34
MEASUREMENT OF BUILDING WORK (A) Task -01 1.1 Any construction work measurement is getting an important place. So we should know important and principles of measurements. We want to get correct and accurate measurement for this we use SMM7 this standard method of measurement provides a uniform basis for measuring building works and ombidies the essentials of good practice. Bills of quantity shall fully describe and accurately represent the quantity and quality of the works to be carried out. More detailed information than is required by these rules shall be given where necessary in order to define the precise nature and extent of the required work. SMM7’s including following type of information Use of the tabulate rules 1. Generally 2.Classification table Quantities 1. Supplementary rules Descriptions Drawing information Catalogued or standard components Work of special types Procedure where the drawn and specification information required by these rules in not available Fixing, base and background Composite item Work not covered Symbols and abbreviations Work to existing buildings General definition For this information we can take measurement easily and quickly so SMM7 is more important for building works. Principles of measurement practices For the measurement quantity surveyor using by following stationeries this are called as surveyor’s stationeries. (1) Query sheet Size- A 4 BCAS Page 1

Measurement of Building Work (a)

Embed Size (px)

DESCRIPTION

civil engineering measurment

Citation preview

Page 1: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Task -01

1.1 Any construction work measurement is getting an important place. So we should know important and principles of measurements. We want to get correct and accurate measurement for this we use SMM7 this standard method of measurement provides a uniform basis for measuring building works and ombidies the essentials of good practice. Bills of quantity shall fully describe and accurately represent the quantity and quality of the works to be carried out. More detailed information than is required by these rules shall be given where necessary in order to define the precise nature and extent of the required work.

SMM7’s including following type of information Use of the tabulate rules 1. Generally 2.Classification table Quantities

1. Supplementary rules Descriptions Drawing information Catalogued or standard components Work of special types Procedure where the drawn and specification information required by these rules in

not available Fixing, base and background Composite item Work not covered Symbols and abbreviations Work to existing buildings General definition

For this information we can take measurement easily and quickly so SMM7 is more important for building works.

Principles of measurement practices

For the measurement quantity surveyor using by following stationeries this are called as surveyor’s stationeries.

(1) Query sheet Size- A4

Use- Some dimensions are not including on plan that time asking question for architecture we use this sheet,

Modal-

BCAS Page 1

Page 2: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

QUERY ANSWER

Architect’s Signature: -........................

(2)Dimension sheet Size- A4

Use- Get measurement Modal- 9mm

b.

14mm T

15mm D

16mm S

55mmDis

14mm T

15mm D

16mm S

56mm Des

b. – Binding marginT – Timesing columnD – Dimension columnS – Squaring columnDes – Description column

BCAS Page 2

Page 3: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

MEASUREMENT PROCEDURES

When we entering dimension should fallow following information(1). Spacing of itemEntering two or more separate item we spaced 12mm each

Description

Bk.Wall

Fr. Wk

(2).Waste calculation or method of reaching dimensions

BCAS Page 3

500mm

1000mm

125mm

3000mmm

125mm

12mm Spacing

T D

1.000.50

0.130.133.00

S

Page 4: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Description

External length

External width 3450

BCAS Page 4

2/225 450

2000

2500

112.5

5062.5

2500

3000

2000

225 112.5

2/225 450

3000

T D S

Page 5: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

(3).Order of dimension

All dimensions are entering in meters with two decimals in dimension column. Dimension is entered in following order.

Horizontal length Horizontal width or breadth Vertical height or depth

Description

L-Length W-Width/breadth H-Height/Depth 02-Number

(4).Timsing

BCAS Page 5

T D

L W H

02

S

T

2/½/

D

5.25 2.10

S

11.025

Page 6: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Description

(5).Grouping of dimension

BCAS Page 6

Area = ½ × 5.25×2.10

5250

21002100

5250

Page 7: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Description

Disposal load

Tr. Excn.

&

Disposal of exct. Mat.

BCAS Page 7

850

10000

1000

A1 A2

1500

10001500

2000

T D

10.00 0.85 1.00

1.001.501.502.00

S

11.764

1.50

3.004.50

Page 8: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Bk.Wall

(6).Alternative of dimension

Description

BK.Wall. NIL

(7).Measurement of irregular figures

BCAS Page 8

T D

XXX XXX XXX XXX

S

- -NIL -

Page 9: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Description

r=225

Task-01

1.3 Indentify and describe the major part of a bill of quantities (P3)

After entering Abstract sheet next we use bill page so BOQ has major 5patrs these are follows 1). Preliminaries

Preliminaries Items we separate two parts.

Not specific to work section Specific to work sectionThis items not specific to work section but This items are specific to work sections on

BCAS Page 9

A

r r=1500

A=πr2

2000

1500

A= ½ ×A×H

2000

4000

1500

A=½×(A+B)×H

2000

V=πr2h

T π/

½/

½/

π/

D

1.50 1.50

2.001.50

6.001.50

0.230.232.00

S

xxx

3.00

9.00

2.05

Page 10: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

that has cost.Eg:- 1.Tendering process 2.Contractual requirements for insurances 3.Site facilities for the employer’s representative and payments to the local Authorities.

the work time only after working these are removed or finished so that has cost such as,1.Water for work2.Supervision3. Temporary work.

Temporary road Hats / office Electric supply

4. Scaffolding.

2).Sectional trade bill

There would be a number of sectional trade bills in accordance with the scope, or complexity of the project. All the measured work in according with the SMM7 will be inserted in to sectional trade bills, such as,

*Bill No.2D-Ground work

*Bill No.3F-Masenry

*Bill No.4E-In-site concrete etc.

3).Preambles.

Preambles are clauses usually inserted at the head of each work section bills, and principally contained descriptions, together with another relevant information of which the contractor should be aware in pricing. Inserting the preamble in the BOQ the length of the work descriptions are reduced and the specifications is not necessary if they provide the information. Another procedure is to combine all preamble clauses in a separate bill, following preliminaries.

Functions of preambles

۩ Specify quality of materials.

۩ Specify the standard of the workmanship required .

۩ Assist in pricing measured work.

۩ Repetition of same information item by item will be avoided and hence the work

Descriptions will be more concise.

4).Money provision.

BCAS Page 10

Page 11: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

There are two types of money provisions that are inserted in to a BOQ

1. Prime cost sums.

The term “Prime cost sum” (PC sum) is a sum provided in the bill of quantities for works or services to be executed by a nominated subcontractor, or for materials or goods to be obtained from a nominated supplier such sums are exclusive of any profit required by the main contractor and provision is made for its addition following the Pc sum general and special attendance by the main contractor on nominated subcontractors is provided as an item in the preliminaries bill. These can be entered either as fixed or time related charges.

A Provide the PC sum of Rupees 200000for the

Supply of 12 Nr sanitary appliances, to be

Obtained from M/S sanitaryware ltd. 200000 00

B Add main contractor’s profit

C Provide the PC sum of Rupees1500000 of or

The installations of a lift to be exacted by a

Nominated sub-contractor. 1500000 00

D Add special attendance %

E Add Main contractor’s profit %

2. Provisional Sums

Where the work cannot be descried and given in accordance with SMM (SL) rules, It shall be given as a provisional sum and identified as for either defined or undefined work. In defined work items a description and indication of the amount of work. Can be given and the contractor will be deemed to have made due allowance in programming, planning and pricing the preliminaries. Whore these details cannot be supplied the work is classified as undefined and the contractor will be deemed not to have made any allowance in programming, planning and pricing the preliminaries. Work by local authorities and statutory undertaking are the subject of provisional sums.

A Allow the general provisional sum of Rupees

100000 to cover the cost of any unforeseen

Works. This sum is to be expanded the

discretion of the Architect/Engineer. 100000 00

BCAS Page 11

Page 12: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

5).General summary.

There general summary is to provide monetary collection at the end of each group of work sections such as D-Ground works, F-Masonry the total of which are then trans tarred to the final summary.

1. General summary.

D-Ground work

E-In-suit concrete

F-Masonry

G-Creasing timber

H-Covering

Total carried to final summary

Rs($) Cts(P)

XXX XXX

2. Final summary.

1.Preliminaries /General condition

2.prime cost and provisional sum

3. Measred work.

4. Contingencies.

Total carried to form of tender.

Rs($) Cts(P)

XXX XXX

BCAS Page 12

Page 13: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1.

2.

Bill No:-1A50-Nominated suppliersPreambles.

1. Iron mongaries give by ABC nominated sub contractors.

2. All iron mongaries made by pure steel and brash.

Nominated suppliersAllow a pc sum of Rs 200000 supplying of necessary iron mongaries a.b.d.

15 % for main contractor’s profit

Pc sum

%

Sum

15

BCAS Page 13

Page 14: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1. 1.11.21.3

2.

3.

Bill No:-2D-20 Excavating and fillingPreambles.

1. Machineries are use for cutting down trees and tree stumps

2. Mechanical or manually excavation shall use as appropriate.

3. Excavated materials shall disposal 150m away on site.

4. Imported gravel shall use for filling.

5. 150mm tick layer shall compact manually.

6. 2nd class timber shall use for the earth work support.

SITE PREPARATIONCutting down trees.Girth 600-1500Girth 1500-3000Girth >3000

Removing tree stumps girth >3000

Clearing site vegetation including

NrNrNr

Nr

M2

574

2

136

BCAS Page 14

Page 15: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

4.5.6.7.

8.

9.10.

all bushes, hegges and tree stumps girth ≤ 600

EXCAVATION150mm top soil Pit max depth ≤ 2000Pit max depth ≤ 1000Tranch max depth ≤ 1000

EARTH WORK SUPPORTESide of excavation max depth ≤1000Distance between opposing faces ≤2000

DISPOSALSurface waterExcavated materials a.b.d

M2

M3

M3

M3

M2

IM2

136 23 01 19

88

Item 62

Total forwarded to next page

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

11.

12.

13. 14.

Total brought from previous page

FILLING TO EXCAVATIONThick > 0.25m a.b.d

FILLING TO MAKE UP LEVELSThick > 0.25m a.b.d

SURFACE TREATMENT Compacting bottoms of excavation a.b.dTrimming sides of cuttings

M3

M3

M2

M2

09

19

56 88

BCAS Page 15

Page 16: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1. 2. 3. 4. 5.

Bill No:-3

E10-Mixing/Curing/Curing in-situ concrete

Preambles.1. Mechanical or manually

mixing shall use as mixing concrete.

2. 1:3:6 mass concrete shall use for foundation.

3. Concrete shall cure by manually.

4. Concrete shall compact manually.

5. Grade 25 reinforced concrete shall use.

ISOLATED FOUNDATIONSFoundations a.b.dBed foundation thick ≤ 150 a.b.dConcrete in slab thick 150-450mm a.b.dConcrete in columns DPC to 1st floor a.b.dConcrete in stair case DPC to 1st floor a.b.d

M3

M3

M3

M3

M3

07 12 18 02 02

BCAS Page 16

Page 17: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1. 2. 3. 4. 5. 6. 7.

E20- Formwork for in-situ concrete

Preambles.1. 25mm thick 2nd class

plywood shall use for formwork.

SIDES OF FOUNDATIONSSides of foundation ht ≤250 a.b.dColumn base ht ≤ 1000Formwork for sides soffits of slab ht to soffits<3000, Thick≤ 200Soffits of landings a.b.dEdges of suspended slab height ≤250 a.b.dSides of column dpc to 1st floor a.b.dStair case 1000mm width, 150mwaist, and 150 rise a.b.d

MM2

M2

M2

M2

M2

M2

27 18

136 02 68 40 11

Total forwarded to next page

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1 2 3.

Total brought from previous page

E30-Reinforcement for in-situ concrete

Preambles.1. Yield steel bar reinforcement

shall use for column base, slab, beam, and stair case.

2. Tor steel bar reinforcement shall use for stirrups.

3. Lap length shall be 24xd4. Staircase lap length shall be

52xd

BARY-12 bar reinforcement a.b.d R-12 bar reinforcement a.b.dY-16 bar reinforcement a.b.d

ttt

02 0.2 01

BCAS Page 17

Page 18: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

.

1. 2.

Bill No:-4F10-Brick / Block walling

Preambles.1. 215x102.5x65 common brick

shall use for brick wall.2. 1:6 cement: motar shall use.3. Bricks are bonded with English

bond.

WALLS225mm thick wall dpc to 1st floor a.b.d112.5mm thick wall a.b.d

F20- Natural stone rubble walling.

Preambles.1. Natural stone shall use for

rubble walling2. 1:6 cement:Motar shall use for

m2

m2 130 04

BCAS Page 18

Page 19: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1.

1.

bonding.

WALLS450mm thick wall a.b.d

F30- Assessorial / Sundry items for brick/ Block/ Stone walls.

Preambles.1. 20mm thick dpc for shall use 2. Apply 2 cots of hat dpc tar

planted with find sand. 3. 1:4 cement: sand shall use for dpc.Damp proof coursesDpc width >300 a.b.dF31- Precast concrete sills / Lintels / Copings / Features.

Preambles.1. PCC lintel shall use.2. Lintels include 4Nos Y10 bar

reinforcement. 3. R6 reinforcement Links shall

use.

m2

m2

48

27

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1. 2. 3. 4. 5. 6.

.

Total brought from previous page

LINTELS

225x150x2100 Lintel a.b.d112.5x100x1800 lintel a.b.d225x150x1500 lintel a.b.d1950x225x150 lintel a.b.d1650x225x150 lintel a.b.d675x222x150 lintel a.b.d

NrNrNrNrNrNr

01 03 01 05 01 02

BCAS Page 19

Page 20: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1. 2. 3. 4. 5.

Bill No:-5G20- Carpentry/Timber framing/First fixing

Preambles.1. 1st class timber shall use for

roofing2. Wall plate shall fixed with on

the wall3. Other plates are fixed on the

post.4. Valance board shall for gutter

board.

PLATE75x100 wall plate a.b.d50x175 ridge platea.b.d100x100 post a.b.d

mmmmm

39 02 03 20 275

BCAS Page 20

Page 21: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

6. 50x125 parlin a.b.d50x100 rafters a.b.d25x225 velancy board fix to wooden surface.

m 46

Total forwarded to general summary ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

.

Bill No:-6H32-Plastics profiled sheet cladding / Covering / Siding.

Preambles.1. Asbestors sheet shall use for roof covering.2.50x50 batten shall use3.600m canters spacing shall use 4.4000x1000 sheet shall use.

ROOF COVERING21° pitch sheet a.b.d

M2 71

BCAS Page 21

Page 22: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

.

1.

Bill No:-7J30-Liquid Applied tanking / Damp proof membrance.

Preambles.1. Gage 1000 polytheen shall

use for damp proofing.2. 150 side and end lap for use

dpm.3. 2 cots of polytheen shall use

for dpm.

Tanking and damp proofingDPM a.b.d

m2 71

BCAS Page 22

Page 23: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1.

Bill No:-8K40- Demountable suspended ceiling.

Preambles.1. 15mm thick smooth soffit

plywood shall use for ceiling.2. 1st class plywood shall use. 3. Plywood shall fix with wooden

surface.

CEILLINGPlywood ceiling a.b.d

m2 79

BCAS Page 23

Page 24: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

Bill No:-9L10- Windows / Roof light / screens / covers.

Preambles.1. Windows and window frames

are made by 1st class timber.2. Window frames fixed with wall

surface.3. Casements fixed with wooden

frames.4. Windows including 300mm

trellis.

BCAS Page 24

Page 25: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1. 2. 3. 4.

1. 1.1 1.2 1.3 2. 2.1 2.2 2.3

Windows and window frame1500x2100 three Casements glazed window a.b.d1500x1500 window a.b.d1200x1500 two Casements window a.b.d450x 300 fan light a.b.d

L20- Doors /Shutters / Hatches

Preambles.1. 1st class treated timber shall

use for door frame.2. Decorated ply wood door shall

use for front door.3. Timber panelled door shall

use 4. PVC door shall use for toilet.

DOORS1230x2040 plywood door a.b.d1550x1990 door a.b.d930x1740 pvc door a.b.d

DOOR FRAME AND DOOR LININGS75x100 jambs a.b.dHeads a.b.dTransoms a.b.b

NrNr

NrNr

NrNrNr

NrNrNr

02 03

01 02

03 01 01

21 07 02

Total forwarded to next page

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

1

Total brought from previous page

L40- General glazing

Preambles.1. 3mm thick standard plain

glaze shall use.2. Glaze fixed with wooden

surface.3. Fixed wooden bed and

springs. m2 5

BCAS Page 25

Page 26: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

STANDARAD PLAIN GLASSPlain glass a.b.d

Total forwarded to general summary

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNTBill No:-10M20-Plastered / Rendered / Roughcast Coatings.

Preambles.1. 20mm thick smooth bed shall

do the internal plastering.2. 20mm thick semi rough bed

do the external plastering.

BCAS Page 26

Page 27: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1. 2.

1 1.1 1.2

2 2.1

3. Plastered against brick surface.

4. 1:1:5 Cement, lime, mortar shall use for plastering.

5. Material shall mix with manually.

6. Plastered for dpc to 1st floor.

WALLSInternal width >300 a.b.dExternal width >300 a.b.d

M40- Stone/ Concrete/ Quarry /Ceramic tilling/ Mosaic.

Preambles.1. 600x600 ceramic tiles shall

use for floor tilling.2. 8mm thick tiles shall use3. 100x600 ceramic tiles shall

use for skirting.4. 10mm thick ceramic tiles shall

use for skirting.5. Joint two tiles with matching

colour tile grouts.6. 20mm thick 1:4 cement, sand

bed shall use tilling.7. Clay ridge tile shall use

roofing. 8. Tilling for 1500mm height rise

and 1000mm width trade stair case.

FLOORSFloor tiles a.b.dLanding a.b.d

TREADSStair case

m2

m2

m2

m2

L

203 83

81 02

05

Total forwarded to next page ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

3 3.1

4 4.1

Total brought from previous pageRISERSStair case a.b.d

SKIRTINGS

L

m

05

150

BCAS Page 27

Page 28: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

4.2

1. 1.1 1.2.

2. 2.1

Skirting a.b.dRidge tile a.b.d

M60- Painting/Clear finisihing

Preambles.1. Tyner mix with the paint.2. Painting with general surface. 3. 2 Carts of oil paint shall use.4. Paint mix with manually.

General surfaceInternal painting dpc to 1st floor a.b.dExternal painting a.b.d

GLAZED WINDOWSSpan area a.b.d

m

m2

m2

m2

02

390 106

30

Total forwarded to general summary ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

Bill No:-11P20- Unframed isolated trims/ Skirting / Sundry items.

Preambles.

BCAS Page 28

Page 29: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1.

1 2 3 4 5 6 7 8

1. Decorated hand rails shall make.

2. Hand rails made with steel.

ISOLATED HAND RAILS AND GRAB RAILS.Hand rail a.b.d

P21- Ironmongery

Preambles.1. Ironmongeries fixed only

wooden surface. TYPE OF ITEM,UNIT OR SET STATED150 brase butts fix only o wooden surfaces.Casement rings a.b.dCasement stays a.b.dCasement fastners a.b.dMotice lock a.b.dEyelence a.b.d100mm brase butts a.b.d Barral ball a.b.d

L

Nr

NrNrNrNrNrNrNr

06

15 02 29 29 05 01 44 01

Total forwarded to general summary ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT

Bill No:-12R10-Rainwater pipe work /Gutters.

Preambles.

BCAS Page 29

Page 30: Measurement of Building Work (a)

MEASUREMENT OF BUILDING WORK (A)

1. 2. 3. 4. 5.

1.83mm diameter pipe shall use 2.Pipe fixed to brick wall. 3.Pipes are connected with pvc brackets 750 counter.

PIPESDown pipe a.b.dExtra over a.b.d sp jts to pipes.100mm sqd pvc gutter fixed with pvc gutter brackets in 200center a.b.dE.o pvc bendE.o pvc running had to gutters.

LNrL

NrNr

14 02 46

04 02

Total forwarded to next page

BCAS Page 30