Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
Q.1) Providing adequate resources are key to productivity Comment.
Explain the relevance of Work Breakdown Structure in determining
responsibility area. What do you understand by Resource Smoothing?
Ans : To encourage productivity, the researchers must be provided with
adequate resources in terms of personnel, equipment, facilities and time.
It is extremely frustrating to a professional to be given a challenging,
interesting assignment, but not the necessary resources to complete it in
an effective manner. Stable financial support is a major factor in
sustaining the researchers commitment and enthusiasm for a project and
in encouraging creativity. Resources should also be available to follow
up on unplanned ideas as they evolve during a project. Creative workers
must be provided with sufficient time for reading, discussion and
thought and creative reflection. While pressure in the form of deadlines
is thought to encourage creativity, the deadline should be set in
consultation with the staff, otherwise it is counterproductive. More time
can be made available for creative people to conduct their research byreducing their administrative burdens.
The aim of this productivity management guide is to provide small
business owners and managers with an overview of how company
productivity can be improved. It covers what productivity is, how it is
measured, and what a company can do to increase it.
Why should productivity management growth be a national concern?
It is because, if too low, the Nation can neither improve its standard of
living at home nor compete successfully abroad. Productivity growth
affects wage negotiations, inflation rates, business decisions, exchange
rates, a host of other economic, political and social conditions, and,
therefore, every small business owner and manager.
Assignment-2 Page 1 of 17
7/28/2019 MB0049-PROJECT MGT.doc
2/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
The factors affecting both National and individual firm productivity are
many and diverse. Nationally, changes in employment, hours worked,
the educational, age and sex composition of the work force, levels of
capital investment and savings, government regulations, capacity
utilization, inflation, among others, all can affect, favorably or
unfavorably, productivity rates.
There are many productivity factors the firm can manage. How well
does the firm utilize new knowledge; is it working at an economy-of-
scale level; are the employees highly motivated and loyal or is there
labor unrest and high worker turnover; is the resource (human and
capital) allocation maximizing established goals; and finally, what is the
overall quality of the company's management? And, if management sees
productivity as a problem, is there a commitment to establish a
company-wide Productivity Improvement Program?
Work Breakdown Structure (WBS)
The entire process of a project may be considered to be made up on
number of sub process placed in different stage called the Work
Breakdown Structure (WBS). A typical example of a WBS of a
recruitment process is indicated in following diagram.
Assignment-2 Page 2 of 17
7/28/2019 MB0049-PROJECT MGT.doc
3/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
WBS is the technique to analyse the content of work and cost by
breaking it down into its component parts. Project key stages form the
highest level of the WBS, which is then used to show the details at the
lower levels of the project. Each key stage comprises many tasks
identified at the start of planning and later this list will have to be
validated.
WBS is produced by identifying the key elements, breaking each
element down into component parts and continuing to breakdown until
manageable work packages have been identified. These can then be
allocated to the appropriate person. The WBS does not show
dependencies other than a grouping under the key stages. It is not time
based there is no timescale on the drawing.
The WBS is organized around the primary products of the project (or
planned outcomes) instead of the work needed to produce the products
(planned actions). Since the planned outcomes are the desired ends ofthe project, they form a relatively stable set of categories in which the
costs of the planned actions needed to achieve them can be collected. A
well-designed WBS makes it easy to assign each project activity to one
and only one terminal element of the WBS. In addition to its function in
cost accounting, the WBS also helps map requirements from one level of
system specification to another, for example a requirements crossreference matrix mapping functional requirements to high level or low
level design documents.
Resource Smoothing Resource smoothing is part of the resource
leveling process. In itself, resource smoothing is the process that, not
withstanding any constraints imposed during the leveling process,
attempts to determine a resource requirement that is "smooth" and where
peaks and troughs are eliminated. For example, even if 7 units of a given
Assignment-2 Page 3 of 17
7/28/2019 MB0049-PROJECT MGT.doc
4/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
resource are available at any one time, utilizing 5 of these units each
week is preferable to 4 one week, 7 the next, 2 the next and so on. Even
if there is no limit to the amount of any one resource available, it is still
desirable that resource usage is as smooth as possible. Given that the
resource requirements of those activities on the critical path are fixed,
some order or priority needs to be established for selecting which
activity and which particular resource associated with this activity
should be given priority in the smoothing process. In determining which
activity should be given priority, a subjective judgment should be made
about the type of resource (or resources) associated with each activity;
priority should be given to the activities whose resources are considered
to be most important. Beyond this consideration, activities should be
ranked in order of total work content and total float or slack available for
that activity. A useful device for prioritizing is to consider the ratio of
total work content/total float remaining and give priority to activities
with the highest value of this ratio.
Solving the resource scheduling problem for optimal solutions is
extremely complex, particularly for large project networks with many
different resource types. However, several heuristics are available to
solve such problems. These heuristics allocate resources to activities to
minimize project delay based on certain priority rules. The two mostcommonly used heuristics are the serial and the parallel methods. In the
serial method of resource allocation, activities are sorted into a list and
resources are allocated to each of these activities one at a time until
resources are allocated to all activities. In the parallel method, however,
resources are allocated on a period by period basis rather than each
activity. In this method only those activities whose preceding activities
have been completed will be considered. If two or more activities
compete for the same resources, then allocation of resources is based on
Assignment-2 Page 4 of 17
7/28/2019 MB0049-PROJECT MGT.doc
5/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
certain prescribed priority rules. Compared to the serial method, the
parallel method has been the most widely used heuristic. The following
priority rules, in the order presented, have been found to be the most
effective in minimizing project delay.
Minimum slack
Smallest duration
Lowest activity identification number
Regardless of the scheduling heuristic used, the primary impact of
resource constrained scheduling is the loss of flexibility due to the
reduction in slack. Furthermore, the reduction in slack also increases the
number of critical or near-critical activities
Q.2) Explain the concept of concurrency in High Technology Development.
What are the main utilities of an ERP package? What is the
significance of reviewing ROI ?
Ans:Concurrency in High Technology Development - As the application of
technology has become critical for the survival of organization it has
become imperative for organizations to initiate measures for the
development of high technology to be ahead of competition. No doubt,
there are many specialized Research and Development firms which offer
their expertise to their clients problems. However, their services are
available to the competitors and many technologies developed by the
companys own research personnel cannot be shared with outsiders. So
the strategy would be utilize the services of external resource to the
extent they are suitable for our purpose, but with a strong base of R and
D of our own. This will really differentiate the best companies from
other ordinary ones.
Assignment-2 Page 5 of 17
7/28/2019 MB0049-PROJECT MGT.doc
6/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
The following give some guidelines in the form of rules which would
help organization to be strong in this area. Building concurrency into
every activity is essential to reduce the development cycle time and to
counter the technology obsolescence. Many of the tasks that are
normally done in a serial fashion can be done in parallel by
synchronizing the flow of information. The practices of the concurrent
engineering where the design of the product and all its associated
processes are carried out simultaneously based on team work and
participation. Would not only help in reducing the development cycle
time, but also improves the product functionality with regard to
requirements. Concurrency can be accomplished in many ways both for
product development as well as technology transfer, user evaluation and
production.
Enterprise resource planning (ERP) is an integrated computer-based
system used to manage internal and external resources including
tangible assets, financial resources, materials, and human resources. It is
a software architecture whose purpose is to facilitate the flow of
information between all business functions inside the boundaries of the
organization and manage the connections to outside stakeholders. Built
on a centralized database and normally utilizing a common computing
platform, ERP systems consolidate all business operations into a
uniform and enterprise wide system environment.
An ERP system can either reside on a centralized server or be distributed
across modular hardware and software units that provide "services" and
communicate on a local area network. The distributed design allows a
business to assemble modules from different vendors without the need
for the placement of multiple copies of complex, expensive computer
systems in areas which will not use their full capacity
Assignment-2 Page 6 of 17
http://en.wikipedia.org/wiki/Local_area_networkhttp://en.wikipedia.org/wiki/Local_area_network7/28/2019 MB0049-PROJECT MGT.doc
7/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
The main Utilities of ERP Components are
i) Financials
ii) Distribution
iii) Human Resources
iv) Product lifecycle management
v) Customer Relationship Management (CRM)
vi) Supply chain management
Purchasing
Manufacturing
Distribution
vii) Warehouse Management System
viii) Management Portal/Dashboard
ix) Decision Support System
All the above modules can exist in a complete system or utilized in an
ad-hoc fashion.
Commercial Applications
Manufacturing Engineering, bills of material, scheduling, capacity,
workflow management, quality control, cost management,
manufacturing process, manufacturing projects, and manufacturing flow
Supply chain management Order to cash, inventory, order entry,
purchasing, product configurator, supply chain planning, supplier
scheduling, and inspection of goods, claim processing, and commission
calculation
Financials General ledger, cash management, accounts payable,
accounts receivable, fixed assets
Project management Costing, billing, time and expense, performance
units, activity management
Assignment-2 Page 7 of 17
http://en.wikipedia.org/wiki/Manufacturinghttp://en.wikipedia.org/wiki/Supply_chain_managementhttp://en.wikipedia.org/wiki/Order_to_cashhttp://en.wikipedia.org/wiki/Project_managementhttp://en.wikipedia.org/wiki/Manufacturinghttp://en.wikipedia.org/wiki/Supply_chain_managementhttp://en.wikipedia.org/wiki/Order_to_cashhttp://en.wikipedia.org/wiki/Project_management7/28/2019 MB0049-PROJECT MGT.doc
8/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
Human resources payroll, training, time and attendance, roistering,
benefits
Customer relationship management Sales and marketing,
commissions, service, customer contact and call center support
Data services Various "self-service" interfaces for customers,
suppliers, and/or employees
Access control Management of user privileges for various processes
In the absence of an ERP system, a large manufacturer may find itself
with many software applications that cannot communicate or interface
effectively with one another. Tasks that need to interface with one
another may involve:
ERP systems connect the necessary software in order for accurate
forecasting to be done. This allows inventory levels to be kept at
maximum efficiency and the company to be more profitable.
Integration among different functional areas to ensure proper
communication, productivity and efficiency
Design engineering (how to best make the product)
Order tracking, from acceptance through fulfillment
The revenue cycle, from invoice through cash receipt
Managing inter-dependencies of complex processes bill of
materials
Tracking the three-way match between purchase orders (what was
ordered), inventory receipts (what arrived), and costing (what the
vendor invoiced)
Assignment-2 Page 8 of 17
http://en.wikipedia.org/w/index.php?title=Data_services&action=edit&redlink=1http://en.wikipedia.org/wiki/Access_controlhttp://en.wikipedia.org/w/index.php?title=Data_services&action=edit&redlink=1http://en.wikipedia.org/wiki/Access_control7/28/2019 MB0049-PROJECT MGT.doc
9/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
The accounting for all of these tasks: tracking the revenue, cost
and profit at a granular level.
ERP Systems centralize the data in one place. Benefits of this include:
Eliminates the problem of synchronizing changes between
multiple systems - consolidation of finance, marketing and sales,
human resource, and manufacturing applications
Permits control of business processes that cross functional
boundaries
Provides top-down view of the enterprise (no "islands of
information"), real time information is available to management
anywhere, anytime to make proper decisions.
Reduces the risk of loss of sensitive data by consolidating
multiple permissions and security models into a single structure.
Shorten production lead-time and delivery time
Facilitating business learning, empowering, and building common
visions
Some security features are included within an ERP system to protect
against both outsider crime, such as industrial espionage, and insider
crime, such as embezzlement. A data-tampering scenario, for example,
might involve a disgruntled employee intentionally modifying prices to
below-the-breakeven point in order to attempt to interfere with the
company's profit or other sabotage. ERP systems typically provide
functionality for implementing internal controls to prevent actions of
this kind. ERP vendors are also moving toward better integration with
other kinds of information security tools
Assignment-2 Page 9 of 17
7/28/2019 MB0049-PROJECT MGT.doc
10/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
ROI - Return on Investment (ROI) is the calculated benefit that an
organization is projected to receive in return for investing money
(resources) in a project. Within the context of the Review Process, the
investment would be in an information system development or
enhancement project. ROI information is used to assess the status of the
business viability of the project at key checkpoints throughout the
projects lifecycle.
ROI may include the benefits associated with improved mission
performance, reduced cost, increased quality, speed, or flexibility, and
increased customer and employee satisfaction. ROI should reflect such
risk factors as the projects technical complexity, the agencys
management capacity, the likelihood of cost overruns, and the
consequences of under or nonperformance. Where appropriate, ROI
should reflect actual returns observed through pilot projects and
prototypes. ROI should be quantified in terms of dollars and should
include a calculation of the breakeven point (BEP), which is the date
when the investment begins to generate a positive return. ROI should be
recalculated at every major checkpoint of a project to see if the BEP is
still on schedule, based on project spending and accomplishments to
date. If the project is behind schedule or over budget, the BEP may
move out in time; If the project is ahead of schedule or under budget the
BEP may occur earlier. In either case, the information is important for
decision making based on the value of the investment throughout the
project lifecycle. Any project that has developed a business case is
expected to refresh the ROI at each key project decision point (i.e., stage
exit) or at least yearly.
Assignment-2 Page 10 of
17
7/28/2019 MB0049-PROJECT MGT.doc
11/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
Exclusions If the detailed data collection, calculation of benefits and
costs, and capitalization data from which Return on Investment (ROI) is
derived was not required for a particular project, then it may not be
realistic or practical to require the retrofit calculation of ROI once the
project is added to the Review portfolio. In such a case, it is
recommended that a memorandum of record be developed as a substitute
for ROI. The memorandum should provide a brief history of the
program, a description of the major benefits realized to date with as
much quantitative data as possible, and a summary of the process used
to identify and select system enhancements.
Some of the major benefits experienced by sites that installed the
information system that would be important to include in the
memorandum are:
Decommissioning of mainframe computers
Reduction/redirection of labour
Elimination of redundant systems
Ability to more cost effectively upgrade all sites with one standard
upgrade package.
In each case above, identify the specific site, systems, and labour
involved in determining the cited benefit. Identify any costs or dollar
savings that are known or have been estimated.
The memorandum will be used as tool for responding to any future audit
inquiries on project ROI.
For the Project Management Review, it is recommended that the project
leader replace the text on the ROI document through
Assignment-2 Page 11 of
17
7/28/2019 MB0049-PROJECT MGT.doc
12/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
1) A note stating which stage of its cycle the project is in;
2) A bulleted list of the most important points from the
memorandum of record; and
3) A copy of the memorandum of record for the Review repository.
In subsequent Reviews of the information system, the ROI slide can be
eliminated from the package. There is one notable exception to this
guidance. Any internal use software project in the maintenance phase of
its lifecycle that adds a new site or undertakes an enhancementor
technology refresh that reaches the cost threshold established by
Standard will need to satisfy capitalization requirements. It requires all
agencies to capitalize items acquired or developed for internal use if the
expected service life is two or more years and its cost meets or exceeds
the agencys threshold for internal use software. The standard requires
capitalization of direct and indirect costs, including employee salaries
and benefits for both Federal and Contractor employees who materially
participate in the Software project.
Program managers are considered to be the source of cost information
for internal use software projects. If capitalization data is collected for
the project in the future, the project would be expected to calculate and
track its ROI.
Q.3) Explain three levels of SCMo documentation. Explain PILIN.
Explain in detail GDM and its key features.
Ans: Supply Chain Monitoring (SCMo) is a multi-level SCM concept
supporting the fulfilment/execution process. It is possible today to
establish a monitoring system aligned with an organisations supply
Assignment-2 Page 12 of
17
7/28/2019 MB0049-PROJECT MGT.doc
13/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
chain. Supply Chain Monitoring (SCMo) can be an add-on to existing
ERP systems. The main objectives of SCMo are as follows.
i) Prevention of stock-out and over supply.
ii) Early warnings, elimination of bull-whip effect.
iii) Optimized allocation in bottleneck situations due to network-wide
inventory and demand transparency.
The intent of this document is to define the structure of the
documentation system, its content, and the method generation and to
attain common documentation of all standard process of Odette. The
documentation is valid for the SCM-group of Odette. The
Documentation system is internet based to provide immediate access to
current, up-to-date process documentation. The system allows users to
manage through graphical structures to relevant documentation and
process which were created with the ARIS Toolset.
The process pro-document action system serves the following
objectives:
Present standard process to be adhered to across the industry and in so
doing secure their correct application.
1. Offer a central location of all process and system related
information from customizing documentation to working
guidelines.
2. Allow flexible and quick adaptation in case of process changes or
enhancement and provide the update information immediately.
3. Present the standard process in the intranet, where users can look
up the current process whenever necessary.
Assignment-2 Page 13 of
17
7/28/2019 MB0049-PROJECT MGT.doc
14/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
PILIN Persistent Identifiers and Linking Infrastructure
There has been a growing realisation that sustainable identifier
infrastructure is required to deal with the vast amount of digital assets
being produced and stored within universities.
PILIN is a particular challenge for e-research communities where
massive amounts of data are being generated without any means of
managing this data over any length of time. The broad objectives are to:
1. Support adoption and use of persistent identifiers and shared
persistent identifier management services by the project stakeholders
2. Plan for a sustainable, shared identifier management infrastructure
that enables persistence of identifiers and associated services over
archival lengths of time
3. Deploy a Worldwide Site Consolidation Solution for Exchange Server
2003 at Microsoft
4. Add Picture
5. Use Microsoft Exchange Server 2003 to consolidate more than 70
messaging sites worldwide into seven physical locations
GLOBAL DELIVERY MODEL (GDM) is enables an industry or
business to plan, design and deliver products and services to any
customer worldwide with speed, accuracy, economy and reliability.
GDM enables its customer to leverage varied locations across the globe
Assignment-2 Page 14 of
17
7/28/2019 MB0049-PROJECT MGT.doc
15/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
that provides optimised value for every component of delivery. The key
features of GDM are shown in below figure.
Let us discuss each key feature of GDM.
a. Standardisation It includes ingenious design and development of
components and features which are like to be accepted by 90% of world-
wide customers. GDM heavily depends on Global Standards of Designfocusing on highly standardised methods and processes of manufacture
or development. It adopts plug-and-socket concepts with minimum
adaptable joints or connections.
b. Modularisation GDM requires product or solution to be split up
into smallest possible individual identifiable entities. These entities will
have limited individual functioning capability but they can become
powerful and robust in combination with other modules.
c. Minimum Customisation GDM mandates only minimum changes
or modifications to suit individual customers. Customization, inmarketing, manufacturing, call centers and management, is the use of
flexible computer-aided manufacturing systems to produce custom
output. Those systems combine the low unit costs of mass production
Assignment-2 Page 15 of
17
http://resources.smude.edu.in/slm/wp-content/uploads/2010/02/clip-image0165.jpg7/28/2019 MB0049-PROJECT MGT.doc
16/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
processes with the flexibility of individual customization. Many
implementations of mass customization are operational today, such as
software-based product configurations which make it possible to add
and/or change functionalities of a core product or to build fully custom
enclosures from scratch. This degree of mass customization has only
seen limited adoption, however. If an enterprise's marketing department
offers individual products (atomic market fragmentation) it doesn't often
mean that a product is produced individually, but rather that similar
variants of the same mass-produced item are available.
d. Maximum Micro Structuring GDM encourages splitting of the
Product Modules further into much smaller entity identifiable more
through characteristics rather than application features. These Microbial
Entities are standardised even across Multiple Modules. Application of
these Microbial Entities rest within multiple Projects or Products or even
as add-on to suit customer needs later.
Special Features of GDM
In addition to the features discussed above, some of the special features
of GDM are:
A global presence with a knowledge of the local language and culture
(it helps in better understanding of customer requirements)
A global access implying that the organisation has access to
resources of varying costs (it helps in delivering services to its
customers at an optimal cost, typically a mix of costlier on-site
resources combined with cheaper offshore resources)
Assignment-2 Page 16 of
17
7/28/2019 MB0049-PROJECT MGT.doc
17/17
Project Management Manasa Ranjan Patnaik
(MB 0049) 511021350
A global delivery model implying that potentially, a firm can work
round the clock for its customer, handing off work from one location
to another at the end of the day shift
Unimaginable speed of response and introduction
Common pool of Microbial Components
Largely independent of skill sets required at delivery stages
Highly automated processes
Quality Assurance as a concurrent rather than a controlled Process
Near-Shore development, manufacture and delivery for better
logistics
Mapping of economical zones rather than geographic zones
Continuous floating of virtual inventory to save time and efforts
Assignment-2 Page 17 of