Trusted to deliver excellence © 2015 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies. MHS ME Creating a Compliance Tech– Pack “the BCP- SCP” Rolls-Royce proprietary information Prepared by: Phong MEP Prepared date: 31 Jul 2015

ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Embed Size (px)

Citation preview

Page 1: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Trusted to deliver excellence

© 2015 Rolls-Royce plcThe information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc.This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies.

MHS ME

Creating a Compliance Tech–Pack “the BCP- SCP”

Rolls-Royce proprietary information

Prepared by: Phong MEPPrepared date: 31 Jul 2015

Page 2: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

Contents1. Manufacturing Engineering Road Map

1.1. ME Strategic Theme’s for 2015-20161.2. Where we want to be?1.3. What to do?

2. BCP & SCP Process Compliance2.1. BCP & SCP Process Principle2.2. BCP & SCP Practice

3. Manufacturing Core Processes Implementation3.1. Manufacturing Core Process Overview3.2. Tech Pack LOP C.4.70 & BCP Checklist Tracking

4. Others

Page 3: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

1. Manufacturing Engineering Road Map

• ME Vision: To provide repeatable processes that meet design intent, meeting customer requirements in a safe, cost effective way throughout supply chain (internal & external)

Page 4: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

1.1 Strategic Themes’s for 2015 and 2016

SABReCapability Improvement focus on high impact commodities and suppliers- Key suppliers implemented- Audit core processes compliance

Every single part/component shall be aligned and appropriate to specifications - All Tech Pack Alignment- Approved by delegated person- Retention as category A- Source & Method Change C.4.53 (Conduct Risk of Transfer and Supplier

Manufacturing Capabilities)

NPI- FAIR

BCP & SCPMoM capture and Tech pack comply in order to- Build capable products- Supply capable products- SP3 &SP4 _Produce Product and Verify Produced Product

Manufacturing Engineering work throughout PLC

Area focus to comply in-house & supplier Manufacturing Method & Quality- Tech pack C.4.70- Build in Quality: pFMEA, CP/IP, GR&R

Continuous Improvements

Area focus to improve Manufacturing in-house & suppliers- Manufacturing Led Cost Reduction (Time & Cost)- Kaizen Events- ME Cost Saving Target Register on ARM

Page 5: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

1.2. Where we are & How to do? Technical Instruction

Testing and Inspection

Approval and Documentation

Design Definitions

Build in Quality

Page 6: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

1.3. What do MEs do?

• Key focus: Number 1 to 7• Weakness: not created to control the

CNC programes by engineers yet

Monitor & Assess Supplier Performance

(PPM/DI/Audit)

Escalate Poor Performance (Red Flag)

Drive containment and problem resolution in

low disruption suppliers (7 Step)

Drive improvement in high disruption suppliers (BCP)

Recommend resourcing where appropriate

(Source Change)

What do MEPs do?

• Key focus: Number 1 to 5• Weakness: not involved much in terms of

Sourcing commodities strategy

Page 7: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

2. BCP & SCP Process Compliance 2.1. BCP & SCP Process Principle

• Key focus: SP3-Produce Product, SP4-Verify produced product, and Control Production system Change to meet QCD & Safety

targets.• Link access: http://www.infocentre.rolls-royce.com/rrqms/

Page 8: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

2.2. BCP & SCP Practice • Keep doing the BCP to AKOFS project• Implementation for internal Projects launching with BCP-SCP

and Tech Pack to the site• Deploy and how to align the BCP to Vungtau’s shop-floor

Page 9: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

93. Manufacturing Core Processes Implementation• Pilot Order: do exactly the same to BCP and SCP principle to release FAIR• Improvement: save production time and CoNQ

Page 10: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

3.1. Manufacturing core Processes OverviewTechnical Instruction

Testing and Inspection

Approval and Documentation

Design Definitions

Build in Quality

Page 11: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

113.2. Tech Pack LOP C.4.70 & BCP Checklist Tracking

LOP C.4.70 Self-Asseessment Checklist

Page 12: ME -Creating a Compliance Tech Pack_VT (Jul-2015)

Private - Rolls-Royce Data

4. Others• Power Pack Escalation: 1_ Electrical motors; 2_

Pumps (screw pump); 3_ Expansion tank; 4_ Filter; 5_ Refilling pump (optionally fitted to the power pack); 6_ Bed frame

• FAT procedure: for PSV winches pilot order is missing specific parameter for testing

• ME Vungtau team has planned for the next 6 months:

BCP compliance

Tech Pack C4.70

Implement

Product Family Tech

Pack

Kaizen Events

Project AKOFS will be completed on 30 Aug 2015

NAConsider for

AKOFS

NAConsider for

AKOFS

NA

Project PSV Winches will be completed on 30 Aug 2015

Project PSV Winches will be completed on 30 Aug 2015

Project PSV Winches will be completed on 30 Sept 2015

Project PSV Winches will be utilized by end of Nov 2015