McNicoll Bus Garage Public Open House May 14, 2014 6:30 pm – 8:30 pm Consultation Summary Report Kennedy Public School 20 Elmfield Ave

McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

McNicoll Bus Garage Public Open House

May 14, 2014 6:30 pm – 8:30 pm Consultation Summary Report

Kennedy Public School 20 Elmfield Ave

Page 2: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Table of Contents

1 INTRODUCTION ....................................................................................... 1 1.1 Background ..................................................................................................... 1 1.2 Consultation Process ........................................................................................ 1 1.3 First Nations Consultation ................................................................................. 2 1.4 Event Details- Public Open House ....................................................................... 2

2 SUMMARY OF QUESTIONS AND COMMENTS ............................................ 2 2.1 Selection of Site .............................................................................................. 2 2.2 Communication and Consultation........................................................................ 3 2.3 Impacts to Community ...................................................................................... 3 2.4 Design ............................................................................................................ 3 2.5 Operations ...................................................................................................... 4 2.6 Additional Comments ....................................................................................... 4

3 NEXT STEPS ........................................................................................... 4

APPENDICES APPENDIX 1 – Event Notice (English and Chinese) APPENDIX 2 – Public Open House May 14, 2014 APPENDIX 3 – Presentation Panels

Page 3: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 1

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

1 INTRODUCTION 1.1 Background

Within the next five years, the TTC will need a new bus garage to accommodate its growing ridership and expanding bus fleet. The facility being proposed at Kennedy Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new articulated buses along with some of the current fleet. The proposed site was purchased approximately 10 years ago for use as a transit facility. The site is zoned by the City of Toronto as “Heavy Industrial”- a zoning which allows for the construction of a bus maintenance and storage facility. The following report summarizes the second preliminary consultation, which was held with the community to answer questions and identify concerns, prior to the Transit Project Assessment (TPA) study. The TPA will identify potential community impacts resulting from the project as well as mitigation measures where required. The public will be able to view the full report on-line. A hard copy will also be available at a public facility in the community. Construction is expected to begin in 2016 and be completed by 2019.

1.2 Consultation Process On May 14, 2014, the TTC held its second Public Open House for the construction of the new McNicoll Bus Garage. The event was widely advertised through distribution of flyers in English and Chinese. Details of this distribution are included in section 1.4 of this report. Local elected officials were informed of the meeting and encouraged to promote the event through their own networks. Additional meetings with local stakeholders and adjacent property owners were held following the Open House. This provided an opportunity for the project team to identify and address property-specific concerns. TTC presented panels showing the preliminary plans for the facility (see Appendix 3), including details on location, layout, operations and schedule. Comments and suggestions collected through evening have been channeled through the Senior Community Liaison Officer (CLO) to the project team for review and action. Comments that relate to community or environmental impacts have been documented in this report and will also be included in the, more formal, Environmental Project Report (EPR). A Senior Community Liaison Officer has been assigned to this project and will be the single point of contact for the community. This will ensure a timely response to queries related to this project.

Page 4: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 2

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

1.3 First Nations Consultation As with the first public open house, TTC extended an invitation to First Nations identified by the Ministry of Aboriginal Affair and Indian and Native Affairs Canada, as potentially interested in projects within Toronto.

1.4 Event Details- Public Open House Venue: Kennedy Public School 20 Elmfield Ave Date: May 14, 2014 Time: 6:30 pm - 8:30 pm Attendees: 55

The event was promoted as follows:

• Over 3300 invitations/notices distributed via Canada Post to an area bound by

Passmore Ave, Midland Ave, Finch Ave E and Morebank Ave. • Consultation Notice posted on the TTC project website - projects.ttc.ca • Chinese and English Event Notices were prepared and sent to key stakeholders in

the community, including Scarborough Community Baptist Church for distribution to its congregation, Mon Sheong Foundation for the Long Term Care Facility, Mon Sheong Condominium Complex (adjacent to project site) and the Bamburgh Gate Condominium.

• Notice was sent via e-mail blast and regular mail to all those on the project list. This includes individuals who attended previous meetings or have asked to be kept abreast of the project.

• Paid advertising in the Scarborough Mirror –May 8, 2014

2 SUMMARY OF QUESTIONS AND COMMENTS The following is a high-level summary of the discussion and feedback from the meeting. Comments were recorded by TTC staff and the project team who were available throughout the evening to answer questions from participants.

2.1 Selection of Site

• Participants asked if TTC could rezone the site to residential to better reflect the

surrounding area. • Can the site be relocated further east, closer to Markham and away from the

residential area - TTC confirmed that the site is properly zoned “Heavy Industrial” which permits

the use of a transit facility. It is appropriately sized, and situated in an area serviced by buses. These strategic location helps reduce deadhead time which will result in cost savings that can be channeled back into improving service, including north east Scarborough.

Page 5: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 3

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

- City Planning staff advised that Mon Sheong management was fully informed of the zoning in this area prior to construction of their facility and that the “heavy-industrial” zoning should not come as a surprise.

• Would the upcoming election affect plans for this site ? TTC staff take direction from its Board which includes members of Council.

2.2 Communication and Consultation • Event Notices were made available to adjacent stakeholders in English and Chinese

(Mon Sheong and Scarborough Community Baptist Church) for their use and distribution.

• Public Meeting signs were placed outside and inside the event venue, displaying which room the open house was taking place.

• A Mandarin and Cantonese speaking interpreter was available throughout the evening. Attendees appreciated TTC’s efforts to reach out to non-English speaking residents.

• A map of the facility and study area, was included on the Event Notice. • Attendees signed in and provided contact information and how they would like to

receive future correspondence (email or regular mail). • Participants were also asked for permission to share their contact information with

the local councillor. • The event was structured as an open house however throughout the meeting, TTC

staff and City Planning staff were on hand to respond to questions related to the facility and zoning.

2.3 Impacts to Community

Residents raised concerns about: • Increased emissions from diesel buses • Added traffic, aggravating an already congested intersection at Kennedy and

McNicoll, particularly during rush hour and on weekends • Seniors at Mon Sheong who may be disrupted by noise during early morning and

late evening bus traffic • The number of seniors in the area and their safety given the increased bus activity • Repair and maintenance work should be contained inside the buildings and only

take place during the day. • The garage will hinder the employment growth in this part of the city. The

potential to partner with and accommodate the overspill of Markham’s success would be hindered by the garage and its 250 buses.

2.4 Design

Q: Any plans for bicycle lanes on Redlea Ave? A: TTC is unaware of plans of bike lanes. Q: Are there any plans to incorporate traffic lanes on Redlea Ave.? A: TTC is working closely with the City of Toronto and sharing the results of the

Traffic Impact Study.

Page 6: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 4

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Q: Will there be a Milliken GO Station connection? A: TTC is not aware of a future Go Station at this location. Q: Will there be a cross walk or light signal on Redlea Ave. A: This will be determined by the City. They will not be able to investigate

pedestrian movement in this area before Redlea Avenue is fully operational. Only when warranted, will City Council approve a new crossing.

2.5 Operations

Q: Will the facility include employee parking? A: Yes approximately 400 spots are planned, however this is subject to change as

the design advances. Q: Will there be a new traffic count after the Redlea built? A: Traffic counts are undertaken by the City of Toronto Transportation Division on

an as-required basis. Should there be a need for a study, one will be undertaken. Q: Will there be any hazardous materials transported on the CN/G0 line? A: This line is currently used a passenger rail line for GO Transit. TTC is unaware of

CN`s future plans to use it for freight transportation.

2.6 Additional Comments

• One resident commented that the facility does not comply with the Ontario Places to Grow Act nor the City of Toronto’s Offical Plan which encourages intensification…adjacent to rapid transit stations.

• Reduce the engine noise by properly maintaining engines • TTC should provide a 3D model of the building at the next meeting. • Employee traffic should be included in traffic volume graph • Provide a landscape plan when at next meeting

3 NEXT STEPS

TTC will incorporate comments received at the meeting into their preliminary planning and future, Environmental Project Report. Comments will be reviewed and addressed by the project team.

Page 7: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

APPENDICES

Page 8: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 1-1

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Appendix 1 Event Notice (English and Chinese)

Page 9: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 1-2

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Page 10: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 3-1

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Appendix 2 Images Public Open House May 14, 2014

Page 11: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 3-2

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Page 12: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

Title: McNicoll Bus Garage Summary Report Rev. 0 Issue Date: May 14, 2014 Page 4-1

Online version is a controlled document, printed version is an uncontrolled copy. Always refer to online version for latest issue.

Appendix 3 Presentation Panels

Page 13: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

1McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

New McNicoll Bus GaragePublic Open House

May 14, 2014Kennedy Public School

Page 14: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

2McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

The Need for a New Bus Garage

The Problem•Garagesareoperatingatover-capacity•Newbusgaragerequiredwithinfiveyearstoaccommodateincreased

ridership•Somebusesservingeast-endroutesarestoredandmaintainedin west-endgarages

•Extradeadheadtime(travelwhenbusesarenotinservice)addsunwantedwearandtearonbuses,shorteningbuslifespanandincreasingoperatingcosts

•Notfeasibletoexpandexistingfacilitiesandinsufficientmaintenancecapacity

Riders Buses GarageIncreasedridershipmeans

Need fornew

buses

And anew busfacility

Page 15: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

3McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

The Need for a New Bus GarageOpportunities•Growthinridership=needtoexpandandimprovetransitserviceacrossthecityandnorth-eastScarborough

•Newbusesandanewmaintenanceandstoragefacilityareneededtosupportridershipgrowth

•Afacilityclosetothebusroutesservedwillresultinefficienciesandcostsavings

Page 16: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

4McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

CommunityBenefits•Increasedtransitserviceonnearbyroutesfrombusesenteringandleavingthegarage

•Enhancedperimeterlandscaping

•Treestohelpmitigatenoise

•Severalhundred,stable,securejobs

•Newcustomerbaseforlocalretailersandrestaurants

•Costsavingsfromefficiencieswillbechanneledbackintoserviceimprovementsacrossthenetwork

•TTCtoapply“GoodNeighbourPolicy”

Page 17: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

5McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

RecentServiceImprovements•ServicelevelsarebasedonobservedridershiplevelsandTTCBoard-approvedservicestandards

•Servicelevelsareconstantlyadjustedtomeetchangesinpassengerdemand

•Moreriders=IncreasedService

Recentserviceincreasesonlocalroutes43 Kennedy•Morningpeakperiod(April2014)•Lateevening(April2014)•Monday-Fridaymidday(March2013)

17Birchmount•SaturdayandSundaydaytime(January2014)•Afternoonpeakperiod(September2013)

Page 18: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

6McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

The Need for a New Bus Garage

Newbusgaragewillbeabletoaccommodateconventionalbusesaswellasthelongerarticulatedbuses(40ftand60ft)

Page 19: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

7McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

McNicollGarage–ProposedSite

TTCSite

McNicollA

ve

McNicollA

ve

Kennedy Rd

Mary Ward

Catholic

Secondary School

Kennedy Rd

Scarborough ChineseBaptistChurch

EnbridgeConstructionandMaintenanceFacility

Mon Sheong FoundationLongTermCareFacilities

SiverStarBlvd

GOStouffvilleLine

Page 20: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

8McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

WhyThisLocation?•Proximitytobusroutesbeingserviced

•Availabilityofsuitably-sizedparceloflandtoaccommodatebusstorageandmaintenanceneeds

•Thefacilitywillbecapableofsupporting250in-servicebuses

•Sitelocationandneedwereexaminedinafeasibilitystudyin2008

•PropertyisownedbytheCityofTorontoforTTCuse

•Landisalreadyzoned“EmploymentHeavyIndustrial”

Page 21: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

9McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

PropertyZoning•Propertyiszoned“Employment Heavy Industrial”

•Otherpermittedusesinclude: •PesticideorFertilizerManufacturing •Cementorasphaltplant •SyntheticRubberManufacturing •LargeScaleSmelting •IndustrialGasorPetrochemicalManufacturing

Page 22: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

10McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ExistingBusGarages

Page 23: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

11McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

BusGarageandRoutesServed

SheppardAvenueandMarkhamRoad

BirchmountAvenueandDanforthRoad

WardenAvenueandEglintonAvenueEast

AllenRoadandWilsonAvenue

FutureMcNicollBusGarage

FutureMcNicollBusGarageFutureMcNicollBusGarage

FutureMcNicollBus Garage

Page 24: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

12McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ProjectScope•Newfacilitytostoreandmaintain250buses•Siteatnorth-eastquadrantofKennedyandMcNicoll•Projectwillinclude: •Indoorstorageareafor250buses •Capacitytofuelandcleanbuses •Trafficofficesfordispatchingoperators •Trainingrooms •Employeeparkinglot

Page 25: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

13McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ProjectProcess•PotentialenvironmentalimpactswillbeassessedinaccordancewiththeTransitProjectAssessmentProcess(TPAP)

•Stakeholderconsultationisongoing: •PublicOpenHouse#1:November27,2013 •PublicOpenHouse#2:May14,2014 •PublicOpenHouse#3:Fall2014

Pre-Planning Activities

1. Determine Details of Site Layout Design2. Impact Assessment3. Draft EPR4. Public Open House #1 - November 27, 2013

Assessment Process1. Confirm Potential Environmental Effects2. Confirm Mitigation Measures3. Confirm Site Layout Details

Consultation and Documentation (120 Days) 30 Days 35 Days

Notice ofCompletion

January 2015

Notice ofCommencement

Fall 2014

Public / Agency Review Periodof EPR

Minister of MOEto Act

Statementof

Completion

EnvironmentalProjectReport(EPR)

Page 26: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

14McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

FacilityFactsOperations•Maintainandstore250buses•Operate24/7•Allbusesstoredindoors

WillbebuilttoTorontoGreenStandard•EnergyEfficiency•StormwaterRetentionandReuse•StorageandCollectionofRecyclingandOrganicWaste

Page 27: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

15McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

FacilityFactsPreliminaryBuildingConcept(~26,000m2)

•~17,000m2ofindoorbusstorage•~5,300m2 of repair garage•~1,600m2 of indoor fueling and washing lanes•~2,100m2ofofficeandadministrativeuses

TotalSiteArea(~70,000m2)

Page 28: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

16McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

GarageFunctions

Trafficofficesfordispatching,equipmentstorage,buswash,andrefueling

Page 29: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

17McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

GarageFunctions

Maintenanceanddailysafetyinspections

Page 30: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

18McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

GarageFunctions

Parking,storageandfuelingstation

Page 31: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

19McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

TypicalBusFrequency–TTCBusGarages

4:00 am

4:00 am – 5:00 am

5:00 am – 6:00 am

6:00 am – 7:00 am

7:00 am – 8:00 am

8:00 am – 10:00 am

10:00 am – 12:00 pm

12:00 pm – 2:00 pm

2:00 pm – 3:00 pm

3:00 pm – 4:00 pm

4:00 pm – 6:00 pm

6:00 pm – 8:00 pm

8:00 pm – 10:00 pm

10:00 pm – 12:00 am

Total

WeekdaysTime Weekends

Buses Outbound

2

27

70

60

13

0

0

0

50

20

0

0

0

0

242

Buses Inbound

40

6

7

0

0

48

53

0

0

0

1

40

25

22

242

Buses Outbound

2

16

22

13

0

36

10

15

1

0

0

0

0

0

115

Buses Inbound

18

2

2

0

0

0

0

0

0

0

0

52

17

24

115

Weekday BusTravel•Approximately15busesoutboundduring morning rush hour 7:00am–10:00am

•Approximately20busesoutboundbetween 3:00pm–6:00pm

Page 32: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

20McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ConsultationandPlanningSchedule

Technical AnalysisIdentify Problems & Opportunities

Public Consultation #1

Draft Report to TTC Board

Draft Report to City Council

Notice of Commencementfor TPAP

Public Consultation #3 on Draft Environmental Project Report

Notice of Completion of Environmental Project Report

30-Day Review Period

35-Day MOE Review/ Minister Decisionon whether this project can proceed

Tasks Jul Aug Sep Oct Nov Dec Jan Feb Mar

City - TTC Transit Project Assessment Process

Provincial Transit Project Assessment Process (TPAP)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr

2013 2014 2015

Public Consultation #2

Page 33: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

21McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

IssuesRaisedFromOpenHouse#1OpenHouse#1washeldonNovember27,2013•Over40peopleattendedthePublicOpenHouse#1•CommentsandquestionswererecordedandincludedinaConsultationReport,postedontheprojectwebpage projects.ttc.ca

AirQuality

Noise

TrafficImpact

VegetationRemovals

AnAirQualityAssessmentwasundertaken.Resultsindicatethatmitigationisnotwarranted.

ANoiseAssessmentwasundertaken.Mitigationmeasureshavebeendeveloped.See"NoiseMitigation"panels.

ATrafficImpactAssessmentStudywasundertaken.TheMcNicollBusGaragewouldcauseminimalimpactstothetrafficconditionsgiventhefrequencyofbusestravellingtoandfromtheFacilityduringrushhours.See“TypicalBusFrequency-TTCBusGarages”panels.

Nofishhabitatorwatercourseswerefoundwithinthesubjectsite.Vegetationcommunitiesonthesiteareconsistedofmainlynon-nativespeciesthatistypicalforabandonedagriculturalfields.FurtherconsultationwithTRCAwillbeundertaken.

Page 34: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

22McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

PreferredDesignLayout

CNR/GO Rail

Redlea Avenue

McN

icoll Avenue

Main Entrance

Bus Storage

Repair Bays

Storage

LoadingDockCleaning and

Re-Fuelling Station

EmployeeAdministration

Body Shop

Articulated Brake Bay

Safety Inspection Bay

Tire Bay

Touch-up

Paint ShopDeg

reas

e Sho

p

Page 35: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

23McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

EnvironmentalProjectReport•DraftEnvironmentalProjectReport(EPR)willinclude: •ArchaeologicalAssessment •TrafficImpactStudy •AirQualityAssessment •NoiseAssessment •NaturalEnvironmentAssessment

•EPRwillprovidetheprojectbackground, preliminarydetailsoftheproposeddesign,potential impactsandmitigationmeasuresandasummary consultationundertaken•EPRwillbeavailablefora30-daypublicandagencyreviewperiodaspartofthe120-dayTPAPprocess

McNicoll Bus GarageEnvironmental Project Report

Page 36: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

24McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ArchaeologicalAssessmentStage1ArchaeologicalAssessment–completed•Includesgeographic,landusehistoricalinformation•WillhelpdeveloprecommendationsforStage2assessment

Stage2ArchaeologicalAssessmentscheduledforspring 2014•Includestestpittingandvisualreviewofartifactsonthesurface

TheresultsofthearchaeologicalassessmentswillbedocumentedintheEnvironmentalProjectReport

Page 37: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

25McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

TrafficImpact•TheTrafficImpactStudyrevealedpooroverallintersectionoperations

•KennedyRoad/McNicollAvenue •MidlandAvenue/McNicollAvenue

•Pooroperationsaregenerallyduetotrafficgrowthinthearea,andarenotrelatedtotheMcNicollBusGarage

•Busactivityfromthefacilitywilloccurprimarilyduringoff peak hours

•Studyrevealsthatsitetrafficwillresultinminimalinfiltrationontolocalroads

Page 38: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

26McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

BusDistributionInbound/Outbound

0

5

10

15

20

25

4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00

# o

f Fut

ure

Bus

es

Time of Day

Inbound / Outbound Bus Trips From Site Source: TTC Vehicle Count

Pull-Out Pull-In

AM

Pea

k 8:

00-9

:00

PM

Pea

k 16

:15

-17:

15

Page 39: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

27McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

BusvsCarVolumes

VehiculartrafficflowsthroughKennedyRoadandMcNicollAvenue

0

100

200

300

400

500

600

700

0:00

0:30

1:00

1:30

2:00

2:30

3:00

3:30

4:00

4:30

5:00

5:30

6:00

6:30

7:00

7:30

8:00

8:30

9:00

9:30

10:0

0

10:3

0

11:0

0

11:3

0

12:0

0

12:3

0

13:0

0

13:3

0

14:0

0

14:3

0

15:0

0

15:3

0

16:0

0

16:3

0

17:0

0

17:3

0

18:0

0

18:3

0

19:0

0

19:3

0

20:0

0

20:3

0

21:0

0

21:3

0

22:0

0

22:3

0

23:0

0

23:3

0

# o

f Veh

icle

s

Time (15 min intervals)

Existing Traffic vs. TTC Bus Traffic

McNicoll Traffic TTC Buses

Page 40: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

28McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ProjectedBusMovement

McNicoll Ave

Ken

ned

y R

oad

Futu

re R

edle

a A

ve E

xten

sio

n

Property Line

Mary WardCatholic

SecondarySchool

EmployeeParking

Scarborough ChineseBaptist Church

Recommend Entrance/Exit

Recommend Entrance

Enbridge Constructionand Maintenance Facility

Mon Sheong FoundationLong Term Care

Facilities

Run

nin

g T

rack

IndoorBus

Parking

RepairGarage

30%

15% 5%50%

Page 41: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

29McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

AirQualityAssessment• AirQualityAssessmentStudywascarriedoutinaccordancewithMinistryoftheEnvironment(MOE)andMinistryofTransportation(MTO)guidelines

• Studyreviewedninecontaminantstypicallyemittedbymotorvehiclesincludingnitrogendioxideandcarbonmonoxide

• BackgroundcontaminantlevelswerebasedonmaximumvaluesreportedinthestudyareafromMOEandNationalAirPollutionSurveillancemonitoringstations

• EmissionrateswereestimatedbasedonU.S.EnvironmentalProtectionAgencyandMOEpublishedvalues

Page 42: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

30McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

AirQualityAssessment•Maximumbackgroundconcentrationswerecombinedwithmaximumpredictedemissionsfromthefacilityinordertoassess compliance

•ThemaximumcombinedconcentrationswereallbelowtheirrespectiveMOE(MinistryoftheEnvironment)guidelinesorCanadaWideStandardsexceptforbenzenandPM10

•Assessmentrevealedexcedenceof<1%ofthetimeforbenzeneandPM10

•PM10includesdustandsmokefromnearbyfactoriesandroads

•Assuch,mitigationmeasuresarenotwarrantedperMOEguidelinesand/orCanadaWideStandards

Page 43: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

31McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

NoiseAssessment•Noisemitigationmeasuresarerequiredtoreducedisruptionforlocalresidents;aconcernexpressedatthefirstpublicmeetinginNovember,2013

Thenoisemitigationplanconsistsof:•Acousticpanelsaroundrooftopfans•BusesaccessfacilityfromRedleaAvenue(preferredoverusingMcNicoll)•Falsefaçades(anextensionoftheroof)tothewestofthefacility•Baydoorsalongthewestsideofthefacilitytobeclosedwhennotinuse

ThesenoisemitigationmeasureswillreducenoiselevelsforthecommunityandmeetProvincialsoundlevelrequirements

Page 44: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

32McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

NoiseAssessmentNoiseLevels–PotentialImpacts• Ambientnighttimenoiselevelsatthewestperimeteroftheproposedfacilityrangefrom37dBAto51dBA

• Nighttimesoundlevellimitis45dBA (nighttime–11:00p.m.to7:00a.m.)

• MOErequiresmitigationforimpactsexceedingthenoiseguidelinelimit

• AmbientnoiseandFacilitynoisedonotexceed45dBA

140dB

Threshold of Pain

Chainsaw

Hairdryer

Raindrops

NormalConversation

MilitaryJet Tak-off

Threshold ofHearing (TOH)

Rustling Leaves

130

120

110

100

90

80

70

60

50

40

30

20

1010 dB

0 dB

40 dB

60 dB

90 dB

130 dB

110 dB

140 dB

0

Location

NoiseSensitiveAreatotheWestoftheFacility

RelevantNoiseGuidelineLimit

45dBA

PredictedNoiseLevelfromFacilityw/Mitigation

45dBA

NetImpact

0dBA

Page 45: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

33McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

NaturalEnvironmentAssessment•Nofishhabitatorwatercourseswerefoundwithinthesubjectsite

•Thesiteisdominatedprimarilybyasignificantnon-nativecomponentthatistypicalforabandonedagriculturalfields.Norareorendangeredspecieswereencounteredduringfieldwork

•AportionofthesiteislocatedintheTorontoandRegionConservationAuthority(TRCA)regulatedarea

•OngoingconsultationwithTRCA

Page 46: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

34McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

TTCCommitment•Consultationthroughplanninganddesignprocess•CommunityLiaisonOfficer(CLO)assignedtoproject•CLOtorespondtoallquestionsandadvocateforthecommunityinterests

•Meetwithstakeholders:residents,businessesandthestakeholdergroupstoaddressspecificenquiries

•Provideupdateprojectinformation•Postregularupdatesonadedicatedprojectpageatprojects.ttc.ca

Page 47: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

35McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

NextSteps•RespondtocommentsreceivedatthisOpenHouseandpostonprojects.ttc.ca

•Refinemitigationmeasurestominimizeoravoidenvironmentalimpacts

•HoldPublicConsultation#3inthefallof2014•StartTransitProjectAssessmentProcess(TPAP) (provincialregulatoryprocess)

Continue community consultations through detailed design and construction planning

Page 48: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

36McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ScheduleNovember27,2013 ProjectAssessmentPublic Consultation#1May14,2014 PublicConsultation#2Summer/Fall2014 TransitProjectAssessment TTCBoardandCityCouncil2015 Detaileddesignandconstruction planning2016 Startconstruction2019 Completeconstructionand commissionfacility

Page 49: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

37McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

ContactUsFormoreinformationortosubmityourcomments:Web: www.projects.ttc.caEmail: [email protected]:416-397-8699TTY: 416-397-0831 Fax: 416-338-0251Mail: LitoRomano TTCCommunityLiaisonOfficer 5160YongeStreet,13thFloor Toronto,ONM2N6L9CommentswouldbeappreciatedbyMay23,2014Thankyouforyourparticipation!

Page 50: McNicoll Bus Garage Public Open House - TTC · Road and McNicoll Avenue in Scarborough will store and maintain TTC’s new ... TTC is not aware of a future Go Station at this location

38McNicol l Bus Garage – Publ ic Open House #2May 14, 2014

FreedomofInformationandProtectionofPrivacyActInformationcollectedwillbeusedinaccordancewiththeFreedom of Information and Protection of Privacy Act.Withtheexceptionofpersonalinformation,allcommentswillbecomepartofthepublicrecord.

YouareencouragedtocontactmembersoftheProjectTeamifyouhaveanyquestionsorconcernsregardingtheaboveinformation.