Bunker Road Hillside Drive N Hillside Drive N Concordia Way McGill Road McMaster Way Reservoir Trail Ponderosa Trail Red-Tailed Hawk Trail Kenna Cartwright Park Copperhead Dr Trails Existing power lines New power lines Substation area New communication towers Access to our construction areas is mainly from Cooperhead Road. Steel pipe part of foundation for power line structure Construction in Kenna Cartwright Park Construction is underway for the new power lines’ 30—35 metres steel structures. Stringing of the lines will take place May through June. We’ll also install another power line for distribution this year. Work continues on the new 12 metre communication tower in the park. IMPORTANT! To ensure your safety and that of our crews, avoid any fenced areas and please follow posted construction signs or directions provided by the on-site crews. Kamloops is growing. More people and businesses mean a need for more power. This substation will ensure we continue to provide a clean reliable supply of electricity to Kamloops. Activity Planned Start Substation site preparation Completed Clearing of trees for the new lines and communications tower Completed Substation construction Underway Construction of power lines Underway Substation in-service December 2018 Duct bank work completed January 2019 *subject to change Schedule* MAY 2018 New West Kamloops Substation Project Update BCH18-392 Where can you find more information? Project updates can be found at bchydro.com/westkamsub. Comments or questions? Email: [email protected] Phone: 1 866 647 3334

MAY 2018 New West Kamloops Substation Project Update

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MAY 2018 New West Kamloops Substation Project Update

Bunker Road

Hillside D

rive N

Hillside Driv

e N

Concordia Way

McG

ill Road

McMaste

r WayReservoir Trail

Ponderosa Trail

Red-Tailed Haw

k Trail

Kenna Cartwright Park

Copperhead Dr

Trails

Existing power lines

New power lines

Substation area

New communication towers

BCH18-285

West Kamloops Substation Project

Access to our construction areas is mainly from Cooperhead Road.Steel pipe part of foundation for power line structure

Construction in Kenna Cartwright Park

Construction is underway for the new power lines’ 30—35 metres steel structures. Stringing of the lines will take place May

through June. We’ll also install another power line for distribution this year. Work continues on the new 12 metre communication

tower in the park.

IMPORTANT!

To ensure your safety and

that of our crews, avoid any

fenced areas and please

follow posted construction

signs or directions provided

by the on-site crews.

Kamloops is growing.

More people and

businesses mean a need

for more power.

This substation will ensure

we continue to provide

a clean reliable supply of

electricity to Kamloops.

Activity Planned Start

Substation site preparation Completed

Clearing of trees for the new lines and communications tower Completed

Substation construction Underway

Construction of power lines Underway

Substation in-service December 2018

Duct bank work completed January 2019

*subject to change

Schedule*

MAY 2018

New West Kamloops Substation Project Update

BCH18-392

Where can you find more information?Project updates can be found at bchydro.com/westkamsub.

Comments or questions? Email: [email protected]

Phone: 1 866 647 3334

Page 2: MAY 2018 New West Kamloops Substation Project Update

Steel structures looking east Overall site looking east

The Control Building, the brain of the substation, has been

built and work continues inside. Two transformers, the heart

of the substation, have been delivered and installed.

The communication tower has been erected and work

continues on the electrical equipment and steel structures

to support the power lines that will connect the substation

to the electrical system.

Substation Construction

Thompson River

New Ductbank

Existing Ductbank

New Substation

City street work

In late summer/early fall, we’ll construct underground duct banks for cables that will connect the substation to

the West End neighbourhood.

BCH18-392