Measures against Ice Storm:De-icing, Protection, Precaution

Xi-cai ZHAO

Page 2: Measures against Ice Storm De-icing, Protection

2

• Ice Storm in Jan-Mar 2008, CSG• Fault or even Damage of Lines

• 7541 lines out of service (>10kV)• 126,247 Towers/Poles collapsed (>10kV)• 859 Substations out of service (>35kV)

• Damage of Communication Facility• 54 OPGW, 52 ADSS

• Direct Economic Loss• 15 billion RMB(2.4 Billion USD)

Background

Page 3: Measures against Ice Storm De-icing, Protection

3

Background

Page 4: Measures against Ice Storm De-icing, Protection

4

Background

Ice Storm in Jan-Mar 2008

Page 5: Measures against Ice Storm De-icing, Protection

5

Background

Ice Storm in Jan-Mar 2008

Page 6: Measures against Ice Storm De-icing, Protection

6

• Ice Storm in Jan-Mar 2008, CSG• Interruption of Railway Transportation

• Passengers for Chinese New Year Holidays• Coal for Power Plants

• Interruption of Public Transportation• Shortage of Food, Water, Gas• Outage of Communication

• Telephone, Mobile phone

• Outage of Broadcast, Television

Background

Page 7: Measures against Ice Storm De-icing, Protection

7

Background-Consequence

200 thousand Passengers Stranded in

Guangzhou Railway Station

Some people had to stay away from family during Chinese New Year holidays.

Railway transportation interrupted-Passengers-Coal for Thermal Power plant

Page 8: Measures against Ice Storm De-icing, Protection

8

• De-icing

• Protection

• Precaution

Countermeasures

Page 9: Measures against Ice Storm De-icing, Protection

9

De-icing

Page 10: Measures against Ice Storm De-icing, Protection

10

De-icing

DC De-icer

Page 11: Measures against Ice Storm De-icing, Protection

11

De-icing

Page 12: Measures against Ice Storm De-icing, Protection

12

De-icing

225MW De-icer

(Rectifier Transformer + Valve Hall + Control Room + Cooling Room)

Page 13: Measures against Ice Storm De-icing, Protection

13

De-icing

100MW De-icer

(Rectifier Transformer + Valve Hall + Control Room + Cooling Room)

Page 14: Measures against Ice Storm De-icing, Protection

14

De-icing

25MW De-icer(1*TEU)

60MW De-icer(Rectifier Transformer+2*TEU)

Page 15: Measures against Ice Storm De-icing, Protection

15

De-icing

Page 16: Measures against Ice Storm De-icing, Protection

16

De-icing

Effectiveness

before after

• On-site experience

• 26 De-icers from NR in service

Page 17: Measures against Ice Storm De-icing, Protection

17

De-icingAs De-icer As SVC

De-icer

Auto-SW

Page 18: Measures against Ice Storm De-icing, Protection

18

• Line protection• Protection Function Integration

• Differential Prot. (87) + Distance Prot. (21)

• Communication• Multiple Communication Ports (2-3)• Different Types (FO / Carrier)• Different Routes (if available)

• Centralized Load Shedding Scheme

Protection

Page 19: Measures against Ice Storm De-icing, Protection

19

Protection

BUS

LINE

25

FR

FL

52

87 21

Data Transmitt/Receive27

59

50BF67P21D 67G

50STB (Only for one and a half breakers arrangement)

50G

51G

50P

51P

79SOTF

49 46BC51GVT 51PVT 62PD

81

50DZ

Integration - Differential Protection+ Distance Protection

Page 20: Measures against Ice Storm De-icing, Protection

20

• Communication for Line Protection• Multiple Communication Ports (2-3)• Different Types (FO / Carrier)• Different Routes (if available)

• Dedicated FO (for 87 & 21)• Multiplex 64 Kbit/s Channel (for 87 & 21)• Multiplex 2048 Kbit/s Channel (for 87 & 21)• Dedicated Carrier Channel (for 21)• Multiplex Carrier Channel (for 21)

Protection

Page 21: Measures against Ice Storm De-icing, Protection

21

• Duplicated FO Communication Channels• Both channels are active at the same time • Redundant protection functions (87*2+21*2)• At least one 87/21 is on during channel switching• Higher dependability

• Vs

– Backup channel will be active if main channel is in emergency.

Protection

Page 22: Measures against Ice Storm De-icing, Protection

22

Protection

Carrier

PCS-931

87

21

21

87

FO1

FO2

TXRX

RXTX

MUX2MD

2048kBit

Optic fibre

2048 kBit/s 2M(HDB3, G.703)

SDH

Coaxial cable

TXRX

RXTX

MUX64D

64kBit PCM

Twisted pairOptic fibre

64 kBit/s 2M(HDB3,G.703)

SDH

64 k,G.703

Coaxial cable

TXRX

Dedicated Optic fibre

Dedicated Carrier Channel

Multiplex Carrier Channel

Page 23: Measures against Ice Storm De-icing, Protection

23

Centralized Load Shedding Scheme based on

on-line Decision Making System

Protection

Page 24: Measures against Ice Storm De-icing, Protection

24

• Forecast of Bad & Disastrous Weather• Early Warning, Precaution

• Optimization of Networks Operation• Usage of Renewable Energy• Protection of Environment• Planning, Dispatching.

Operation Decision Support System Integrated with Meteorological information

Precaution

Page 25: Measures against Ice Storm De-icing, Protection

25

Forecast

Key technology 1: discrimination on different causes of icingKey technology 2 :

research on icing mechanism

Key technology 3 : Real-time monitoring & forecast revising

Page 26: Measures against Ice Storm De-icing, Protection

26

Forecast

Display

Real-time monitoring

Forecast

Page 27: Measures against Ice Storm De-icing, Protection

27

Early warning

Acquire weather infocontinuously

Locate substations and equipments that will be influenced by bad weather

based on GIS

Refer to historical recording of the similar weather

Generate anticipated contingencies list automatically for further analysis according to the character of bad weather

e.g.severe convection weather => trip of line after phase-phase fault

Typhoon => lose of entire transmission corridorBush fire => trip of multiple lines across the same section in succession

Page 28: Measures against Ice Storm De-icing, Protection

28

Early warning

Weather Info

Stability analysis(Thermal, transient, dynamic stability)

under anticipated contingencescaused by bad weather

Anticipated contingencies Future mode

Early warning on potential risks

Page 29: Measures against Ice Storm De-icing, Protection

29

Future mode

Predict operation mode in future 30 mins to 24 hrs

Provide early warning and suggestion on adjustment

Optimization of Networks Operation

Short-term Load Forecast

Busbar load forecast

Generation plan

Interconnection plan

Maintenance plan

Weather info-temperature, humidity, precipitation, sunshine, wind……

Weather info-temperature, humidity, precipitation, sunshine, wind……

Change mode

Power-flow check

N-1stability Check

Section Stability Check

Sensitivity Check

Security Constraint Check

Re-plan

Not pass

Page 30: Measures against Ice Storm De-icing, Protection

30

3. Data center / full-view model

4. Applications and display

1. Acquisition and application of meteorological data

2. Integrated with geographic info & grid info

Operation Decision Support System