16
Mechanical Unit Module Of Pro-E Edit by Akina

mechanical unit module

Embed Size (px)

Citation preview

Page 1: mechanical unit module

Mechanical Unit Module Of Pro-E

Edit by Akina

Page 2: mechanical unit module

2

Mechanical Unit Module Of Pro-E

Mechanical unit

The mechanical units are some functional structures, as below.

Plastic hook Metal bend Location pin Screw

Page 3: mechanical unit module

3

Mechanical Unit Module Of Pro-E

Grouping

Plastic Hook creating process as below.

Group those steps into mechanical units for engineers build mechanisms by UDF features.

Adding Rib Adding Hook Adding Chamfer Adding Radius

Page 4: mechanical unit module

4

Mechanical Unit Module Of Pro-E

Goal

Definitely, the mechanical units should have some advantage for engineers to apply easily.

Anywhere applicable

Use easier

Children relative-less

Unit repeatable

Process consistent Operation simplified

Mechanical Unit

Page 5: mechanical unit module

5

Mechanical Unit Module Of Pro-E

Module The modules integrate the mechanical units with many functions for simplifying operation.

Mapkey

Mechanical UnitRelationship

Configure

Icon

Screen

Module

Page 6: mechanical unit module

6

Mechanical Unit Module Of Pro-E

Environment

Please copy a direction for this module.

From L:\VIC\FLEX-TDC to D:\

Page 7: mechanical unit module

7

Mechanical Unit Module Of Pro-E

Opening

PRO-E is opening.

1. Click “ Tools\Options“

2. Click “ “ to choose

D:\FLEX-TDC\config.pro

3. Click button “ ”

Page 8: mechanical unit module

8

Mechanical Unit Module Of Pro-E

Interface

Please key-in “FLEX-TDC” for this operating interface

Unit module area. Mapkey area

Page 9: mechanical unit module

9

Mechanical Unit Module Of Pro-E

Water Drop sign

1. The top point is for direction.

2. The arc center is for sketched dimension.

3. The surface is for height.

This sign has to be created for modules’ reference.

Page 10: mechanical unit module

10

Mechanical Unit Module Of Pro-E

Process

4.Unit copying 3.Dimension modified

1. Water drop sign placing 2.Module inserting

Page 11: mechanical unit module

11

Mechanical Unit Module Of Pro-E

InsertingWhen the unit module is inserted, some prompts will show for object selecting, as below.

Plastic module need 1-3 picked item.Metal module need 1-5 picked item.

1 2 3

4

5

Page 12: mechanical unit module

12

Mechanical Unit Module Of Pro-E

VariableThe dimensions can be adjusted but don’t delete any dimension due to some relationships are already put into unit module.

The dimension range 1.20mm >X<1.0mm

ID >= 2.0mm

Page 13: mechanical unit module

13

Mechanical Unit Module Of Pro-E

Copy

Tracing the highlight chooses the same item in the other sign.

The sign is for module copying completely.

Page 14: mechanical unit module

14

Mechanical Unit Module Of Pro-E

Suggestion

Assembly

Placing the sign of water drop in skeleton will get efficient design.

A part

B part

Skeleton

Page 15: mechanical unit module

15

Mechanical Unit Module Of Pro-E

Let’s get operating

Page 16: mechanical unit module

16

Mechanical Unit Module Of Pro-E

Q&A