mic

al p

ollu

tant

s and

shal

l be

cons

truc

ted

and

seal

ed a

s req

uire

d fo

r 1-h

our

fire-

resis

tanc

e-ra

ted

cons

truc

tion

asse

mbl

ies.

Alte

rnat

ivel

y, fo

r jan

itoria

l roo

ms a

nd c

lose

ts, a

ll ch

emic

als s

hall

be st

ored

inap

prov

ed c

hem

ical

safe

ty st

orag

e ca

bine

ts.

2. D

oors

in th

e en

clos

ing

wal

ls sh

all b

e au

tom

atic

or s

elf-c

losin

g.3.

An

HVAC

syst

em sh

all b

e pr

ovid

ed th

at: p

rovi

des s

epar

ate

exha

ust a

irflo

w to

the

outd

oors

at a

rate

of n

ot le

ss th

an 0

.50

cfm

per s

quar

e fo

ot (2

.4 L

/s/m

2); t

hat m

aint

ains

a n

egat

ive

pres

sure

of n

ot le

ss th

an 7

Pa

with

in th

e ro

om; a

nd th

at p

rohi

bits

the

reci

rcul

atio

n of

air

from

the

room

to o

ther

por

tions

of t

he b

uild

ing.

Filte

rs: F

ilter

s for

air-

cond

ition

ing

syst

ems t

hat s

erve

occ

upie

d sp

aces

shal

l be

rate

d at

MER

V 11

or h

ighe

r, in

acc

orda

nce

with

ASHR

AE S

tand

ard

52.2

, and

syst

em e

quip

men

t sha

ll be

des

igne

d to

be

com

patib

le. T

he a

ir-ha

ndlin

g sy

stem

des

ign

shal

l acc

ount

for p

ress

ure

drop

acr

oss t

he fi

lter.

The

pres

sure

dro

p ac

ross

cle

an M

ERV

11 fi

lters

shal

l be

not g

reat

er th

an 0

.45

in. w

.c. a

t 500

FPM

(412

Pa

at 2

.54

m/s

) filt

er fa

ce v

eloc

ity. F

ilter

per

form

ance

shal

l be

show

n on

the

filte

r man

ufac

ture

r's d

ata

shee

t.

PRO

HIBI

TED

MAT

ERIA

LSTh

e us

e of

the

follo

win

g m

ater

ials

shal

l be

proh

ibite

d:1.

Asb

esto

s-co

ntai

ning

mat

eria

ls.2.

Ure

a-fo

rmal

dehy

de fo

am in

sula

tion

GC sh

all v

erify

, prio

r to

orde

ring,

that

all

mat

eria

ls sp

ecifi

ed a

nd/o

r to

be in

corp

orat

ed in

to th

e pr

ojec

t mee

t the

Mat

eria

lEm

issi

on a

nd P

ollu

tant

Con

trol

requ

irem

ents

spec

ified

in C

hapt

er 8

of t

he 2

012

IGCC

.Em

issi

ons f

rom

com

posi

te w

ood

prod

ucts

: Com

posit

e w

ood

prod

ucts

use

d in

terio

r to

the

appr

oved

wea

ther

cov

erin

g of

the

build

ing

shal

l com

ply

with

the

emiss

ion

limits

or b

e m

anuf

actu

red

in a

ccor

danc

e w

ith th

e st

anda

rds c

ited

in IG

CC T

able

806

.1.

Com

plia

nce

with

em

issio

n lim

its sh

all b

e de

mon

stra

ted

follo

win

g th

e re

quire

men

ts o

f Sec

tion

9312

0 of

Titl

e 17

, Cal

iforn

ia C

ode

of R

egul

atio

ns, A

irbor

ne T

oxic

Cont

rol M

easu

re to

Red

uce

Form

alde

hyde

Em

issio

ns fr

om C

ompo

site

Woo

d Pr

oduc

ts.

Exce

ptio

ns:

1. C

ompo

site

woo

d pr

oduc

ts th

at a

re m

ade

usin

g ad

hesiv

es th

at d

o no

t con

tain

ure

a-fo

rmal

dehy

de (U

F) re

sins.

2. C

ompo

site

woo

d pr

oduc

ts th

at a

re se

aled

with

an

impe

rmea

ble

mat

eria

l on

all s

ides

and

edg

es.

3. C

ompo

site

woo

d pr

oduc

ts th

at a

re u

sed

to m

ake

elem

ents

con

sider

ed to

be

furn

iture

, fix

ture

s and

equ

ipm

ent (

FF&

E) th

atar

e no

t per

man

ently

inst

alle

d.Ad

hesi

ves a

nd se

alan

ts.

A m

inim

um o

f 85

perc

ent b

y w

eigh

t or v

olum

e, o

f spe

cific

cat

egor

ies o

f site

-app

lied

adhe

sives

and

seal

ants

use

d on

the

inte

rior

side

of th

e bu

ildin

g en

velo

pe sh

all c

ompl

y w

ith th

e VO

C co

nten

t lim

its in

IGCC

Tab

le 8

06.2

(1) o

r alte

rnat

ive

VOC

emiss

ion

limits

in IG

CC T

able

806

.2(2

). Th

e VO

C co

nten

t sha

ll be

det

erm

ined

in a

ccor

danc

e w

ith th

e ap

prop

riate

stan

dard

bei

ng e

ither

U.S

. EPA

Met

hod

24 o

r SCA

QM

D M

etho

d 30

4, 3

16A

or 3

16B.

The

exe

mpt

com

poun

d co

nten

t sha

ll be

det

erm

ined

by

eith

er S

CAQ

MD

Met

hods

302

and

303

or A

STM

D 3

960.

Tab

le 8

06.2

(1) a

dhes

ives

and

seal

ants

regu

lato

ry c

ateg

ory

and

VOC

cont

ent c

ompl

ianc

ede

term

inat

ion

shal

l con

form

to th

e SC

AQM

D Ru

le 1

168

Adhe

sive

and

Seal

ant A

pplic

atio

ns a

s am

ende

d on

1/7

/05.

The

prov

ision

s of t

his s

ectio

n sh

all n

ot a

pply

to a

dhes

ives

and

seal

ants

subj

ect t

o st

ate

or fe

dera

l con

sum

er p

rodu

ct V

OC

regu

latio

ns. H

VAC

duct

seal

ants

shal

l be

clas

sifie

d as

"Oth

er”

cate

gory

with

in th

e SC

AQM

D Ru

le 1

168

seal

ants

tabl

e.Ex

cept

ion:

HVA

C ai

r duc

t sea

lant

s are

not

requ

ired

to m

eet t

he e

miss

ions

or t

he V

OC

cont

ent r

equi

rem

ents

whe

n th

e ai

rte

mpe

ratu

re in

whi

ch th

ey a

re a

pplie

d is

less

than

40°

F (4

.5°C

).Ar

chite

ctur

al p

aint

s and

coa

tings

: A m

inim

um o

f 85

perc

ent b

y w

eigh

t or v

olum

e, o

f site

-app

lied

inte

rior a

rchi

tect

ural

coa

tings

shal

l com

ply

with

VO

C co

nten

t lim

its in

Tab

le 8

06.3

(1) o

r the

alte

rnat

e em

issio

ns li

mits

in IG

CC T

able

806

.3(2

). Th

e ex

empt

com

poun

d co

nten

t sha

ll be

det

erm

ined

by

ASTM

D 3

960.

Floo

ring:

A m

inim

um o

f 85

perc

ent o

f the

tota

l are

a of

floo

ring

inst

alle

d w

ithin

the

inte

rior o

f the

bui

ldin

g sh

all c

ompl

y w

ith th

ere

quire

men

ts o

f IGC

C Ta

ble

806.

4(2)

. Whe

re fl

oorin

g w

ith m

ore

than

one

dist

inct

pro

duct

laye

r is i

nsta

lled,

the

emiss

ions

from

each

laye

r sha

ll co

mpl

y w

ith th

ese

requ

irem

ents

. The

test

met

hodo

logy

use

d to

det

erm

ine

com

plia

nce

shal

l be

from

CDPH

/EHL

B/St

anda

rd M

etho

d V.

1.1,

Sta

ndar

d M

etho

d fo

r Tes

ting

VOC

Emiss

ions

Fro

m In

door

Sou

rces

, dat

ed F

ebru

ary

2010

.Th

e em

issio

ns te

stin

g sh

all b

e pe

rfor

med

by

a la

bora

tory

that

has

the

CDPH

/EHL

B/St

anda

rd M

etho

d V.

1.1

test

met

hodo

logy

inth

e sc

ope

of it

s ISO

170

25 A

ccre

dita

tion.

Whe

re p

ost-

man

ufac

ture

coa

tings

or s

urfa

ce a

pplic

atio

ns h

ave

not b

een

appl

ied,

the

floor

ing

liste

d in

IGCC

Tab

le 8

06.4

(1) s

hall

be d

eem

ed to

com

ply

with

the

requ

irem

ents

of I

GCC

Tabl

e 80

6.4(

2).

Acou

stic

al c

eilin

g til

es a

nd w

all s

yste

ms:

A m

inim

um o

f 85

perc

ent o

f aco

ustic

al c

eilin

g til

es a

nd w

all s

yste

ms,

by

squa

re fe

et,

shal

l com

ply

with

the

requ

irem

ents

of I

GCC

Tabl

e 80

6.5(

2). W

here

cei

ling

and

wal

l sys

tem

s with

mor

e th

an o

ne d

istin

ct p

rodu

ctla

yer a

re in

stal

led,

the

emiss

ions

from

eac

h la

yer s

hall

com

ply

with

thes

e re

quire

men

ts. T

he te

st m

etho

dolo

gy u

sed

tode

term

ine

com

plia

nce

shal

l be

from

CDP

H/EH

LB/S

tand

ard

Met

hod

V.1.

1, S

tand

ard

Met

hod

for T

estin

g VO

C Em

issio

ns F

rom

Indo

or S

ourc

es, d

ated

Feb

ruar

y 20

10. T

he e

miss

ions

test

ing

shal

l be

perf

orm

ed b

y a

labo

rato

ry th

at h

as th

eCD

PH/E

HLB/

Stan

dard

Met

hod

V.1.

1 te

st m

etho

dolo

gy in

the

scop

e of

its I

SO 1

7025

Acc

redi

tatio

n.W

here

pos

t-m

anuf

actu

re c

oatin

gs o

r sur

face

app

licat

ions

hav

e no

t bee

n ap

plie

d, th

e ce

iling

or w

all s

yste

ms l

isted

in IG

CC T

able

806.

5(1)

shal

l be

deem

ed to

com

ply

with

the

requ

irem

ents

of I

GCC

Tabl

e 80

6.5(

2).

Insu

latio

n: A

min

imum

of 8

5 pe

rcen

t of i

nsul

atio

n sh

all c

ompl

y w

ith th

e re

quire

men

ts o

f IGC

C Ta

ble

806.

6(1)

or I

GCC

Tabl

e80

8.6(

2). T

he te

st m

etho

dolo

gy u

sed

to d

eter

min

e co

mpl

ianc

e sh

all b

e fr

om C

DPH/

EHLB

/Sta

ndar

d M

etho

d V.

1.1,

Sta

ndar

dM

etho

d fo

r Tes

ting

VOC

Emiss

ions

Fro

m In

door

Sou

rces

, dat

ed F

ebru

ary

2010

. The

em

issio

ns te

stin

g sh

all b

e pe

rfor

med

by

ala

bora

tory

that

has

the

CDPH

/EHL

B/St

anda

rd M

etho

d V.

1.1

test

met

hodo

logy

in th

e sc

ope

of it

s ISO

170

25 A

ccre

dita

tion.

Sepa

ratin

g as

sem

blie

s: W

all a

nd fl

oor-

ceili

ng a

ssem

blie

s tha

t sep

arat

e a

mec

hani

cal o

r em

erge

ncy

gene

rato

r equ

ipm

ent r

oom

or sp

ace

from

the

rem

aind

er o

f the

bui

ldin

g sh

all h

ave

a so

und

tran

smiss

ion

clas

s (ST

C) o

f not

less

than

60

dete

rmin

ed in

acco

rdan

ce w

ith A

STM

E 9

0 an

d AS

TM E

413

, or f

or c

oncr

ete

mas

onry

and

cla

y m

ason

ry a

ssem

blie

s as c

alcu

late

d in

acc

orda

nce

with

TM

S 03

02 o

r as d

eter

min

ed in

acc

orda

nce

with

AST

M E

90

and

ASTM

E 4

13.

HVAC

bac

kgro

und

soun

d: H

VAC

syst

em c

ause

d ba

ckgr

ound

soun

d le

vels

for a

ll m

odes

of o

pera

tion

with

in ro

oms s

hall

be in

acco

rdan

ce w

ith th

e lo

wer

and

upp

er n

oise

crit

eria

(NC)

lim

its a

s sho

wn

in IG

CC T

able

807

.3.2

. Spe

cial

insp

ectio

ns sh

all b

ere

quire

d an

d co

nduc

ted

in a

ccor

danc

e w

ith IG

CC S

ectio

n 90

3.1

in o

rder

to d

emon

stra

te c

ompl

ianc

e.Sp

ecia

l ins

pect

ions

for s

ound

tran

smis

sion

: An

appr

oved

age

ncy,

em

ploy

ed b

y th

e bu

ildin

g ow

ner,

shal

l fur

nish

repo

rt(s

) of

test

find

ings

indi

catin

g th

at th

e re

sults

are

in c

ompl

ianc

e w

ith th

is se

ctio

n an

d th

e co

nstr

uctio

n do

cum

ents

. Disc

repa

ncie

s sha

llbe

bro

ught

to th

e at

tent

ion

of th

e de

sign

prof

essio

nal a

nd c

ode

offic

ial p

rior t

o th

e co

mpl

etio

n of

that

wor

k. A

fina

l tes

ting

repo

rt d

ocum

entin

g re

quire

d te

stin

g an

d co

rrec

tions

of a

ny d

iscre

panc

ies n

oted

in p

rior t

ests

shal

l be

subm

itted

at a

poi

nt in

time

agre

ed u

pon

by th

e bu

ildin

g ow

ner,

or b

uild

ing

owne

r's a

gent

, des

ign

prof

essio

nal,

and

the

code

offi

cial f

or p

urpo

ses o

fde

mon

stra

ting

com

plia

nce.

Exce

ptio

n: T

est r

epor

ts a

re n

ot re

quire

d fo

r app

rove

d as

sem

blie

s with

an

esta

blish

ed so

und

tran

smiss

ion

clas

s (ST

C) ra

ting.

Test

ing

for m

echa

nica

l and

em

erge

ncy

gene

rato

r equ

ipm

ent o

utsi

de o

f bui

ldin

gs: I

n ac

cord

ance

with

IGCC

Sec

tion

807.

3.1,

all

mec

hani

cal a

nd e

mer

genc

y ge

nera

tor e

quip

men

t sha

ll be

fiel

d te

sted

in a

ccor

danc

e w

ith T

able

903

.1. T

estin

g sh

all b

eco

nduc

ted

follo

win

g th

e co

mpl

ete

inst

alla

tion

of th

e eq

uipm

ent o

r gen

erat

ors,

the

inst

alla

tion

of so

und

redu

ctio

n ba

rrie

rs, a

ndba

lanc

ing

and

oper

atio

n of

the

equi

pmen

t or g

ener

ator

s. T

estin

g sh

all b

e at

loca

tions

repr

esen

ting

the

four

car

dina

l dire

ctio

nsfr

om th

e fa

ce o

f the

pro

ject

bui

ldin

g. S

uch

test

ing

shal

l occ

ur o

n a

Tues

day,

Wed

nesd

ay o

r Thu

rsda

y at

bot

h th

e da

y an

d ni

ght

times

with

in th

e pe

riods

show

n in

IGCC

Tab

le 8

07.3

.1.

Test

ing

for b

uild

ing

syst

em b

ackg

roun

d no

ise:

Tes

ting

shal

l be

exec

uted

in a

ccor

danc

e w

ith IG

CC S

ectio

n 80

7.3.

1 w

ithin

not

less

than

50

perc

ent o

f the

tota

l num

ber o

f roo

ms c

onta

ined

in a

bui

ldin

g or

stru

ctur

e, e

xclu

sive

of c

lose

ts a

nd st

orag

e ro

oms

less

than

50

squa

re fe

et in

are

a, a

nd e

xclu

sive

of to

ilet f

acili

ties i

n ac

cord

ance

with

Tab

le 9

03.1

. Tes

ting

shal

l occ

ur fo

llow

ing

the

com

plet

e in

stal

latio

n of

the

equi

pmen

t and

syst

ems,

the

inst

alla

tion

of a

ny so

und

redu

ctio

n ba

rrie

rs, a

nd b

alan

cing

and

oper

atio

n of

the

equi

pmen

t and

syst

ems.

COM

MIS

SIO

NIN

GTh

e Co

mm

issio

ning

Age

nt re

tain

ed b

y th

e O

wne

r sha

ll pe

rfor

m c

omm

issio

ning

dur

ing

cons

truc

tion

and

afte

r occ

upan

cy a

sre

quire

d by

IGCC

Tab

le 9

03.1

. Whe

re IG

CC T

able

903

.1 sp

ecifi

es th

at c

omm

issio

ning

is to

be

done

on

a pe

riodi

c ba

sis, t

heCo

mm

issio

ning

Age

nt sh

all p

rovi

de a

sche

dule

of p

erio

dic

com

miss

ioni

ng w

ith th

e su

bmitt

al d

ocum

ents

that

shal

l be

revi

ewed

and

appr

oved

by

the

code

offi

cial.

The

Com

miss

ioni

ng A

gent

shal

l be

qual

ified

and

shal

l dem

onst

rate

com

pete

nce,

to th

e sa

tisfa

ctio

n of

the

code

offi

cial,

for t

heco

mm

issio

ning

of t

he p

artic

ular

type

of c

onst

ruct

ion

or o

pera

tion.

The

Com

miss

ioni

ng A

gent

shal

l pro

vide

writ

ten

docu

men

tatio

n to

the

code

offi

cial d

emon

stra

ting

com

pete

nce

and

rele

vant

exp

erie

nce

or tr

aini

ng. E

xper

ienc

e or

trai

ning

shal

lbe

con

sider

ed re

leva

nt w

here

the

docu

men

ted

expe

rienc

e or

trai

ning

is re

late

d in

com

plex

ity to

the

sam

e ty

pe o

fco

mm

issio

ning

act

iviti

es fo

r pro

ject

s of s

imila

r com

plex

ity a

nd m

ater

ial q

ualit

ies.

Preo

ccup

ancy

repo

rt re

quire

men

t: Th

e GC

and

Com

miss

ioni

ng A

gent

shal

l kee

p re

cord

s of t

he c

omm

issio

ning

requ

ired

by IG

CCTa

ble

903.

1. T

he C

omm

issio

ning

Age

nt sh

all f

urni

sh c

omm

issio

ning

repo

rts t

o th

e ow

ner a

nd th

e re

gist

ered

des

ign

prof

essio

nal

in re

spon

sible

cha

rge

and,

upo

n re

ques

t, to

the

code

offi

cial.

Repo

rts s

hall

indi

cate

that

wor

k w

as o

r was

not

com

plet

ed in

conf

orm

ance

to a

ppro

ved

cons

truc

tion

docu

men

ts. D

iscre

panc

ies s

hall

be b

roug

ht to

the

imm

edia

te a

tten

tion

of th

e co

ntra

ctor

for c

orre

ctio

n. W

here

disc

repa

ncie

s are

not

cor

rect

ed, t

hey

shal

l be

brou

ght t

o th

e at

tent

ion

of th

e ow

ner,

code

offi

cial a

nd to

the

regi

ster

ed d

esig

n pr

ofes

siona

l in

resp

onsib

le c

harg

e pr

ior t

o th

e co

mpl

etio

n of

that

pha

se o

f the

wor

k. P

rior t

o th

e iss

uanc

eof

a C

ertif

icat

e of

Occ

upan

cy, a

fina

l com

miss

ioni

ng re

port

shal

l be

subm

itted

to a

nd a

ccep

ted

by th

e co

de o

fficia

l.

Post

-occ

upan

cy re

port

requ

irem

ent:

Post

-occ

upan

cy c

omm

issio

ning

shal

l occ

ur a

s spe

cifie

d in

the

appl

icab

le se

ctio

ns o

f thi

sco

de. A

pos

t-oc

cupa

ncy

com

miss

ioni

ng re

port

shal

l be

prov

ided

to th

e ow

ner w

ithin

30

mon

ths a

fter

the

Cert

ifica

te o

fO

ccup

ancy

is is

sued

for t

he p

roje

ct a

nd sh

all b

e m

ade

avai

labl

e to

the

code

offi

cial u

pon

requ

est.

BUIL

DIN

G O

PERA

TIO

NS

AND

MAI

NTE

NAN

CEGe

nera

l: Bu

ildin

g op

erat

ions

and

mai

nten

ance

doc

umen

ts in

acc

orda

nce

with

IGCC

Sec

tion

904.

3 sh

all b

e su

bmitt

ed, b

y th

e GC

,to

the

owne

r prio

r to

the

issua

nce

of th

e Ce

rtifi

cate

of O

ccup

ancy

. Rec

ord

docu

men

ts sh

all b

e in

acc

orda

nce

with

IGCC

Sec

tion

904.

2. T

he b

uild

ing

owne

r sha

ll fil

e a

lett

er w

ith th

e co

de o

fficia

l cer

tifyi

ng th

e re

ceip

t of r

ecor

d do

cum

ents

and

bui

ldin

gop

erat

ions

and

mai

nten

ance

doc

umen

ts. A

t lea

st o

ne c

opy

of th

ese

mat

eria

ls sh

all b

e in

the

poss

essio

n of

the

owne

r and

at

leas

t one

add

ition

al c

opy

shal

l rem

ain

with

the

build

ing

thro

ugho

ut th

e lif

e of

the

stru

ctur

e.

Reco

rd d

ocum

ents

: The

cov

er sh

eet o

f the

reco

rd d

ocum

ents

for t

he p

roje

ct sh

all c

lear

ly in

dica

te th

at a

t lea

st o

ne c

opy

of th

em

ater

ials

shal

l be

in th

e po

sses

sion

of th

e ow

ner.

Reco

rd d

ocum

ents

shal

l inc

lude

all

of th

e fo

llow

ing:

1. C

opie

s of t

he a

ppro

ved

cons

truc

tion

docu

men

ts, i

nclu

ding

pla

ns a

nd sp

ecifi

catio

ns.

2. A

s-bu

ilt p

lans

and

spec

ifica

tions

indi

catin

g th

e ac

tual

loca

tions

of p

ipin

g, d

uctw

ork,

val

ves,

con

trol

s, e

quip

men

t, ac

cess

pane

ls, li

ghtin

g an

d ot

her s

imila

r com

pone

nts w

here

they

are

con

ceal

ed o

r are

inst

alle

d in

loca

tions

oth

er th

an th

ose

indi

cate

don

the

appr

oved

con

stru

ctio

n do

cum

ents

.3.

For

site

s tha

t hav

e pr

evio

usly

bee

n a

brow

nfie

ld, o

r req

uire

d en

viro

nmen

tal c

orre

ctiv

e ac

tion,

rem

edia

tion

or re

stor

atio

n at

the

fede

ral,

stat

e or

loca

l lev

el, c

opie

s of e

ngin

eerin

g an

d in

stitu

tiona

l con

trol

info

rmat

ion

shal

l be

prov

ided

.4.

A c

opy

of th

e Ce

rtifi

cate

of O

ccup

ancy

.

Build

ing

oper

atio

ns a

nd m

aint

enan

ce d

ocum

ents

: The

bui

ldin

g op

erat

ions

and

mai

nten

ance

doc

umen

ts sh

all c

onsis

t of

man

ufac

ture

r's sp

ecifi

catio

ns a

nd re

com

men

datio

ns, p

rogr

amm

ing

proc

edur

es a

nd d

ata

poin

ts, n

arra

tives

, and

oth

er m

eans

of

illus

trat

ing

to th

e ow

ner h

ow th

e bu

ildin

g, si

te a

nd sy

stem

s are

inte

nded

to b

e m

aint

aine

d an

d op

erat

ed. T

he fo

llow

ing

info

rmat

ion

shal

l be

incl

uded

in th

e m

ater

ials,

as a

pplic

able

to th

e sp

ecifi

c pr

ojec

t:1.

Dire

ctio

ns to

the

owne

r or o

ccup

ant o

n th

e m

anua

l cov

er sh

eet i

ndic

atin

g th

at a

t lea

st o

ne c

opy

of th

e m

ater

ials

shal

l be

inth

e po

sses

sion

of th

e ow

ner o

r occ

upan

t.2.

Ope

ratio

ns a

nd m

aint

enan

ce m

anua

ls fo

r equ

ipm

ent,

prod

ucts

and

syst

ems i

nsta

lled

unde

r or r

elat

ed to

the

prov

ision

s of

IGCC

Cha

pter

4 in

clud

ing,

but

not

lim

ited

to, t

he fo

llow

ing,

as a

pplic

able

:2.

1. V

eget

ativ

e sh

adin

g, v

eget

ativ

e ro

ofs a

nd n

atur

al re

sour

ce p

rote

ctio

ns a

nd se

tbac

ks.

2.2.

Wat

er-c

onse

rvin

g la

ndsc

ape

and

irrig

atio

n sy

stem

s.

2.3.

Sto

rmw

ater

man

agem

ent s

yste

ms.

2.4.

Per

man

ent e

rosio

n co

ntro

l mea

sure

s.2.

5. L

ands

cape

or t

ree

man

agem

ent p

lans

.3.

Ope

ratio

ns a

nd m

aint

enan

ce d

ocum

ents

for m

ater

ials,

pro

duct

s, a

ssem

blie

s and

syst

ems i

nsta

lled

unde

r or r

elat

ed to

the

prov

ision

s of t

his c

ode

for m

ater

ial r

esou

rce

cons

erva

tion

in a

ccor

danc

e w

ith IG

CC C

hapt

er 5

incl

udin

g, b

ut n

ot li

mite

d to

, the

follo

win

g, a

s app

licab

le:

3.1.

Car

e an

d m

aint

enan

ce in

stru

ctio

ns a

nd re

com

men

ded

repl

acem

ent s

ched

ule

for f

loor

ing,

incl

udin

g, b

ut n

ot li

mite

d to

,ca

rpet

ing,

wal

k-of

f mat

s and

tile

.3.

2. C

are

and

mai

nten

ance

inst

ruct

ions

for n

atur

al m

ater

ials

incl

udin

g, b

ut n

ot li

mite

d to

, woo

d, b

io-b

ased

mat

eria

ls an

d st

one.

3.3.

Ava

ilabl

e m

anuf

actu

rer's

inst

ruct

ions

on

mai

nten

ance

for:

3.3.

1. E

xter

ior w

all f

inish

es.

3.3.

2. R

oof c

over

ings

.3.

3.3.

Ext

erio

r doo

rs, w

indo

ws a

nd sk

ylig

hts.

3.4.

Info

rmat

ion

and

reco

mm

ende

d sc

hedu

le fo

r req

uire

d ro

utin

e m

aint

enan

ce m

easu

res,

incl

udin

g, b

ut n

ot li

mite

d to

, pai

ntin

gan

d re

finish

ing.

4. O

pera

tions

and

mai

nten

ance

doc

umen

ts fo

r equ

ipm

ent,

prod

ucts

and

syst

ems i

nsta

lled

unde

r or r

elat

ed to

the

prov

ision

s of

this

code

for e

nerg

y co

nser

vatio

n in

acc

orda

nce

with

IGCC

Cha

pter

6 in

clud

ing,

but

not

lim

ited

to, t

he fo

llow

ing:

4.1.

Hea

ting,

ven

tilat

ing

and

air-

cond

ition

ing

syst

ems i

nclu

ding

:4.

1.1.

Rec

omm

ende

d eq

uipm

ent m

aint

enan

ce sc

hedu

le.

4.1.

2. A

ir fil

ters

and

flui

d fil

ters

, inc

ludi

ng re

com

men

ded

repl

acem

ent s

ched

ule

and

mat

eria

ls.4.

1.3.

Tim

e cl

ocks

, inc

ludi

ng se

ttin

gs d

eter

min

ed d

urin

g co

mm

issio

ning

.4.

1.4.

Pro

gram

mab

le c

ontr

ols a

nd th

erm

osta

ts, i

nclu

ding

sett

ings

det

erm

ined

dur

ing

com

miss

ioni

ng.

4.2.

Dom

estic

hot

wat

er sy

stem

s inc

ludi

ng p

erfo

rman

ce c

riter

ia a

nd c

ontr

ols.

4.3.

Bui

ldin

g th

erm

al e

nvel

ope

syst

ems i

nclu

ding

:4.

3.1.

Gla

zing

syst

ems i

nspe

ctio

n sc

hedu

le.

4.3.

2. P

erfo

rman

ce c

riter

ia fo

r rep

lace

men

ts a

nd re

pairs

.4.

3.3.

Info

rmat

ion

and

reco

mm

ende

d sc

hedu

le o

n re

quire

d ro

utin

e m

aint

enan

ce m

easu

res,

incl

udin

g bu

t not

lim

ited

to,

seal

ants

, mor

tar j

oint

s and

scre

ens.

4.4.

Ele

ctric

al a

nd li

ghtin

g sy

stem

s inc

ludi

ng:

4.4.

1. T

echn

ical

spec

ifica

tions

and

ope

ratin

g in

stru

ctio

ns fo

r ins

talle

d lig

htin

g eq

uipm

ent.

4.4.

2. L

umin

aire

mai

nten

ance

and

cle

anin

g pl

an.

4.4.

3. L

amp

sche

dule

, rec

omm

ende

d re

lam

ping

pla

n, a

nd la

mp

disp

osal

info

rmat

ion.

4.4.

4. P

rogr

amm

able

and

aut

omat

ic c

ontr

ols d

ocum

enta

tion,

incl

udin

g se

ttin

gs d

eter

min

ed d

urin

g co

mm

issio

ning

.4.

4.5.

Occ

upan

t sen

sor a

nd d

aylig

ht se

nsor

s doc

umen

tatio

n, in

clud

ing

sett

ings

det

erm

ined

dur

ing

com

miss

ioni

ng.

4.5.

Aut

omat

ic d

eman

d re

duct

ion

syst

ems.

5. O

pera

tions

and

mai

nten

ance

doc

umen

ts fo

r equ

ipm

ent,

prod

ucts

and

syst

ems i

nsta

lled

unde

r or r

elat

ed to

the

prov

ision

s of

this

code

for w

ater

con

serv

atio

n in

acc

orda

nce

with

IGCC

Cha

pter

7, i

nclu

ding

, but

not

lim

ited

to th

e fo

llow

ing:

5.1.

Dom

estic

fixt

ures

.5.

2. W

ater

-reg

ulat

ing

devi

ces i

nclu

ding

fauc

ets a

nd v

alve

s.5.

3. Ir

rigat

ion

and

rain

wat

er a

nd g

ray

wat

er c

atch

men

t.6.

Ope

ratio

ns a

nd m

aint

enan

ce d

ocum

ents

for e

quip

men

t pro

duct

s and

syst

ems u

nder

or r

elat

ed to

the

prov

ision

s of t

his c

ode

for i

ndoo

r env

ironm

enta

l qua

lity

in a

ccor

danc

e w

ith IG

CC C

hapt

er 8

, inc

ludi

ng, b

ut n

ot li

mite

d to

, the

follo

win

g:6.

1. H

umid

ifica

tion/

dehu

mid

ifica

tion.

6.2.

Gre

en c

lean

ing

prod

ucts

, pro

cedu

res a

nd te

chni

ques

.6.

3. R

ecom

men

ded

win

dow

cle

anin

g sc

hedu

le.

6.4.

Ven

tilat

ion

cont

rols.

6.5.

Flo

or fi

nish

es.

6.6.

Fire

plac

es a

nd c

ombu

stio

n ap

plia

nces

.

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14

Page 5: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

OFF

ICE

BU

ILD

ING

2 S

TOR

Y10

,604

SF.

51 P

AR

KS

MO

NU

ME

NT

SIG

N A

0.2

3 C

AR

GA

RA

GE

US

PS

BO

X

BIK

E R

AC

KS

CU

RB

RA

MP

(TO

TR

AS

HE

NC

LOS

UR

E)

CO

NC

RE

TE A

PR

ON

RE

: CIV

IL

BE

NC

H

A0.

1

A7.

0-7.

1

A1.

0-5.

0

TYP

A0.

2

CU

-2

CU

-7

CU

-4

CU

-1

CU

-3

CU

-6

CU

-5

CU

-9

CU

-8

HC

PA

RK

ING

SIG

NS

17'-4

"

12'-8" 2'-3"

8"2'

-6"

3'-6

"

7'-0

" CLE

AR

(2) 1

" DIA

. SLE

EV

ES

FOR

CA

NE

BO

LTS

PE

R D

OO

R

6" S

TEE

L P

IPE

BO

LLA

RD

,C

ON

CR

ETE

FIL

LED

6" S

TEE

L P

IPE

BO

LLA

RD

.C

ON

CR

ETE

FIL

LED

, TY

P.

TRA

SH

EN

CLO

SU

RE

RE

CY

CLI

NG

EN

CLO

SU

RE

3'-9

"3'

-9"

2'-6

"

7'-0

" CLE

AR

3 Y

D. D

UM

PS

TER

3 Y

D. D

UM

PS

TER

1'-0" 6'-0" 6"

6'-0

" H x

4'8

" W M

ETA

L D

EC

KG

ATE

S. P

RIM

E &

PA

INT

TOM

ATC

H S

TUC

CO

11 2"M

ETA

L S

LID

E L

ATC

HB

Y C

ON

TRA

CTO

RM

ETA

L S

PA

CE

R. C

AP

&W

ELD

CO

NTI

NU

OU

S T

OP

OS

TS.

15b 4

2'-8"4'-6"

4"

16

1715b

154

RE

INFO

RC

ED

CO

NC

RE

TE S

LAB

(SLO

PE

TO

GA

TES

)

#5 B

AR

S @

12"

EA

. WA

Y

PA

INT

ALL

EX

PO

SE

D F

AC

ES

TO M

ATC

H S

TUC

CO

CE

ME

NTI

TIO

US

STU

CC

OR

E: F

INIS

H S

CH

ED

ULE

NE

W A

SP

HA

LTP

AR

KIN

G L

OT

RE

: CIV

IL

CA

ULK

TR

AN

SIT

ION

SE

ALA

NT

AT

ALL

SE

AM

S -T

YP

.

7'-4"

16 1715b

154

CO

MP

AC

TED

SU

BG

RA

DE

OR

SE

LEC

T FI

LL

#5 B

AR

S @

16"

O.C

.

BO

ND

BE

AM

W/ (

2) #

5 B

AR

S

8" C

ON

C. B

LOC

K,

GR

OU

T S

OLI

D

(2) #

5 B

AR

S

2'-0"

1'-0"

2'-6

"

1'-6

''

3'-0" 6"3'-O''

CO

NC

RE

TE P

AV

ING

GR

OU

T S

OLI

D6'

' DIA

. SC

H. 4

O S

TEE

L P

IPE

,

FIN

ISH

SM

OO

THC

ON

VE

X C

ON

CR

ETE

CA

P

CO

NC

RE

TE F

OU

ND

ATI

ON

1/2"

EX

PA

NS

ION

JO

INT

XX

XX

XX

XX

X

SE

ALA

NT

1'' CAP

4x4x

1/4

STE

EL

TUB

E

(3 P

ER

GA

TE, W

ELD

ED

TO

TU

BE

WE

LDA

BLE

STE

EL

BU

TT H

ING

ES

8" C

MU

, RE

: STR

UC

IN 2

'-0"x

3'-0

" CO

NC

. FO

UN

DA

TIO

N

3x3x

1/4

STE

EL

TUB

E D

OO

R F

RA

ME

PR

IME

& P

AIN

T TO

MA

TCH

STU

CC

O

1 1/

2", 1

6 G

A M

ETA

L D

EC

K G

ATE

P

RIM

E &

PA

INT

TO M

ATC

H S

TUC

CO

TY

P.

5-#5

1-#5

EA

. EN

D

PL5

/8x1

0x0'

-10"

W/4

- 5/8

"ØA

307

HE

AD

ED

AN

CH

OR

BO

LTS

(EM

BE

D 1

0")

TUB

E C

OL.

RE

: PLA

N,

GR

OU

T S

OLI

D

3/4"

NO

N-S

HR

INK

NO

N-M

ETA

LIC

GR

OU

T

2-#5

CO

NT.

1'-0"

3'-8" (MIN.)

3'-0

" SQ

.

XX

XX

XX

XX

XX

EN

CA

SE

CO

LUM

N IN

CO

NC

RE

TE T

O G

RA

DE

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14

SC

ALE

: 1/1

6" =

1'-0

"

8'16

'0

32'

SE

E C

IVIL

DR

AW

ING

S F

OR

AD

DIT

ION

AL

DE

TAIL

S

FOR

EX

TER

IOR

FIN

ISH

ES

NO

T LI

STE

DIN

DR

AW

ING

, RE

FER

TO

A2.

1

Page 6: MEDICAL OFFICE BUILDING - Himmelman Construction · exterior walls do not have to be fire-rated ... connections, and penetrations. all required exits shall be operable from the inside

4'-10"

12'-1

34"

STU

CC

O B

ELO

W

1'-818"

1'-0

"

39 S

F D

OU

BLE

SID

ED

, IN

TER

NA

LLY

ILLU

MIN

ATE

D S

IGN

CA

BIN

ET

WIT

H E

MB

OS

SE

D A

LUC

OB

ON

D F

AC

E B

Y S

IGN

CO

NTR

AC

TOR

. FIE

LD V

ER

IFY

OP

EN

ING

DIM

EN

SIO

NS

.

1'-7"5'-4"1'-6"

8'-4"

10'-1

34"

RE

: STR

UC

16 17154

1

8'-6

1 4"

4'-6"

934"

934"

1'-0"2'-0"

3'-0"

8"

(OP

EN

TO

BE

YO

ND

)

1'-7"5'-4"1'-6"

8'-4"

1'-5

34"

RE

: STR

UC

16 17154

1

+ 0'

-6"

T.O

. CO

NC

. BA

SE

(4) 3

/4" D

IA. X

30"

GA

LV.

AN

CH

OR

BO

LTS

FU

RN

ISH

ED

BA

SE

CO

VE

R, P

RO

VID

ED

W/ P

OLE

+ 0'

-0"

FIN

ISH

GR

D.

SE

T B

OLT

S P

ER

TE

MP

LATE

- 6'-0

"B

.O. F

OU

ND

ATI

ON

EQ

UA

LLY

SP

AC

ED

ON

18"

DIA

.(4

) #7

BA

RS

VE

RT.

x 7

'-2" L

G.

SIT

E E

LEC

TRIC

AL

PLA

NE

LEC

TRIC

AL

CO

ND

UIT

, SE

E

(7) #

3 TI

ES

ON

15"

CE

NTE

RS

HA

ND

HO

LE W

/CO

VE

R

SE

E S

ITE

PLA

N F

OR

NU

MB

ER

OF

SIT

E

6" M

INIM

UM

BE

LOW

FIN

ISH

ED

GR

AD

EP

AIN

T TO

MA

TCH

STU

CC

O A

LL E

XP

OS

ED

ALL

FO

UN

DA

TIO

N F

OR

MS

TO

BE

RE

MO

VE

D

+ 20

'-0"

TOP

OF

FIX

TUR

E

4" S

QU

AR

E P

OLE

3/4"

BA

SE

PLA

TEW

/11"

BO

LT C

IRC

LE

CIR

CLE

(3) #

3 TI

ES

AT

TOP

14" A

BO

VE

FD

N.

STU

B 3

/4" C

ON

DU

IT

WIT

H P

OLE

LIG

HTS

.

CO

NC

RE

TE F

OU

ND

ATI

ON

BA

SE

PLA

TE

NO

TE:

2'-6" MIN.

6'-0"6"

2'-0

" DIA

.

4"

20'-0"

19'-6"

6"

11"

2'-0

" MIN

.TO

CU

RB

SIT

E L

IGH

T FI

XTU

RE

RE

FER

TO

SIT

E E

LEC

TRIC

AL

PLA

NFO

R M

OD

EL

No.

RE

FER

TO

SIT

E E

LEC

TRIC

AL

PLA

NFO

R M

OD

EL

No.

ALL

FO

UN

DA

TIO

N F

OR

MS

TO

BE

RE

MO

VE

D 6

" MIN

IMU

M B

ELO

W F

INIS

HE

D G

RA

DE

.

SIT

E L

IGH

TIN

G N

OTE

:

INC

LUD

ED

IN T

HE

CO

NTR

AC

T B

Y T

HE

ELE

CTR

ICA

L C

ON

TRA

CTO

R.

RE

GIS

TER

ED

PR

OFE

SS

ION

AL

EN

GIN

EE

R A

ND

DO

CU

ME

NTE

D IN

TH

E S

HO

P

INC

LUD

ING

SH

OP

DR

AW

ING

S, S

OIL

TE

STI

NG

AN

D D

ES

IGN

FE

ES

SH

ALL

BE

DR

AW

ING

S.

ALL

AS

SO

CIA

TED

CO

STS

FO

R T

HE

TO

TAL

INS

TALL

ATI

ON

VE

RIF

IED

BY

TH

EO

N A

CTU

AL

SIT

E S

OIL

BO

RIN

GS

AN

D A

NA

LYS

IS F

OR

EA

CH

PO

LE L

OC

ATI

ON

AS

SH

OP

DR

AW

ING

S M

AY

BE

FO

R W

OR

ST

CA

SE

SO

IL C

ON

DIT

ION

S O

R M

AY

BE

BA

SE

D

SH

OW

CO

MP

LIA

NC

E W

ITH

TH

E A

PP

LIC

AB

LE B

UIL

DIN

G C

OD

E, F

OR

WIN

D L

OA

DIN

G.

LUM

INA

IRE

, AN

D R

EIN

FOR

CE

D C

ON

CR

ETE

EN

CA

SE

ME

NT

CA

LCU

LATI

ON

S T

OP

RO

FES

SIO

NA

L E

NG

INE

ER

. S

HO

P D

RA

WIN

GS

SH

ALL

INC

LUD

E T

HE

PO

LE,

PR

OV

IDE

SH

OP

DR

AW

ING

S S

IGN

ED

AN

D S

EA

LED

BY

A R

EG

ISTE

RE

D

14

131

16 17154

(2) #

5 C

ON

T.

(3) 2

x12

BE

AM

2X6

FRA

MIN

G

EX

T G

RA

DE

PLY

WO

OD

2x8

RA

FTE

RS

2x B

LOC

KIN

G

8" C

MU

SO

LID

GR

OU

T W

/ #5

@ 2

4"O

.C. V

ER

T. C

EN

TER

IN C

ELL

S.

CU

LTU

RE

D S

TON

E T

O M

ATC

HB

UIL

DIN

G

6'-1034"

2'-0" 1'-0"

2'-8

"

3'-0"

8"

14131

16 17154

8" C

MU

SO

LID

GR

OU

T W

/ #5

@ 2

4"O

.C. V

ER

T. C

EN

TER

IN C

ELL

S.

(2) #

5 C

ON

T.

STU

CC

O. P

AIN

T TO

MA

TCH

PR

IMA

RY

BU

ILD

ING

STU

CC

O C

OLO

R

CU

LTU

RE

D S

TON

E T

O M

ATC

HB

UIL

DIN

G

BA

CK

LIT

ALU

MIN

UM

SIG

N C

AB

INE

TB

Y S

IGN

CO

NTR

AC

TOR

(3) 2

x12

BE

AM

2X6

FRA

MIN

G

EX

T G

RA

DE

PLY

WO

OD

2x8

RA

FTE

RS

2x B

LOC

KIN

G

STA

ND

ING

SE

AM

ME

TAL

RO

OF

BE

RR

IDG

E "C

EE

-LO

CK

" STA

ND

ING

SE

AM

ME

TAL

RO

OF,

RE

D

CE

ME

NTI

TIO

US

STU

CC

OS

TO O

R E

QU

AL

WIT

H T

AN

ELA

STO

ME

RIC

CO

ATI

NG

,

FAS

CIA

PR

EFI

NIS

HE

D M

ETA

L FA

SC

IA, R

ED

SO

FFIT

PR

EFI

NIS

HE

D T

AN

1/4

"x X

" ME

TAL

LAP

PA

NE

L

MA

NU

FAC

TUR

ED

STO

NE

VE

NE

ER

MA

NU

FAC

TUR

ED

STO

NE

CA

P

LE

DG

E S

TYLE

MA

NU

FAC

TUR

ED

STO

NE

MA

NU

FAC

TUR

ED

STO

NE

BA

SE

MA

NU

FAC

TUR

ED

STO

NE

VE

NE

ER

MA

NU

FAC

TUR

ED

STO

NE

VE

NE

ER

1 4 13 14 15 16 17

*U

SE

MFG

RE

CO

ME

ND

ED

JO

INT

SP

AC

ING

10'-1

34"

10'-0

"8'

-61 4"

4

THES

E PL

ANS

ARE

INST

RUM

ENTS

OF

PROF

ESSI

ONAL

SER

VICE

AND

ARE

PROT

ECTE

D BY

COM

MON

LAW

, STA

TUTO

RY A

NDOT

HER

RES

ERVE

D RI

GHTS

INCL

UDIN

G CO

PYRI

GHT.

TH

EY M

AYNO

T BE

REP

RODU

CED

OR U

SED

FOR

ANY

PURP

OSE

WIT

HOU

TTH

E W

RITT

EN C

ONSE

NT O

F TH

E DE

SIGN

PRO

FESS

IONA

L©20

14