MBA782.Aggr.Plng CAJ9.12.1 • Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets Planning with Mathematical Models Operations Management Aggregate Planning

MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

Embed Size (px)

Citation preview

Page 1: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.1

• Aggregation

• Relationship to Other Plans

• Reactive vs. Aggressive Alternatives

• Aggregate Planning Strategies

• Planning with Spreadsheets

• Planning with Mathematical Models

Operations Management

Aggregate Planning

Page 2: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.2

Aggregate Plan is....– statement of ____________ rates,

_____________ levels, and _______________ holdings based on customer demands and capacity limitations

Goal: Specify the ____________ combination of– production rate– workforce level– inventory on hand

that _____________ all relevant costs.

Aggregate Planning Overview

Problem Context

Page 3: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.3

• Translation of annual business plans into ______ labor

and output plans for the ________________ term

• Generalize the problem

– too ____ to solve for each individual product

• Aggregate quantities into broad categories or product

groups

• Intermediate Range

Aggregate Planning Overview

Aggregation

Page 4: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.4

• Long-range planning

– Greater than _____ year planning horizon

• Intermediate-range planning

– ____ to _______ months

• Short-range planning

– One day to less than ____ months

Aggregate Planning Overview

Planning Horizons

Page 5: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.5

• Brings operations, finance, and marketing __________

• Manufacturing....

– business plan

> a ______________ of income, costs, and profits

– _________________ plan

> sets production rates, inventory levels, and work-

force levels for a product family

– ____________ production schedule

> specifies _________ and productions __________

Aggregate Planning

Relationship to Other Plans

Page 6: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.6

Aggregate Planning Overview

Relationship to Other Plans

CapacityRequirementsPlan (CRP)

MasterProduction

Schedule (MPS)

ProductionPlan

Material RequirementsPlan (MRP)

Work-forceSchedule)

StaffingPlan

BusinessPlan

Manufacturing Service

AggregatePlans

Page 7: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.7

• Should inventories be used to absorb changes in demand?

• Should the ______ of the workforce vary?

• Should part-time, overtime, and/or undertime be used?

• Should sub-contractors be used to maintain a stable

workforce?

• Should price or other factors be changed to influence

demand?

Aggregate Production Planning

Production Planning Environment

Page 8: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.8

• Accept demand forecast as a given, and

_______ to fluctuations in demand.

• Resources:

– changing inventory levels

– varying work force size by hiring or layoffs

– varying production capacity through overtime

or idle time

– subcontracting

– using part-time workers

Production Planning Environment

Capacity Management Options

Page 9: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.9

• _________ the demand pattern to achieve

efficiency and reduce costs.

• Resources:

– competitive pricing and promotion

– counter-seasonal product mixing

– backordering during high demand periods

Production Planning Environment

Demand Management Options

Page 10: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.10

Level Strategy

• Keep the work-force level __________– not hiring or laying off workers

• Vary _____-workforce capacity or demand options

• Advantage of level output rates and

________ work force

• Disadvantages of

– increased inventory investment, and

– increased undertime and overtime expenses

Aggregate Production Planning

Production Planning Strategies

Page 11: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.11

Level Strategy

Aggregate Production Planning

Production Planning Strategies

01020304050607080

0 1 2 3 4 5 6 7 8 9 10 11 12

Period

Uni

ts

Inventory:

Sales:

Production:

Page 12: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.12

• Chase Strategy

– production _________ demand

– uses _______ ___ ________ to match demand

– does not include building of anticipation inventory

– produces ___________ inventory investment.

– expense of adjusting work-force size

– potential alienation of workforce, loss of productivity,

and lower quality

– favored by service organizations because inventory is difficult

if not impossible to adopt

Aggregate Production Planning

Production Planning Strategies

Page 13: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.13

• Chase Strategy

Aggregate Production Planning

Production Planning Strategies

01020304050607080

0 1 2 3 4 5 6 7 8 9 10 11 12

Period

Uni

ts

Inventory:

Sales:

Production:

Page 14: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.14

Mixed Strategy

• Neither a pure level or pure chase strategy– work force level is not exactly level, and– does not exactly match demand on

a period-by-period basis

Fitting the Situation

• The best strategy must fit the companies– environment, and – competitive priorities

Aggregate Production Planning

Production Planning Strategies

Page 15: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.15

Mixed Strategy

Aggregate Production Planning

Production Planning Strategies

01020304050607080

0 1 2 3 4 5 6 7 8 9 10 11 12

Period

Uni

ts

Inventory:

Sales:

Production:

Page 16: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.16

Relevant costs to consider and include:

• Basic production (labor) costs– regular time and overtime

• __________ in production levels

– hiring, training, layoff

• Inventory costs ( _________ costs):

– storage, insurance, taxes,spoilage, obsolescence

• Backorder and stockout costs ( ___________ costs):

– expediting, goodwill, lost sales

Aggregate Production Planning

Relevant Costs

Page 17: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.17

• Cut-and-Try charting and graphic methods– trial & error approach

– cost out _______________ plans and

pick the _______ one– popular & easy-to-understand

• Mathematical approaches

Aggregate Planning

Aggregate Planning Techniques

Page 18: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.18

• Forecast of demand for each period

• Determine the ____________ for regular time, overtime, and subcontracting, for each period

• Determine the labor ______, hiring and firing costs, and inventory holding costs

• Consider company policies which may apply to the workers or to stock levels

• Develop ______________ plans, and examine their total costs

Aggregate Planning Techniques

Cut-and-Try

Page 19: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.19

• Use a spreadsheet approach for– stating a strategy,– developing a plan,– identifying possible improvements, and– modify until we are satisfied.

• Components of a spreadsheet are:– input values– derived values, and – calculated costs.

Aggregate Planning Techniques

Using Spreadsheets

Page 20: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.20

Number of working days:

Jan 22Feb 19Mar 22Apr 21May22Jun 20

Using Spreadsheets

Aggregate Planning Example

Monthly Demand for the Executive Line

8,000

6,0007,000

9,000

5,5004,500

-

2,000

4,000

6,000

8,000

10,000

12,000

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Dem

and

(u

nit

s/m

on

th)

Page 21: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.21

Using Spreadsheets

Aggregate Planning ExampleHolding Cost: 1.00$ per unit per month

Backorder Cost: 1.25$ per unit per monthHiring Cost: 200$ per workerLayoff Cost: 250$ per worker

Regular Labor Cost: 8.00$ per hourOvertime Labor Cost: 12.00$ per hour

Undertime Labor Cost: -$ per hour

Materials: 5.00$ per unitSubcontracting Cost: 20.00$ per hour

Production Time: 0.15 hours per unitTime at regular pay: 8.00 hours per day

Productivity: 1.00 Overtime Limit: 20% of regular labor hours

Sub-contracting Limit: 10% of regular plus overtime hours

Page 22: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.22

Using Spreadsheets

Level Strategy ExampleJanuary

Demand: - 8,000 Beginning inventory: -

Net requirement: - Labor hours required: -

Days per month: - Required workers: -

Workforce size: 5 Regular hours: -

Overtime hours: - Undertime hours: -

Subcontract hours: - Number to hire: - Number to fire: -

Units produced: - Ending inventory: 250

Page 23: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.23

Using Spreadsheets

Level Strategy Example

January February March April May June TotalsDemand: - 8,000 6,000 7,000 9,000 5,500 4,500 40,000

Beginning inventory: - 250 (6) - - (1,608) - Net requirement: - 7,750 6,006 7,000 9,000 7,108 4,500

Labor hours required: - 1,163 901 1,050 1,350 1,066 675 Days per month: - 22 19 22 21 22 20

Required workers: - 6.605 5.927 5.966 8.036 6.058 4.219 Workforce size: 5 5 5 5 5 5 5 Regular hours: - 880 760 880 840 880 800

Overtime hours: - 176 141 170 168 176 - Undertime hours: - - - - - - -

Subcontract hours: - 106 - - 101 10 - Number to hire: - - - - - - - Number to fire: - - - - - - -

Units produced: - 7,744 6,006 7,000 7,392 7,108 5,333 40,583 Ending inventory: 250 (6) - - (1,608) - 833

Page 24: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.24

Using Spreadsheets

Level Strategy Example

January

Material costs: - -$ Regular labor costs: - -

Overtime labor costs: - - Undertime costs: - -

Subcontract costs: - - Hiring costs: - - Firing costs: - -

Holding costs: - - Backorder costs: - -

Totals: -$

Page 25: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.25

Using Spreadsheets

Level Strategy Example

January February March April May June Totals

Material costs: - -$ -$ -$ -$ -$ -$ -$ Regular labor costs: - 7,040 6,080 7,040 6,720 7,040 6,400 40,320

Overtime labor costs: - 2,112 1,691 2,040 2,016 2,112 - 9,971 Undertime costs: - - - - - - - -

Subcontract costs: - 2,112 - - 2,016 204 - 4,332 Hiring costs: - - - - - - - - Firing costs: - - - - - - - -

Holding costs: - - - - - - 833 833 Backorder costs: - 8 - - 2,010 - - 2,018

Totals: 11,272$ 7,771$ 9,080$ 12,762$ 9,356$ 7,233$ 57,474$

Page 26: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.26

Using Spreadsheets

Chase Strategy ExampleJanuary

Demand: - 8,000 Beginning inventory: -

Net requirement: - Labor hours required: -

Days per month: - Required workers: -

Workforce size: 5 Regular hours: -

Overtime hours: - Undertime hours: -

Subcontract hours: - Number to hire: - Number to fire: -

Units produced: - Ending inventory: 250

Page 27: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.27

Using Spreadsheets

Chase Strategy Example

January February March April May June TotalsDemand: - 8,000 6,000 7,000 9,000 5,500 4,500 40,000

Beginning inventory: - 250 90 810 530 490 590 Net requirement: - 7,750 5,910 6,190 8,470 5,010 3,910

Labor hours required: - 1,163 887 929 1,271 752 587 Days per month: - 21 21 21 21 21 21

Required workers: - 6.920 5.277 5.527 7.563 4.473 3.491 Workforce size: 5 7 6 6 8 5 4 Regular hours: - 1,176 1,008 1,008 1,344 840 672

Overtime hours: - - - - - - - Undertime hours: - - - - - - -

Subcontract hours: - - - - - - - Number to hire: - 2 - - 2 - - Number to fire: - - 1 - - 3 1

Units produced: - 7,840 6,720 6,720 8,960 5,600 4,480 40,320 Ending inventory: 250 90 810 530 490 590 570

Page 28: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.28

Using Spreadsheets

Chase Strategy Example

January

Material costs: - -$ Regular labor costs: - -

Overtime labor costs: - - Undertime costs: - -

Subcontract costs: - - Hiring costs: - - Firing costs: - -

Holding costs: - - Backorder costs: - -

Totals: -$

Page 29: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.29

Using Spreadsheets

Chase Strategy Example

January February March April May June Totals

Material costs: - -$ -$ -$ -$ -$ -$ -$ Regular labor costs: - 9,408 8,064 8,064 10,752 6,720 5,376 48,384

Overtime labor costs: - - - - - - - - Undertime costs: - - - - - - - -

Subcontract costs: - - - - - - - - Hiring costs: - 400 - - 400 - - 800 Firing costs: - - 250 - - 750 250 1,250

Holding costs: - 90 810 530 490 590 570 3,080 Backorder costs: - - - - - - - -

Totals: 9,898$ 9,124$ 8,594$ 11,642$ 8,060$ 6,196$ 53,514$

Page 30: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.30

• Mathematical Models– Transportation algorithm– Linear Programming– Simulation

• Managerial considerations– Mathematical techniques are ___________ aids to

the planning process– Planning process is dynamic and complicated by

_______________ objectives– Manager - not _______________ - make decisions

Aggregate Planning Methods

Aggregate Planning with Mathematical Models

Page 31: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.31

• Close control of labor hours to ensure ________

response to customer demand

• Some form of ___ - ______ labor resource that can

be added or deleted to meet unexpected demand

• Flexibility of individual worker skills to permit

______________ of available labor

Aggregate Planning

Workforce Issues in Service Firms

Page 32: MBA782.Aggr.PlngCAJ9.12.1 Aggregation Relationship to Other Plans Reactive vs. Aggressive Alternatives Aggregate Planning Strategies Planning with Spreadsheets

MBA782.Aggr.Plng CAJ9.12.32

• Read Chapter 12

• Concepts / Terminology

• Review Lecture notes

• Recommended Problems

– none

Aggregate Planning

Chapter Wrap-Up