    INSTRUCTION MANUAL

    FOR

    ROTARY FEEDER

    (TYPE BVS/BPS)

    TO AVOID SERIOUS INJURY, IT IS EXTREMELY IMPORTANT THAT

    YOU FOLLOW

    THE SAFETY INSTRUCTIONS LISTED BELOW.

    IF YOU DO NOT UNDERSTAND ANY OF THESE INSTRUCTIONS,

    DO NOT PROCEED

    UNTIL YOU HAVE OBTAINED CLARIFICATION WHICH ANSWERS YOUR

    QUESTIONS.

    SHANDONG ZHANGHUANG MACHINERY INDUSTRY CO., LTD.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    2/14

    2

    CONTENTS

    1. Safety Instruction

    1.1Explanation of Symbols1.2Prohibition Work

    2. General Cautions

    3. Test Operation

    4. Cautions in Operation

    5. Instructions for Disassembly and Assembly

    5.1 Disassembly

    5.2 Assembly

    6. Lubricant Table

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    3/14

    3

    1. Safety Education

    1.1Explanation of Symbols1.1.1 Personal danger

    Warning notes indicated this symbol, which if not strictly observed,

    could result in personal injury or possible death.

    1.1.2. Possible damage to equipment

    Caution notes indicated this symbol, which if not strictly

    observed, could result in property damage or destruction of the

    equipment.

    1.1.3 Technical characteristics

    This symbol is used for the attention to special technical characteristics.

    1.2 Prohibition work

    Do not step on the rotary feeder.

    Do not disassembly in operation.

    NOTE

    Do not insert hands, tools or other foreign

    object into openings.Failure to observe this warning may result in

    bodily harm or death.

    Keep chain cover in place

    Do not start until all guards and covers aremounted in their proper place.

    Failure to observe this warning may result in

    bodily harm or death.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    4/14

    4

    Any maintenance and disassembly should be done as follows

    1Reduce internal pressure to be same as atmospheric pressure.

    2stop to supply the gas while cleaning.

    3Shut off the power. Functions of Each Parts

    Drain Plug

    For easily melting powder and pellets, gas-cleaning must be done.

    Overload formed after accumulate powder melted, rotary feeder stopped to

    rotate.

    For Type BP, gas-cleaning from here.

    Clean of Shaft

    For type BVSBPSBVSTBPST, to prevent power

    stop between the rotor and side board, remove the

    drain plug to apply and clean the gas.

    Remove the upper drain plug to apply, gas pressure

    10~20kPa higher than system pressure.

    Remove the under drain plug to clean, gas pressure

    10~20kPa higher than system pressure.

    For type BV/ BP/BVT/ BPT, to prevent gas leaks

    caused by the powder inside the feeder, remove the

    drain plug to apply or clean, gas pressure 10~20kPa

    higher than system pressure.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    5/14

    5

    Be sure to clean the shaft, otherwise may cause gas leakage an also increase the abrasion of

    packing gland.

    Options

    Dead Block

    Vent Chamber

    Vent Pipe

    While transporting hardy pellets, install the dead block

    upside the rotary feeder to relax the impact, or reduce

    the fragmentation of pellets

    While the out pressure is obviously higher than inlet,

    gas leakage will prevent falling of powder and pellets.

    Vent chamber installed for the purpose to deal with

    this gas leakage.

    Vent pipe can deal with gas leakage if no space for

    installing vent chamber while materials are pellets.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    6/14

    6

    Do not disassembly vent-pipe to avoid cutting off the fingers.

    Gas leakage may include powder, so vent pipe can not have the sameeffect as vent chamber.

    INSTALLATION

    Portage

    Serious accident may happen while falling.

    Lift job should be done by the persons who learn the lift technical or take the

    safety education of lift job.

    Method Using four steel ropes to lift.

    Following values are for safety load:Model: GR7-600 GR800-1600

    Safety load: 1,000kgs 2,000kgs

    Note: For the quality of rotary feeder, reference the drawings when delivery.

    Installation

    Repairing place needed when installing the rotary feeder.

    Remove the safety film in the flange before install the

    associated piping.

    Unload operation

    To confirm load of the associated piping, and no foreign materials in the casing, do

    follow the instructions:

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    7/14

    7

    Serious accident may happen while operating.

    Follow the safety instructions:

    Check the load of piping connected and no foreign materials in the casing.

    1Shut off the power after installing the associated piping.

    2Remove chain cover and chain.

    3Rotate the feeder manually. Make sure that it rotates smoothly.

    Loosen packing gland and make rotary feeder rotates smoothly if feeling itrotates tightly.

    Unload operation

    1Check all the associated piping connected.

    2Feed the geared motor with an adequate and proper volume of lubricating oil.

    Motors with a grease lubrication system are already provided with grease.

    3Confirm the chain cover well installed.

    4Check the rotational direction.

    5When above check is completed, operate the feeder 15~30 minutes with no load,

    and make sure that no abnormal sound is generated.

    6Tighten the gland packing again if gas leaks between the packing and the shaft.

    7If no vibration and noise, unload operation finished.

    Periodical Maintenance

    It is important to do the maintenance periodically to make sure the well-running of the

    rotary feeder, or faults happened before the date of maintenance.

    1Periodical inspection monthly.

    2Periodical inspection annually.

    Periodical inspection monthly

    Check the Noise or vibration.

    Check the Leakage of packing gland.

    Check tense of Chain.Add oil to the chain.

    NOTE

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    8/14

    8

    Periodical inspection annually.

    Disassembly the rotary feeder.

    Check and clean all the parts.

    Replace gland packing.

    Replace bearing ( if damaged)

    Replace damaged parts.

    Replace O-ring and oil seal.

    Adjust the clearance.

    Add lubrication oil.

    Note: Maintenance of the geared motors must follow the manual instructions of

    manufacturer.

    Instructions for disassembly and assembly

    For all work, observe the safety instructions in section 1.

    Disassembly

    1Remove the chain cover, chain and sprocket.

    2Remove the pipes connected to the rotary feeder.

    3Before disassembling, measure the clearance between the casing and the rotor.

    Record all the measurement values of the clearance.

    4Loosen the gland.

    5Remove the taper pin.

    6Remove the bolt and then the bearing covers.

    7Remove the lock nut and the lock washer.

    The teeth of the lock washer are folded up to engage in the lock nut recesses.

    Before unfolding the washer teeth, mark on the nut and washer to indicate which

    tooth corresponds to which recess.

    8Type BVSBPSBVSTBPSTN/A

    Type BVBPBVTBPTRemove lock screw.

    9(Type BVSBPS) N/A

    Type BVSTBPSTRemove bearing base.

    Type BV

    BP

    BVT

    BPT

    Remove the bearing base, ball bearing, lock collar andpacking.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    9/14

    9

    NoteTo adjust the clearance, sometimes add a spacing ring between the block and

    roller bearings. Check no parts are missing before assembly.

    10Remove the side board.

    11Remove the rotor from the casing slowly and squarely.

    12Remove the gland packing and the lantern ring if present. Remove oil seals, roller

    bearing, ball bearing.

    ASSEMBLYType BVSBPSBVSTBPST

    1Check that no parts are missing, and that each part is free from damage.

    Damaged parts should be replaced.

    2Clean the disassembled parts.

    Especially clean the sections directly exposed to particles and inside the casing

    cylinder.Clean and regress the bearings.

    3Fit the gland packing, lantern ring(if present), and the gland.

    Do not fasten the nuts tightly.

    4To replace the bearings, tap the roller bearing into the rear side cover housing, the

    roller bearing outer ring into the front side cover housing, and the inner ring onto

    the shaft using, for example, a flat chisel.

    5Insert the rotor into the casing. Do not twist when inserting.

    6Type BVBPInstall side board(driven side) to the casing, fasten the screw tightly.

    Type BVTBPTOrderly install side board and bearing base(driven side) to the

    casing, fasten the screw tightly

    7Drive the taper pin, fasten the bolt tightly.

    8Install the ball bearing. To avoid the damage of ball bearing,

    be sure to follow right drawing, install

    inner and outer ring simultaneously, and

    symmetrically use the force into the place

    where lock nut can go, then, fit the lock nut, install the roller bearing to setting

    place.

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    10/14

    10

    8Install the lock washer, fasten the lock nut so that the marks on the washer and the

    nut coincide, and fold the lock washer teeth into the nut recesses again.

    9Drive the taper pin, fasten the bolt tightly.

    10Type BVBPInstall the side board(drive side) to the casing, fasten the bolt

    tightly.

    Type BVTBPTOrderly install side board and bearing base(drive side) to the

    casing, fasten the screw tightly

    11Drive the taper pin tightly, fasten the screw.

    12Install the bearing covers.

    13Rotate the feeder manually. Make sure that it rotates smoothly.

    14Measure the clearance between the casing and the rotor and compare the value to

    the one obtained before the disassembly.

    Repeat the reassemble if the values are lower than the values measured before thedisassembly or the lowest allowable value the Inspection Report indicates.

    15Orderly install the spacing block, end thrust ball bearing and locking collar.

    Make sure to install the spacing collar (if have) between spacing

    block and ball bearing , otherwise the value of clearance will be high and cause

    damage of rotary feeder.

    16 Install the lock bolt, fix with setting screw.

    17Install the lock washer, fasten the lock nut so that the marks on the washer and the

    nut coincide, and fold the lock washer teeth into the nut recesses again.

    18Install the bearing covers.

    ASSEMBLYType BVBPBVTBPT

    1Check that no parts are missing, and that each part is free from damage.

    Damaged parts should be replaced.

    2Clean the disassembled parts.

    Especially clean the sections directly exposed to particles and inside the casing

    cylinder.

    Clean and regress the bearings.

    3Fit the gland packing, lantern ring(if present), and the gland.

    Do not fasten the nuts tightly.4To replace the bearings, tap the roller bearing into the rear side cover housing, the

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    11/14

    11

    roller bearing outer ring into the front side cover housing, and the inner ring onto

    the shaft using, for example, a flat chisel.

    5Type BVBPInstall side board(driven side) to the casing, fasten the screw tightly.

    Type BVTBPTOrderly install side board and bearing base(driven side) to the

    casing, fasten the screw tightly

    6Drive the taper pin, fasten the bolt tightly.

    7Insert the rotor into the casing. Do not twist when inserting.

    8Orderly install the spacing block, end thrust ball bearing and locking collar.

    Make sure to install the spacing collar (if have) between spacing

    block and ball bearing, otherwise the value of clearance will be high and cause

    damage of rotary feeder.

    9 Install the lock bolt, fix with setting screw.

    10Install the lock washer, fasten the lock nut so that the marks on the washer and the

    nut coincide, and fold the lock washer teeth into the nut recesses again.

    11Type BVBPInstall the side board(drive side) to the casing, fasten the bolt

    tightly.

    Type BVT

    BPT

    Orderly install side board and bearing base(drive side) to thecasing, fasten the screw tightly

    12Drive the taper pin, fasten the bolt tightly.

    13Install the bearing covers.

    14Rotate the feeder manually. Make sure that it rotates smoothly.

    15Measure the clearance between the casing and the rotor and compare the value to

    the one obtained before the disassembly.

    Repeat the reassemble if the values are lower than the values measured before the

    disassembly or the lowest allowable value the Inspection Report indicates.

    16Install the bearing covers.

    TROUBLESHOOTING

    Trouble Source Action

    Noise

    Flour between casing and rotor Gas washing from the part of drain plug

    Touch of casing and rotor Enlarge the clearance to be proper

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    12/14

    12

    Flour adhere inside the casingflour smelt

    and the clearance of casing and rotor

    disappears

    Lessen the dimension of rotor surface

    Vibration

    Chain tightness Loosen the chain properly

    Particle in Install buffer plate

    Lack of

    displacement

    Particle is blocked during falling due to the

    effect of air leakage

    Take measures to air bleeding

    Volume weigh of particles is not same as

    design value

    Increase the speed to be proper

    Chucking

    Casing deformation

    Temperature rises and over the clearance

    temperature.

    Install soft pipe on or below the rotary

    feeder

    Enlarge the clearance to be proper

    NotesTouch of casing and rotor may cause damage of rotary feederrotating drag

    increasing, most time can cause motors trip.

    LUBRICATION OILThe rotary feeder is full of oil before shipment.

    Standard BrandZL3H synthetic lithium grease

    AmountLType

    PointGR7 GR153050

    GR7090

    120150GR220

    GR300400

    GR600

    GR800

    1000

    GR13001600

    2000

    Bearing (Dr.) 6 10 15 25 35 100 150

    SPARE PARTS LIST

    Item

    Type

    25

    Roller Bearing

    26

    Ball Bearing

    30

    Oil Seal

    31

    Oil Seal

    32

    O-Ring

    33

    Gland Packing

    GR7 NU206 6206 Sq6.5ID45

    GR15

    NU207 6207 AG2649A0 AG2055A0

    1655.7

    Sq6.5ID45GR30 1855.7

    GR50 2105.7

    GR70

    NU210 6210 AG3217A4 AG2860A0

    2405.7

    Sq9.5ID60GR90

    GR120 2905.7

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    13/14

    13

    GR150

    GR220 NU211 6211 AG3516A0 AG3038A4 3255.3 Sq9.5ID70

    GR300

    NU214 6214 AG3926E0 AG3516A0

    3755.3

    Sq9.5ID90GR400 3755.3

    GR600 4507.0

    GR800 NU315 6315 AG4010E0 AG3613A4 5007.0 Sq12.5ID95

    CONSTRUCTIONTYPE BVSBPSBVSTBPST

  • 8/12/2019 May Cap Da Voi Nhiet Dien

    14/14

    14

    01 Casing 20 Shaft 30 Oil Seal 50 Tapered Cotter

    03 Rotor 21 Shaft Sleeve 31 Oil Seal 51 Parallel Key

    04 Sideboard 22 Shaft Ring 32 O-Ring 52 Gib Head Key

    06 Sideboard 25 Pin Bearing 33 Packing Seal 54 Hex.Bolt

    08 Bearing Cover 26 Ball Bearing 34 Grease Nipple 55 Hex.Bolt

    09 Bearing Cover 28 Round Nut 35 Drain Plug 65 Nameplate

    10 Packing Gland 29 Lock Washer 37 Ring Seal 66 Drain Plug