Measurement Assigment 2

Embed Size (px)

Citation preview

  • 7/28/2019 Measurement Assigment 2

    1/12

    SCHOOL OF ARCHITECTURE, BUILDING AND

    DESIGN

    BACHELOR OF QUANTITY SURVEYING

    (HONOURS)

    QSB 1114Measurement 1

    Site Report

    April Semester 2013

    Individual Assignment

    Submission Date: 2 July 2013

    NAME : Lim Ai Pei

    Student ID : 0307972

  • 7/28/2019 Measurement Assigment 2

    2/12

    Content page

    1. OBJECTIVE OF SITE VISIT

    2. CONTENT / TECHNICAL OBSERVATION

    3. PHOTOS AND DESCRIPTION

    4. LEARNING OUT COME / CONCLUTION

  • 7/28/2019 Measurement Assigment 2

    3/12

    CONTENT / TECHNICAL OBSEVATIONS

    In order to visit the site we were split in to 2 sessions, the first session was at

    8:45 am to 9:45 am and the second session starts at 9;45 am to 10;45 am.On the 21of June 2013 we gathered at the entrance of the site. The site was located in Subang

    Jaya close to Subang Parade. The address in : LOT PT12590,Senahagian Rezab

    Talian Rintasan Elektrik Subang Jaya, Mukim Damansara,Daerah Petaling, Selangot

    Darul Ehsan. The architect in charged is Soonchai Architect. The Civil and Structure

    mechanical and electrical engineer are J & A Association SDN BHD. The conteactor

    in charged is KP Synergies berhad -Trangrid venture SDH BHD consortium.Startingdate of construction is18 October 2010 the estimated time for this project to be

    completed is 3 years from the starting date.

    We were shown around the site by Mr. Peter. First we had a look at the bar

    bending area. All the reinforcement bars are placed there while the bar benders

    bend the bar bending machine. Secondly we visited the carpentry area, this is where

    wood used for formwork are placed and cut in to their specific sizes. Later on, we

    saw construction workers make the concrete spacer. Concrete are mixed then

    poured in a mould then in cut in to the specific sizes and left t dry. Certain concrete

    spaces are inserted with wires and some not. We learned that concrete spacers with

    wire attached to it are made for the sides of the reinforcement bars and the ones

    without the wire are for the bottom.

    After that, we observed how the construction workers work one site. The

    construction workers that are working at a high level would secure them self by

    attaching them self to the scaffolding. This is to prevent the worker from falling down

    from a high level. We were told that only the pile caps are precast and the rest of the

    concrete work on site where insitu casting and the industrialised building system

    (IBS) is not used trough out this construction. The columns are all sitting on the pile

    caps because if the column where to sit on the beam it would not be strong enough.

    The maximum high of a column is 11 meters. Because this is a substation platforms

    are specially made according to the size and able to with stand the weight of the

    transformers.

  • 7/28/2019 Measurement Assigment 2

    4/12

    Objective of site visit

    To understand the basic of the construction process

    To understand the practical aspect of construction techniques on site and the

    comparison of theories from books.

    To be exposed to actual working environment on site including uncertainty

    circumstances

    To learn the ability of communicating with the construction team members on

    site and to learn the importance of teamwork in the building team.

    To witness the usage of construction equipment on site that includes

    mechanical plants.

    To explore and identify various types of building materials and technology on

    site.

    To be aware of the importance of safety on site and understanding of safety

    problems and site conditions.

    To recognize the items measurable for sub-structure and reinforced concrete

    frame works.

    To adopt a systematic approach to take-off quantities from drawings for the

    preparation of Bills of Quantities for substructures and reinforced concrete

    frame works.

    To demonstrate a systematic and orderly mind and be able to visualize the

    drawings and details given for substructure and reinforced concrete frame

    works.

  • 7/28/2019 Measurement Assigment 2

    5/12

    Photos and descriptions

    Information of the construction is written on this board.

    Saftey precaution sign bords out side of the site.

  • 7/28/2019 Measurement Assigment 2

    6/12

    Site office.

    Reinforcement bars in the barbending yard.

    .

    Bar benders bending the bars with the bar bending machine

  • 7/28/2019 Measurement Assigment 2

    7/12

    .

    Reinforcement bars for columns

    Mesh fabrics on site

  • 7/28/2019 Measurement Assigment 2

    8/12

    Formwork to edges and faces of column and formwork to edges and soffit of beams.

    Formwork has been strike off after the concrete in the column is dried. The

    reinforcement bar above the column are starter bars, it indicates the width of the next

    column,

  • 7/28/2019 Measurement Assigment 2

    9/12

    Platform for the transformer with an excavator at the back.

    Safty performance grading board

  • 7/28/2019 Measurement Assigment 2

    10/12

    Reinforcement bars with links

    Concrete spacer tied to reinforcement bars

    Concrete spacer with wire and without the wire.the ons with the wire are tied to the

    sides of the re-bar and the one with out is plased at the bottom.

  • 7/28/2019 Measurement Assigment 2

    11/12

    Discription tag on the rebar.

    Reinforcement bar that has not been bend.

  • 7/28/2019 Measurement Assigment 2

    12/12

    Learning outcomes and Conculution

    From this site visit I managed to understand the basic of the construction

    process and the practical aspect of construction techniques on site and the

    comparison of theories from books. I also was exposed to actual working

    environment on site including uncertainty circumstances. I learn the ability of

    communicating with the construction team members on site and to learn the

    importance of teamwork in the building team. Besides that I managed to witness

    the usage of construction equipment on site that includes mechanical plants.

    Through this site visit I am able to explore and identify various types of building

    materials and technology on site. I am now aware of the importance of safety on

    site and understanding of safety problems and site conditions. In addition I learn

    recognize the items measurable for sub-structure and reinforced concrete frame

    works and adopt a systematic approach to take-off quantities from drawings for

    the preparation of Bills of Quantities for substructures and reinforced concrete

    frame works. I am able to demonstrate a systematic and orderly mind and be

    able to visualize the drawings and details given for substructure and reinforced

    concrete frame works.

    In conclusion I managed to learn a lot of things that were not in texts books

    and now I am able to visualise what I am learning because I had first-hand

    experience of visiting a site.