22 October 2013 ANDREW SMITH, PE, CFM LAURIE BROWN MCCLAY VALLEY DETENTION BASIN RETROFITS

MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

22

Oct

ob

er

20

13

ANDREW SMITH, PE, CFM LAURIE BROWN

MCCLAY VALLEY DETENTION BASIN RETROFITS

Page 2: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

AGENDA

Project Background

Water Quality in Detention Basins

Improvement Features

Proposed Project Improvements

Questions

2

Page 3: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PROJECT BACKGROUND

3

Page 4: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PR

OJE

CT

BA

CK

GR

OU

ND

PROJECT BACKGROUND

4

2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected for improvement design

Meeting with trustees on May 20th Hydrologic and Hydraulic Investigations

Page 5: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

WATER QUALITY IN DETENTION BASINS

5

Page 6: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

WA

TE

R Q

UA

LIT

Y I

N D

ET

EN

TIO

N B

AS

INS

WATER QUALITY

6

Methods of WQ Improvement

• Removal of Sediment

• Nutrient Uptake

• Detention of Small Events

• Filtering Overland Flow

Page 7: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

IMPROVEMENT FEATURES

7

Page 8: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

IMP

RO

VE

ME

NT

FE

AT

UR

ES

• Improved McClay Valley Outlet

• Debris screen to prevent clogging of the outlet

• Low flow outlet for small events

• Improved Francis Howell Outlet will provide Water Quality Improvement

• Debris Screen

• Plate with holes drains small events

• Overflow outlet for larger storms

MODIFIED OUTLET

8

Page 9: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

IMP

RO

VE

ME

NT

FE

AT

UR

ES

• Provides Water Quality Improvement

• Prevents Sediment Accumulation in Basin

• Assists with Flood Control

• Prevents debris from clogging outlet

SEDIMENT FOREBAYS

9

Sediment Forebay Locations

Page 10: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

IMP

RO

VE

ME

NT

FE

AT

UR

ES

• Native Plantings

• Provides Water Quality Improvement

• Habitat for Fish and Aquatic Species

SHORELINE TREATMENT

10

Page 11: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PROPOSED PROJECT IMPROVEMENTS

11

Page 12: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PR

OP

OS

ED

MC

CL

AY

VA

LL

EY

IM

PR

OV

EM

EN

TS

• Rebuild Spillway and Outlet

• Replace existing apron

• Provides WQ Storage

• Reduces downstream flows

• Re-shape/Revegetate Basin

• Replace Downstream Pipe with Open Channel

• Sediment Forebay

• Remains a Dry Detention Basin

FRANCIS HOWELL BASIN IMPROVEMENTS

12

Page 13: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PR

OP

OS

ED

MC

CL

AY

VA

LL

EY

IM

PR

OV

EM

EN

TS

• Modified Outlet

• Permanent Pool lowered to original 554 elevation

• Provides WQ Storage

• Reduces downstream flows

• Eliminate Overtopping

• Dredge Sediment

• Shoreline Treatments

• South Bank Stabilization

• Sediment Forebay

MCCLAY VALLEY BASIN IMPROVEMENTS

13

Page 14: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

PR

OP

OS

ED

MC

CL

AY

VA

LL

EY

IM

PR

OV

EM

EN

TS

BASIN IMPROVEMENTS

14

Page 15: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

EXISTING CONDITIONS

Page 16: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

10/28/2013

16

PROPOSED ENHANCEMENTS

Page 17: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

EXISTING CONDITIONS

Page 18: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

26 December 2012 PowerPoint Sample

18

PROPOSED ENHANCEMENTS

Page 19: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected

QU

ES

TIO

NS

19

QUESTIONS

Page 20: MCCLAY VALLEY DETENTION BASIN RETROFITSOct 22, 2013  · PROJECT BACKGROUND 4 2012 Stormwater Masterplan •Basins Identified for Water Quality Retrofits •Black & Veatch team selected