Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
06-12-17
A S S O C I A T E SMcLANE
PWB
TJM
1724
CV
NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING
DAYS IN DESIGN STAGE - STOP CALL 1-800-242-1776
PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS
PA1System Inc.
CALL BEFORE YOU DIG
1
-
8
0
0
-
2
4
2
-
1
7
7
6
PENNSYLVANIA ONE CALL SYSTEM, INC.
LIST OF DRAWINGS
DESCRIPTION
DWG.
NUMBER
C-1
CV
C-2
C-3
LOOP TRAIL LAYOUT - SOUTH SECTION
OVERALL LOOP TRAIL LAYOUT
COVER
LOOP TRAIL LAYOUT - NORTH SECTION
N
SITE
C-3
C-2
JUNE 12, 2017
9
4
9
2
9
2
94
96
98
1
3
0
0
02
3
0
2
8
2
4
2
2
2
0
1
8
1
6
1
4
1
2
1
0
0
8
0
6
0
4
2
6
3
2
32
3
4
1
3
3
6
3
4
3
6
30
1
3
0
0
9
8
9
6
9
4
1302
1304
1302
1300
1
3
0
6
1
3
1
0
1
3
1
2
1
3
2
0
1
8
1
6
1
4
10
1
2
08
0
6
1
0
0
8
0
6
1
3
3
6
1
3
3
4
1
3
0
2
1
3
0
4
1306
0
4
0
6
0
8
1
4
1
2
1
0
1
4
1
3
0
2
1
3
1
8
2
0
1
2
9
8
1
3
0
0
22
24
26
28
1
8
2
0
1
6
9
6
9
8
9
4
1
3
3
4
1
3
3
2
1
3
3
6
C-2
2
1
C-2
2
C-2
1
C-3
C-3
4
C-3
1
C-2
1
C-3
2
3
C-3
2
C-3
2
C-3
30B
Wurtsboro
442B
Wyom
ing
12
Gleneyre-K
im
bles
30B
Wurtsboro
442B
Wyom
ing
30B
Wurtsboro
38B
Sw
artsw
ood
30B
Wurtsboro
442B
Wyom
ing
30B
Wurtsboro
30B
Wurtsboro
RENO
MATTRESS
DS-1
DS-2
FOOTBRIDGE 2
FOOTBRIDGE 3
DS-1
DS-2
DS-1
RENO
MATTRESS
DS-1
FOOT
BRIDGE 4
LOOP TRAIL
STONE DUST
(STA. 42+50 - 44+67)
LOOP TRAIL
MULCH HYBRID
(STA. 31+00 - 42+50)
LOOP TRAIL
REMNANT ROAD
(STA. 0+00 - 3+50)
(STA. 28+00 - 31+00)
LOOP TRAIL
MULCH
(STA. 22+00 - 28+00)
LOOP TRAIL
MULCH
(STA. 0+00 - 22+00)
FOOT
BRIDGE 1
DS-1
SOIL TYPES
239C - OQUAGAVERY STONY LOAM; 8 TO 15 PERCENT SLOPES; EXTREMELYBOULDERY; POORLY SUITED TO BUILDING SITE DEVELOPMENT;AREAS OF ROCK OUTCROP NEED TO BE CONSIDERED;HYDROLOGIC GROUP C.
38B - SWARTSWOODSTONY FINE SANDY LOAM; 0 TO 8 PERCENT SLOPES;EXTREMELY STONY, WELL DRAINED; FAIRLY WELL SUITED TOBUILDING SITE DEVELOPMENT AND SANITARY FACILITIES;STONES AND BOULDERS ON THE SURFACE REQUIRE MORESITE PREPARATION.; HYDROLOGIC GROUP C.
30B - WURTSBOROSTONY FINE SANDY LOAM; 0 TO 8 PERCENT SLOPES;EXTREMELY STONY, MODERATELY WELL DRAINED; POORLYSUITED TO BUILDING SITE DEVELOPMENT AND SANITARYFACILITIES; HYDROLOGIC GROUP C.
442B/442C - WYOMINGVERY COBBLY SANDY LOAM; 3 TO 8 PERCENT SLOPES;SOMEWHAT EXCESSIVELY DRAINED FAIRLY WELL SUITED TOWOODLAND AND BUILDING SITE DEVELOPMENT; HYDROLOGICGROUP A.
12 - GLENEYRE-KIMBLESCOMPLEX, 0 TO 2 PERCENT SLOPES; VERY POORLY DRAINED;BEDROCK DEPTH VERY DEEP; 0 TO 7 INCH SEASONAL WATERTABLE; HYDROLOGIC GROUP D; HYDRIC SOIL.
LEGENDEXISTING
PROPERTY LINE
10' CONTOUR
2' CONTOUR
UTILITY POLE
BUILDING
ROAD
DRIVEWAY
STREAM
WETLAND
BIORETENTION AREA
06-12-17
A S S O C I A T E SMcLANE
PWB
TJM
1724
C-1
PROPOSED
= TRAIL
= RENO MATTRESS
= NPDES BOUNDARY(FOLLOWS PROPERTY LINE)
= LIMIT OF DISTURBANCE
LEGEND
C-3
C-2
94
96
98
1
3
0
0
0
2
3
0
2
8
2
4
2
2
2
0
1
8
1
6
1
4
1
2
1
0
0
8
0
6
0
4
2
6
3
2
32
3
4
1
3
3
6
3
4
3
6
30
1302
1304
1302
1300
1
3
0
6
1
3
1
0
1
3
1
2
1
3
3
6
1
3
3
4
1
3
0
2
1
3
0
4
1306
0
4
0
6
0
8
1
3
0
2
1
2
9
8
1
3
0
0
9
6
9
8
9
4
1
3
3
4
1
3
3
2
1
3
3
6
1
C-2
2
C-2
1
C-3
3
C-3
2
C-3
2
C-3
442B
Wyom
ing
30B
Wurtsboro
30B
30B
Wurtsboro
DS-1
DS-2
FOOTBRIDGE 2
FOOTBRIDGE 3
DS-1
DS-2
DS-1
RENO
MATTRESS
LOOP TRAIL
STONE DUST
(STA. 42+50 - 44+67)
LOOP TRAIL
MULCH HYBRID
(STA. 31+00 - 42+50)
LOOP TRAIL
REMNANT ROAD
(STA. 0+00 - 3+50)
(STA. 28+00 - 31+00)
LOOP TRAIL
MULCH
(STA. 22+00 - 28+00)
FOOT
BRIDGE 1
DS-1
LEGENDEXISTING
PROPERTY LINE
10' CONTOUR
2' CONTOUR
UTILITY POLE
BUILDING
ROAD
DRIVEWAY
STREAM
WETLAND
BIORETENTION AREA
06-12-17
A S S O C I A T E SMcLANE
PWB
TJM
1724
C-2
PROPOSED
= TRAIL
= RENO MATTRESS
= NPDES BOUNDARY(FOLLOWS PROPERTY LINE)
= LIMIT OF DISTURBANCE
LEGEND
2% CROSS SLOPE
RENO MATTRESS
7'-0"
UNDISTURBED
SUBGRADE
RENO MATTRESS - 6"
DEPTH
E
X
I
S
T
I
N
G
S
L
O
P
E
TRAIL
6'-0"
12'-0"
SECTION
PLAN
NOTES:1. RENO MATTRESS TO BE FILLED WITH R-3 STONE2. ALL MATTRESSES SHALL BE ZINC COATED3. THE FOUNDATION ON WHICH THE RENO MATTRESS IS TO BE PLACED ON SHALL BE LEVEL, AND GRADED TO THE ELEVATIONS AS SHOWN ON THE
PROJECT CONSTRUCTION DRAWINGS4. THE 1' OVERHANG SHALL BE APPLIED TO THE UPPER SIDE OF THE SLOPE5. ASSEMBLY OF MATRESSES SHOULD MEET ALL THE SPECIFICATIONS SET FORTH BY MACCAFERRI INC.6. SEE PLAN FOR LOCATIONS
S
L
O
P
E
S
L
O
P
E
100
98
96
R-3 STONE
(NTS)
(NTS)
WIDTH
7'-0"
LENGTH
8-0"
HEIGHT 6"
PERSPECTIVE(NTS)
2
C-2
NOT TO SCALE
RENO MATTRESS
1
C-2
NOT TO SCALE
FOOT BRIDGE / BOARDWALK
C-3
C-2
30% Chewings Fescue (Festuca rubra ssp. commutata)
30% Creeping Red Fescue, 'Pennlawn' (Festuca rubra, 'Pennlawn')
20% Annual Ryegrass (Lolium multiflorum (L. perenne var. italicum))
10% Rough Bluegrass (Poa trivialis)
10% Kentucky Bluegrass, 'Alley Cat' (Poa pratensis, 'Alley Cat')
CONSERVATION SHADE MIX (ERNMX - 129)
SEED RATE: 8LB PER 1,000 SF
MULCH RATE: 140LB PER 1,000 SF
EARTH DISTURBANCE AREAS
DISTURBED EARTH AREAS NOT STABILIZED WITH MULCH SHOULD BE SEEDED
WITH THE ABOVE SEED MIX TO STABILIZE THE GROUND. PENNDOT FORMULA B
CAN BE USED IN ANY AREAS NOT UNDER CANOPY.
TOP VIEW
6'-0"
5'-4"
2" X 4" CURB
DECK BOARDS (2" x 6")
2" X 6" DECKING
2" X 6" STRINGER
TO BE RECESSED 2"
UNDER DECKING
2" x 4" CURB
2" X 6" STRINGER
BOARDWALK TO BE
UNDERLAIN WITH 6" AASHTO
#57, IF NEEDED TO LEVEL
2" x 6" x 36"
FASTENER BLOCK
3
8
" CARRIAGE BOLTS
DECK SCREWS
2" X 6" JOIST
2" X 6" JOIST
NOTE:
1. APPLY TWO COATS OF CLEAR ACRYLIC OUTDOOR STAIN TO ALL WOOD SURFACES
2. ALL LUMBER TO BE PRESSURE TREATED SOUTHERN YELLOW PINE
3. FASTENERS TO BE STAINLESS STEEL
ANCHOR FRAME TO EXISTING BOULDERS TO
SECURE IN PLACE (HARDWARE TBD IN FIELD)
APPROXIMATE LENGTHS:
FOOTBRIDGE 1 = 20 LF FOOTBRIDGE 2 = 35 LF
FOOTBRIDGE 3 = 40 LF FOOTBRIDGE 4 = 20 LF
1
3
2
0
1
8
1
6
1
4
10
1
2
08
0
6
1
0
0
8
0
6
1
4
1
2
1
0
1
4
1
3
1
8
2
0
22
24
26
28
1
8
2
0
1
6
C-2
2
C-3
4
C-3
1
C-2
1
C-3
2
442B
Wyom
ing
442B
Wyom
ing
30B
Wurtsboro
RENO
MATTRESS
DS-1
FOOT
BRIDGE 4
LOOP TRAIL
MULCH
(STA. 0+00 - 22+00)
LEGENDEXISTING
PROPERTY LINE
10' CONTOUR
2' CONTOUR
UTILITY POLE
BUILDING
ROAD
DRIVEWAY
STREAM
WETLAND
BIORETENTION AREA
06-12-17
A S S O C I A T E SMcLANE
PWB
TJM
1724
C-3
TRAIL
RENO MATTRESS
NPDES BOUNDARY (PROPERTY LINE)
LIMIT OF DISTURBANCE
2" TSA
4" ASPHALT MILLINGS
2% MIN CROSS SLOPE IN
DIRECTION OF EXISTING GRADE
6' TRAIL WIDTH 1' MIN.
6"
3'-0"
4'-0"
1'-6"
6" x 6" MIN PCF 0.60
lb/ft3 SOUTHERN
YELLOW PINE
2A MODIFIED (MIXED
WITH DRY CEMENT)
PADOT 2B STONE
30.0Á
NOTES:
1. APPLY TWO COATS OF CLEAR ACRYLIC OUTDOOR STAIN TO
ALL WOOD SURFACES
2. SIGNS ARE TO BE LOCATED APPROXIMATELY 10' FROM THE
START OR INTERSECTION OF A TRAIL, ADJACENT TO TRAIL (1')
SIDE VIEW
1
2
" ROUTED PLASTIC
ARROW. DIRECTION OF
ARROW INDICATED ON
PLAN. ARROW IS TO BE
PAINTED TRAIL COLOR.
FRONT VIEW
L
O
O
P
T
R
A
I
L
HORIZONTAL ROUTED
TRAIL NAME.
ARROW STYLE FOR POSTS
INDICATED ON PLAN
LOOP TRAIL
SPUR TRAIL
6' TRAIL WIDTH
8'-0" CLEAR
CORRIDOR
HEIGHT
MULCH 4" DEPTH
GEOTEXTILE FABRIC
ASPHALT MILLINGS *
SEE NOTES
(DEPTH VARIES BASED ON SURFACE ROCK)
UNDISTURBED SUBGRADE
NOTES:
1. ASPHALT MILLINGS NEEDED ONLY IN AREAS OF HIGH SURFACE ROCKS
2. NO EARTH DISTURBANCE BEYOND CONSTRUCTION FENCE NEAR WETLANDS.
2
C-3
NOT TO SCALE
MULCH & MULCH-HYBRID TRAIL
PROPOSED
8' TRAIL CORRIDOR
3
C-3
NOT TO SCALE
STONE DUST TRAIL
1' MIN.
1
C-3
NOT TO SCALE
DIRECTIONAL SIGNAGE (DS)
4
C-3
NOT TO SCALE
TEMPORARY CONSTRUCTION FENCING
2"X2"X6' STAKES
FENCING - ORANGE
VINYL CONSTRUCTION
6' MAX.
SIDE VIEW
TOP VIEW
5'
1' MIN.
C-3
C-2
LAWN
RESTORATION