    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    Q.1) Providing adequate resources are key to productivity Comment.

    Explain the relevance of Work Breakdown Structure in determining

    responsibility area. What do you understand by Resource Smoothing?

    Ans : To encourage productivity, the researchers must be provided with

    adequate resources in terms of personnel, equipment, facilities and time.

    It is extremely frustrating to a professional to be given a challenging,

    interesting assignment, but not the necessary resources to complete it in

    an effective manner. Stable financial support is a major factor in

    sustaining the researchers commitment and enthusiasm for a project and

    in encouraging creativity. Resources should also be available to follow

    up on unplanned ideas as they evolve during a project. Creative workers

    must be provided with sufficient time for reading, discussion and

    thought and creative reflection. While pressure in the form of deadlines

    is thought to encourage creativity, the deadline should be set in

    consultation with the staff, otherwise it is counterproductive. More time

    can be made available for creative people to conduct their research byreducing their administrative burdens.

    The aim of this productivity management guide is to provide small

    business owners and managers with an overview of how company

    productivity can be improved. It covers what productivity is, how it is

    measured, and what a company can do to increase it.

    Why should productivity management growth be a national concern?

    It is because, if too low, the Nation can neither improve its standard of

    living at home nor compete successfully abroad. Productivity growth

    affects wage negotiations, inflation rates, business decisions, exchange

    rates, a host of other economic, political and social conditions, and,

    therefore, every small business owner and manager.

    Assignment-2 Page 1 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    2/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    The factors affecting both National and individual firm productivity are

    many and diverse. Nationally, changes in employment, hours worked,

    the educational, age and sex composition of the work force, levels of

    capital investment and savings, government regulations, capacity

    utilization, inflation, among others, all can affect, favorably or

    unfavorably, productivity rates.

    There are many productivity factors the firm can manage. How well

    does the firm utilize new knowledge; is it working at an economy-of-

    scale level; are the employees highly motivated and loyal or is there

    labor unrest and high worker turnover; is the resource (human and

    capital) allocation maximizing established goals; and finally, what is the

    overall quality of the company's management? And, if management sees

    productivity as a problem, is there a commitment to establish a

    company-wide Productivity Improvement Program?

    Work Breakdown Structure (WBS)

    The entire process of a project may be considered to be made up on

    number of sub process placed in different stage called the Work

    Breakdown Structure (WBS). A typical example of a WBS of a

    recruitment process is indicated in following diagram.

    Assignment-2 Page 2 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    3/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    WBS is the technique to analyse the content of work and cost by

    breaking it down into its component parts. Project key stages form the

    highest level of the WBS, which is then used to show the details at the

    lower levels of the project. Each key stage comprises many tasks

    identified at the start of planning and later this list will have to be

    validated.

    WBS is produced by identifying the key elements, breaking each

    element down into component parts and continuing to breakdown until

    manageable work packages have been identified. These can then be

    allocated to the appropriate person. The WBS does not show

    dependencies other than a grouping under the key stages. It is not time

    based there is no timescale on the drawing.

    The WBS is organized around the primary products of the project (or

    planned outcomes) instead of the work needed to produce the products

    (planned actions). Since the planned outcomes are the desired ends ofthe project, they form a relatively stable set of categories in which the

    costs of the planned actions needed to achieve them can be collected. A

    well-designed WBS makes it easy to assign each project activity to one

    and only one terminal element of the WBS. In addition to its function in

    cost accounting, the WBS also helps map requirements from one level of

    system specification to another, for example a requirements crossreference matrix mapping functional requirements to high level or low

    level design documents.

    Resource Smoothing Resource smoothing is part of the resource

    leveling process. In itself, resource smoothing is the process that, not

    withstanding any constraints imposed during the leveling process,

    attempts to determine a resource requirement that is "smooth" and where

    peaks and troughs are eliminated. For example, even if 7 units of a given

    Assignment-2 Page 3 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    4/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    resource are available at any one time, utilizing 5 of these units each

    week is preferable to 4 one week, 7 the next, 2 the next and so on. Even

    if there is no limit to the amount of any one resource available, it is still

    desirable that resource usage is as smooth as possible. Given that the

    resource requirements of those activities on the critical path are fixed,

    some order or priority needs to be established for selecting which

    activity and which particular resource associated with this activity

    should be given priority in the smoothing process. In determining which

    activity should be given priority, a subjective judgment should be made

    about the type of resource (or resources) associated with each activity;

    priority should be given to the activities whose resources are considered

    to be most important. Beyond this consideration, activities should be

    ranked in order of total work content and total float or slack available for

    that activity. A useful device for prioritizing is to consider the ratio of

    total work content/total float remaining and give priority to activities

    with the highest value of this ratio.

    Solving the resource scheduling problem for optimal solutions is

    extremely complex, particularly for large project networks with many

    different resource types. However, several heuristics are available to

    solve such problems. These heuristics allocate resources to activities to

    minimize project delay based on certain priority rules. The two mostcommonly used heuristics are the serial and the parallel methods. In the

    serial method of resource allocation, activities are sorted into a list and

    resources are allocated to each of these activities one at a time until

    resources are allocated to all activities. In the parallel method, however,

    resources are allocated on a period by period basis rather than each

    activity. In this method only those activities whose preceding activities

    have been completed will be considered. If two or more activities

    compete for the same resources, then allocation of resources is based on

    Assignment-2 Page 4 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    5/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    certain prescribed priority rules. Compared to the serial method, the

    parallel method has been the most widely used heuristic. The following

    priority rules, in the order presented, have been found to be the most

    effective in minimizing project delay.

    Minimum slack

    Smallest duration

    Lowest activity identification number

    Regardless of the scheduling heuristic used, the primary impact of

    resource constrained scheduling is the loss of flexibility due to the

    reduction in slack. Furthermore, the reduction in slack also increases the

    number of critical or near-critical activities

    Q.2) Explain the concept of concurrency in High Technology Development.

    What are the main utilities of an ERP package? What is the

    significance of reviewing ROI ?

    Ans:Concurrency in High Technology Development - As the application of

    technology has become critical for the survival of organization it has

    become imperative for organizations to initiate measures for the

    development of high technology to be ahead of competition. No doubt,

    there are many specialized Research and Development firms which offer

    their expertise to their clients problems. However, their services are

    available to the competitors and many technologies developed by the

    companys own research personnel cannot be shared with outsiders. So

    the strategy would be utilize the services of external resource to the

    extent they are suitable for our purpose, but with a strong base of R and

    D of our own. This will really differentiate the best companies from

    other ordinary ones.

    Assignment-2 Page 5 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    6/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    The following give some guidelines in the form of rules which would

    help organization to be strong in this area. Building concurrency into

    every activity is essential to reduce the development cycle time and to

    counter the technology obsolescence. Many of the tasks that are

    normally done in a serial fashion can be done in parallel by

    synchronizing the flow of information. The practices of the concurrent

    engineering where the design of the product and all its associated

    processes are carried out simultaneously based on team work and

    participation. Would not only help in reducing the development cycle

    time, but also improves the product functionality with regard to

    requirements. Concurrency can be accomplished in many ways both for

    product development as well as technology transfer, user evaluation and

    production.

    Enterprise resource planning (ERP) is an integrated computer-based

    system used to manage internal and external resources including

    tangible assets, financial resources, materials, and human resources. It is

    a software architecture whose purpose is to facilitate the flow of

    information between all business functions inside the boundaries of the

    organization and manage the connections to outside stakeholders. Built

    on a centralized database and normally utilizing a common computing

    platform, ERP systems consolidate all business operations into a

    uniform and enterprise wide system environment.

    An ERP system can either reside on a centralized server or be distributed

    across modular hardware and software units that provide "services" and

    communicate on a local area network. The distributed design allows a

    business to assemble modules from different vendors without the need

    for the placement of multiple copies of complex, expensive computer

    systems in areas which will not use their full capacity

    Assignment-2 Page 6 of 17

    http://en.wikipedia.org/wiki/Local_area_networkhttp://en.wikipedia.org/wiki/Local_area_network
  • 7/28/2019 MB0049-PROJECT MGT.doc

    7/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    The main Utilities of ERP Components are

    i) Financials

    ii) Distribution

    iii) Human Resources

    iv) Product lifecycle management

    v) Customer Relationship Management (CRM)

    vi) Supply chain management

    Purchasing

    Manufacturing

    Distribution

    vii) Warehouse Management System

    viii) Management Portal/Dashboard

    ix) Decision Support System

    All the above modules can exist in a complete system or utilized in an

    ad-hoc fashion.

    Commercial Applications

    Manufacturing Engineering, bills of material, scheduling, capacity,

    workflow management, quality control, cost management,

    manufacturing process, manufacturing projects, and manufacturing flow

    Supply chain management Order to cash, inventory, order entry,

    purchasing, product configurator, supply chain planning, supplier

    scheduling, and inspection of goods, claim processing, and commission

    calculation

    Financials General ledger, cash management, accounts payable,

    accounts receivable, fixed assets

    Project management Costing, billing, time and expense, performance

    units, activity management

    Assignment-2 Page 7 of 17

    http://en.wikipedia.org/wiki/Manufacturinghttp://en.wikipedia.org/wiki/Supply_chain_managementhttp://en.wikipedia.org/wiki/Order_to_cashhttp://en.wikipedia.org/wiki/Project_managementhttp://en.wikipedia.org/wiki/Manufacturinghttp://en.wikipedia.org/wiki/Supply_chain_managementhttp://en.wikipedia.org/wiki/Order_to_cashhttp://en.wikipedia.org/wiki/Project_management
  • 7/28/2019 MB0049-PROJECT MGT.doc

    8/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    Human resources payroll, training, time and attendance, roistering,

    benefits

    Customer relationship management Sales and marketing,

    commissions, service, customer contact and call center support

    Data services Various "self-service" interfaces for customers,

    suppliers, and/or employees

    Access control Management of user privileges for various processes

    In the absence of an ERP system, a large manufacturer may find itself

    with many software applications that cannot communicate or interface

    effectively with one another. Tasks that need to interface with one

    another may involve:

    ERP systems connect the necessary software in order for accurate

    forecasting to be done. This allows inventory levels to be kept at

    maximum efficiency and the company to be more profitable.

    Integration among different functional areas to ensure proper

    communication, productivity and efficiency

    Design engineering (how to best make the product)

    Order tracking, from acceptance through fulfillment

    The revenue cycle, from invoice through cash receipt

    Managing inter-dependencies of complex processes bill of

    materials

    Tracking the three-way match between purchase orders (what was

    ordered), inventory receipts (what arrived), and costing (what the

    vendor invoiced)

    Assignment-2 Page 8 of 17

    http://en.wikipedia.org/w/index.php?title=Data_services&action=edit&redlink=1http://en.wikipedia.org/wiki/Access_controlhttp://en.wikipedia.org/w/index.php?title=Data_services&action=edit&redlink=1http://en.wikipedia.org/wiki/Access_control
  • 7/28/2019 MB0049-PROJECT MGT.doc

    9/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    The accounting for all of these tasks: tracking the revenue, cost

    and profit at a granular level.

    ERP Systems centralize the data in one place. Benefits of this include:

    Eliminates the problem of synchronizing changes between

    multiple systems - consolidation of finance, marketing and sales,

    human resource, and manufacturing applications

    Permits control of business processes that cross functional

    boundaries

    Provides top-down view of the enterprise (no "islands of

    information"), real time information is available to management

    anywhere, anytime to make proper decisions.

    Reduces the risk of loss of sensitive data by consolidating

    multiple permissions and security models into a single structure.

    Shorten production lead-time and delivery time

    Facilitating business learning, empowering, and building common

    visions

    Some security features are included within an ERP system to protect

    against both outsider crime, such as industrial espionage, and insider

    crime, such as embezzlement. A data-tampering scenario, for example,

    might involve a disgruntled employee intentionally modifying prices to

    below-the-breakeven point in order to attempt to interfere with the

    company's profit or other sabotage. ERP systems typically provide

    functionality for implementing internal controls to prevent actions of

    this kind. ERP vendors are also moving toward better integration with

    other kinds of information security tools

    Assignment-2 Page 9 of 17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    10/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    ROI - Return on Investment (ROI) is the calculated benefit that an

    organization is projected to receive in return for investing money

    (resources) in a project. Within the context of the Review Process, the

    investment would be in an information system development or

    enhancement project. ROI information is used to assess the status of the

    business viability of the project at key checkpoints throughout the

    projects lifecycle.

    ROI may include the benefits associated with improved mission

    performance, reduced cost, increased quality, speed, or flexibility, and

    increased customer and employee satisfaction. ROI should reflect such

    risk factors as the projects technical complexity, the agencys

    management capacity, the likelihood of cost overruns, and the

    consequences of under or nonperformance. Where appropriate, ROI

    should reflect actual returns observed through pilot projects and

    prototypes. ROI should be quantified in terms of dollars and should

    include a calculation of the breakeven point (BEP), which is the date

    when the investment begins to generate a positive return. ROI should be

    recalculated at every major checkpoint of a project to see if the BEP is

    still on schedule, based on project spending and accomplishments to

    date. If the project is behind schedule or over budget, the BEP may

    move out in time; If the project is ahead of schedule or under budget the

    BEP may occur earlier. In either case, the information is important for

    decision making based on the value of the investment throughout the

    project lifecycle. Any project that has developed a business case is

    expected to refresh the ROI at each key project decision point (i.e., stage

    exit) or at least yearly.

    Assignment-2 Page 10 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    11/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    Exclusions If the detailed data collection, calculation of benefits and

    costs, and capitalization data from which Return on Investment (ROI) is

    derived was not required for a particular project, then it may not be

    realistic or practical to require the retrofit calculation of ROI once the

    project is added to the Review portfolio. In such a case, it is

    recommended that a memorandum of record be developed as a substitute

    for ROI. The memorandum should provide a brief history of the

    program, a description of the major benefits realized to date with as

    much quantitative data as possible, and a summary of the process used

    to identify and select system enhancements.

    Some of the major benefits experienced by sites that installed the

    information system that would be important to include in the

    memorandum are:

    Decommissioning of mainframe computers

    Reduction/redirection of labour

    Elimination of redundant systems

    Ability to more cost effectively upgrade all sites with one standard

    upgrade package.

    In each case above, identify the specific site, systems, and labour

    involved in determining the cited benefit. Identify any costs or dollar

    savings that are known or have been estimated.

    The memorandum will be used as tool for responding to any future audit

    inquiries on project ROI.

    For the Project Management Review, it is recommended that the project

    leader replace the text on the ROI document through

    Assignment-2 Page 11 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    12/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    1) A note stating which stage of its cycle the project is in;

    2) A bulleted list of the most important points from the

    memorandum of record; and

    3) A copy of the memorandum of record for the Review repository.

    In subsequent Reviews of the information system, the ROI slide can be

    eliminated from the package. There is one notable exception to this

    guidance. Any internal use software project in the maintenance phase of

    its lifecycle that adds a new site or undertakes an enhancementor

    technology refresh that reaches the cost threshold established by

    Standard will need to satisfy capitalization requirements. It requires all

    agencies to capitalize items acquired or developed for internal use if the

    expected service life is two or more years and its cost meets or exceeds

    the agencys threshold for internal use software. The standard requires

    capitalization of direct and indirect costs, including employee salaries

    and benefits for both Federal and Contractor employees who materially

    participate in the Software project.

    Program managers are considered to be the source of cost information

    for internal use software projects. If capitalization data is collected for

    the project in the future, the project would be expected to calculate and

    track its ROI.

    Q.3) Explain three levels of SCMo documentation. Explain PILIN.

    Explain in detail GDM and its key features.

    Ans: Supply Chain Monitoring (SCMo) is a multi-level SCM concept

    supporting the fulfilment/execution process. It is possible today to

    establish a monitoring system aligned with an organisations supply

    Assignment-2 Page 12 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    13/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    chain. Supply Chain Monitoring (SCMo) can be an add-on to existing

    ERP systems. The main objectives of SCMo are as follows.

    i) Prevention of stock-out and over supply.

    ii) Early warnings, elimination of bull-whip effect.

    iii) Optimized allocation in bottleneck situations due to network-wide

    inventory and demand transparency.

    The intent of this document is to define the structure of the

    documentation system, its content, and the method generation and to

    attain common documentation of all standard process of Odette. The

    documentation is valid for the SCM-group of Odette. The

    Documentation system is internet based to provide immediate access to

    current, up-to-date process documentation. The system allows users to

    manage through graphical structures to relevant documentation and

    process which were created with the ARIS Toolset.

    The process pro-document action system serves the following

    objectives:

    Present standard process to be adhered to across the industry and in so

    doing secure their correct application.

    1. Offer a central location of all process and system related

    information from customizing documentation to working

    guidelines.

    2. Allow flexible and quick adaptation in case of process changes or

    enhancement and provide the update information immediately.

    3. Present the standard process in the intranet, where users can look

    up the current process whenever necessary.

    Assignment-2 Page 13 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    14/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    PILIN Persistent Identifiers and Linking Infrastructure

    There has been a growing realisation that sustainable identifier

    infrastructure is required to deal with the vast amount of digital assets

    being produced and stored within universities.

    PILIN is a particular challenge for e-research communities where

    massive amounts of data are being generated without any means of

    managing this data over any length of time. The broad objectives are to:

    1. Support adoption and use of persistent identifiers and shared

    persistent identifier management services by the project stakeholders

    2. Plan for a sustainable, shared identifier management infrastructure

    that enables persistence of identifiers and associated services over

    archival lengths of time

    3. Deploy a Worldwide Site Consolidation Solution for Exchange Server

    2003 at Microsoft

    4. Add Picture

    5. Use Microsoft Exchange Server 2003 to consolidate more than 70

    messaging sites worldwide into seven physical locations

    GLOBAL DELIVERY MODEL (GDM) is enables an industry or

    business to plan, design and deliver products and services to any

    customer worldwide with speed, accuracy, economy and reliability.

    GDM enables its customer to leverage varied locations across the globe

    Assignment-2 Page 14 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    15/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    that provides optimised value for every component of delivery. The key

    features of GDM are shown in below figure.

    Let us discuss each key feature of GDM.

    a. Standardisation It includes ingenious design and development of

    components and features which are like to be accepted by 90% of world-

    wide customers. GDM heavily depends on Global Standards of Designfocusing on highly standardised methods and processes of manufacture

    or development. It adopts plug-and-socket concepts with minimum

    adaptable joints or connections.

    b. Modularisation GDM requires product or solution to be split up

    into smallest possible individual identifiable entities. These entities will

    have limited individual functioning capability but they can become

    powerful and robust in combination with other modules.

    c. Minimum Customisation GDM mandates only minimum changes

    or modifications to suit individual customers. Customization, inmarketing, manufacturing, call centers and management, is the use of

    flexible computer-aided manufacturing systems to produce custom

    output. Those systems combine the low unit costs of mass production

    Assignment-2 Page 15 of

    17

    http://resources.smude.edu.in/slm/wp-content/uploads/2010/02/clip-image0165.jpg
  • 7/28/2019 MB0049-PROJECT MGT.doc

    16/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    processes with the flexibility of individual customization. Many

    implementations of mass customization are operational today, such as

    software-based product configurations which make it possible to add

    and/or change functionalities of a core product or to build fully custom

    enclosures from scratch. This degree of mass customization has only

    seen limited adoption, however. If an enterprise's marketing department

    offers individual products (atomic market fragmentation) it doesn't often

    mean that a product is produced individually, but rather that similar

    variants of the same mass-produced item are available.

    d. Maximum Micro Structuring GDM encourages splitting of the

    Product Modules further into much smaller entity identifiable more

    through characteristics rather than application features. These Microbial

    Entities are standardised even across Multiple Modules. Application of

    these Microbial Entities rest within multiple Projects or Products or even

    as add-on to suit customer needs later.

    Special Features of GDM

    In addition to the features discussed above, some of the special features

    of GDM are:

    A global presence with a knowledge of the local language and culture

    (it helps in better understanding of customer requirements)

    A global access implying that the organisation has access to

    resources of varying costs (it helps in delivering services to its

    customers at an optimal cost, typically a mix of costlier on-site

    resources combined with cheaper offshore resources)

    Assignment-2 Page 16 of

    17

  • 7/28/2019 MB0049-PROJECT MGT.doc

    17/17

    Project Management Manasa Ranjan Patnaik

    (MB 0049) 511021350

    A global delivery model implying that potentially, a firm can work

    round the clock for its customer, handing off work from one location

    to another at the end of the day shift

    Unimaginable speed of response and introduction

    Common pool of Microbial Components

    Largely independent of skill sets required at delivery stages

    Highly automated processes

    Quality Assurance as a concurrent rather than a controlled Process

    Near-Shore development, manufacture and delivery for better

    logistics

    Mapping of economical zones rather than geographic zones

    Continuous floating of virtual inventory to save time and efforts

    Assignment-2 Page 17 of