    This integrated business management system is authorised in its entirety (i.e. to incorporate allpages), as the definitive document defining the Business Management System at McPhillips(Wellington) Limited.

    Controlled Copy

    Signed:

    Safety, Training & Quality Manager

  • 8/10/2019 McPhillips Integrated Management System Manual

    2/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 2 of 15

    Revision Record Sheet

    Date Section PageNo.

    NewIssueNo.

    Reason for Change Authority

    27.01.09

    27.01.09

    04.03.09

    01.09.11

    07.11.11

    27.03.13

    Throughout document

    Exclusions

    Section headedExclusions andJustifications deleted,including ScopeExclusion

    SHE Appendix 4.5.2Evaluation of Compliance

    4.6 Management Review

    All relevant sections

    1

    6

    6

    14

    15

    All

    2

    2

    3

    4

    4

    5

    Amended to read ISO 9001:2008

    Scope of Cover clarification

    Deletion of Exclusion from scope ofcover.

    Revision to detail of Evaluation ofCompliance

    Combined Management Review process

    Organisation Changes

    J Butler

    J Butler

    J Butler

    J Butler

    J Butler

    S Bishop

    This page will be re-issued to holders of controlled copies of the Business Management System,together with the revised page(s), by the Management Representative, whenever pages arerevised.

  • 8/10/2019 McPhillips Integrated Management System Manual

    3/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 3 of 15

    COMPANY PROFILE

    McPhillips (Wellington) Limited was founded by Jim McPhillips in 1963 and became a limited company in

    December 1964. The Company has enjoyed sustained growth over the years and currently employs

    approximately 250 people providing award winning civil engineering and building solutions throughout the

    Midlands, North West England and Wales.

    The Company remains family owned and managed with Peter McPhillips and Nicholas McPhillips as Joint

    Managing Directors.

    McPhillips has been based in Shropshire since its inception and moved to its present purpose built

    headquarters at Hortonwood, Telford in 1989. This extensive facility incorporates modern office space with

    fully integrated IT infrastructure, Plant Maintenance Workshop and a bespoke Training Centre.

    McPhillips has always carried out operations utilising its directly employed workforce which currently stands

    at over 210 highly trained, skilled and experienced construction personnel. McPhillips believes this strategyprovides reductions in risk, as well as advantages in the control of quality, resourcing, co-ordination and

    health & safety. The Company is committed to local employment, with 92% of personnel living within 20 miles

    of its Telford offices.

    A modern fleet of plant and equipment ensures that the correct apparatus is available when required. An in-

    house Plant Department provides approved servicing, repair and calibration to maintain these assets and a

    rolling replacement programme guarantees efficient and reliable machinery.

  • 8/10/2019 McPhillips Integrated Management System Manual

    4/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 4 of 15

    MANAGEMENT POLICY

    PRINCIPLES

    McPhillips are committed to setting and maintaining high standards of systemmanagement and co-operating with all regulatory authorities to ensure a safe, healthyand environmentally acceptable code of working practices for its activities. Our aims are

    to manage and reduce any negative impacts of the business on our Employees,stakeholders and the environment. Other detailed policies are available in support ofthis declaration and publicly available.

    OBJECTIVES

    The purpose of this policy is to give the overall intentions and the direction of theorganisation as related to Quality, Health, Safety & Welfare of our employees,Stakeholders, our Environment and the international standards to which we subscribe.This Policy is subject to annual review or following significant changes to ourbusiness practices, it is also available to any interested party and provides the

    framework for establishing Quality, Health, Safety, Welfare and EnvironmentalTargetsand Objectives. This policy is a living document and is a formal statement ofdirection endorsed by the Senior Management Team and the Managing Directors. Thefollowing statements are made in support of the Management system.

    STATEMENTS OF INTENT

    We will implement and maintain a documented SHEQmanagement system.

    We will provide adequate resource, time people and finance.

    We will ensure that all our employees and associates who come under our control

    have the requirements of our standards communicated to them and also that wewill ensure these requirements are understood.

    We are committed to continual improvement of the integrated managementsystem with regard to SHEQactivity.

    We will strive to prevent injury and ill health to employees or stakeholders who aresubject to our activities.

    We are committed to prevention of pollution.

    We will comply with all relevant current and future legislative and otherrequirements.

    We will review our SHEQ performance through appropriate measurement &Analysis to support our continual improvement of the Management system and ourassociated business performance.

    Mr P F J McPhillips Mr N P J McPhillips

    Joint Managing Director Joint Managing Director

  • 8/10/2019 McPhillips Integrated Management System Manual

    5/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 5 of 15

    Scope of Cover

    McPhillips (Wellington) Limitedis committed to maintaining and improving its service to itscustomers for: -

    Civil Engineering and Building Contractors incorporating the management of designand development of a wide range of construction projects to the private & publicsectors.

    Quality Management

    McPhillips (Wellington) Limitedwill monitor its performance in line with Customer Satisfactionand the international standard ISO 9001:2008and will manage its business to meet the BusinessObjectivesof which the measurable Key Performance Indicatorsare listed below and at thesame time strive for Continual Improvementin the Business.

    Business Objectives & KPIs

    Safety & Health

    Environmental

    Quality

    Economic Sustainability

    Honesty, Respect, Integrity

    Customer Satisfaction

  • 8/10/2019 McPhillips Integrated Management System Manual

    6/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 6 of 15

    MANAGEMENT SYSTEM DOCUMENTATION

    The documented management system implemented at McPhillips (Wellington) Limited is based around thislevel 1, Policy Manual, level 2,ProcessProcedures,level 3, Quality Documents,level 4,Work Instructions.

    This document sets the managements policy and plan for the Company. Process Procedures describe mandatory

    controls for all activities; from the processing of an enquiry, to the receipt of payment for services provided.

    There is a quality document matrixMcP 01 that controls the issue status of all documents in level 3.

    The above-mentioned documents are all based upon the requirements of nationally / internationally recognisedmodels / requirements / standards / specifications.

    Documented System Structure

    Level 1 Policy Manual

    Level 2 Processes / Procedures

    Level 3 Documents / Forms

    Level 4 Work Instructions

  • 8/10/2019 McPhillips Integrated Management System Manual

    7/15

    Management Systems Policy Manual. Issue No: 5 27.03.13

    Control ofDocuments

    QAP 01

    Control ofRecords

    QAP 02

    Non-ConformingProduct

    QAP 04

    InternalAudits

    QAP 03

    Tendering

    QAP 08

    ContractAwarded

    QAP 09

    Managof DesDrawin

    QAP 1

    Construction

    QAP 10 & 22QAP 21

    Suppliers

    QAP 12

    Purchasing/ GI / Inv.

    QAP 13 & 14

    Calib

    QAP 1

    Competency& Skills

    QAP 15

    Preventive

    Action

    QAP 06

    ManagementReview

    QAP 07

    Plant

    QAP 18

    CustomerFeedback

    QAP 17

    COMPANY PROCESS MAP

    Customer Communication

    CUSTOMERINPUT COMPANY CORE ACTIVITIES

    COMPANY CORE ACTIVITIES

    SUPPORT ACTIVITIES

    SUPPORT ACTIVITIES

  • 8/10/2019 McPhillips Integrated Management System Manual

    8/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 8 of 15

    Organisation Structure

    BOARD OF DIRECTORS

    Safety, Health

    Company Secretary Training and & Safety

    Quality Manager * Consultant

    Commercial Director Contracts Director

    Deputy Quality Manager ** ***Environmental Manager

    Contracts Manager

    Plant/Transport Manager

    Purchasing Site Agent Yard Manager Fitters/

    Manager Mechanics

    Site Foreman Site Engineer Yard Foreman Lorry Drivers

    General Machine

    Operative Operator

    * Safety, Training & Quality Manager - Stuart Bishop

    ** Deputy Quality Manager - Andrew Dunham

    *** Environmental Manager - Stuart Mackenzie

  • 8/10/2019 McPhillips Integrated Management System Manual

    9/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 9 of 15

    Roles, Responsibility, Accountability & Authority

    Responsibility& Authority

    Managing

    Directors

    SHEQ

    Manager

    Commercial

    Director

    Contract

    Director

    Company

    Secretary

    Accountant

    Contracts

    Managers

    SiteAgent

    SiteForeman

    StrategicDevelopment

    Marketing &SalesFinancialMatters

    QualityAssuranceClientRelationshipWorkforce /

    Plant Prog.

    IT SystemReliabilityStaff Training&CompetencyHealth &Safety

    Environmental

    Primary

    Secondary

  • 8/10/2019 McPhillips Integrated Management System Manual

    10/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 10 of 15

    Appendix 1 HSE Management Requirements.

    4.1 General Requirements

    Objective. To implement and maintain a documented integrated Management System which along with the

    internationally recognised standards satisfies our wider business objectives and meets our Corporate Social

    Responsibility obligations.

    The Business Management System scope includes the meeting of ISO 9001: 2008, ISO 14001:2004 & BS

    18001: 2007 standards in full. The system is fully integrated utilising both electronic and paper media. The

    core processes are ISO 9001: 2008 with supporting activities arranged for management of Health, Safety and

    Environment.

    Process / Procedure. N/A

    DocumentsBusiness Manual Document.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.2 Policy The following document is a statement of intent specific to the requirements of Environmental

    Management Systems 14001:2004, Quality Management ISO 9001:2008 and Health & Safety BS 18001:

    2007.

    Objective. To ensure that all our employees, associates, members of the public, any other interested party or

    any other body employed on our behalf is aware of our intentions with regard to Quality, Health, Safety and

    the Environment while carrying out our Business Activities.

    Process / Procedure. N/ADocuments

    Integrated Policy Document. Page 4 of manual.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

    4.3 Planning The following procedure defines how our Business Management System satisfies the

    requirements of our Business Activity, ISO 9001: 2008, 14001:2004 & BS 18001: 2007. Business planning is

    core to the success of our operation and the following activities are specific our Objectives.

    4.3.1 Aspects and Impacts. Hazard Identification, Risk Assessment and Control.

    Objectives. To ensure that all our activities whether administrative, support such as maintenance and supply

    yard, site work evaluate their activities with regard to Environmental impact.

    Analysis will determine our organisational activities that have an interaction with the Environment. We will

    endeavour to evaluate both site and Head Office. When established our Aspects and Impacts evaluation will

    be the basis for generating meaningful, measurable and achievable targets and objectives.

    Specific controls will be in place to mitigate any potential adverse effects; these may take the form of

    Training, Inspections, Communication, and Work Instruction, Toolbox talks. Consideration will be for

    normal and abnormal scenarios.

  • 8/10/2019 McPhillips Integrated Management System Manual

    11/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 11 of 15

    Process / Procedure. N/A

    Documents.

    Aspects and Impacts Register

    SHEQ KPIs

    HS Risk Assessments

    Env. Risk Assessments

    Training Database

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.3.2 Legal & Other Requirements.

    Objectives. To ensure that the organisation and its activities fully comply with current & future Legislation

    and also to any other requirements that may have influence on the organisations activities.

    Our Organisation will evaluate the applicable legislation that applies, we will endeavour to meet all current

    and future legislative requirements, we will review our continuing compliance by regular reviews at agreed

    frequencies, action plans will be implemented with timing and responsibility allocated to ensure satisfactory

    closure.

    We will also meet any other applicable requirements that may apply due to the customer or sector

    requirements or indeed any positive influences that the company my deem benefit.

    Process / Procedure. N/A

    Documents

    Environmental Legislation Register

    Health & Safety Legislation Register

    Management Review Minutes.

    Other Requirements.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.3.3 Targets and Objectives

    Objectives. A management programme will be developed, establishing measurable, quantifiable standards,

    measured in comparison to an agreed normalisation factor. The targets and objectives will be meaningful,

    responsibility will be allocated and targets will be allocated achievable time frames. Targets and Objectives

    will be established in line with our Policy, The Business & Financial influence, Interested parties and the

    wider global issues that affect us all.

    As a result of historical analysis and our review of significant Aspects and Impacts we will establish, reviewand meet an agreed annual programme of action, which will be a demonstration of our continual

    improvement and commitment.

    Process / Procedure. N/A

    Documents.

    KPIs

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

  • 8/10/2019 McPhillips Integrated Management System Manual

    12/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 12 of 15

    4.4 Implementation and Operation

    4.4.1 Resources, Roles, Responsibility, Accountability & Authority.

    Objectives. To ensure all employees engaged whether indirectly or directly involved in our business activities

    has a complete understanding of their obligations with regard to Quality, Health, Safety and The

    Environment.

    Process / Procedure QAP 15 Competency and Skills.

    Documents

    Zone Plan. Site & HQ.

    Organisational chart.

    Defined Roles & Responsible. See HR records.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

    4.4.2 Competence, Training, Awareness.

    Objectives. To ensure all employees and company associates engaged by or on behalf of the company, full orpart time, Head quarters or site specific have the required competence to fulfil their obligations with regard to

    SHEQ.

    All employees, associates and contractors employed directly or indirectly are involved in the company 14001:

    2004 training and Awareness process. Records of these activities will be maintained.

    Process / Procedure QAP15 Competency & Skills.

    Documents

    Induction.

    Training Evaluation Questionnaire.

    Environmental FactsMc Phillips certification / Training Data base.

    CITB Training Plan.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.4.3 Communication. ( 4.4.3.1 Participation & 4.4.3.2 Consultation)

    Objectives. To establish effective, useful and appropriate mediums of communication with a view to

    supporting our commitment of endeavouring to ensure our employees associates and interested parties

    understand our intentions in regard to SHEQ.

    Process / Procedure. N/AInternal Communication Presentations & Tool Box Talks

    Documents

    Notice Board.

    Newsletter.

    Web site.www.mcphillips.co.ukInduction.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

  • 8/10/2019 McPhillips Integrated Management System Manual

    13/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 13 of 15

    4.4.4 / 4.4.5 Documentation & Control of Documentation

    Objectives. To identify and control the required documents for the system, to ensure availability where

    required, to ensure the latest authorised version is only available, to retain, locate and dispose of spent

    documents in the approved manner.

    Process / Procedure QAP 1 Control of Documents

    Documents.Document Matrix.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

    4.4.6 Operational Control

    Objectives- To ensure all our activities are controlled in both normal and abnormal circumstance.

    Process / Procedure

    Operational Control EP 55-EP59 - EP64

    Operational Control HSP 01- SiteOperational Control HSP 02- Workshop & Depot

    Operational Control HSP 03 - Offices

    Documents Permits to Work Safe Systems of Work (Risk Assessments) Method Statements

    Work Instructions

    Waste Management Plans & Analysis.

    Certification.

    Licences.

    Consents.

    Environmental Risk Assessment

    Suppliers, Contractors & Purchasing.

    HO Site Plans including drains, utilities, fire hydrant, local watercourses, Emergency lighting and call points,

    chemical and fuel storage locations.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

    4.4.7 Emergency Preparedness and Response

    Objective- Our objective is to ensure we mitigate the adverse effects of any foreseeable Emergency scenario

    wherever our business activity is involved, we will practise our response scenario, measure, analyse and

    improve on it. The objective is to protect Human Beings, Safe Guard the Environment and ensure our

    business can be swiftly brought back on line; our philosophy is that of prevention.

    Documents

    Computer Back Up

    Environmental Risk Assessments

    Environmental Work Instructions

    H & S Risk Assessments

    H & S Work Instructions

    Emergency Response Performance Analysis.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

  • 8/10/2019 McPhillips Integrated Management System Manual

    14/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 14 of 15

    4.5 Checking

    4.5.1 Performance, Monitoring and Measurement.

    Objective- To ensure suitable monitoring & measurement of both system and business activities are in place to

    ensure suitable ongoing targets and objectives are established, driving the organisation forward in the spirit of

    continual improvement with mutual benefit for the business, the community, our employees and the

    Environment. The following influences are an example but not an exhaustive list of suggested measurable.An appropriate normalisation factor will be agreed to ensure the measures have meaning.

    Reduction of skips used M3.

    Quantity of Construction material recycled Wood, Polythene, Brick and Mortar etc

    Fuel used in litres converted to C02. Conversion factor is 2.68.

    Kwhrs of Electricity used converted to C02. Conversion factor is 0.43.

    Kwhrs of gas consumed converted to C02. Conversion is 0.19

    Kgs of paper recycled against quantity purchased.

    Litres of water used / saved.

    System performance audits completed on time, concerns closure in target.

    RIDDOR Accident Statistics,Near Miss and Health issues

    Process / Procedure N/A

    Documents

    Business KPIs

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.5.2 Evaluation of Compliance.

    4.5.2.1

    4.5.2.2

    Objectives- We have established a method to ensure our business and the system is and remains fullycompliant with all its Legal and other Requirements.

    Process / Procedure.

    Evaluation of Compliance Environmental Legislation

    Evaluation of Compliance H & S Legislation

    Documents

    SMS

    Internal & External Audits

    R G Wilbrey Facility, Equipment & Site Inspections

    Review of Near Misses & Risk Assessments

    Contract Managers and /or Directors Observations

    EMSInternal & External Audits

    Regulatory Inspections i.e. EA & Clients

    Review of Incidents

    Environmental Managers and /or Directors Observations

    Management Review

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie.

  • 8/10/2019 McPhillips Integrated Management System Manual

    15/15

    Management Systems Policy Manual. Issue No: 5 27.03.13 Page 15 of 15

    4.5.3 Non Conformity, Corrective Action, & Preventive Action.

    Objectives- to ensure all environmental concerns whether a near miss, actual situation, concern raised as a

    result of any of our SHEQ triggers is progressed to satisfactory closure.

    Process / Procedure

    QAP 04 Control of Non-Conforming Product

    QAP 05 Corrective ActionQAP 06 Preventive Action

    RG Wilbrey (Consultants) Ltd Monthly Site Inspection Reports

    Documents.

    NCR Monitor

    Observations Monitor

    Complaints Register

    Owners. Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.5.4 Control of Records.

    Objective- To identify, store and dispose of all required Management System Records. To ensure they remainavailable and legible, they are not circulated to unauthorised recipients whether intentionally or not, records

    subject to Data Protection Act will be treated accordingly. Records can be hard paper, Marketing material,

    magazines or electronic and includes our intranet facility.

    Process / Procedure. QAP 2 Control of Records.

    Documents

    Quality Document Matrix.

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.5.5 Internal Audits.

    Objectives- To establish a full programme of auditing activity to ensure continuing suitability of all system

    Manuals, Policy, Procedures, Documents, Work Instructions and statutory obligations are effective and

    opportunity for improvement is identified.

    Process / Procedure QAP 3 Internal Audit.

    Documents.

    Quality Audit Programme

    Environmental Audit Programme

    Health & Safety Audit Programme

    Owners: Stuart Bishop, Andrew Dunham & Stuart Mackenzie

    4.6Management Review.

    Objectives- To ensure at least once per annum our complete management system is reviewed for continuing

    suitability.

    Process / Procedure.

    QAP 0 7 Management Review

    EP 54 Management Review

    H&S Management Review

    Documents

    Owners: Directors & Safety, Training & Quality Manager & Environment Manager