31
MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

Embed Size (px)

Citation preview

Page 1: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

MBS PCI SCOPE REDUCTION AND CPE MAINTENANCEMike Chalk – MBS Development

Page 2: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

MBS PCI SCOPE REDUCTION:MBS OPENEDGE PAYMENT PROCESSING

Page 3: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

3www.cdg.ws

With the 4.0 release of MBS, credit card processing will change in two important ways

MBS software and servers will no longer “touch” credit card dataMBS will launch an embedded OpenEdge payment screen within MBS to capture payment details

MBS will no longer store credit cardsAs OpenEdge processes credit card transactions, they will return a “token” that represents the card, and MBS will store that value as needed for submitting future transactions

PCI “OUT OF SCOPE”

Page 4: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

4www.cdg.ws

MBS will store the last 4 digits of the credit card, meaning extraction of credit card numbers from MBS will no longer be possible

Expiration date will continue to be stored

CDG tools will continue to exist

OpenEdge supports automatic update of credit card numbers and expiration dates (Decline Minimizer)

Tokens link to credit cards stored in OpenEdge to support credit card reuse and auto-pay (Managed Payer Data)

In the 4.0 release, we will “tokenize” your payment data

CREDIT CARD DATA

Page 5: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

5www.cdg.ws

Screen Shots…

NEW PAYMENT SCREENS

Page 6: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

6www.cdg.ws

EFT CREDIT CARD PANEL

Page 7: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

7www.cdg.ws

EFT CREDIT CARD ENTRY

Page 8: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

8www.cdg.ws

EFT BANK ACCOUNT PANEL

Page 9: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

9www.cdg.ws

EFT BANK ACCOUNT ENTRY

Page 10: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

10www.cdg.ws

CREDIT CARD EFT FROM E-CARE

Page 11: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

11www.cdg.ws

CREDIT CARD EFT – E-CARE ENTRY

Page 12: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

12www.cdg.ws

BANK DRAFT EFT FROM E-CARE

Page 13: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

13www.cdg.ws

BANK DRAFT EFT – E-CARE ENTRY

Page 14: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

14www.cdg.ws

PAYMENT SCREEN FROM E-CARE

Page 15: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

15www.cdg.ws

CREDIT CARD PAYMENT FROM E-CARE

Page 16: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

16www.cdg.ws

BANK DRAFT PAYMENT FROM E-CARE

Page 17: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

17www.cdg.ws

CASH DRAWER – CREDIT CARD

Page 18: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

18www.cdg.ws

CASH DRAWER – CREDIT CARD DETAILS

Page 19: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

19www.cdg.ws

CASH DRAWER – BANK ACCOUNT

Page 20: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

20www.cdg.ws

CASH DRAWER – BANK ACCOUNT DETAILS

Page 21: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

21www.cdg.ws

AUTOMATIC CREDIT CARD PROCESS

Page 22: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

22www.cdg.ws

NEW PAYMENT PROCESS

Page 23: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

www.cdg.ws 23

Page 24: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

CPE MAINTENANCE:CUSTOMER PREMISE EQUIPMENT PROCESS IMPROVEMENTS

Page 25: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

25www.cdg.ws

MBS already supports managing and provisioning your CPE, but we have plans to improve the process and management:

Add the ability to manage CPE outside of Customer Care

Support equipment reservations

Make it easier (and in some cases, automatic) to set the appropriate location as equipment is installed, moved and returned

Add support for inventory quantity controls

MBS CPE IMPROVEMENTS – OVERVIEW

Page 26: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

26www.cdg.ws

Allow users to make equipment changes from Task Management, Trouble, and Plant

For pending installs, the equipment would inherit the pending install session

The system would create a new session, if needed (such as for swapping out equipment for a Trouble Ticket)

The system will issue a warning if the Subscriber is locked

MANAGING CPE OUTSIDE OF CUSTOMER CARE

Page 27: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

27www.cdg.ws

During an install, you can reserve a quantity of equipment by type and model

Reservations will be replaced with actual equipment, later in the install process (w/flexibility)

We will display reservations numbers on the Equipment Master summary screen, and in Dashboards

If warehouses are tied to service areas, we can reserve equipment from the correct warehouse

As reservations are entered, low inventory warnings will display

MBS CPE – RESERVATIONS

Page 28: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

28www.cdg.ws

CPE can be shared cross services (e.g. ONTs)

This sharing can span Subscribers (such as multiple businesses sharing an ONT)

Inventory control min/max values can be set to support reorder warnings and identify surplus equipment

MBS CPE – SHARING, CONTROL

Page 29: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

29www.cdg.ws

The MBS equipment table already includes an optional location

We will add the ability to set the location value when outing equipment

MBS users can have a default location (such as themselves, their truck, front desk, warehouse 1, etc.), so “outted” equipment will default to that location

We will phase out the current Truck and Warehouse status values, and replace them with Available

 

MBS CPE – LOCATIONS

Page 30: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

30www.cdg.ws

We will create an Equipment Transfer batch, to give users the ability to quickly change the locations of several pieces of equipment

Equipment scanned into a list

Equipment tied to an account

Equipment tied to an Install or PD session

Equipment locations can optionally be associated with service areas, allowing the system to default the expected equipment location for an install

MBS CPE – LOCATIONS

Page 31: MBS PCI SCOPE REDUCTION AND CPE MAINTENANCE Mike Chalk – MBS Development

www.cdg.ws 31