7
SAP PP/QM User manual Published by Team of SAP Consultants at SAPTOPJOBS Visit us at www.sap-topjobs.com Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS

MCEC LTP Material Analysis Ecc6

Embed Size (px)

DESCRIPTION

MCEC LTP Material Analysis

Citation preview

Page 1: MCEC LTP Material Analysis Ecc6

SAP PP/QM User manual

Published by Team of

SAP Consultants at

SAPTOPJOBS

Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS

Page 2: MCEC LTP Material Analysis Ecc6

Material Analysis in Long Term Planning Definition:- With LTP process, future planning is done and final total activity requirement, expected procurement details are calculated through LTP MRP run. To analyze further on procurement details i.e to know how much of specific Raw material or packing materials are to be procured, it is required to transfer those details to inventory module. Once it is transferred to Purchase Info system, the result is analyzed material wise. Objective :- LTP run is completed and it is required to transfer the data to inventory module. After transferring to purchasing info system, it is required to analyze the result material wise. One will be in a position to perform material analysis in LTP with this document. Prerequisites:- Completed LTP MRP run Transfer to purchasing Info system is completed. Menu path :- Logistics → Production → Production → Production Planning → Long-Term Planning → Evaluations → Purchasing Info Sys. → MCEC - Material

Page 3: MCEC LTP Material Analysis Ecc6

Double click on MCEC

Page 4: MCEC LTP Material Analysis Ecc6

1. Maintain the following data

Field Name Values Planning scenario

Enter value in Planning scenario.

Plant Enter value in Plant. Planning scenario

Enter value in Planning scenario.

Page 5: MCEC LTP Material Analysis Ecc6

2. Press Execute .

3. Press Enter .

4. Press Exit Shift+F3 .

Page 6: MCEC LTP Material Analysis Ecc6

Exit Material analysis

5. Press No .

Page 7: MCEC LTP Material Analysis Ecc6

SAP PP/QM User manual

Published by Team of

SAP Consultants at

SAPTOPJOBS

Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS