    Generally, the contractor shall allow for all necessary measures to monitor and avoid cracking in

    fresh hydrating concrete, regardless the size or volume of the pour. Such measures shall be to the

    satisfaction of the Engineer and shall be such that maximum surface crack width on hardenedconcrete measure immediately after the pour does not exceed 0.00 times the nominal cover of

    the main reinforcement.

    !he contractor shall allow for and provide approved instrumentation for the measurement of

    internal temperature changes in large pours. !he maximum concrete temperature at the point ofdelivery shall not in general exceed the lower of either "# degree $, or % degree $ above the

    prevailing shade temperature in accordance with the recommendations of &$'. !he limiting

    internal temperature differential measured across the extreme faces of concrete mass shall notexceed () degrees $ at any time.

    $uring of hardened concrete shall be executed in accordance with the curing specification.

    Generally, the element surface shall not be cooled to dissipate heat from the concrete. $uring

    methods, such as the wetting of heated concrete elements exposed to prolonged and directradiation, which induce temperature gradients within the concrete mass are strictly prohibited.

    *or large pours, the contractor shall allow for and take extra precautions to reduce concrete

    temperature gradient and to prevent the loss of surface moisture. Such measures include but are

    not limited to+

    eeping all mix constituents shaded where possible to reduce their temperatures in the

    stockpile

    $ooling of mixing water and-or replacing part or whole of the added water with ice.

    educing the cement content by the use of admixtures /but not below that reuired for

    the durability1

    2sing a cement with a lower heat of hydration

    'n3ecting liuid nitrogen after mixing of concrete

    estring the time between mixing and placing of the concrete to not more than ( hours

    4roviding approved surface insulation continuously over all exposed surfaces to prevent

    draughts and to maintain uniform temperature through the concrete mass

    'nitiating curing immediately after final tamping and continue until the approved surface

    insulation system is fully in place

    4roviding shade to the concrete surface to prevent heat gain from direct radiation.

  • 7/24/2019 Measures to Avoid Cracking in Fresh Concrete

    2/2

    'f the surface exhibits crack after compaction, it shall be retamped to close the cracks while the