28
Annapolis Community Outreach Meeting Blue Heron Center, Quiet Waters Park August 17, 2016 / 6:30 PM – 8:30 PM Mayo WRF ENR Upgrade and Expansion Project Update

Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Annapolis Community Outreach Meeting Blue Heron Center, Quiet Waters ParkAugust 17, 2016 / 6:30 PM – 8:30 PM

Mayo WRF ENR Upgrade and Expansion Project Update

Page 2: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Agenda

1) Project Background2) Construction Methods 3) Construction Contracts4) Schedule

Mayo WRF: Expansion Capital Project Overview

Page 3: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Project Background

Page 4: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Historical Recap & The Selected Alternative

Seven Preliminary Expansion Alternatives were suggested in the Mayo WRF ENR Upgrade and Expansion Alternatives Report (Jan. 2010).

With MDE’s approval, the three ‘best’ Alternatives were examined in GHD’s Preliminary Engineering Report (Nov. 2012).

The selected Alternative will require a sewage pipeline to be constructed from the Mayo WRF to the Annapolis WRF:• The Mayo WRF will be decommissioned and converted into a regional

pumping station.• A force main will pump all septic tank effluent flow collected from the

Mayo Service Area to the Annapolis WRF for treatment and disposal.• The treated effluent would be discharged through the existing Annapolis

WRF outfall into the mouth of the Severn River.

Page 5: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Proposed Construction

Page 6: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

History of Public Outreach EventsThe Annapolis Community and the Annapolis Neck Federation• April 4, 2013 - Annapolis Senior High School• June 18, 2014 - Blue Heron Center, Quiet Waters Park• October 22, 2014 - Blue Heron Center, Quiet Waters Park• March 4, 2015 – Blue Heron Center, Quiet Waters Park• April 16, 2016 – Eastport Library

The Mayo Community and the Mayo Citizens Advisory Committee• October 9, 2012 - The Mayo Water Reclamation Facility• December 11, 2012 - The Mayo Water Reclamation Facility• May 13, 2014 - The Mayo Water Reclamation Facility• October 7, 2014 - The Mayo Water Reclamation Facility• October 7, 2015 – The Mayo Water Reclamation Facility• March 21, 2016 – Mayo Water Reclamation Facility• May 17, 2016 – South River High School• June 17, 2016 – Loch Haven Community Association• June 23, 2016 – Beverly Beach Community Association• June 20, 2016 – Glebe Heights Community Association

Newspaper Articles in the Capital Gazette• March 26, 2013 - “County plans to pump Mayo sewage to Annapolis”• October 21, 2014 - “Approval near to pump Mayo sewage to Annapolis”• November 4, 2015 – “Big Dig from Mayo to Annapolis Begins”

Past presentation materials and newspaper articles are available upon request.

Page 7: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Construction Methods

Page 8: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

HDD Installation Method Details

(figures courtesy of www.dipra.org)

Page 9: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Anne Arundel County ExperienceHorizontal Directional Drilling Projects

Pipeline Description Date Installed(year)

Pipe Diameter(inches)

Pipe Length (feet)

Marley Creek Crossing 1990 24" 1,200Woodland Beach FM 2005 24" 8,400Annapolis Junction FM 2004 15" & 16" 13,800Riva Road FM 2012 14"-18" 6,000Mayo Influent FM 1998 16" 8,100Arundel Gateway FM ongoing 16"Cayuga Farms FM 2004 16" 15,200

Page 10: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Pipe Stockpiling

Page 11: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Staging Area

Page 12: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Visual and Sound Buffers

Page 13: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Visual and Sound Buffers

Page 14: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Entry Pit

Page 15: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Exit Pit

Page 16: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Pipe Fusion

Page 17: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Pipe Laydown

Page 18: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Valve Vault and Odor Control

Page 19: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Construction Contracts

Page 20: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Contract 1 Loch Haven – HDD Overview

MAYO WRF

LOCH HAVEN DR

Page 21: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Contract 2 South River – HDD Overview

LOCH HAVEN DR

SOUTH RIVER

Page 22: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Contract 3 Quiet Waters Park – HDD Overview

QUIET WATERS PARK RD

Page 23: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Contract 4A Hillsmere – HDD Overview

HDD 9

HDD 9 EXIT

HDD 9 ENTRY

HDD 10 EXIT

HDD 10 ENTRY

HDD 10

HILLSMERE DR

BAY RIDGE RD

EDGEWOOD RD

Page 24: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Contract 4B Edgewood – HDD Overview

HDD 11 ENTRY

HDD 11

HDD 11 EXIT

HDD 12 EXIT

HDD 12 ENTRY

HDD 12

EDGEWOOD RD

BAY RIDGE RD

ANNAPOLIS WRF

Page 25: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Schedule

Page 26: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Overall Project Schedule

* Bidding/Award and Construction time frames overlap for the six separate contracts

Task Duration Start Date Completion DateNotice to Proceed - March 14, 2014 -

Schematic Design Phase 125 days March 14, 2014 September 5, 2014

Design Development Phase 142 days May 14, 2014 November 27, 2014

Construction Document Phase 154 days September 12, 2014 April 15, 2015

Bidding/Award Phase* 130 days April 15, 2015 August 12, 2016

Construction* 488 days October 9, 2016 February 8, 2017

• Construction for Mayo WRF and Glebe Heights CS decommissioning will take place in late 2017.

Page 27: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

Force Main Construction Schedule Summary

Contract Duration Start Date Completion Date

1. Loch Haven 180 days February 12, 2016 August 10, 20162. South River 280 days October 9, 2015 July 12, 20163. Quiet Waters Park 190 days January 4, 2016 July 12, 20164A. Hillsmere 180 days August 12, 2016 February 8, 20164B. Edgewood 180 days August 12, 2016 February 8, 2016

Page 28: Mayo WRF ENR Upgrade and Expansion Project Update · 17.08.2016  · Mayo WRF ENR Upgrade and Expansion Project Update. Agenda 1) Project Background 2) Construction Methods ... •

Mayo WRF: Expansion Capital Project Overview

View a copy of this presentation at: http://www.aacounty.org/DPW/

Follow-up Comments or Questions?

Contact [email protected]